Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

CONSIDERATIONS FOR GROUT FORMULATIONS FOR FACILITY CLOSURES USING IN SITU STRATEGIES

The U.S. Department of Energy (DOE) is conducting in situ closures (entombment) at a large number of facilities throughout the complex. Among the largest closure actions currently underway are the closures of the P and R Reactors at the Savannah River Site (SRS), near Aiken, South Carolina. In these facilities, subgrade open spaces are being stabilized with grout; this ensures the long term structural integrity of the facilities and permanently immobilizes and isolates residual contamination. The large size and structural complexity of these facilities present a wide variety of challenges for the identification and selection of appropriate fill materials. Considerations for grout formulations must account for flowability, long term stability, set times, heat generation and interactions with materials within the structure. The large size and configuration of the facility necessitates that grout must be pumped from the exterior to the spaces to be filled, which requires that the material must retain a high degree of flowability to move through piping without clogging while achieving the required leveling properties at the pour site. Set times and curing properties must be controlled to meet operations schedules, while not generating sufficient heat to compromise the properties of the fill material. The properties of residual materials can result in additional requirements for grout formulations. If significant quantities of aluminum are present in the facility, common formulations of highly alkaline grouts may not be appropriate because of the potential for hydrogen generation with the resultant risks. SRS is developing specialized inorganic grout formulations that are designed to address this issue. One circum-neutral chemical grout formulation identified for initial consideration did not possess the proper chemical characteristics, having exceptionally short set times and high heat of hydration. Research efforts are directed toward developing grout formulations that can meet operational requirements for chemical compatibility, extended set times and reduced heat generation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stochastic DC optimal power flow with reserve saturation

We propose an optimization framework for stochastic optimal power flow with uncertain loads and renewable generator capacity. Our model follows previous work in assuming that generator outputs respond to load imbalances according to an affine control policy, but introduces a model of saturation of generator reserves by assuming that when a generator’s target level hits its limit, it abandons the affine policy and produces at that limit. This is a particularly interesting feature in models where wind power plants, which have uncertain upper generation limits, are scheduled to provide reserves to balance load fluctuations. Here, the resulting model is a nonsmooth nonconvex two-stage stochastic program, and we use a stochastic approximation method to find stationary solutions to a smooth approximation. Computational results on 6-bus and 118-bus test instances demonstrate that by considering the effects of saturation, our model can yield solutions with lower expected generation costs (at the same target line violation probability level) than those obtained from a model that enforces the affine policy to stay within generator limits with high probability.

17 WIND ENERGY↗

Probabilistic Hydropower Flexibility Valuation: Case Studies for Boating Flow Regime

The optimal scheduling of hydropower generation holds significant importance to power system operation. The unique requirements of environmental constraints and the power system, depending on their respective objectives, demand distinct flow patterns. While power system stakeholders strive to optimize revenue in electricity markets, stakeholders from boating recreation seeks to identify flow ranges that optimize the boating experience. In pursuit of a win-win solution, this study aims to reconcile the interests of various stakeholders in hydropower scheduling. The maximum revenue from day-ahead electricity market is explored through an optimization process considering both plant operation constraints, boating flow constraints, water availability, and market prices. Results of real world case studies at a river in California show that the proposed approach can achieve dual objectives: maximizing market revenue while addressing boating recreation necessities. In addition, as the accuracy of electricity price forecasting and flow forecasting increase, the optimal revenue becomes increasingly advantageous to hydropower plant operators.

13 HYDRO ENERGY↗

Deep RL for Fast Long-Horizon Operations Scheduling on NASA's Carruthers Geocorona Observatory Mission

Spacecraft operations scheduling is a highly constrained, long-horizon combinatorial optimization problem that traditionally relies on heuristics, constraint programming, or manual planning. We present a scalable deep reinforcement learning framework developed and deployed for NASA’s Carruthers Geocorona Observatory mission. Our framework introduces a macro-action abstraction known as activity blocks coupled with dynamic action-masking to navigate the intractably large search space and strictly enforce complex power, thermal, and instrument constraints. The resulting architecture generates globally feasible schedules with overwhelming probability, establishes operational trust, and executes a full training cycle in under six hours, circumventing the need for policy robustness by enabling rapid, on-demand retraining. Further, resulting schedules outperform baseline heuristics in scheduled science quality. The deep reinforcement learning framework was deployed as the default operational scheduler for the Carruthers Geocorona Observatory mission from the outset of the mission, demonstrating that deep reinforcement learning can be trusted for real spacecraft operations under complex, evolving constraints.

Geocorona↗

Performance evaluation of an agent-based occupancy simulation model

Occupancy is an important factor driving building performance. Static and homogeneous occupant schedules, commonly used in building performance simulation, contribute to issues such as performance gaps between simulated and measured energy use in buildings. Stochastic occupancy models have been recently developed and applied to better represent spatial and temporal diversity of occupants in buildings. However, there is very limited evaluation of the usability and accuracy of these models. This study used measured occupancy data from a real office building to evaluate the performance of an agent-based occupancy simulation model: the Occupancy Simulator. The occupancy patterns of various occupant types were first derived from the measured occupant schedule data using statistical analysis. Then the performance of the simulation model was evaluated and verified based on (1) whether the distribution of observed occupancy behavior patterns follows the theoretical ones included in the Occupancy Simulator, and (2) whether the simulator can reproduce a variety of occupancy patterns accurately. Results demonstrated the feasibility of applying the Occupancy Simulator to simulate a range of occupancy presence and movement behaviors for regular types of occupants in office buildings, and to generate stochastic occupant schedules at the room and individual occupant levels for building performance simulation. For future work, model validation is recommended, which includes collecting and using detailed interval occupancy data of all spaces in an office building to validate the simulated occupant schedules from the Occupancy Simulator.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

RL-HEMS: Reinforcement Learning Based Home Energy Management System for HVAC Energy Optimization

Heating, ventilation, and air conditioning (HVAC) is one of the major energy consumers in the residential sector. It is important to be able to monitor and control the energy consumed to provide utility services such as load shaping while satisfying the comfort and economic constraints of the homeowner. The objective of this work is to create the optimal schedule for HVAC operation to reduce the cost while satisfying the home-owner and equipment’s constraints using a model-free Reinforcement Learning (RL)-based optimization. The specific goal is to find the right balance between reducing energy cost, consumption, and customer comfort level. Our research effort addresses this optimization problem using multiple components: the development of initial learning test-bed and implementation of RL techniques on a real home. This will enable the rapid evaluation of the RL techniques and provide an early baseline to train before implementation on site. The RL algorithm is designed to learn the energy use patterns and generate the optimized schedule for HVAC within an acceptable time-interval to satisfy the homeowner’s comfort and minimize the energy usage. Our preliminary results are promising and we have observed a 17% reduction in the total cost and a 15% reduction in the power utilization using our RL-based HVAC model—RL-HEMS.

Kotevska, Olivera↗

SMC 2021 : Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU. RUR: This dataset is the job scheduler traces collected from the Titan supercomputerfrom 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected usingResource Utilization Report (RUR), a Cray-developed resource-usage data collectionand reporting system. It contains the usage information of its critical resources (CPU,Memory, GPU, and I/O) of each running job on Titan during that period [2]. ProjectAreas: Every job is associated with a project ID. TheProjectAreas.csvdatasetprovides a mapping of the project ID to its domain science. GPU: There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has the following fields: 1. SN : Serial number of a GPU 2. location : The location where it is installed 3. insert : The time when it was inserted into that location 4. remove : The time when it was removed from that location 5. duration : Amount of time the GPU spent in this location 6. out : If the device was taken out entirely w/o a re-installment into a new location. 7. event : If the GPU was taken out entirely, the reason for its removal. To learn more about this dataset, please refer to the git repositoryhttps://github.com/olcf/TitanGPULifeand the related publication [1]. References [1] George Ostrouchov, Don Maxwell, Rizwan A Ashraf, Christian Engelmann, MallikarjunShankar, and James H Rogers. Gpu lifetimes on titan supercomputer: Survival analysisand reliability. InSC20: International Conference for High Performance Computing,Networking, Storage and Analysis, pages 1-14. IEEE, 2020. [2] Feiyi Wang, Sarp Oral, Satyabrata Sen, and Neena Imam. Learning from five-yearresource-utilization data of titan system. In2019 IEEE International Conference onCluster Computing (CLUSTER), pages 1-6. IEEE, 2019.

42 ENGINEERING↗

SMC 2021 Data Challenge: Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU: RUR dataset is the job scheduler traces collected from the Titan supercomputer from 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected using resource Utilization Report (RUR), a Cray-developed resource-usage data collection and reporting system. It contains the usage information of its critical resources (CPU, Memory, GPU, and I/O) of each running job on Titan during that period (https://ieeexplore.ieee.org/abstract/document/8891001). It includes ProjectAreas as additional information, every job is associated with a project ID. TheProjectAreas.csv dataset provides a mapping of the project ID to its domain science. GPU dataset has information regarding GPU failure on Titan. There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has seven attributes, we provided a short description of these attributes in the ReadMe file. To learn more about this dataset, please refer to the git repository https://github.com/olcf/TitanGPULife and the related publication (https://ieeexplore.ieee.org/abstract/document/9355319).

42 ENGINEERING↗

Systematic Approach to Better Understanding Integration Costs

This research presents a systematic approach to evaluating the costs of integrating new generation and operational procedures into an existing power system, and the methodology is independent of the type of change or nature of the generation. The work was commissioned by the U.S. Department of Energy and performed by the National Renewable Energy Laboratory to investigate three integration cost-related questions: (1) How does the addition of new generation affect a system's operational costs, (2) How do generation mix and operating parameters and procedures affect costs, and (3) How does the amount of variable generation (non-dispatchable wind and solar) impact the accuracy of natural gas orders? A detailed operational analysis was performed for seven sets of experiments: variable generation, large conventional generation, generation mix, gas prices, fast-start generation, self-scheduling, and gas supply constraints. For each experiment, four components of integration costs were examined: cycling costs, non-cycling VO&M costs, fuel costs, and reserves provisioning costs. The investigation was conducted with PLEXOS production cost modeling software utilizing an updated version of the Institute of Electrical and Electronics Engineers 118-bus test system overlaid with projected operating loads from the Western Electricity Coordinating Council for the Sacramento Municipal Utility District, Puget Sound Energy, and Public Service Colorado in the year 2020. The test system was selected in consultation with an industry-based technical review committee to be a reasonable approximation of an interconnection yet small enough to allow the research team to investigate a large number of scenarios and sensitivity combinations. The research should prove useful to market designers, regulators, utilities, and others who want to better understand how system changes can affect production costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic Modeling of Overtime Occupancy and Its Application in Building Energy Simulation and Calibration

Overtime is a common phenomenon around the world. Overtime drives both internal heat gains from occupants, lighting and plug-loads, and HVAC operation during overtime periods. Overtime leads to longer occupancy hours and extended operation of building services systems beyond normal working hours, thus overtime impacts total building energy use. Current literature lacks methods to model overtime occupancy because overtime is stochastic in nature and varies by individual occupants and by time. To address this gap in the literature, this study aims to develop a new stochastic model based on the statistical analysis of measured overtime occupancy data from an office building. A binomial distribution is used to represent the total number of occupants working overtime, while an exponential distribution is used to represent the duration of overtime periods. The overtime model is used to generate overtime occupancy schedules as an input to the energy model of a second office building. The measured and simulated cooling energy use during the overtime period is compared in order to validate the overtime model. A hybrid approach to energy model calibration is proposed and tested, which combines ASHRAE Guideline 14 for the calibration of the energy model during normal working hours, and a proposed KS test for the calibration of the energy model during overtime. The developed stochastic overtime model and the hybrid calibration approach can be used in building energy simulations to improve the accuracy of results, and better understand the characteristics of overtime in office buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wind-Friendly Flexible Ramping Product Design in Multi-Timescale Power System Operations

With increasing wind power penetration in the electricity grid, system operators are recognizing the need for additional flexibility, and some are implementing new ramping products as a type of ancillary service. However, wind is generally thought of as causing the need for ramping services, not as being a potential source for the service. In this paper, a multi-timescale unit commitment and economic dispatch model is developed to consider the wind power ramping product (WPRP). An optimized swinging door algorithm with dynamic programming is applied to identify and forecast wind power ramps (WPRs). Designed as positive characteristics of WPRs, the WPRP is then integrated into the multi-timescale dispatch model that considers new objective functions, ramping capacity limits, active power limits, and flexible ramping requirements. Numerical simulations on the modified IEEE 118-bus system show the potential effectiveness of WPRP in increasing the economic efficiency of power system operations with high levels of wind power penetration. It is found that WPRP not only reduces the production cost by using less ramping reserves scheduled by conventional generators, but also possibly enhances the reliability of power system operations. Moreover, wind power forecasts play an important role in providing high-quality WPRP service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Opportunities for Automated Demand Response in Wastewater Treatment Facilities in California - Southeast Water Pollution Control Plant Case Study

This report details a study into the demand response potential of a large wastewater treatment facility in San Francisco. Previous research had identified wastewater treatment facilities as good candidates for demand response and automated demand response, and this study was conducted to investigate facility attributes that are conducive to demand response or which hinder its implementation. One years' worth of operational data were collected from the facility's control system, submetered process equipment, utility electricity demand records, and governmental weather stations. These data were analyzed to determine factors which affected facility power demand and demand response capabilities The average baseline demand at the Southeast facility was approximately 4 MW. During the rainy season (October-March) the facility treated 40% more wastewater than the dry season, but demand only increased by 4%. Submetering of the facility's lift pumps and centrifuges predicted load shifts capabilities of 154 kW and 86 kW, respectively, with large lift pump shifts in the rainy season. Analysis of demand data during maintenance events confirmed the magnitude of these possible load shifts, and indicated other areas of the facility with demand response potential. Load sheds were seen to be possible by shutting down a portion of the facility's aeration trains (average shed of 132 kW). Load shifts were seen to be possible by shifting operation of centrifuges, the gravity belt thickener, lift pumps, and external pump stations These load shifts were made possible by the storage capabilities of the facility and of the city's sewer system. Large load reductions (an average of 2,065 kW) were seen from operating the cogeneration unit, but normal practice is continuous operation, precluding its use for demand response. The study also identified potential demand response opportunities that warrant further study: modulating variable-demand aeration loads, shifting operation of sludge-processing equipment besides centrifuges, and utilizing schedulable self-generation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Loads as a Resource: Frequency Responsive Demand

Current power grid operation predominantly relies on scheduling and regulating generation resources to supply loads and balance load changes. Due to the inherent intermittency of renewable energy, more flexible and fast ramping capacity is required to compensate for the uncertainty and variability introduced by renewable energy resources. With the advancement of information technologies, power system end-use loads are becoming more agile and can participate in provision of balancing energy and other grid services. The use of demand response can greatly reduce the required generation reserve in a clean and environmentally friendly way. In this report, a new frequency responsive load (FRL) controller was proposed based on the GFA controller, which can respond to both over and under-frequency events. A supervisory control was introduced to coordinate the autonomous response from FRLs in order to overcome the issues of excessive system response due to high penetration of FRLs. The effectiveness of the proposed FRL controller was demonstrated by large-scale simulation studies on the WECC system. Specifically, the FRLs were deployed in the WECC system at different penetration levels to analyze the performance of the proposed strategy both with and without supervisory level control. While both methods have their own advantages, the case without supervisory control could lead to system-wide instability depending on the size of the contingency and the number of FRLs deployed in the system. In addition, the voltage impacts of this controller on distribution system were also carefully investigated. Finally, a preliminary measurement and verification approach was also developed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tuning the Legacy Survey of Space and Time (LSST) Observing Strategy for Solar System Science

Abstract The Vera C. Rubin Observatory is expected to start the Legacy Survey of Space and Time (LSST) in early to mid-2025. This multiband wide-field synoptic survey will transform our view of the solar system, with the discovery and monitoring of over five million small bodies. The final survey strategy chosen for LSST has direct implications on the discoverability and characterization of solar system minor planets and passing interstellar objects. Creating an inventory of the solar system is one of the four main LSST science drivers. The LSST observing cadence is a complex optimization problem that must balance the priorities and needs of all the key LSST science areas. To design the best LSST survey strategy, a series of operation simulations using the Rubin Observatory scheduler have been generated to explore the various options for tuning observing parameters and prioritizations. We explore the impact of the various simulated LSST observing strategies on studying the solar system’s small body reservoirs. We examine what are the best observing scenarios and review what are the important considerations for maximizing LSST solar system science. In general, most of the LSST cadence simulations produce ±5% or less variations in our chosen key metrics, but a subset of the simulations significantly hinder science returns with much larger losses in the discovery and light-curve metrics.

79 ASTRONOMY AND ASTROPHYSICS↗

A cycle timer for testing electric vehicles

A cycle timer was developed to assist the driver of an electric vehicle in more accurately following and repeating SAE driving schedules. These schedules require operating an electric vehicle in a selected stop-and-go driving cycle and repeating this cycle pattern until the vehicle ceases to meet the requirements of the cycle. The heart of the system is a programmable read-only memory (PROM) that has the required test profiles permanently recorded on plug-in cards, one card for each different driving schedule. The PROM generates a direct current analog signal that drives a speedometer displayed on one scale of a dual movement meter. The second scale of the dual movement meter displays the actual speed of the vehicle as recorded by the fifth wheel. The vehicle operator controls vehicle speed to match the desired profile speed. The PROM controls the recycle start time as well as the buzzer activation. The cycle programmer is powered by the test vehicle's 12-volt accessory battery, through a 5-volt regulator and a 12-volt dc-to-dc converter.

Soltis, R. F.↗

California's geothermal resource potential

According to a U.S. Geological Survey estimate, recoverable hydrothermal energy in California may amount to 19,000 MW of electric power for a 30-year period. At present, a geothermal installation in the Geysers region of the state provides 502 MWe of capacity; an additional 1500 MWe of electric generating capacity is scheduled to be in operation in geothermal fields by 1985. In addition to hydrothermal energy sources, hot-igneous and conduction-dominated resources are under investigation for possible development. Land-use conflicts, environmental concerns and lack of risk capital may limit this development.

Leibowitz, L. P.↗

Forecasting of loading on the Deep Space Network for proposed future NASA mission sets

The paper describes a computer program, DSNLOAD, which provides the Deep Space Network (DSN) loading information given a proposed future NASA mission set. The DSNLOAD model includes required pre- and post-calibration periods, and station 'overhead' such as maintenance or 'down' time. The analysis is presented which transforms station view period data for the mission set into loading matrices used to assess loading requirement. Assessment of future loading on the DSN for a set of NASA missions by estimating the tracking situation and presenting the DSN loading data, and a flowchart for selecting a possible future mission, determining a heliocentric orbit for the mission, generating view period schedules, and converting these schedules into basic loading data for each mission for each station are given. The tracking schedule model which considers the tracking schedule to be represented by passes of maximum required length and centered within the view period of available tracking time for each mission is described, and, finally, an example of typical loading study is provided.

Webb, W. A.↗