Search NASA⌕ Search

SEARCH · Search NASA

Results for “ILC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Fermilab Steering Group Report

The Fermilab Steering Group has developed a plan to keep U.S. accelerator-based particle physics on the pathway to discovery, both at the Terascale with the LHC and the ILC and in the domain of neutrinos and precision physics with a high-intensity accelerator. The plan puts discovering Terascale physics with the LHC and the ILC as Fermilab's highest priority. While supporting ILC development, the plan creates opportunities for exciting science at the intensity frontier. If the ILC remains near the Global Design Effort's technically driven timeline, Fermilab would continue neutrino science with the NOvA experiment, using the NuMI (Neutrinos at the Main Injector) proton plan, scheduled to begin operating in 2011. If ILC construction must wait somewhat longer, Fermilab's plan proposes SNuMI, an upgrade of NuMI to create a more powerful neutrino beam. If the ILC start is postponed significantly, a central feature of the proposed Fermilab plan calls for building an intense proton facility, Project X, consisting of a linear accelerator with the currently planned characteristics of the ILC combined with Fermilab's existing Recycler Ring and the Main Injector accelerator. The major component of Project X is the linac. Cryomodules, radio-frequency distribution, cryogenics and instrumentation for the linac are the same as or similar to those used in the ILC at a scale of about one percent of a full ILC linac. Project X's intense proton beams would open a path to discovery in neutrino science and in precision physics with charged leptons and quarks. World-leading experiments would allow physicists to address key questions of the Quantum Universe: How did the universe come to be? Are there undiscovered principles of nature: new symmetries, new physical laws? Do all the particles and forces become one? What happened to the antimatter? Building Project X's ILC-like linac would offer substantial support for ILC development by accelerating the industrialization of ILC components in the U.S. and creating an engineering opportunity for ILC cost reductions. It o.ers an early and tangible application for ILC R&D in superconducting technology, attracting participation from accelerator scientists worldwide and driving forward the technology for still higher-energy accelerators of the future, such as a muon collider. To prepare for a future decision, the Fermilab Steering Group recommends that the laboratory seek R&D support for Project X, in order to produce an overall design of Project X and to spur the R&D and industrialization of ILC linac components needed for Project X. Advice from the High Energy Physics Advisory Panel will guide any future decision to upgrade the Fermilab accelerator complex, taking into account developments a.ecting the ILC schedule and the continuing evaluation of scientific priorities for U.S. particle physics. Fermilab should also work toward increased resources for longer-term future accelerators such as a muon collider, aiming at higher energies than the ILC would provide.

43 PARTICLE ACCELERATORS↗

Reliability of Upright and Supine Power Measurements Using an Inertial Load Cycle Ergometer

Practical, reliable, and time efficient methods of measuring muscular power are desirable for both research and applied testing situations. The inertial-load cycling method (ILC; Power/Cycle, Austin, TX) requires subjects to pedal as fast as possible against the inertial load of a flywheel for only 3-5 seconds, which could help reduce the time and effort required for maximal power testing. PURPOSE: 1) To test the intramachine reliability of ILC over 3 separate sessions, 2) to compare postural stance (upright vs. supine) during testing, and 3) to compare the maximal power (Pmax) output measured using ILC to that obtained from traditional isokinetic and leg press testing. METHODS: Subjects (n = 12) were tested on 4 non-consecutive days. The following tests were done on the first day of testing: isometric knee extension, isokinetic knee extension at several speeds, isokinetic power/endurance at 180/sec (Biodex System 4), leg press maximal isometric force, and leg press power/endurance. The other 3 days consisted exclusively of ILC testing. Subjects performed 6 ILC tests in an upright position and 6 ILC tests in a supine position on each day. The starting position was counterbalanced. Mixed-effects linear modeling was used to determine if any differences existed between testing days and between upright and supine for Pmax and revolutions per minute at Pmax (RPMpk). Mixed-modeling was also used to calculate intraclass correlation coefficients (ICC) to determine the reliability of the ILC on each testing day for Pmax and RPMpk (ICCs were calculated separately for upright and supine). gKendall fs Tau a h was used to determine the association between ILC Pmax and isokinetic and leg press data. RESULTS: For Pmax, significant differences were found between days 1 and 2 (upright: p = 0.018; supine: p = 0.014) and between days 1 and 3 (upright: p = 0.001; supine: p = 0.002), but not between days 2 and 3 (upright: p = 0.422; supine: p = 0.501). Pmax ICC values were greater than or equal to 0.97 for all days in both positions. Also, no significant differences between upright and supine postures were found for Pmax. No significant differences between days were found for RPMpk; however, there was a significant posture effect (upright greater than supine). Moderate correlations were observed between ILC Pmax and isokinetic and leg press tests (upright: 0.64-0.79, supine: 0.52-0.82). CONCLUSIONS: Overall, ILC is a very reliable test. Since a significant difference was found between day 1 and the other ILC testing days, it is suggested that day 1 of ILC testing should be used as a familiarization session to allow for subject learning. No significant difference in Pmax was seen from test 3 to test 6. However, an increase of 1.3% was observed from test 4 to test 6. Therefore, although 4 tests may be sufficient for most subjects to produce Pmax, in some cases 6 tests may be required. PRACTICAL APPLICATIONS: No differences were seen in Pmax between upright and supine positions despite differing RPMpk. This suggests that ILC testing can be used to provide reliable testing both in an upright position (appropriate for athletes) and in research (e.g., bed rest) or rehabilitation settings where supine testing is necessary. Future research should evaluate whether peak power measurements obtained with the ILC are sensitive to changes such as that observed with training and de-training.

Wickwire, P. J.↗

International Linear Collider Accelerator Physics R&D

ILC work at Illinois has concentrated primarily on technical issues relating to the design of the accelerator. Because many of the problems to be resolved require a working knowledge of classical mechanics and electrodynamics, most of our research projects lend themselves well to the participation of undergraduate research assistants. The undergraduates in the group are scientists, not technicians, and find solutions to problems that, for example, have stumped PhD-level staff elsewhere. The ILC Reference Design Report calls for 6.7 km circumference damping rings (which prepare the beams for focusing) using “conventional” stripline kickers driven by fast HV pulsers. Our primary goal was to determine the suitability of the 16 MeV electron beam in the AØ region at Fermilab for precision kicker studies.We found that the low beam energy and lack of redundancy in the beam position monitor system complicated the analysis of our data. In spite of these issues we concluded that the precision we could obtain was adequate to measure the performance and stability of a production module of an ILC kicker, namely 0.5%. We concluded that the kicker was stable to an accuracy of ~2.0% and that we could measure this precision to an accuracy of ~0.5%. As a result, a low energy beam like that at AØ could be used as a rapid-turnaround facility for testing ILC production kicker modules. The ILC timing precision for arrival of bunches at the collision point is required to be 0.1 picosecond or better. We studied the bunch-to-bunch timing accuracy of a “phase detector” installed in AØ in order to determine its suitability as an ILC bunch timing device. A phase detector is an RF structure excited by the passage of a bunch. Its signal is fed through a 1240 MHz high-Q resonant circuit and then down-mixed with the AØ 1300 MHz accelerator RF. We used a kind of autocorrelation technique to compare the phase detector signal with a reference signal obtained from the phase detector’s response to an event at the beginning of the run. We determined that the device installed in our beam, which was instrumented with an 8-bit 500 MHz ADC, could measure the beam timing to an accuracy of 0.4 picoseconds. Simulations of the device showed that an increase in ADC clock rate to 2 GHz would improve measurement precision by the required factor of four. As a result, we felt that a device of this sort, assuming matters concerning dynamic range and long-term stability can be addressed successfully, would work at the ILC. Cost effective operation of the ILC will demand highly reliable, fault tolerant and adaptive solutions for both hardware and software. The large numbers of subsystems and large multipliers associated with the modules in those subsystems will cause even a strong level of unit reliability to become an unacceptable level of system availability. An evaluation effort is underway to evaluate standards associated with high availability, and to guide ILC development with standard practices and well-supported commercial solutions. One area of evaluation involves the Advanced Telecom Computing Architecture (ATCA) hardware and software. We worked with an ATCA crate, processor monitors, and a small amount of ATCA circuit boards in order to develop a backplane “spy” board that would let us watch the ATCA backplane communications and pursue development of an inexpensive processor monitor that could be used as a physics-driven component of the crate-level controls system. We made good progress, and felt that we had determined a productive direction to extend this work. We felt that we had learned enough to begin designing a workable processor monitor chip if there were to be sufficient interest in ATCA shown by the ILC community. Fault recognition is a challenging issue in the crafting a high reliability controls system. With tens of thousands of independent processors running hundreds of thousands of critical processes, how can the system identify that a problem has arisen and determine the appropriate steps to take to correct, or compensate, for the failure? One possible solution might come through the use of the OpenClovis supervisory system, which runs on Linux processors and allows a select set of processors to monitor the behavior of individual processes and processors in a large, distributed controls network. We found that OpenClovis exhibited an irritating amount of sensitivity to the exact version of the Linux kernel running on the processors, and that it was poorly equipped to help us sort through problems that arose through conflicts so deep in the operating systems of the processors. But once this issue was addressed, we found that it performed as expected, recognizing crashes and process (and processor) failures.

43 PARTICLE ACCELERATORS↗

The International Large Detector: Letter of Intent

The International Large Detector (ILD) is a concept for a detector at the International Linear Collider, ILC. The ILC will collide electrons and positrons at energies of initially 500 GeV, upgradeable to 1 TeV. The ILC has an ambitious physics program, which will extend and complement that of the Large Hadron Collider (LHC). The ILC physics case has been well documented, most recently in the ILC Reference Design Report, RDR. A hallmark of physics at the ILC is precision. The clean initial state and the comparatively benign environment of a lepton collider are ideally suited to high precision measurements. To take full advantage of the physics potential of ILC places great demands on the detector performance. The design of ILD, which is based on the GLD and the LDC detector concepts, is driven by these requirements. Excellent calorimetry and tracking are combined to obtain the best possible overall event reconstruction, including the capability to reconstruct individual particles within jets for particle flow calorimetry. This requires excellent spatial resolution for all detector systems. A highly granular calorimeter system is combined with a central tracker which stresses redundancy and efficiency. In addition, efficient reconstruction of secondary vertices and excellent momentum resolution for charged particles are essential for an ILC detector. The interaction region of the ILC is designed to host two detectors, which can be moved into the beam position with a 'push-pull' scheme. The mechanical design of ILD and the overall integration of subdetectors takes these operational conditions into account. The main features of ILD are outlined below. The central component of the ILD tracker is a Time Projection Chamber (TPC) which provides up to 224 precise measurements along the track of a charged particle. This is supplemented by a system of Silicon (Si) based tracking detectors, which provide additional measurement points inside and outside of the TPC, and extend the angular coverage down to very small angles. A Si-pixel based vertex detector (VTX) enables long lived particles such as b- and c-hadrons to be reconstructed. This combination of tracking devices, which has a large degree of redundancy, results in high track reconstruction efficiencies, and unprecedented momentum resolution and vertex reconstruction capabilities. One of the most direct measures of detector performance at the ILC is the jet-energy resolution. Precise di-jet mass reconstruction and separation of hadronically decaying W and Z bosons are essential for many physics channels. The ultimate jet energy resolution is achieved when every particle in the event, charged and neutral, is measured with the best possible precision. Within the paradigm of particle flow calorimetry, this goal is achieved by reconstructing charged particles in the tracker, photons in the electromagnetic calorimeter (ECAL), and neutral hadrons in the ECAL and hadronic calorimeter (HCAL). The ultimate performance is reached for perfect separation of charged-particle clusters from neutral particle clusters in the calorimeters. Thus, a highly granular calorimeter outside the tracker is the second key component of ILD. Sampling calorimeters with dense absorber material and fine grained readout are used. A tungsten absorber based electromagnetic calorimeter (ECAL) covers the first interaction length, followed by a somewhat coarser steel based sampling hadronic calorimeter (HCAL). Several ECAL and HCAL readout technologies are being pursued.

43 PARTICLE ACCELERATORS↗

Governance of the International Linear Collider Project

Governance models for the International Linear Collider Project are examined in the light of experience from similar international projects around the world. Recommendations for one path which could be followed to realize the ILC successfully are outlined. The International Linear Collider (ILC) is a unique endeavour in particle physics; fully international from the outset, it has no 'host laboratory' to provide infrastructure and support. The realization of this project therefore presents unique challenges, in scientific, technical and political arenas. This document outlines the main questions that need to be answered if the ILC is to become a reality. It describes the methodology used to harness the wisdom displayed and lessons learned from current and previous large international projects. From this basis, it suggests both general principles and outlines a specific model to realize the ILC. It recognizes that there is no unique model for such a laboratory and that there are often several solutions to a particular problem. Nevertheless it proposes concrete solutions that the authors believe are currently the best choices in order to stimulate discussion and catalyze proposals as to how to bring the ILC project to fruition. The ILC Laboratory would be set up by international treaty and be governed by a strong Council to whom a Director General and an associated Directorate would report. Council would empower the Director General to give strong management to the project. It would take its decisions in a timely manner, giving appropriate weight to the financial contributions of the member states. The ILC Laboratory would be set up for a fixed term, capable of extension by agreement of all the partners. The construction of the machine would be based on a Work Breakdown Structure and value engineering and would have a common cash fund sufficiently large to allow the management flexibility to optimize the project's construction. Appropriate contingency, clearly apportioned at both a national and global level, is essential if the project is to be realised. Finally, models for running costs and decommissioning at the conclusion of the ILC project are proposed. This document represents an interim report of the bodies and individuals studying these questions inside the structure set up and supervised by the International Committee for Future Accelerators (ICFA). It represents a request for comment to the international community in all relevant disciplines, scientific, technical and most importantly, political. Many areas require further study and some, in particular the site selection process, have not yet progressed sufficiently to be addressed in detail in this document. Discussion raised by this document will be vital in framing the final proposals due to be published in 2012 in the Technical Design Report being prepared by the Global Design Effort of the ILC.

43 PARTICLE ACCELERATORS↗

Clinical Outcomes Using Accelerated Partial Breast Irradiation in Patients With Invasive Lobular Carcinoma

Purpose: We compared clinical outcomes of women diagnosed with either invasive lobular carcinoma (ILC) or invasive ductal carcinoma (IDC) treated with accelerated partial breast irradiation (APBI). Methods and Materials: A total of 16 patients with ILC received APBI as part of their breast-conservation therapy (BCT) and were compared with 410 patients with IDC that received APBI as part of their BCT. Clinical, pathologic, and treatment related variables were analyzed including age, tumor size, hormone receptor status, surgical margins, lymph node status, adjuvant hormonal therapy, adjuvant chemotherapy, and APBI modality. Clinical outcomes including local recurrence (LR), regional recurrence (RR), disease-free survival (DFS), cause-specific survival (CSS), and overall survival (OS) were analyzed. Results: Median follow-up was 3.8 years for the ILC patients and 6.0 years for the IDC patients. ILC patients were more likely to have positive margins (20.0% vs. 3.9%, p = 0.006), larger tumors (14.1 mm vs. 10.9 mm, p = 0.03) and less likely to be node positive (0% vs. 9.5%, p < 0.001) when compared with patients diagnosed with IDC. The 5-year rate of LR was 0% for the ILC cohort and 2.5% for the IDC cohort (p = 0.59). No differences were seen in the rates of RR (0% vs. 0.7%, p = 0.80), distant metastases (0% vs. 3.5%, p = 0.54), DFS (100% vs. 94%, p = 0.43), CSS (100% vs. 97%, p = 0.59), or OS (92% vs. 89%, p = 0.88) between the ILC and IDC patients, respectively. Additionally, when node-positive patients were excluded from the IDC cohort, no differences in the rates of LR (0% vs. 2.2%, p = 0.62), RR (0% vs. 0%), DFS (100% vs. 95%, p = 0.46), CSS (100% vs. 98%, p = 0.63), or OS (92% vs. 89%, p = 0.91) were noted between the ILC and IDC patients. Conclusion: Women with ILC had excellent clinical outcomes after APBI. No difference in local control was seen between patients with invasive lobular versus invasive ductal histology.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Application of International Linear Collider superconducting cavities for acceleration of protons.

Beam acceleration in the International Linear Collider (ILC) will be provided by 9-cell 1300 MHz superconducting (SC) cavities. The cavities are designed for effective acceleration of charged particles moving with the speed of light and are operated on p-mode to provide a maximum accelerating gradient. A significant research and development effort has been devoted to develop ILC SC technology and its rf system which resulted in excellent performance of ILC cavities. Therefore, the proposed 8-GeV proton driver in Fermilab is based on ILC cavities above {approx}1.2 GeV. The efficiency of proton beam acceleration by ILC cavities drops fast for lower velocities and it was proposed to develop squeezed ILC-type (S-ILC) cavities operating at 1300 MHz and designed for {beta}G=0.81, geometrical beta, to accelerate protons or H{sup -} from {approx}420MeV to 1.2 GeV. This paper discusses the possibility of avoiding the development of new {beta}G=0.81 cavities by operating ILC cavities on 8 / 9{pi}-mode of standing wave oscillations.

43 PARTICLE ACCELERATORS↗

International Linear Collider-A Technical Progress Report

The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

43 PARTICLE ACCELERATORS↗

The International Linear Collider: A Global Project

The International Linear Collider (ILC) is now under consideration as the next global project in particle physics. In this report, we review of all aspects of the ILC program: the physics motivation, the accelerator design, the run plan, the proposed detectors, the experimental measurements on the Higgs boson, the top quark, the couplings of the W and Z bosons, and searches for new particles. We review the important role that polarized beams play in the ILC program. The first stage of the ILC is planned to be a Higgs factory at 250 GeV in the centre of mass. Energy upgrades can naturally be implemented based on the concept of a linear collider. We discuss in detail the ILC program of Higgs boson measurements and the expected precision in the determination of Higgs couplings. We compare the ILC capabilities to those of the HL-LHC and to those of other proposed e + e - Higgs factories. We emphasize throughout that the readiness of the accelerator and the estimates of ILC performance are based on detailed simulations backed by extensive RandD and, for the accelerator technology, operational experience.

43 PARTICLE ACCELERATORS↗

Geometric Analysis Based Double Closed-loop Iterative Learning Control of Output PDF Shaping of Fiber Length Distribution in Refining Process

In order to improve the pulp quality and to reduce the energy consumption, the fiber length distribution (FLD) is generally employed as one of the important technological indexes in the refining process. Considering that the traditional mean and variance of fiber length are unable to adequately characterize the non-Gaussian distribution properties, this paper proposes a novel geometric analysis based double closed-loop iterative learning control (ILC) method for probability density function (PDF) shaping of output FLD in the refining process. Primarily, a RBF neural network (NN) with Gaussian-type is utilized to approximate the square root PDF in the inner loop, where the RBF basis function parameters (center and width) are tuned between any two adjacent batches by using an ILC law, and the subspace identification method can be applied to establish the state-space model of weight vector. Then, for the sake of accelerating the convergence rate of the closed-loop sysyem, a geometric analysis based ILC method is adopted in the outer loop. Lastly, both simulation and experiments demonstrate the effectiveness and practicability of the proposed approach.

42 ENGINEERING↗

Application of Intelligent Load Control to Manage Building Loads to Support Rapid Growth of Distributed Renewable Generation

Electricity utilities are faced with the mounting challenge of providing a stable supply of power to meet the growing demand while also integrating rapid growth in distributed variable renewable generation. Traditional means of balancing short- and long-term supply and demand imbalance will be expensive. Alternative approaches of using flexible loads in buildings are needed to mitigate the imbalance at a lower cost. This paper shows how the intelligent load control (ILC) process can be used to manage loads in buildings by dynamically prioritizing loads for curtailment using both quantitative and qualitative criteria. The ILC process can be deployed on low-cost computing platforms without the need for any additional sensing. ILC was first validated in a simulation environment to provide two grid service use cases: (1) managing monthly peak electricity demand and (2) managing buildings’ electricity consumption during a capacity bidding event. After being successfully tested in a simulation environment, ILC was deployed on real buildings to manage electricity consumption to provide two different use cases under different outdoor operating conditions. Both the simulation tests and the real building experiments were deployed using VOLTTRON™, a distributed sensing and control platform. The results from the tests and experiments showed that ILC was able to manage the controllable loads (heat pumps) in the building to maintain the electricity consumption at the desired level without a significant impact on occupant comfort. Overall, the results demonstrate that the ILC allows coordination of the controllable loads and provides a more intelligent means of load management than the traditional duty-cycling approach.

Kim, Woohyun↗

The E166 experiment: Development of an Undulator-Based Polarized Positron Source for the International Linear Collider

A longitudinal polarized positron beam is foreseen for the international linear collider (ILC). A proof-of-principle experiment has been performed in the final focus test beam at SLAC to demonstrate the production of polarized positrons for implementation at the ILC. The E166 experiment uses a 1 m long helical undulator in a 46.6 GeV electron beam to produce a few MeV photons with a high degree of circular polarization. These photons are then converted in a thin target to generate longitudinally polarized e{sup +} and e{sup -}. The positron polarization is measured using a Compton transmission polarimeter. The data analysis has shown asymmetries in the expected vicinity of 3.4% and {approx}1% for photons and positrons respectively and the expected positron longitudinal polarization is covering a range from 50% to 90%. The full exploitation of the physics potential of an international linear collider (ILC) will require the development of polarized positron beams. Having both e{sup +} and e{sup -} beams polarized will provide new insight into structures of couplings and thus give access to physics beyond the standard model [1]. The concept for a polarized positron source is based on circularly polarized photon sources. These photons are then converted to longitudinally polarized e{sup +} and e{sup -} pairs. While in an experiment at KEK [1a], Compton backscattering is used [2], the E166 experiment uses a helical undulator to produce polarized photons. An undulator-based positron source for the ILC has been proposed in [3,4]. The proposed scheme for an ILC positron source is illustrated in figure 1. In this scheme, a 150 GeV electron beam passes through a 120 m long helical undulator to produce an intense photon beam with a high degree of circular polarization. These photons are converted in a thin target to e{sup +} e{sup -} pairs. The polarized positrons are then collected, pre-accelerated to the damping ring and injected to the main linac. The E166 experiment is dedicated to test this concept of a helical-undulator-based polarized positron source for the ILC. The experiment was carried out at SLAC where it benefitted from the high quality electron beam in the final focus test beam (FFTB).

43 PARTICLE ACCELERATORS↗

ATF2 Summary and Status

The Accelerator Test Facility (ATF) [1] at KEK was originally constructed as a Damping Ring (DR) demonstration facility for the next generation of electron linear colliders. It consists of a 1.3 GeV s-band linac and a 136m circumference damping ring which can routinely generate 1.6 nC electron bunches with very small vertical emittances (<10pm.rad). Completed in December of 2008, a new extraction line and final focus optics was built, this is referred to as ATF2 [2]. The location of ATF in-relation to the KEK site can be seen in Figure 1. ATF is a general-purpose facility for accelerator physics related R and D activities, with approximately 50% of the available beam time currently devoted to the ATF2 program. The ATF2 extraction line (EXT) and final focus system (FFS) extends about 90 meters from the DR extraction point, a sketch of this system can be seen in figure 2, along with the location of key instrumentation. The primary purpose of the ATF2 beam line is to demonstrate a new style of magnetic focusing optics intended for use at future linear colliders, such as ILC or CLIC based on a local chromaticity correction scheme. The primary goal of the collaboration is to demonstrate the ability of this optics to focus an electron beam of similar emittance to the ILC using a FFS of the same design chromaticity. A comparison of some of the ATF2 design parameters with those of the ILC and CLIC are shown in table 1. With the 1.3 GeV beam energy of ATF2, the target spot size to prove the operability of this optics for ILC is 37nm. This is referred to as 'Goal 1'. In addition, Goal 1 requires the demonstration of stable operations with such a beam size at the Interaction Point (IP). 'Goal 2' is to demonstrate nm-level stability with respect to the IP beam monitors, such as is required for stable beam collisions at ILC or CLIC. A further goal is to attempt to increase the chromaticity of the final focus optics, reducing the IP beta functions to a level where the system more closely resembles the CLIC FFS, and also for some of the newly proposed ILC parameters. It is anticipated that the difficulty of successfully tuning the FFS to deliver design IP beam spot sizes scales with the chromaticity of the system. The design of the achromatic focusing system involves fine cancelation of first, second and third order aberrations at the IP. One needs more accurate cancelation the tighter one attempts to focus the beam, also including more higher order terms. By gradually pushing the system to smaller IP beta functions and higher chromaticity we hope to learn what the limits of such a design are when applied practically. This will give confidence in the design philosophy behind future high-luminosity colliders and in the simulations used to predict their behaviour.

43 PARTICLE ACCELERATORS↗

Signal-preserving CMB component separation with machine learning

Analysis of microwave sky signals, such as the cosmic microwave background, often requires component separation using multifrequency methods, whereby different signals are isolated according to their different frequency behaviors. Many so-called blind methods, such as the internal linear combination (ILC), make minimal assumptions about the spatial distribution of the signal or contaminants, and only assume knowledge of the frequency dependence of the signal. The ILC produces a minimum-variance linear combination of the measured frequency maps. In the case of Gaussian, statistically isotropic fields, this is the optimal linear combination, as the variance is the only statistic of interest. However, in many cases the signal we wish to isolate, or the foregrounds we wish to remove, are non-Gaussian and/or statistically anisotropic (in particular for the case of Galactic foregrounds). In such cases, it is possible that machine learning (ML) techniques can be used to exploit the non-Gaussian features of the foregrounds and thereby improve component separation. However, many ML techniques require the use of complex, difficult-to-interpret operations on the data. We propose a hybrid method whereby we train an ML model using only combinations of the data that , and combine the resulting ML-predicted foreground estimate with the ILC solution to reduce the error from the ILC. We demonstrate our methods on simulations of extragalactic temperature and Galactic polarization foregrounds and show that our ML model can exploit non-Gaussian features, such as point sources and spatially varying spectral indices, to produce lower-variance maps than ILC—e.g., reducing the variance of the B-mode residual by factors of up to 5—while preserving the signal of interest in an unbiased manner. Moreover, we often find improved performance even when applying our ML technique to foreground models on which it was not trained. Published by the American Physical Society 2025

McCarthy, Fiona (ORCID:0000000253893565)↗

Neoadjuvant Endocrine Therapy Versus Neoadjuvant Chemotherapy in Node-Positive Invasive Lobular Carcinoma

Background: Neoadjuvant chemotherapy (NACT) is often recommended for patients with node-positive invasive lobular carcinoma (ILC) despite unclear benefit in this largely hormone receptor-positive (HR+) group. We sought to compare overall survival (OS) between patients with node-positive ILC who received neoadjuvant endocrine therapy (NET) and those who received NACT. Methods: Women with cT1–4c, cN1–3 HR+ ILC in the National Cancer Data Base (2004–2014) who underwent surgery following neoadjuvant therapy were identified. Kaplan–Meier curves and Cox proportional hazards modeling were used to estimate unadjusted and adjusted overall survival (OS), respectively. Results: Of the 5942 patients in the cohort, 855 received NET and 5087 received NACT. NET recipients were older (70 vs. 54 years) and had more comorbidities (Charlson–Deyo score ≥ 1: 21.1% vs. 11.5%), lower cT classification (cT3–4: 44.2% vs. 51.0%), lower rates of mastectomy (72.5% vs. 82.2%), lower rates of pathologic complete response (0% vs. 2.5%), and lower rates of postlumpectomy (73.2% vs. 91.0%) and postmastectomy (60.0% vs. 80.8%) radiation versus NACT recipients (all p < 0.001). NACT recipients had higher unadjusted 10-year OS versus NET recipients (57.9% vs. 36.0%), but after adjustment, there was no significant difference in OS between the two groups (p = 0.10). Conclusions: Patients with node-positive ILC who received NET presented with smaller tumors, older age, and greater burden of comorbidities versus NACT recipients but had similar adjusted OS. While there is evidence from clinical trials supporting efficacy of NET in HR+ breast cancer, our findings suggest the need for further, histology-specific investigation regarding the optimal inclusion and sequence of endocrine therapy and chemotherapy in ILC.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Was Reexcision Less Frequent for Patients with Lobular Breast Cancer After Publication of the SSO-ASTRO Margin Guidelines?

Background: The Society of Surgical Oncology and American Society for Radiation Oncology consensus guidelines defined a negative margin for breast-conserving surgery (BCS) as no ink on tumor, and implementation has reduced rates of additional surgery for patients with invasive ductal cancer (IDC). The outcomes for invasive lobular cancer (ILC) patients are uncertain. Methods: This study identified patients who had stage 1 or 2 ILC treated with BCS from January 2010 to February 2018. The guidelines were adopted 1 January 2014. Clinicopathologic characteristics, margin status, and reexcisions were compared before and after adoption of the guidelines and with those of IDC patients treated from May 2013 to February 2015. Results: Among 745 early-stage ILC patients undergoing BCT, 312 (42%) were treated before the guidelines and 433 (58%) after the guidelines. Most clinicopathologic characteristics were similar between the two groups, with differences in lobular carcinoma in situ, lymphovascular invasion, and node-positivity rates. The overall rates of additional surgery declined significantly after the guidelines (31.4 to 23.1%; p = 0.01), but the difference did not reach significance for reexcisions (19.9 to 15.2%; p = 0.12) or conversions to mastectomy (11.5 to 7.9%; p = 0.099) individually. Between eras, no difference in incidence or number of tumor on ink or ≤ 2 mm margins was observed (all p = 0.2). Larger tumors, younger age, and pre-guideline era were independently associated with additional surgery. Only younger age was predictive of mastectomy. Among 431 pre-guideline and 601 post-guideline IDC patients, reexcisions declined from 21.3 to 14.8% (p = 0.008), and conversion to mastectomy was rare (0.6%). The magnitude of reduction in any additional surgery (interaction, p = 0.92) and reexcisions (interaction, p = 0.56) was similar between ILC and IDC. Conclusions: Despite differences in growth pattern and conspicuity, guideline adoption significantly reduced additional surgery among ILC patients, with a magnitude of benefit similar to that among IDC patients.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

International Linear Collider Physics and Detectors (2011 Status Report)

The studies of physics and detectors for the International Linear Collider are an important parallel element to the effort for the ILC Technical Design Report. The studies comprise the physics opportunities, detector requirements, and detector development to achieve the challenging high performance demanded by the physics, as well as integration of detectors into the accelerator. The current phase of this effort began with a call for Letters of Intent (LOIs) in 2007 and will lead to the submission of Detailed Baseline Design (DBD) report together with the ILC Technical Design Report at the end of 2012. Here we summarise the current status of this process, review what it has accomplished and identify the work that still needs to be completed. This report, titled International Linear Collider Physics and Detectors: 2011 Status Report, does just this. This report begins with a discussion of the outstanding issues in physics that motivate the construction of the ILC. It describes the organisation of the LOI process, the validation of the LOIs by the International Detector Advisory Group, and the results of R&D carried out to support the detector designs. The details of the concept detectors have already been published in the LOIs, which were completed in 2009. This report will, in a complementary way, describe the status of the detector R&D for each individual detector component and the status of the physics simulation infrastructure that has been built for the detector design process. Much of this work is carried out in cooperation between the two detector concept groups. This report describes the five common task groups and two working groups that have organised these cooperative activities. Many members of the detector concept groups and the common task groups have contributed to this report. Many more people have carried out the actual work that is reviewed. The complete list of members of each detector concept group can be found from the author lists of the published LOIs. The members of the ILC physics and detector organisation are listed at the end of this document. As we are now nearing the completion of the DBD phase, we are also entering a new stage of our preparation process. The experiments at the Large Hadron Collider at CERN, Switzerland, are accumulating data and are extending our knowledge of the physics of the teraelectronvolt energy scale. The LHC results may confirm the standard model of electroweak symmetry breaking or they may deliver something completely new. In either case, we believe, the ILC will be critical to resolve the questions that the LHC programme will bring forward. In any scenario, we will need very high-quality detectors and excellent technical and simulation capabilities. This report describes the status of our work in pursuit of that goal.

Brau, James E.↗

Project X Accelerator R&D Plan

Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R&D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H{sup -} stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10{sup 13} H{sup -} ions delivered per pulse. H{sup -} are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10{sup 14} protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds, producing approximately 2.3 MW of beam power at 120 GeV. At lower proton energies Main Injector cycle times can be shorter, allowing a beam power above 2 MW in the range of proton energy between 60 GeV and 120 GeV. In parallel, because the loading of the Recycler only requires 0.6 seconds, up to four linac cycles are available for accumulation and distribution of 8 GeV protons from the Recycler. Total available 8 GeV beam power lies in the range of 100-200 kW, depending on the energy in the Main Injector. Primary modifications to the existing accelerator complex to support Project X include integration of an H{sup -} injection system, a new RF system, a new extraction system, and measures to mitigate electron cloud effects, in the Recycler Ring. The Main Injector would need a new RF system, measures to preserve beam stability through transition, and measures to mitigate electron cloud effects. Finally, substantial modifications to the existing NuMI target station will be required to support >2 MW operations. It is anticipated that Project X configured as described above would initially support high intensity neutrino beams to the NOvA experiment, in parallel with at least one new 8 GeV based flavor/rare decay experiment. Depending upon future directions flexibility is retained for delivering neutrinos toward the DUSEL site and/or protons into the Tevatron. The purpose of this document is to describe an R&D plan that would position the U.S. to initiate construction of Project X in the 2012 time frame, assuming a go ahead decision in roughly 2010. The organization of this document is as follows: (1) Goals - Describes goals of the R&D and preliminary design period (2008-2011). Included are design, technical development, project documentation, and organizational goals. These are described in the context of an overall set of performance goals for Project X. (2) R&D Plan Elements - Describes the essential technical elements of the plan, including major subsystem performance requirements, associated accelerator and technology issues, and the plans for addressing these issues. (3) R&D Plan - Describes how the plan elements are assembled into a time-ordered plan, defines the associated resources required to support this plan, and describes the alignment of activities undertaken within the Project X, SRF/ILC, and HINS programs. Also describes how the R&D plan will be organized and executed by the prospective participating institutions.

43 PARTICLE ACCELERATORS↗