Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

Modelling and analysis of nuclear reactor system coupled with a liquid metal battery

Traditionally, nuclear power plants in the U.S. provide baseload power to the power grid because they have less flexibility for ramping their output power than natural gas peaking plants. However, achieving climate goals to reduce the consumption of fossil‐based natural gas places pressure on nuclear power plants and other power generators to ramp up their power output to balance grid generation with demand. This paper presents the modelling and performance analysis of a nuclear reactor system (NRS) coupled to a liquid‐metal battery (LMB) to improve its dynamic response and enable its black start capability. The NRS and LMB thermal behaviour are modelled in Dymola, while the electrical dynamics of the LMB and power grid are modelled in RTDS‐RSCAD. Both simulation platforms are coupled and share their thermal and electrical data using a Transmission Control Protocol/Internet Protocol (TCP/IP) communication protocol. The dynamic performance of the NRS‐LMB integration is tested on the IEEE 9 bus, which demonstrates its ability to respond and provide frequency and voltage regulation. The black start capability of the NRS‐LMB is also evaluated by simulating a grid outage and using the LMB to supply the auxiliary loads required to bring the NRS back online as soon as possible. The results show that coupling an NRS to an LMB improves the system dynamic performance and enables it to black start after being disconnected from the grid for several days.

25 ENERGY STORAGE↗

Improving Robustness of Spectrogram Classifiers with Neural Stochastic Differential Equations

Signal analysis and classification is fraught with high levels of noise and perturbation. Computer-vision-based deep learning models applied to spectrograms have proven useful in the field of signal classification and detection; however, these methods aren't designed to handle the low signal-to-noise ratios inherent within non-vision signal processing tasks. While they are powerful, they are currently not the method of choice in the inherently noisy and dynamic critical infrastructure domain, such as smart-grid sensing, anomaly detection, and non-intrusive load monitoring. Currently, these models can be brittle, which makes them susceptible to noisy input. This also means they have sub-optimal stability of explanation outputs. Experts and technicians using these models to make decisions in real world scenarios need assurance that a model is performing as it is supposed to. The classification or prediction outputs it generates should be sound and grounded, not likely to change in the presence of shifting noise landscapes. In this work, we explore the idea of Neural Stochastic Differential Equations (NSDE's) to improve the robustness of models trained to classify time series data and the effect of NSDE's on the explainability of outputs. We then test the effectiveness of these approaches by applying them to a non-intrusive load monitoring (NILM) dataset that consists of simulated harmonic signals injected into a real building.

Brogan, Joel↗

Advanced Oxygen-Free Electrolyzer for Ultra-Low-Cost H 2 Storage for Fossil Plants (Final Technical Report)

DOE’s Office of Fossil Energy and Carbon Management has determined that long-duration energy storage solutions co-located with fossil energy assets offer significant benefits to the fossil industry, electric utilities, and customers. T2M Global has developed an Advanced O 2 -Free Electrolyzer System (AES) Technology for low-cost, long-duration H 2 energy storage for fossil plants. The MW-class AES Module conceptual design aims to upgrade stranded assets (dilute/waste syngas streams, excess electricity, and waste heat) at fossil plants to higher value H 2 for additional revenue and greater sustainability. The H 2 energy storage equips fossil plants with the load following capability needed for the lucrative grid-support services market created by Variable Renewable Energy resources.

08 HYDROGEN↗

Electrification Options for Multi-Family Water Heating in Cold Climates - Final Report

In multi-family buildings, large water storage tanks in centralized domestic hot water (DHW) systems can serve as thermal energy storage (TES) batteries to mitigate grid impact. These systems offer demand shift and efficiency benefits, significantly reducing peak power consumption, particularly in cold climates. This study evaluates the load-shifting benefits of a centralized heat pump water heater (HPWH) system equipped with a CO2 heat pump in multi-family buildings through simulation. The heat pump system and water storage tank are sized using design-day sizing. A finite-element-based stratified tank model and CO2 heat pump performance map from a commercial DHW product are used. Annual simulations are conducted to assess the benefits of the centralized DHW system for energy efficiency improvements, load shifting, and emission reductions. These simulations incorporate utility tariffs and marginal grid emission data from Los Angeles and Chicago. In Los Angeles, using a water tank as a thermal battery achieves 7.4% utility cost savings and 10.2% emission reduction. In Chicago, compared to HPWH conventional operation without preheating, TES-enabled central HPWH provides 15% utility cost savings and 13% emission reduction. The case study demonstrates that the demand reduction potential of central CO2 HPWHs is significant in cold climate regions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Resilience Options for the Koolauloa Community Resilience Hub – Energy Technology Innovation Partnership Project, Cohort 2: Summary of Findings and Assessment

Hui o Hau‘ula (HoH) is a community organization dedicated to the well-being of the population of the Ko‘olauloa district on the Hawaiian island of Oahu. In response to growing concerns about challenges related to extreme weather events or natural disasters, HoH formulated the concept of the Ko‘olauloa Community Resilience Hub, or KCRH. The KCRH facility would serve as a focal point for the community during normal conditions, while also providing essential services and acting as a safe space during emergencies, natural or man-made. The concept of the KCRH was initially developed in partnership with the Hawaii Natural Energy Institute, +Lab Architects, and the City and County of Honolulu. In the fall of 2023, the U.S. Department of Energy, under the Energy Technology Innovation Partnership Project Program (ETIPP), provided support to the KCRH project, in the form of technical assistance (TA) to be provided by its National Laboratory complex. In this case, the core TA was provided by Sandia National Laboratories, and it was directed to providing options for designing an energy system based at the KCRH that could support critical loads in the event of a 30- day grid outage. The National Renewable Energy Laboratory (NREL) provided communications and logistics support in the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commercial and Residential Hourly Load Profiles for All Typical Meteorological Year 3 (TMY3) Locations in the United States

One way to achieve grid flexibility is to shed or shift demand to align with changing grid needs. To facilitate this, it is critical to understand how and when energy is used. High-quality end-use load profiles (EULPs) provide this information and can help cities, states, and utilities understand the time-sensitive value of energy efficiency, demand response, and distributed energy resources. Publicly available EULPs have traditionally had limited application because of age and incomplete geographic representation. To help fill this gap, the U.S. Department of Energy funded a 3-year project, End-Use Load Profiles for the U.S. Building Stock, that culminated in this publicly available dataset of calibrated and validated 15-minute-resolution load profiles for all major residential and commercial building types and end uses across all climate regions in the United States. These EULPs were created by calibrating the ResStock and ComStock physics-based building stock models using many different measured datasets, as described in the "Technical Report Documenting Methodology" linked in the submission.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

CityLearn v2: energy-flexible, resilient, occupant-centric, and carbon-aware management of grid-interactive communities

As more distributed energy resources become part of the demand-side infrastructure, quantifying their energy flexibility on a community scale is crucial. CityLearn v1 provided an environment for benchmarking control algorithms. However, there is no standardized environment utilizing realistic building-stock datasets for distributed energy resource control benchmarking without co-simulation or third-party frameworks. CityLearn v2 extends CityLearn v1 by providing a stand-alone simulation environment that leverages the End-Use Load Profiles for the U.S. Building Stock dataset to create grid-interactive communities for resilient, multi-agent, and objective control of distributed energy resources with dynamic occupant feedback. While the v1 environment used pre-simulated building thermal loads, the v2 environment uses data-driven thermal dynamics and eliminates the need for co-simulation with building energy performance software. This work details the v2 environment and provides application examples that use reinforcement learning control to manage battery energy storage system, vehicle-to-grid control, and thermal comfort during heat pump power modulation.

Nweye, Kingsley↗

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory↗

FY25 Electric Grid Security Annual Report

Sandia’s Electric Grid Security program advances a national vision of energy dominance and accessibility, while applying our national security -emphasis on ensuring of a secure, resilient, and affordable electric system for all users. Our achievements reflect a strategic approach combining technology development; modeling, simulation, and data analytics; and partnered demonstrations and outreach to further the adoption of advanced grid and storage technologies. Our FY25 efforts leverage the strengths of our partnerships—spanning Sandia’s core science and technology competencies as well as external technology leaders—to develop the solutions today which enable the grid of tomorrow. Key accomplishments in this report that support our strategy span our technical program areas and include: • New open-source analytical tools for systems -level planning and optimization, including significant advances to the QuESt analytical environment; • Further advancement of artificial intelligence and machine learning to enhanced grid operations and planning as we rise to the challenge of new large loads; • Development of solid-state power conversion technologies and a new medium-voltage research lab; • New technologies to assess wildfire vulnerabilities and mitigate potential impacts; • Advanced applications of new cybersecurity technologies with industry partners; • Contributions to understanding the impacts of electromagnetic pulses and geomagnetic disturbances on grid components; and • Digital twin development for hybrid microgrids with multiple generators, storage, and loads. This report indicates key areas of research and engagement and summarizes the impact of Sandia’s contributions through notable accomplishments, journal publications, patents, and technical conferences and presentations. It is provided with the hope that readers discover ways we can further team to create our modern grid and apply the outcomes of our efforts. The bulk of work described herein is funded by several offices within the U.S. Department of Energy (USDOE), including the Office of Electricity (OE); Cybersecurity, Energy Security, and Emergency Response (CESER); former offices such as the Office of Energy Efficiency and Renewable Energy (EERE), the Grid Deployment Office (GDO), the Office of Clean Energy Demonstrations (OCED), and other key programs at USDOE. As we continue to state in these annual reports, the contributors to our successes are too numerous to name here, though our team wishes to express our deep gratitude to the numerous program and project sponsors at the US Department of Energy, who often function equally as technical collaborators; our many partners in industry, academia, utilities, and other national labs; and fellow researchers and business partners at Sandia whose leadership and creativity have enabled the accomplishments described herein.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multifunctional Heat Pump with Energy Storage Capability

Replacing gas furnaces with heat pumps on a large scale can pose challenges to the electrical grid. It will significantly increase the demand, strain the electrical grid, especially during peak usage times. To ensure that heat pumps contribute to reducing emissions, it's essential to increase the share of renewable energy in the grid. However, the supply of renewable energy is unstable. Large scale of electrification must address the concern of grid resilience to meet necessary heating/cooling demands and shift peak electric load. All these require future heat pumps having energy storage capability. These systems can store excess energy during low-demand periods and release it during high-demand periods, reducing stress on the grid. This paper will introduce an innovative configuration, control, and laboratory investigations of a multifunctional packaged heat pump. In addition to the original indoor and outdoor air coils, the heat pump has a parallel hydronic loop with a brazed plate heat exchanger (BHP). The hydronic loop circulates hot/chilled water to store heating/cooling energy in phase change material (PCM). It is capable of space cooling, space heating, cooling energy storage/defrosting, water heating/heating energy storage with outdoor air source or indoor air source, and cooling/heating energy free discharge. The laboratory studies and breadboard unit are presented. Additionally, building energy simulation demonstrates utility cost reduction potential via charging PCM panels/ceilings during off-peak hours and releasing the energy during peak hours to mitigate the peak power consumption.

Shen, Bo↗

Recovery Simulator and Analysis Formulation: Mathematical Framework for Enhanced Resilience and Resource Allocation

This report introduces recovery simulator and analysis (RSA), a framework aimed at enhancing the resilience of electrical grids post-disruption. The RSA model leverages an optimization problem formulation that focuses on maximizing the load served (or optionally customers served) through a coordinated and cooptimized recovery of non-black start generation, transmission lines, feeders and substations subject to labor budget constraints. By integrating advanced linear programming techniques, the simulator selects efficient reocovery pathways, optimizing both short-term and long-term grid recovery strategies. The mathematical framework guides decision-making through a comprehensive evaluation of potential recovery actions, factoring in the trade-offs between labor constraints and load (or optionally customer) restoration efficacy. This enables grid operators to simulate diverse outage scenarios and delineate optimal recovery pathways, thereby prioritizing critical repair tasks and ensuring resource allocation is both economical and effective. The intended use case of RSA is to allow planners to explore many recovery scenarios quickly and determine assets most critical across a wide range of scenarios, and therefore strong candidates for hardening or additional investment. RSA might also be used in an operational setting, following a single event, for exploring efficient recovery pathways.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Virtual Power Plants and Distributed Energy Resource Management Systems

Virtual Power Plants (VPPs) are aggregations of DERs that can balance electrical loads and provide utility-scale and utility-grade grid services like a traditional power plant. This presentation covers VPP definition, State-of-the-Art, Grid Architectures, Example VPP studies, VPP Standards, and VPP Roadmap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Defining a Platform Approach and Market Participation: Data Driven Business Models for Solid State Transformer-Based Synthetic Inertia and Voltage Stability Controls (CRADA Final Report, Project 1, Mod 1)

The primary objective of this project is to determine the incremental value created with the medium voltage solid-state transformer (MV SST) technology to different stakeholders in view of the updated DER grid regulations. This includes studying the benefits of the MV SST technology in a range of use cases for EV and DER penetration including (1) “corridor charging” for EVs and (2) solar plus storage (FERC 2222). The potential customers of this technology include utilities for EV charging, DER installers who must meet utility interconnection requirements, balancing authorities, and DER aggregators. The traditional transformers on the grid could be a limiting factor for the EV-grid integration as the distribution transformers were not designed to handle the dynamic and fluctuating EV charging loads. Thus, the issues such as voltage fluctuations, increased losses and reduced efficiency [1] can negatively impact the grid operation. To address these challenges, transformers with flexibility and adaptability become imperative to meet the evolving energy demands. In this regard, the concept of Medium Voltage Solid-State Transformers.

14 SOLAR ENERGY↗

Grid Resilience Analysis on Geothermal District Heating and Cooling Implementation Alongside Four Existing Oil and Gas Wells in Tuttle, Oklahoma

This study builds on the existing techno economic and environmental life cycle assessments performed for a geothermal district heating and cooling system implementation in Tuttle Oklahoma with four existing oil and gas wells. Its resilience in meeting the peak annual heating and cooling loads of the district assuming a temporary disconnection from the electrical grid is assessed both qualitatively and quantitatively. Attributes of resilience and qualitative criteria established by Kolker et al. (2022) for geothermal district heating systems are applied to the proposed case to highlight its vulnerabilities. Results indicate that increasing the redundancy and diversity in the physical configuration of the distributional piping can considerably increase the system's resilience. A quantitative assessment executed via the REopt tool predicts that the ancillary electricity required to power the geothermal system's heating and cooling can be met by an onsite emergency diesel generator during times of grid outages for over 28 days.

district heating and cooling↗