Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Performance Considerations for Ground Source Heat Pumps in Cold Climates: Preprint

Remote, cold climates present challenges to finding safe and affordable options to heat homes. In Alaska, residential ground source heat pumps (GSHPs) have been gaining in popularity to fill this gap. However, there is little research on their long-term performance or effect on soil temperatures. The extended heating season and cold soils of Alaska provide a harsh testing ground for GSHPs, even those designed and marketed for colder climates. The large and unbalanced heating load of cold climates creates a challenging environment for GSHPs. In 2013 the Cold Climate Housing Research Center (CCHRC) installed a GSHP at its Research and Testing Facility (RTF) in Fairbanks, Alaska. The heat pump replaced an oil-fired condensing boiler heating a 464 m2 office space via an in-floor hydronic radiant heating system. The ground heat exchanger (GHE) was installed in moisture-rich silty soils underlain with permafrost near 0°C. The intent of the installation was to observe and monitor the system over a 10-year period in order to develop a better understanding of the performance of GSHPs in sites with permafrost and to help inform future design. As of this writing, the heat pump system has been running for seven heating seasons. The efficiency in those seven heating seasons has been variable with ups and downs that have been difficult to explain. This paper seeks to understand the variability in performance as well as make recommendations for GSHP use in other cold climates.

cold climate↗

Utah FORGE Project 3-2417: Meteorological Data During 2023 Completion/Circulation

This preliminary data archive includes meteorological data recorded at the Utah FORGE facility over the period of time including the completion/cementing of well 78-16B and the initial 2023 circulation test, largely occurring in June/July/August of 2023. This information may prove useful for understanding seismic and other instrumentation responses during these activities. The meteorological station was installed June 23rd, 2023 during drilling; the circulation test occurred in mid July of 2023 (July 4-19). The included files span this period. All sensors were installed at the 16 pad and hence reflect weather state at the site. This dataset was acquired by the FOGMORE R&D project (Fiber Optic MOnitoring for Reservoir Evolution), Utah FORGE R&D Project 3-2417.

15 GEOTHERMAL ENERGY↗

Hybrid Solar System (Final Scientific/Technical Report)

GTI Energy (GTI) teamed with the University of California at Merced (UCM) to scaleup the hybrid solar system (HSS) technology for demonstrating its performance at the US Gypsum (USG) plant in Plaster City, California. The technology integrates two-stage concentrating solar collector with matching particle thermal transport and storage (TSS) system to deliver cost-effective, and on-demand distributed high temperature industrial process heat up to 600°C with solar thermal, in this case to a gypsum kettle, to reduce its fuel use and carbon footprint. Current solar technologies, which reach these temperatures, are not distributable (towers) or cost-effective (dish). The research team developed a conceptual system design for host site retrofit, including preliminary heat balance, process flow diagram, particle to process heat exchanger and equipment placements at the site. Subsequently, parallel efforts were carried out at UCM to design, build and test a 12 m long commercial scale prototype concentrating thermal-only collector system and at GTI to design, build and test a matching 650°C capable particle TTS system. The nominal 50 kWth collector consists of a parabolic trough and three 4 m long two-stage receivers in series. Prior to on-sun testing, a 4 m long receiver was fabricated and successfully tested at 650 °C in a laboratory setting for 100 hrs of continuous operation showing less than 15% radiation loss. A 7 m wide x 17 m long parabolic trough was then installed at UCM for on-sun testing of the 12 m long receiver, and concurrently several 4 m long receivers were built. The optics of the parabolic trough were calibrated, and on-sun test were carried out on 12 m long receivers. During tests, the intense solar radiation (53x) caused the absorber tubes in the receivers to bend, reducing the overall optical efficiency. To address the bending issue, a self-consistent algorithm that includes ray tracing, thermal and deformation models was developed to perform thermal stress analysis on absorbers for parabolic solar collectors. Results obtained with this algorithm showed a dramatic rise in deformation as absorber tube length increases. A combined efficiency parameter that includes the occluded area for the mounts was developed to obtain an optimized tube length obtained. Based on the results, a length of 2.7 m for the absorber + 0.2 m for the coupler was chosen to minimize any bending and optimize optical efficiency while maintaining ease of mounting. The associated particle TTS system was designed, built and successfully tested at GTI. It includes storage, receiving and lock hoppers and piping that simulates the transfer of captured solar energy to an actual industrial furnace. Tests over 77 charge-discharge cycles demonstrated <2% particle degradation, with no problematic particle accumulations and no flow interruptions. The piping pressure drop was about 5 psi. The team also worked with Stanley Consultants (Stanley) to prepare conceptual and preliminary engineering packages to facilitate follow-on development and commercialization efforts. These include process and instrumentation diagram’s (P&ID’s), general arrangements, electrical one-line, project definitions document, equipment data sheets, schedule, and construction cost estimate for 2 MWth system. Updated HSS technology commercialization and customer engagement plans and detailed costs and evaluated market trade-offs and manufacturing.

03 NATURAL GAS↗

Advanced HVAC Humidity Control for Hot-Humid Climates

During this project we develop and validate a cost-effective, integrated control solution to improve humidity control and comfort for energy-efficient homes in hot-humid climates. This study focuses on developing a strategy that is effective, field tested, and practical for builders to install with minimal disruption to standard practices. A successful solution would simplify the transition to high-performance humidity control and be the basis for design and installation guidance. By relying on the central system as a starting point, the strategy employed minimizes system complexity and cost for builders, while improving comfort and operating cost for homeowners. The solution strategy was to coordinate the cooling, dehumidification, and ventilation functions of central, ducted HVAC systems to better control indoor humidity, improve occupant thermal comfort, and capture energy savings. The primary strategic goals were to: (1) optimize dehumidification by the central air-conditioning system, particularly during part-load conditions, using conventional equipment with modified control settings and lower system airflows; (2) maximize ventilation during heating/cooling on-cycles, to “bank” and condition outdoor ventilation air, and minimize ventilation during off-cycles; (3) quantify the effectiveness and energy impact of the dehumidification and ventilation strategies, while identifying a metric that would be useful to evaluate latent effectiveness. For the test houses in our study, located in Richmond Hill, Georgia; Houston, Texas; and Monroe, Louisiana we observed: (1) the indoor humidity did not exceed 60% RH during the monitored cooling season for 99% of the time in Richmond Hill, 96% of the time in Houston, and 90% of the time in Monroe; (2) the dehumidification strategy improved the steady-state latent capacity of the HVAC system at design conditions by 16% to 49% at the Houston test house and by 28% to 71% at the Monroe test house, depending on which mode the system was operating in; and (3) the good results at the test houses were primarily due to the amount of time the air-conditioning system operated in ramping or dehumidification modes, or both, particularly during the early cooling season. This study demonstrates that air conditioners or heat pumps with a single-stage compressor can provide good humidity control without the need for a two-stage or variable-stage compressor system. The airflow and control settings for ramping and dehumidification modes are critical to control indoor humidity in hot-humid climates, particularly during part-load and shoulder season conditions. The dehumidification strategy used in this study did not jeopardize the mechanical reliability of the cooling equipment. The strategies used in this study are applicable across various equipment brands, models, and efficiency levels, and also applicable to a broad range of homes in hot-humid climates. Results will vary by specific equipment, location, and house configuration and construction.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Acetonitrile Destruction and Fate of Organics in the Reverse Osmosis System at the ETF

The Hanford Site Effluent Treatment Facility (ETF) currently treats aqueous waste streams that include condensates from the 242-A evaporator, leachate from the Environmental Restoration Disposal Facility (ERDF), as well as laboratory wastes and, in the future, will treat liquid effluents from the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and Integrated Disposal Facility (IDF) leachate. Liquid effluents from the WTP will have significant concentrations of acetonitrile. Acetonitrile is formed by reaction of nitrates and sugar in the WTP low activity waste (LAW) melters and is prevalent in the submerged bed scrubber (SBS) and wet electrostatic precipitator (WESP) liquid effluents from WTP off-gas treatment. When these liquids are concentrated in the WTP Effluent Management Facility (EMF) evaporator in the direct feed low activity waste (DFLAW) flow-sheet, testing has shown that the majority of the acetonitrile partitions to the evaporator condensate. Since the evaporator condensate is directed to the ETF, this creates a potential issue with the ETF waste acceptance criteria. Consequently, there is a need to validate flow-sheet assumptions on the fate of acetonitrile and other organics within the ETF. The present plan includes the addition of a steam stripper to the ETF to remove acetonitrile. There is, therefore, also a need to determine a suitable method to destroy acetonitrile in the overhead condensate stream from the new steam stripper. Washington River Protection Solutions, LLC (WRPS) previously contracted with Atkins and the Vitreous State Laboratory (VSL) of The Catholic University of America (CUA) to perform development and testing work to evaluate potential methods for destruction of acetonitrile in WTP secondary liquid effluents. Based on the results of that work, WRPS requested that follow-on testing be conducted to further evaluate acetonitrile destruction in the steam stripper condensate using ultraviolet oxidation (UV/OX) with persulfate. WRPS also requested testing to assess the rejection rate of organics in the reverse osmosis (RO) system installed in the ETF. This report presents the results from testing to address those needs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test cavity and Iris-to-Coax transition for tuning and high-power verification of SNS DTL iris couplers

The Spallation Neutron Source (SNS) Drift Tube Linac (DTL) employs iris couplers to efficiently deliver RF power into the accelerating structure. To support the development, tuning, and high‑power conditioning of these couplers prior to installation in the actual DTLs, a dedicated test cavity and an iris‑to‑coaxial transition structure have been designed. This work presents the electromagnetic design, simulation, and optimization of the test setup, enabling precise characterization of the iris coupler’s performance. The transition structure allows for tuning of the iris opening dimensions without requiring a waveguide taper or full‑size waveguide transitions, while maintaining impedance matching between the coaxial feed and the iris geometry to minimize reflection and power loss. During low‑power tests, the iris opening di-mensions can be evaluated using the iris‑to‑coax transi-tion attached to the test cavity. For high‑power condi-tioning, full‑size waveguides with ceramic vacuum win-dows are connected to the test cavity to replicate opera-tional conditions. Key design parameters were optimized using computer-aided simulation, and sensitivity studies were conducted to assess the impact of mechanical toler-ances on RF performance. The resulting test platform provides a reliable and efficient means for tuning and validating iris couplers, contributing to improved opera-tional stability in the SNS DTL.

Lee, Sung-Woo [ORNL] (ORCID:000000030915835X)↗

A Multi-Sensor Approach for Measuring Bird and Bat Collisions with Offshore Wind Turbines (Final Technical Report)

Collision of birds and bats with wind turbines is a conservation concern for both land-based and offshore wind projects. The fatality rates of birds and bats at land-based turbines are well documented. The measurement strategies on land focus on finding carcasses following collision, estimating the number of carcasses missed through searcher efficiency, carcass persistence trials and carcass fall distributions, and modeling statistically robust fatality rates. Few technologies have been developed to monitor offshore bird and bat collisions, and many that have been developed focused on detecting collisions with large birds. The few studies that have attempted to document collisions at offshore turbines do not account for smaller bodied animals or for collisions that might be missed, which prevents the calculation of statistically robust fatality rates. The overall goal of this report, A Multi-Sensor Approach for Measuring Bird and Bat Collisions with Offshore Wind Turbines (Project), was to develop an effective multi-sensor system for quantifying bird and bat collision rates, specifically for offshore wind facilities. The Project goal and resulting automated collision detection system was achieved through two major technological advancements: 1) refining The Netherlands Organisation for Applied Scientific Research’s (TNO’s) existing WT-Bird® vibration sensing system, that had successfully detected large bird collisions during daytime, to allow for improved detection of smaller birds and bats during both daytime and nighttime hours and 2) improving image processing systems and developing and integrating machine learning algorithms to automatically detect and classify small and large bird and bat collisions with offshore turbines. This final technical report (FTR) summarizes Methods , Results , Conclusions , and Lessons Learned during each of the five Tasks identified for this research and development effort. This FTR includes summaries of the following: Task 1. Initial Engineering Tests to Improve WT-Bird® Task 2. Installation of WT‐Bird® on a Utility-scale Turbine at the National Wind Technology Center – National Renewable Energy Laboratory Task 3. Field Tests and Refinement of the Object Detection System Task 4. Validation of WT-Bird® on a Land-based Turbine Task 5. Preparation for the Implementation of WT-Bird® on an Offshore Turbine. This research and development effort documented successful improvement of the WT Bird® collision detection system to detect small birds and bats, and WT-Bird® is the first collision detection system to validate results compared to land-based post-construction monitoring. The collision trials provide estimates of missed targets that can be used to estimate fatality rates, a significant improvement relative to other offshore collision monitoring systems. Advances were made in developing an edge-processing solution to reduce data storage requirements, which is important if the system is deployed for long periods of time at offshore turbines. The improved WT-Bird® system also provides an important option for wind operators on land or offshore who need to document specific details about when collisions occur, particularly efforts to further research on bat impact minimization, or when standard fatality searches are impractical (e.g. offshore) or inadequate (e.g. challenging locations on land).

17 WIND ENERGY↗

Introduction to MDSplus using Docker

With increased use of MDSplus comes an influx of new users. With them comes a need for more and better ways to learn the suite of tools that is MDSplus. Therefore, the MDSplus team continually evaluates new technologies to improve our software and user experience. To this end, we investigated Docker to determine if and how it could help new users understand MDSplus, make MDSplus easier to install, and allow us to easily test old/new versions. To achieve this, a set of Docker images and instructions have been developed. This paper will provide an overview of MDSplus, and detail the methods to create and use the Docker images. Additionally, we will explore the limitations of such an approach, and the recommended applications. The project where these Docker Images were built, along with the Demo is here: https://github.com/WhoBrokeTheBuild/DockerizedMDSplus https://hub.docker.com/r/whobrokethebuild/mdsplus The now official Docker Images are available here: https://github.com/MDSplus/Docker https://hub.docker.com/r/mdsplus/mdsplus

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Bringing Automated Fault Detection and Diagnostics Tools for HVAC&R Into the Mainstream

Heating, ventilation, and air-conditioning (HVAC) systems consume over 5 quads of energy annually, representing 30% of energy consumption in the U.S. commercial buildings. Additionally, commercial refrigeration (R) systems add about 1 quad to commercial buildings energy consumption. Most HVAC systems operate with one or more faults that result in increased energy consumption. Fault detection and diagnostics (FDD) tools have been developed to address this national issue, and many tools are commercially available. FDD tools have the potential to save considerable energy for an existing commercial rooftop unit (RTU) and refrigeration systems. These devices can be used for both retro commissioning and, when faults are addressed, continuous commissioning. However, there appears to be multiple market barriers for this technology. Although there are efforts to develop FDD tool standards, currently there are no standards and methods to define functions, capabilities, accuracy, and reliability of FDD tools in the field. Moreover, most of the commercial FDD tools have not been verified in the field independently. This paper presents a comprehensive approach for bringing HVAC FDD tools into the mainstream. The approach involves demonstrating ten commercially available FDD tools installed at ten different sites, independent testing and evaluation of the FDD tools, communication with various stakeholders, identifying and assessing market barriers, creating a process evaluation methodology, and assisting utility companies in developing incentive programs. Furthermore, the preliminary baseline results from the case study demonstrate how the use of an independent monitoring system (IMS) can be used for ground-truth in evaluating FDD tools in the field.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Experiences with Porting the FLASH Code to Ookami, an HPE Apollo 80 A64FX Platform

We present initial experiences with running the community simulation code FLASH, developed at the University of Chicago for multi-scale multi-physics applications, on Ookami, a technology testbed featuring the A64FX processor developed by Fujitsu. Our effort focused largely on running FLASH “right out of the box” to see which combinations of compilers and software implementations (e.g. MPI) allowed the code to run with minimal modification. FLASH was one application in a larger effort to deploy Ookami; it served as a test for different versions of newly installed software, and as a cornerstone for the FAQ page of the Ookami website. Here, we report on our results with different compilers and other software, along with our initial scaling results and attempts to utilize the A64FX’s SVE instructions and NUMA architecture. We found that FLASH readily ran with different compilers and MPI implementations, and showed the expected good scaling with no turning. However, more work must be done to fully take advantage of the A64FX’s architectural features and produce a significant speedup for FLASH on Ookami.

79 ASTRONOMY AND ASTROPHYSICS↗

Precipitation Trade Wind Cumuli within EUREC 4 A Field Campaign Report

The campaign Trades Cumuli Precipitation Initiation and Characterization (TCPIC) within the overarching Elucidating the Role of Clouds-Circulation Coupling in Climate EUREC 4 A campaign took place from 17 January 2020 to 20 February 2020, a total of 35 days. The campaign complemented the more extensive EUREC 4 A campaign focusing on cumulus clouds' role in the Earth's climate. TCPIC concentrated on understanding what triggers the onset and development of precipitation in trade wind cumulus clouds. The campaign requested the deployment of the U.S. Department of Energy Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF) roll, pitch, and heave (RPH) stabilization platform to stabilize two radars on the Maria S. Merian research vessel (RV). The advanced remote-sensing techniques from stabilized radars characterized the entire precipitation life cycle, from the formation of larger cloud drops to precipitation evaporating on its way to the surface. Retrievals of evaporation rates, to track how rain affects the trade wind boundary layer, will be based on the zenith-pointing Doppler observations collected from the stabilized micro rain radar (MRR). Figure 1 shows the instrumentation's deployment on the RV: we installed the AMF RPH stabilization platform and the radars on the uppermost deck (peil deck) of the ship. For installing the devices, we coordinated a test phase of the equipment on the Maria S. Merian RV from 25 to 29 October 2019 in Emden harbor, Germany. In this testing phase, we set up all the connections, tested how to mount the W-band and the micro rain radars firmly on the table, and experimented with guided movements of the table to test the resistance of the whole system. Figure 1 shows the final tests conducted in Emden with the stable platform and the radars mounted.

54 ENVIRONMENTAL SCIENCES↗

SPC-70791 Rev 0 MARVEL Inert Gas Subsystem, Secondary Coolant Management Subsystem, and Secondary Coolant Cover Gas Subsystem Tubing and Valve Specification

This specification covers the requirements and details for the selection, testing, cleaning, marking, shipping, inspection and installation (including welding) of the Inert Gas Subsystem, Secondary Coolant Management Subsystem, and Secondary Cover Gas Management Subsystem from the Valve Panel up to the classification division, the patch panel of the upper confinement. Including NaK, argon, eutectic gallium indium tin (eGaInSn), and helium fill tubing, valves, and hangers. These systems consist of the necessary straight lengths, elbows, reducers, fittings, tube connections, instrument taps, and valves called for by applicable drawings. All components shall be procured as ASME Section III Class 2 unless otherwise modified hereinafter. Pressure relief valves have been sized to prevent overpressure in the event there is full regulator flow. This is documented in ECAR-7365.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70792 Rev 0 MARVEL Primary Coolant Management Subsystem Tubing Specification

This specification covers the requirements and details for the selection, fabrication, testing, cleaning, marking, shipping, inspection and installation of the Inert Gas System, and Primary Coolant Management System. This applies to tubing from the upper confinement patch panel to the upper plenum, including NaK and argon fill tubing, valves, and hangers. These systems consist of the necessary straight lengths, elbows, reducers, fittings, tube connections, instrument taps, and valves called for by applicable drawings. All components shall be procured as ASME Section III Class 1.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Cesium Ion Exchange Testing Using Crystalline Silicotitanate with Hanford Tank Waste 241-AP-107

At the time of this testing, the Low-Activity Waste Pretreatment System (LAWPS) was to provide for the initial production of immobilized low-activity waste by feeding Hanford tank supernate from tank farms to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility for immobilization. Washington River Protection Solutions requested that Hanford tank waste collected from tank 241-AP-107 (hereafter called AP-107) be processed using conceived pretreatment steps (suspended solids removal by filtration, Cs removal by ion exchange) then vitrified. A small-scale test platform to demonstrate the solids filtration, Cs removal, and LAW vitrification was constructed and installed at Pacific Northwest National Laboratory. Bench-scale ion exchange testing with approximately 9 L of AP-107 supernate was conducted using crystalline silicotitanate (CST) ion exchange media. The IONSIV R9140-B CST was provided by Honeywell UOP, LLC in 2018 (Batch 2081000057). The ion exchange media was first tested with simulant and was previously described. This report describes the Cs ion exchange batch contact and column test results with the AP-107 tank waste. Batch contact testing helps to evaluate CST performance on tank waste supernate prior to processing it in the ion exchange columns. Batch contacts were performed with the waste at four Cs concentrations at a phase ratio of 200 (liquid volume to exchanger mass) with AP-107. The distribution coefficient (K d ) at the equilibrium condition of 8.57 µg Cs/mL (AP-107 feed condition) was determined to be 669 mL AP-107/g CST. With a CST bed density of 1.00 g/mL, this K d corresponded to a predicted 50% Cs breakthrough of 669 bed volumes (BVs). The Cs load capacity at the equilibrium feed condition was determined to be 7.5 mg Cs/g dry CST. The column testing was prototypic to the intended LAWPS operations in a lead-lag column format, although on a small-scale basis with 10-mL CST beds. The feed was processed downflow through the lead column and then through the lag column at ~2.2 BV/h. Loading continued until the lag column reached the WTP waste acceptance criteria (WAC) for receiving supernatant waste for vitrification (a function of the Na and 137 Cs concentrations). For AP-107, the WAC is 0.114% of the influent 137 Cs concentration; this required a Cs decontamination factor of 876. The Cs effluent from the lag column reached the WAC after processing ~410 BVs. To keep the subsequent product effluent below the WAC, a replacement lag column was prepared, the lead column was removed from service (after processing a total of 471 BVs), the lag column was put into the lead column position, and the replacement lag column was installed. Feed processing continued and after another ~290 BVs the Cs effluent from the lag column again exceeded the WAC. In both cases, the lead columns only reached 25% Cs breakthrough before removal. Although 50% Cs breakthrough was not reached, this value was estimated and averaged based on extrapolation of the loading curves (640 BVs) and agreed within 4% of the predicted 50% Cs breakthrough from batch contact test results (669 BVs). Table ES.1 summarizes the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimize the Autonomous Sensor Fish Device for Understanding Interactions of Aquatic Animals with Marine and Hydrokinetic and Hydro Systems (CRADA 476) Final Report

This project at the Pacific Northwest National Laboratory (PNNL) enhances our understanding of how aquatic life interacts with marine renewable energy (MRE) and hydropower systems through the development and testing of advanced sensor technology. The Marine Sensor Fish (MSF) and its smaller variants, the Sensor Fish Mini (SF Mini) and Flexible Sensor Fish (FSF), measure critical environmental stressors, such as shear forces, pressure changes, and strike impacts, that are essential for assessing the risks posed by energy devices, including tidal turbines, hydropower installations, and other MRE infrastructure. Rigorous field testing has shown that these tools are effective in capturing detailed data on turbulence, pressure variations, strike impacts, and other stressors near these devices, providing valuable insights into the conditions faced by aquatic species. Economically, these tools offer renewable energy developers a practical solution for streamlining environmental assessments and ensuring regulatory compliance, ultimately reducing costs associated with evaluating and mitigating ecological impacts. This research also benefits the public by promoting the growth of renewable energy sources that protect aquatic ecosystems, advancing both sustainable energy production and environmental stewardship.

13 HYDRO ENERGY↗

Feasibility of Using Additive Manufacturing to Produce Axial Flow Hydropower Turbine Housing, Runner, and Draft Tube

Oak Ridge National Laboratory (ORNL) worked with AMJET Turbine Systems, LLC (ATS), to demonstrate additive manufacturing of components for low head hydro turbine/generator applications. Several different types of additive manufacturing systems were used. Components were finished and assembled for testing in a turbine. However, one of the processes, Big Area Additive Manufacturing (BAAM),produced components that did not adequately perform due to persistent leaks that were caused by porosity in the parts produced. Therefore, the BAAM system was eliminated from contention. Vacuum infusion of rein into the parts eventually solved the porosity problem.Components were installed in anATS-8 turbine to be tested on the Keokuk Dam for operationally testing the unit.

13 HYDRO ENERGY↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗