Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

FEDERAL SECTOR METERING AND ENERGY DATA MANAGEMENT

Conference paper for West Coast Energy Management Congress regarding the Federal Building Metering Guidance, subsequent metering implementation plans, and the next steps for Federal agencies.

data management↗

An Overview of the United States Department of Energy's Nuclear Criticality Safety Program and Future Challenges

The United States (US) Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Criticality Safety Program (NCSP) was formally established in January 1998 as part of the Defense Nuclear Facility Safety Board (DNFSB) Recommendation 97-2 implementation plan. The NCSP was initially focused on seven NCSP tasks: Critical Experiments, Benchmarking, Analytical Methods, Nuclear Data, Training and Qualification, Information Preservation and Dissemination, and Applicable Ranges of Bounding Curves and Data. The first NCSP 5-year plan was published in August 1999. Now, more than 20 years later, NCSP continues to serve the United States and the nuclear criticality safety (NCS) community around five technical program elements (TPEs): Analytical Methods, Information Preservation and Dissemination, Integral Experiments, Nuclear Data, and Training and Education. NCSP has three chartered support groups, the Criticality Safety Support Group, the Nuclear Data Advisory Group, and the DOE Criticality Safety Coordinating Team, all of which provide technical advisement to the NCS community, to DOE, and to the NCSP manager. NCSP has a comprehensive mission and vision document that provides technical and budget priorities for TPE attributes and goals to ensure that the needs of the NCS community and DOE NCS are prioritized appropriately to meet the goals defined by the 1998 DNFSB recommendation. Like any DOE/NNSA program, NCSP faces significant challenges in the future that involves program funding, rising nuclear facility costs, aging critical assembly infrastructure, knowledge retention, and other issues. This paper discusses NCSP and provides some insights into these and other challenges moving into the future.

Bowen, Douglas G.↗

INL High-Performance and Sustainable Building Strategy

High-performance buildings are reliable, cost-effective, and sustainable structures that minimize energy and water use, reduce solid waste and pollutant emissions, and limit the depletion of natural resources while also providing a thermally and visually comfortable working environment that increases productivity for building occupants. As Idaho National Laboratory (INL) is the nation’s premier nuclear energy research laboratory, the physical infrastructure requires continual updating and re-purposing to help accomplish that mission. INL’s infrastructure must incorporate high-performance sustainable design features to be fiscally responsible and reflect an image of innovation to the public and prospective employees. INL is a large consumer of energy with annual energy costs exceeding $9M. In the current fiscal reality and with energy costs constantly increasing, this High-Performance and Sustainable Building Strategy will help engineering and construction project teams design facilities that are sustainable and will help to reduce life-cycle operating costs while providing INL employees with a safe and healthy working environment. With these goals in mind, the recommendations described in this document are intended to form INL’s foundation for sustainable and high-performance building standards. This strategy incorporates the latest federal and Department of Energy (DOE) orders and directives including Executive Order (EO) 13834, “Efficient Federal Operations” and its associated implementing instructions, DOE Order 436.1, “Departmental Sustainability,” the DOE Sustainability Report and Implementation Plan (SRIP), the INL Site Sustainability Plan (SSP), and Code of Federal Regulations (CFR). This document identifies the requirements of the Guiding Principles for Sustainable Federal Buildings (Guiding Principles) and briefly highlights the requirements of Leadership in Energy and Environmental Design (LEED®) Gold certification. LEED Gold certification, while optional, can be used to meet many of the requirements of the Guiding Principles.

13834↗

Key Accomplishments & Results: Sustainable Wastewater Infrastructure of the Future

This fact sheet summarizes the key accomplishments and results from DOE's Better Buildings Sustainable Wastewater Infrastructure of the Future (SWIFt) Accelerator. The Accelerator was a 3-year effort between DOE and state and local jurisdictions to promote energy data management practices in wastewater operations in an effort to increase energy efficiency in wastewater facilities around the country. Accelerator participants shared implementation plans, and DOE combined the results into a final toolkit.

wastewater, water resource recovery facilities, en↗

Summary of Workshop on Common Neutrino Event Generator Tools

A neutrino community workshop was held at Fermilab in Jan 2020, with the aim of developing an implementation plan for a set of common interfaces to Neutrino Event Generators. This white paper summarizes discussions at the workshop and the resulting plan.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

How to Flatten the Earth?

Since the passage of the Geospatial Data Act (GDA) in 2018, federal agencies, including the Department of Energy (DOE), have been working to ensure compliance and outline guidance for the geospatial datasets and affiliated products publicly released from their agencies. At DOE this sparked work to develop a geospatial data management strategy and implementation plan; both of which spotlighted the need for the agency to set preferred guidance for the agency to use to inform the release of any public facing geospatial data and products. One of the immediate needs was set around establishing preferred guidance for coordinate systems, given the foundational role they play in all geospatial data, as they help reference data to the earth. DOE’s Geospatial Information Officer (GIO) and the Geospatial Sciences Steering Committee (GSSC) worked together to summarize best practices and current DOE uses to outline recommendations for coordinate systems to use for public geospatial data and products. This poster summarizes the role of coordinate systems, trends in coordinate system use from across the Department that were used to set preferred guidance for the Department to consider when releasing public-facing geospatial data and products.

Bauer, Jennifer↗

Lower Three Runs Remediation Safety Preparation Strategy - 13318

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina that contains six primary stream/river systems. The Lower Three Runs Stream (LTR) is one of the primary streams within the site that is located in the southeast portion of the Savannah River Site. It is a large blackwater stream system that originates in the northeast portion of SRS and follows a southerly direction before it enters the Savannah River. During reactor operations, secondary reactor cooling water, storm sewer discharges, and miscellaneous wastewater was discharged and contaminated a 20 mile stretch of Lower Three Runs Stream that narrows and provides a limited buffer of US DOE property along the stream and flood-plain. Based on data collected during the years 2009 and 2010 under American Recovery and Re-investment Act funding, the stream was determined to be contaminated with cesium-137 at levels that exceeded acceptable risk based limits. In agreement with the Environmental Protection Agency and the South Carolina Department of Health and Environmental Control, three areas were identified for remediation [1] (SRNS April 2012). A comprehensive safety preparation strategy was developed for safe execution of the LTR remediation project. Contract incentives for safety encouraged the contractor to perform a complete evaluation of the work and develop an implementation plan to perform the work. The safety coverage was controlled to ensure all work was observed and assessed by one person per work area within the project. This was necessary due to the distances between the fence work and three transects being worked, approximately 20 miles. Contractor Management field observations were performed along with DOE assessments to ensure contractor focus on safe performance of the work. Dedicated ambulance coverage for remote worker work activities was provided. This effort was augmented with access to medical evacuation services. The areas where the work was performed were remote and difficult to get emergency vehicles to in a timely manner in case of an accident. Satellite phones were utilized due to intermittent phone coverage. High visibility vests were utilized to enable any hunters in the area to see the workers; due to the limited buffer areas along the stream route. An innovative approach to providing the necessary protection for workers during periods of extreme heat and humidity was also employed, which included the use of 'heat islands' with fans and crew trailers and ice vests for workers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying mobile technology to data collection for environmental characterization and remediation, beyond the science - 15453

The rapid advancements of our time bring us new methods of analysis that enhance the accuracy and sensitivity of measurement, improving the science used to solve problems and meet our objectives. What is often overlooked in our industry are the technology advancements that can dramatically improve the speed, accuracy and completeness by which those data can be collected, communicated, managed and reported. In addition, in the time used to generate and collect the analytical data, the technology collects, manages and reports other process data that can be used to better manage and facilitate our business process improving efficiency and communications as well as providing the information needed to track and manage cost and schedule. Good information management practices, including the use of innovative technology solutions like mobile data collection, are the drivers for project implementation. However, experience has highlighted key success factors that will maximize the level of success and benefit realized by the project. These factors include: -A comprehensive, working knowledge of operational objectives; - Detailed, documented process and data work-flows; - Effective technology selection and/or development (right tool for the job); - Complete integration of the technology into day to day work practice accomplished through effective training and implementation planning. Once this formula is in place, and executed consistently, it can be applied to any environmental investigation and/or remediation scenario. The proof is in the calculated return on investment and captured lessons learned for each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stripline Block Sensor System

he Long Baseline Neutrino Facility requires remote handling of the stripline block, the component responsible for providing current to the focusing horns. There are many constraints due to the surroundings the modules reside in such as small clearances as well as a highly radioactive environment. Existing systems have already been implemented within the process; however, these systems offer limited information leaving much risk during operations. This calls for a sensor system that is sufficiently accurate, complies with project constraints, and provides valuable information throughout the replacement period. A proposed solution utilizes a three dimensional indoor positioning system to provide the operator with real-time positioning and rotational information. Future work would consist of finding vendors capable of providing technology that fits our constraints, proof of concept tests, implementation planning, as well as trails within the target hall itself. A three dimensional indoor positioning system would provide an incredibly diverse tool capable of being utilized in a variety of situations.

Espinoza, David↗

Distributed and Secure Spectrum Sharing for 5G and 6G Networks

Secure spectrum sharing or spectrum co-existence of multiple 5G networks and future 6G networks is a powerful enabler technology. The National Spectrum Strategy (NSS) published by the White House in November, 2023, and the subsequent NSS implementation plan led by the National Telecommunication and Information Administration (NTIA) is the driver of a national effort to enable co-existence of government incumbents and commercial networks in selected spectrum bands. Cellular networks such as 5G & 6G and non-cellular Wi-Fi 6E & 7 are the prominent wireless technologies considered for co-existence with incumbent wireless links. Security of the spectrum sharing solutions is a must to make this transformation of spectrum use possible, specially for mission critical communications. However, current spectrum sharing solutions rely on centralized data bases with inherent vulnerabilities. This paper focuses on secure spectrum sharing among multiple 5G networks using unlicensed and shared frequency bands. It presents an innovative AI/ML based distributed spectrum sharing approach that can be autonomously used by multiple networks. Each sharing network uses its own observation of the Radio Frequency (RF) environment, which consists of RF measurements reported from the 5G User Equipment (UE), to adjust the transmission power levels for secure co-existence. Data is presented to illustrate the superior performance of this solution compared to other spectrum sharing solutions where each network can utilize usage data of the other networks. Finally it discusses how this efficient spectrum sharing solution can evolve in the future for the 6G networks.

5G↗

Stripline Block Sensor System

The Long Baseline Neutrino Facility requires a secondary sensor system to aid in the installation and replacement of the stripline blocks. These blocks are responsible for delivering large amounts of current to the horn and must be installed with high precision to avoid possible physical damage. There are many constraints due to the modules' surroundings, such as small clearances and a highly radioactive environment. Existing systems have already been implemented within the process; however, these systems offer limited information, leaving much risk during operations. This calls for a sufficiently accurate sensor system, which has a small space requirement and provides valuable information throughout the replacement period. A variety of methods and technologies were explored to provide an applicable approach to the issue. The proposed solution consisted of the use of retroreflective and target, however, it cannot provide positional feedback throughout the entire process. A proposed alternative utilizes a three-dimensional indoor positioning system to provide the operator with real-time positioning and rotational information. Sensors placed on the module and stripline would communicate with fixed receivers surrounding the target hall to provide precise positional feedback. However, this solution may still contain line-of-sight issues as well as installation complications due to the radioactive environment. Future work would consist of finding vendors capable of providing technology that fits our constraints, proof of concept tests for both solutions, implementation planning, and trials within the target hall itself. Due to its ability to provide continuous positional and rotational feedback, the indoor positioning system is the most suitable solution for accurately installing the stripline block.

Espinoza, David [Unlisted, US]↗

A state-impact-state methodology for assessing environmental impact in land use planning

The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level.

54 ENVIRONMENTAL SCIENCES↗

Planning for Future Implementation of Section 180(c) of the Nuclear Waste Policy Act: DOE's Policy Implementation Exercise - 16612

The Department of Energy (DOE) Office of Nuclear Energy, Nuclear Fuels Storage and Transportation Planning Project (NFST) is currently conducting a 2-year Section 180(c) Proposed Policy Implementation Exercise (the Exercise) with eight states and one Native American Tribe. Under Section 180(c) of the Nuclear Waste Policy Act of 1982 (NWPA), as amended, the DOE is responsible for providing technical and financial assistance to states and Tribes through whose jurisdictions the Secretary of Energy plans to transport spent nuclear fuel (SNF) or high-level radioactive waste to a NWPA-authorized facility for training of local public safety officials. In the 2000's, DOE staff worked closely with state and tribal representatives to develop a revised proposed policy to implement Section 180(c), including grants for assessment and planning activities, as well as training for public safety officials. This revised proposed policy was published in a Federal Register Notice in 2008 (2008 FRN) (73 Federal Register 64933, Oct. 31, 2008). The purpose of the current Exercise is to evaluate the efficacy of DOE's 2008 revised proposed policy for implementing Section 180(c), and identify and resolve outstanding issues. This paper describes how the Exercise was collaboratively designed between DOE and state and tribal stakeholders; how it is being conducted; the interim lessons learned from the first year of the Exercise; and how it may inform and improve future consultations between DOE and state, tribal, and local public safety officials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consideration for Implementing the Safety Regulation Plans on Permanent Shut-own NPP during Transition Period in Korea

Recently the Korean regulatory body has been reviewing the change of permission on permanent shutdown Kori NPP (Nuclear Power Plant) unit 1, since the licensee (KHNP, Korea Hydro and Nuclear Power Co. Ltd) decided the permanent shut-down in June 2015 and applied the amendment of its licensing basis documents in June 2016. Although our institute with technical authority, the KINS (Korea Institute of Nuclear Safety), had performed the peer reviews for the construction permits of 3 NPPs and operating licenses of 25 NPPs, the safety control of permanent shut-down NPP and the transition activities including deactivation and decommissioning preparation are still in early stages and challenging fields. Currently the operation/only-possession system under defueled condition were defined through the peer review of fully revised documents and the major issues which concerned with the rearrangement of safety class or function based on new accident analysis results were produced. And also various transition activities were drawn as reflecting the decommissioning strategy on Kori unit 1. In this study, we described the status and problem of safety regulation based on our subordinate statute for permanent shut-down and transition activities. And then the detail implementation plans or the alternatives will be provided and discussed in order to solve the lack of regulatory experience and guide.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The MARSAME Methodology: Fundamentals, Benefits and Applications - 12135

MARSAME is an acronym for the 'Multi-Agency Radiation Survey and Assessment of Materials and Equipment'. Published in January 2009, MARSAME was a joint effort between the U.S. Department of Energy (DOE), the U.S. Department of Defense, the U.S. Department of Energy, and the U.S. Nuclear Regulatory Commission (NRC) to aid sites in the clearance of materials and equipment (M and E). The MARSAME manual supplements the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM), published in 1997. As cited in the MARSAME, applicable M and E includes metals, concrete, tools, equipment, piping, conduit, and furniture. Also included are dispersible bulk materials such as trash, rubble, roofing materials, and sludge. Solids stored in containers, as well as liquids and gases, represent additional M and E. The MARSAME methodology covers multiple technical areas, including the initial assessment (IA), Measurement Quality Objectives (MQOs), survey approaches and considerations, survey plans, survey implementation, and Data Quality Assessment (DQA). These topics are generally captured under four phases of the data life cycle, which are Planning, Implementation, Assessment, and Decision-Making. Flexibility and a graded approach are inherent components of the MARSAME methodology pertaining to M and E property clearance programs. Because large quantities of M and E potentially affected by radioactivity are present in the United States, owners of the M and E need to identify acceptable disposition options. Thirteen disposition options, broadly defined under both release and interdiction scenarios, are described in MARSAME. Nine disposition options are listed for release; these options are categorized into two for reuse, two for recycle, four for disposal, and one that is essentially 'status quo' (i.e., maintain current radiological controls). Four interdiction options are also cited. To date, applications of the MARSAME approach for M and E property clearance under reuse scenarios have been limited. However, this should change as familiarity increases. Known examples are provided from DOE-contractor and NRC-licensee facilities. If the methodology is appropriately planned and implemented, the benefits of the MARSAME approach include worker and public protection, reduction in the amount of disposed radioactive waste, reuse of materials (resulting in environmental and material sustainability advantages), and cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dosimetry of an In-Line Kilovoltage Imaging System and Implementation in Treatment Planning

Purpose: To present the beam properties of the Siemens 70-kV and 121-kV linear accelerator-mounted imaging modalities and commissioning of the 121-kV beam in the Philips Pinnacle treatment planning system (TPS); measurements in an Alderson phantom were performed for verification of the model and to estimate the cone-beam CT (CBCT) imaging dose in the head and neck, thorax, and pelvis. Methods and Materials: The beam profiles and depth–dose curve were measured in an acrylic phantom using thermoluminescent dosimeters and a soft x-ray ionization chamber. Measurements were imported into the TPS, modeled, and verified by phantom measurements. Results: Modeling of the profiles and the depth–dose curve can be achieved with good quality. Comparison with the measurements in the Alderson phantom is generally good; only very close to bony structures is the dose underestimated by the TPS. For a 200° arc CBCT of the head and neck, a maximum dose of 7 mGy is measured; the thorax and pelvis 360° CBCTs give doses of 4-10 mGy and 7-15 mGy, respectively. Conclusions: Dosimetric characteristics of the Siemens kVision imaging modalities are presented and modeled in the Pinnacle TPS. Thermoluminescent dosimeter measurements in the Alderson phantom agree well with the calculated TPS dose, validating the model and providing an estimate of the imaging dose for different protocols.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-F-T-48: Clinical Implementation of Brachytherapy Planning System for COMS Eye Plaques

Purpose: To commission the Brachytherapy Planning (BP) system (Varian, Palo Alto, CA) for the Collaborative Ocular Melanoma Study (COMS) eye plaques by evaluating dose differences against original plans from Nucletron Planning System (NPS). Methods: NPS system is the primary planning software for COMS-plaques at our facility; however, Brachytherapy Planning 11.0.47 (Varian Medical Systems) is used for secondary check and for seed placement configurations not originally commissioned. Dose comparisons of BP and NPS plans were performed for prescription of 8500 cGy at 5 mm depth and doses to normal structures: opposite retina, inner sclera, macula, optic disk and lens. Plans were calculated for Iodine-125 seeds (OncoSeeds, Model 6711) using COMS-plaques of 10, 12, 14, 16, 18 and 20 mm diameters. An in-house program based on inverse-square was utilized to calculate point doses for comparison as well. Results: The highest dose difference between BP and NPS was 3.7% for the prescription point for all plaques. Doses for BP were higher than doses reported by NPS for all points. The largest percent differences for apex, opposite retina, inner sclera, macula, optic disk, and lens were 3.2%, 0.9%, 13.5%, 20.5%, 15.7% and 2.2%, respectively. The dose calculated by the in-house program was 1.3% higher at the prescription point, and were as high as 42.1%, for points away from the plaque (i.e. opposite retina) when compared to NPS. Conclusion: Doses to the tumor, lens, retina, and optic nerve are paramount for a successful treatment and vision preservation. Both systems are based on TG-43 calculations and assume water medium tissue homogeneity (ρe=1, water medium). Variations seen may result from the different task group versions and/or mathematical algorithms of the software. BP was commissioned to serve as a backup system and it also enables dose calculation in cases where seeds don’t follow conventional placement configuration.

60 APPLIED LIFE SCIENCES↗