Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Signal-Conditioning Amplifier Recorders

Signal-conditioning amplifier recorders (SCAmpRs) have been proposed as a means of simplifying and upgrading the Kennedy Space Center (KSC) Ground Measurement System (GMS), which is a versatile data-acquisition system that gathers and records a variety of measurement data before and during the launch of a space shuttle. In the present version of the GMS system, signal conditioning amplifiers digitize and transmit data to a VME chassis that multiplexes up to 416 channels. The data is transmitted via a high-speed data bus to a second VME chassis where it is available for snapshots. The data is passed from the second VME chassis to a high-speed data recorder. This process is duplicated for installations at two launch pads and the Vehicle Assembly Building (VAB). Since any failure of equipment in the data path results in loss of data, much of the system is redundant. The architecture of the existing GMS limits expansion or any modification to the system to meet changing requirements because of the cost and time required. A SCAmpR-based system is much more flexible. The basis of the simplification, flexibility, and reliability is the shifting of the recording function to the individual amplifier channels. Each SCAmpR is a self-contained single channel data acquisition system, which in its current implementation, has a data storage capacity of up to 30 minutes when operating at the fastest data sampling rates. The SCAmpR channels are self-configuring and self-calibrating. Multiple SCAmpR channels are ganged on printed circuit boards and mounted in a chassis that provides power, a network hub, and Inter-Range Instrument Group (IRIG) time signals. The SCAmpR channels share nothing except physical mounting on a circuit board. All circuitry is electrically separate for each channel. All that is necessary to complete the data acquisition system is a single master computer tied to the SCAmpR channels by standard network equipment. The size of the data acquisition system dictates the requirements for the specific network equipment.

Medelius, Pedro J.↗

Advanced Manufacturing Technologies (AMT): Additive Manufactured Hot Fire Planning and Testing in GRC Cell 32 Project

The objective of this project is to hot fire test an additively manufactured thrust chamber assembly TCA (injector and thrust chamber). GRC will install the additively manufactured Inconel 625 injector, two additively manufactured (SLM) water cooled Cu-Cr thrust chamber barrels and one additively manufactured (SLM) water cooled Cu-Cr thrust chamber nozzle on the test stand in Cell 32 and perform hot fire testing of the integrated TCA.

Fikes, John C.↗

Electric Vehicle Infrastructure Projection Tool (EVI-Pro)

This presentation includes results from the second California installment of EVI-Pro. Pursuant to California Assembly Bill 2127, evolving market and technology conditions warrant updating this statewide infrastructure assessment at least every two years. EVI-Pro has been updated to consider California's 2030 goal to have 5 million zero emission vehicles (ZEVs) on the road by 2030. CEC and NREL with the support of UC Davis and other state agencies, have set out to refine EVI-Pro to reflect increasing PEV market share, evolving vehicle and charging technology, and observed charging behavior.

ADVANCED PROPULSION SYSTEMS,ENERGY STORAGE↗

Space Nuclear Thermal Propulsion Critical Assembly Boron Worth Experiments

The Space Nuclear Thermal Propulsion (SNTP) project was an attempt to create a more powerful and more efficient rocket engine utilizing nuclear technologies. As part of this project a zero-power critical assembly referred to as SNTPCX was designed and installed at Sandia National Laboratories. The SNTP-CX was a light water moderated particle bed reactor utilizing highly enriched uranium fuel in the form of UC particles. The SNTP-CX performed 142 runs covering numerous experiments from the year 1989 to 1992. The program was canceled in 1994 as the nation’s priorities shifted. Now these experiments are being evaluated for use as criticality safety benchmarks. Nineteen of the 142 reactor runs were dedicated to a series of experiments to calculate the worth of the boron used in the light water moderator. This series of experiments has been selected for further evaluation as a critical benchmark for the International Criticality Safety Benchmark Evaluation Project (ICSBEP).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2023

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The focus of GTA has been to test larger radial spur gears sets machined from Inconel 718 along with a variety of bearing components that are to be used in the fuel handling machines built for use in pool-type sodium fast reactors. The testing in GTA also informs the design and material choices for the full-scale Gripper Test Assembly (GrTA) being developed by Argonne. To date, the Inconel 718 gears used in all six GTA experimental campaigns have completed over 23.2 million revolutions under various loads equivalent to approximately 37,156 simulated fuel assembly maneuvers (removal from and reinsertion to core) using a conventional height of a core assembly. While the heat treated and untreated tapered roller bearings and cylindrical pin thrust bearings used in the first five experimental campaigns have experienced mechanical or material failure after completing a range of fuel assembly maneuvers ranging from as early as 575 operations in Campaign #5 to 9800 operations in Campaign #1, Campaign #6 was the most successful campaign, achieving 22,563 maneuvers and was concluded before any catastrophic failure occurred. In this report we will present the results from the most recent campaigns, #5 and #6. The longevity of Campaign #6 was likely aided by a variety of adjustments made to the materials and components used and to the experimental testing procedures employed. In terms of materials and components, new gearboxes were fabricated, as opposed to using the old gear boxes which had been impacted by the previous bearing failures, and ball bearings were replaced with tapered roller bearings. The adjustments to the experimental procedure focused on a lowering of the maximum torque applied to the gears and bearings and the increase of the duration of each simulated fuel assembly maneuver conducted. This report will present and discuss the changes made to the materials, components, and procedures and the subsequent results for Campaign #5 and Campaign #6.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Gear Test Assembly – Experimental Testing and Analysis of Gears and Bearings – FY2024

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The focus of GTA has been to test larger radial spur gear sets machined from Inconel 718 along with a variety of bearing components that are to be used in the fuel handling machines built for use in pool-type sodium fast reactors. The testing in GTA also informs the design and material choices for the full-scale Gripper Test Assembly (GrTA) being developed by Argonne.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integral LOCA fragmentation test on high-burnup fuel

Increasing the fuel burnup limit in light water reactors is sought to enhance fuel cycle economics and requires establishing a technical basis. Experimental observations of severe fuel fragmentation under loss-of-coolant-accident conditions at Halden and Studsvik had raised the need for additional considerations during the development of this technical basis. These test data suggested that the burnup threshold for high burnup fuel fragmentation may be influenced by pre-transient power. Additional loss-of-coolant-accident test data is therefore valuable to complement these tests and enhance the current state of understating. Oak Ridge National Lab has developed the Severe Accident Test Station capable of examining the oxidation kinetics and accident response of irradiated fuel and cladding materials for design basis accident and beyond design basis accident scenarios. Severe Accident Test Station provides various temperature profiles, steam, and the thermal shock conditions necessary for integral loss of coolant accident testing, defueled oxidation quench testing, and high-temperature beyond design basis accident testing. Severe Accident Test Station has been successfully installed and demonstrated in the Irradiated Fuels Examination Laboratory at Oak Ridge National Lab. Furthermore, descriptions of the in-cell re-fabrication capabilities and assembly of the loss-of-coolant-accident test train are provided. Installation of the Severe Accident Test Station system and in-cell re-fabrication restores United States capability to examine postulated and extended loss-of-coolant-accident conditions on spent fuel and cladding and provides a platform for evaluating advanced fuel and accident-tolerant fuel cladding concepts. Lastly, three in-cell integral loss-of-coolant-accident test were performed in the Severe Accident Test Station and compared to the Nuclear Regulatory Commission sponsored loss-of-coolant-accident test as well as the original loss-of-coolant-accident test performed at Argonne National Lab. Finally, the results of these tests as well as all publicly available integral loss-of-coolant-accident test were used to validate a threshold for high burnup fuel fragmentation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

1016516285-AA - Handling Frame Assembly Table Structural and Seismic Analysis

Within the NIF (National Ignition Facility) sustainment project, LLNL is replacing all 1,728 blast shields with new ones. Before the new blast shield glass can be installed on NIF, it must pass through the AMOL (Amplifier Main Optics Loop). The AMOL process involves cleaning and coating the glass, assembling it into a Line Replaceable Unit (LRU), and performing testing and inspection. This work will be conducted in the OPFX cleanroom facility (Building 391, Room 1250) and requires several pieces of custom equipment. One key piece of equipment within the loop is the Handling Frame Assembly Table (see Figure 1.1). Its purpose is to assist operators in installing the blast shield glass into handling frames (1014442709) (see Figure 1.2). The table is also used to store handling frame assembly components. The primary components stored are the L-frames (1015208271), which are kept in a drawer underneath the table (see Figure 1.3). The purpose of this safety note is to ensure that the system does not pose a risk of injury to personnel during a seismic event. The system owner is OMST Engineering & Maintenance.

42 ENGINEERING↗

Floating wind turbine system

A floating wind turbine system with a tower structure that includes at least one stability arm extending therefrom and that is anchored to the sea floor with a rotatable position retention device that facilitates deep water installations. Variable buoyancy for the wind turbine system is provided by buoyancy chambers that are integral to the tower itself as well as the stability arm. Pumps are included for adjusting the buoyancy as an aid in system transport, installation, repair and removal. The wind turbine rotor is located downwind of the tower structure to allow the wind turbine to follow the wind direction without an active yaw drive system. The support tower and stability arm structure is designed to balance tension in the tether with buoyancy, gravity and wind forces in such a way that the top of the support tower leans downwind, providing a large clearance between the support tower and the rotor blade tips. This large clearance facilitates the use of articulated rotor hubs to reduced damaging structural dynamic loads. Major components of the turbine can be assembled at the shore and transported to an offshore installation site.

Viterna, Larry A.↗

A System for Measuring the Sway of the Vehicle Assembly Building

A system was developed to measure the sway of the Vehicle Assembly Building (VAB) at Kennedy Space Center. This system was installed in the VAB and gathered more than one total year of data. The building movement was correlated with measurements provided by three wind towers in order to determine the maximum deflection of the building during high-wind events. The VAB owners were in the process of obtaining new platforms for use in assembling very tall rockets when analysis of the VAB showed that a high wind could move the building sufficiently that an upper platform might impact a rocket. The problem arises because safety requires a relatively small gap between the platform and the rocket, while a large enough gap is needed to ensure that stacking tolerances prevent contact between the rocket and the platform. This only leaves an inch or two (approximately 2 to 5 cm) of total clearance, so when the analysis showed that more than a couple of inches of motion could occur in a high wind, there was a potential for damaging the rocket. The KSC Applied Physics Laboratory was asked to install a system in the VAB that could measure the motion of the building in high winds to determine the actual building sway. The motion of the VAB roof under wind load was measured optically, and under analysis, it was determined that a relatively large-aperture optical system would be required to reduce diffraction effects to less than a small fraction of an inch (approximately mm) at a distance of 500 ft (≈150 m). A 10-in. (approximately 250 mm) telescope was placed on the floor of the building, looking at the ceiling. On the ceiling, a flat plate with three white LEDs was mounted in an "L" shape, such that the telescope was essentially looking at three stars. Software was written to track the motion of these three points using an image processing system. This provided a better than 1/10-in. (approximately 2.5-mm) 2D measurement faster than once a second. Data was downloaded once a month for comparison with the wind tower data. The system was fully operational and provided enough data to show that the VAB will only move 1 in. (approximately 2.5 cm) at the ceiling under 70-knot winds. Adjustable platforms are not required.

Youngquist, Robert↗

Evaluation of the Room Temperature Field Quality Measurements of HL-LHC MQXFA Magnet Assemblies

As a member of the multi-lab U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), Lawrence Berkeley National Laboratory (LBNL) is assembling high-field Nb3Sn low-beta MQXFA quadrupole magnets for eventual installation at CERN as part of the HL-LHC upgrade. Each magnet undergoes room temperature magnetic measurements at two points during the assembly process: once after completion of the coil pack sub-assembly and once after the magnet is fully assembled and pre-loaded. Beyond its use to verify that each magnet assembly can meet operational requirements, the data from this two-stage measurement process allow for investigation into the impact of the pre-loading operation on field quality. Recent measurements on magnet rebuilds as well as exploratory coil pack reconfigurations also provide an opportunity to see in isolation the effects of changes to a magnet’s coil selection or coil layout. In this work, we present the magnetic measurement results of MQXFA magnets assembled or currently in process, focusing particularly on magnets with data corresponding to multiple builds, and discuss trends and insights which may be beneficial for the remaining MQXFA magnet production or for future Nb3Sn accelerator magnets.

Doyle, Jennifer [LBNL, Berkeley] (ORCID:0009000079↗

Alining Heat-Exchanger Tubes for Assembly

Simple support method makes costly jigs and fixtures unnecessary. "Dummy" tubes installed at regular intervals to support "real" tubes before real tubes installed, filled with Cerrobend (or equivalent) material, metallic substance with low melting point, makes dummy tubes rigid so they brace real tubes as installed. When all available spaces for real tubes filled, dummy tubes removed and replaced with real tubes.

Benson, K. A.↗

Cabin-fuselage-wing structural design concept with engine installation

The purpose of this project is to provide a fuselage structural assembly and wing structural design that will be able to withstand the given operational parameters and loads provided by Federal Aviation Regulation Part 23 (FAR 23) and the Statement of Work (SOW). The goal is to provide a durable lightweight structure that will transfer the applied loads through the most efficient load path. Areas of producibility and maintainability of the structure will also be addressed. All of the structural members will also meet or exceed the desired loading criteria, along with providing adequate stiffness, reliability, and fatigue life as stated in the SOW. Considerations need to be made for control system routing and cabin heating/ventilation. The goal of the wing structure and carry through structure is also to provide a simple, lightweight structure that will transfer the aerodynamic forces produced by the wing, tailboom, and landing gear. These forces will be channeled through various internal structures sized for the pre-determined loading criteria. Other considerations were to include space for flaps, ailerons, fuel tanks, and electrical and control system routing. The difficulties encountered in the fuselage design include expanding the fuselage cabin to accept a third occupant in a staggered configuration and providing ample volume for their safety. By adding a third person the CG of aircraft will move forward so the engine needs to be moved aft to compensate for the difference in the moment. This required the provisions of a ring frame structure for the new position of the engine mount. The difficulties encountered in the wing structural design include resizing the wing for the increased capacity and weight, and compensating for a large torsion produced by the tail boom by placing a great number of stiffeners inside the boom, which will result in the relocation of the fuel tank. Finally, an adequate carry through structure for the wing and fuselage interface will be designed to effectively transmit loads through the fuselage.

Ariotti, Scott↗

Automated Progress Monitoring in Modular Construction Factories Using Computer Vision and Building Information Modeling

Modular construction methods have recently gained interest due to the advantages offered in terms of safety, quality, and productivity for projects. In this method, a significant portion of the construction is performed off-site in factories where modular components are built in different workstations, assembled on the production line, and shipped to the site for installation. Due to the labor-intensive nature of tasks, cycle times in modular construction factories are highly variable, which commonly leads to major bottlenecks and delays in construction projects. To remedy this effect, recent methods rely on sensors such as RFID to monitor the production process, which is reportedly expensive, and intrusive to the work process. Recently, computer vision-based methods have been proposed to track the production process in modular construction factories. However, these methods overlook monitoring the assembly process on the production line. Therefore, this paper presents a method to monitor the assembly process by integrating computer vision-based methods with Building Information Modeling (BIM). The proposed method detects the modular units using object segmentation; superimposes the installation area with the corresponding 2D region using BIM, and identifies the installation of the components using image processing techniques. The proposed method has been validated using surveillance videos captured from a modular construction factory in the US. Successful implementation of the proposed method can lead to timely identification of delays during the assembly process and reduce delays in modular integrated construction projects.

building information modeling↗

Hardware Design Improvements to the Major Constituent Analyzer

The Major Constituent Analyzer (MCA) onboard the International Space Station (ISS) is designed to monitor the major constituents of the ISS's internal atmosphere. This mass spectrometer based system is an integral part of the Environmental Control and Life Support System (ECLSS) and is a primary tool for the management of ISS atmosphere composition. As a part of NASA Change Request CR10773A, several alterations to the hardware have been made to accommodate improved MCA logistics. First, the ORU 08 verification gas assembly has been modified to allow the verification gas cylinder to be installed on orbit. The verification gas is an essential MCA consumable that requires periodic replenishment. Designing the cylinder for subassembly transport reduces the size and weight of the maintained item for launch. The redesign of the ORU 08 assembly includes a redesigned housing, cylinder mounting apparatus, and pneumatic connection. The second hardware change is a redesigned wiring harness for the ORU 02 analyzer. The ORU 02 electrical connector interface was damaged in a previous on-orbit installation, and this necessitated the development of a temporary fix while a more permanent solution was developed. The new wiring harness design includes flexible cable as well as indexing fasteners and guide-pins, and provides better accessibility during the on-orbit maintenance operation. This presentation will describe the hardware improvements being implemented for MCA as well as the expected improvement to logistics and maintenance.

Combs, Scott↗

The 8.4-GHz low-noise maser pump source assembly

Improved pump source assemblies and new 8.4-GHz low noise traveling-wave masers (TWMs) were installed at the same time at Deep Space Stations 14 and 43 as part of the Mark IVA DSCC Antenna Microwave Subsystems upgrade. The pump source assemblies are part of the new 8.4-GHz TWMs, which are identified as Block IIA Low-Noise TWMs. Improved reliability of the pump source assemblies was required to meet stress analysis criteria.

Cardenas, R.↗

Metallic threaded composite fastener

A metallic threaded composite fastener, particularly suited for high temperature applications, has a body member made of high temperature resistant composite material with a ceramic coating. The body member has a head portion configured to be installed in a countersunk hole and a shank portion which is noncircular and tapered. One part of the shank may be noncircular and the other part tapered, or the two types of surface could be combined into a frustum of a noncircular cone. A split collar member made of high strength, high temperature tolerant metal alloy is split into two halves and the interior of the halves are configured to engage the shank. The exterior of the collar has a circumferential groove which receives a lock ring to secure the collar halves to the shank. In the assembled condition torque may be transmitted from the body to the split collar by the engaged noncircular portions to install and remove the fastener assembly into or from a threaded aperture and shear loads in the collar threads are transferred to the shank tapered portion as a combination of radial compression and axial tension loads. Thus, tension loads may be applied to the fastener shank without damaging the ceramic coating.

Dunn, Thomas J.↗

Friction Experiment Data Analysis

The Spent Fuel Waste Disposition (SFWD) program under the U.S. Department of Energy (DOE) is planning a seismic shake table test of full-scale dry storage systems of spent nuclear fuel (SNF) to close the gap related to the seismic loads on the fuel assemblies in dry storage systems. This test will allow for quantifying the strains and accelerations on surrogate fuel assembly during representative earthquakes. A concrete layer will be installed on the shake table before the test to simulate conditions representative of an ISFSI pad. In the shake table tests with the vertical cask, the cask will be free-standing because this is representative of all, except two, ISFSIs in the U.S. with vertical dry storage casks. The static and dynamic friction coefficients between the steel bottom of the cask and the concrete layer on the shake table are important parameters that will affect cask behavior during the test. These parameters must be known for the pre- and post-test modelling, data analysis, and model validation. The friction experiment was performed at the Engineering Department of the University of New Mexico (UNM) to determine the friction coefficients between a steel plate with the same finish as the bottom of the vertical cask manufactured for the test and different concrete surfaces. In this experiment the steel plate was fixed and the concrete sample was pulled over the plate with a constant displacement rate using an MTS machine. This allowed for collecting continuous horizontal force data over the length of the steel plate. Four displacement rates and three vertical loads were used. The tests were performed with four concrete blocks with different degrees of the surface roughness - light sandblast, light to medium sandblast, medium bush hammer, and heavy sandblast. The total number of tests was 48. The data were used to calculate static and dynamic friction coefficients.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗