Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

What Can We Learn from US National Transmission Studies?

Multiple US regions have announced new electricity transmission plans, are actively revisiting the future role of transmission, and could benefit from findings from recent national-scale transmission studies. A review of seven national studies shows that significant transmission expansion is cost-optimal for serving new demand, integrating additional resources, and supporting grid reliability. A majority of the reviewed scenarios, which span a range of policy and technology assumptions, include at least a doubling of the transmission system by 2050. The national studies find substantial net system cost savings from transmission expansion and high benefit-cost ratios for transmission investments. The results are derived through multi-value, nationally coordinated, co-optimized, multi-scenario modeling, which is an approach that could yield lower-cost pathways compared to current industry planning practices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated mass transportation system study/definition/implementation program definition

Specific actions needed to plan and effect transportation system improvements are identified within the constraints of limited financial, energy and land use resources, and diverse community requirements. A specific program is described which would develop the necessary generalized methodology for devising improved transportation systems and evaluate them against specific criteria for intermodal and intramodal optimization. A consistent, generalized method is provided for study and evaluation of transportation system improvements.

Ransone, R. K.↗

System Engineering & Integration (SE&I) In-Situ Resource Utilization (ISRU) Modeling and Analysis (SIMA) Tool for Subsystem Integration into Full-Scale Architectures

In situ resource utilization (ISRU) is the practice of producing mission consumables from local lunar/planetary resources, thereby minimizing system launch mass requirements, mainly through the production of propellant fuel components and life support resources. Modeling full ISRU technology architectures significantly impacts the design and optimization of individual unit processes and facilitates their introduction into service with the Science Technology Mission Directorate (STMD) logistical planning and operation space. The Mission Analysis and Integration Tool (MAIT) is a modeling framework that connects individual ISRU subsystem models for the purposes of technology down select, scaling & optimization, and end-to-end process planning. The development project team seeks to address specific STMD capability gaps by simulating ISRU systems in MAIT. The goal is to produce system architectures for the Moon and Mars that are linked to Key Performance Parameters (KPP) and environmental requirements. To that end, the framework is adaptive, flexible, and suitable for collaboration among government, private sector, and international entities. Our approach currently provides conventional outputs, such as mass, power, and volume, to analyze whole system trade spaces. However, the framework was designed to validate current breadboard subsystems, simulate future process design capacity, and allow flexibility to any external developer-driven subsystem model that is in a state of evolution.

SE&I↗

Integrated Urban Services

Integrated Urban Services (IUS) is a program under the United States-Association of Southeast Asian Nations (US-ASEAN) Smart Cities Partnership helping ASEAN cities build resilience in their energy, water, and food (EWF) provisioning systems. The program was launched by U.S. State Department and is jointly implemented by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL), with an aim to promote systems integration and circular economy principles for resource recovery and reuse. This fact sheet summarizes the Integrated Urban Services program.

ASEAN↗

A Model Predictive Control to Improve Grid Resilience

The following article details a model predictive control (MPC) to improve grid resilience when faced with variable generation resources. This topic is of significant interest to utility power systems where distributed intermittent energy sources will increase significantly and be relied on for electric grid ancillary services. Previous work on MPCs has focused on narrowly targeted control applications such as improving electric vehicle (EV) charging infrastructure or reducing the cost of integrating Energy Storage Systems (ESSs) into the grid. In contrast, this article develops a comprehensive treatment of the construction of an MPC tailored to electric grids and then applies it integration of intermittent energy resources. To accomplish this, the following article includes a description of a reduced order model (ROM) of an electric power grid based on a circuit model, an optimization formulation that describes the MPC, a collocation method for solving linear time-dependent differential algebraic equations (DAEs) that result from the ROM, and an overall strategy for iteratively refining the behavior of the MPC. Next, the algorithm is validated using two separate numerical experiments. First, the algorithm is compared to an existing MPC code and the results are verified by a numerically precise simulation. It is shown that this algorithm produces a control comparable to existing algorithms and the behavior of the control carefully respects the bounds specified. Second, the MPC is applied to a small nine bus system that contains a mix of turbine-spinning-machine-based and intermittent generation in order to demonstrate the algorithm’s utility for resource planning and control of intermittent resources. This study demonstrates how the MPC can be tuned to change the behavior of the control, which can then assist with the integration of intermittent resources into the grid. The emphasis throughout the paper is to provide systematic treatment of the topic and produce a novel nonlinear control compatible design framework applicable to electric grids and the control of variable resources. This differs from the more targeted application-based focus in most presentations.

microgrid↗

Resilient Energy Transition Planning for Ouzinkie, Alaska

This report documents an energy system planning study for the village of Ouzinkie, Alaska, conducted by the U.S. Department of Energy's (DOE) Energy Transitions Initiative Partnership Project (ETIPP). Ouzinkie is a small remote community located on Spruce Island, Alaska, in the Kodiak Archipelago. The Ouzinkie community is served by a local electrical system powered by a combination of diesel generators and a hydroelectric turbine. Due to aging assets, however, the power system reliability has declined in recent years, while the cost of operating the diesel generators has increased significantly. To address these problems, Ouzinkie asked ETIPP to provide technical assistance to develop an updated integrated plan for improvements to the Ouzinkie power system, in order to transition to a more reliable and resilient system powered by renewable energy resources.

13 HYDRO ENERGY↗

The role of remotely sensed and relayed data in the Delaware River Basin

A discussion is presented of the planned integration of the existing Delaware River Basin water quality monitoring and data processing systems with a data relay experiment proposed for the Earth Resources Technology Satellite (ERTS)-A, which will be launched in 1972. The experiment is designed to use ERTS-A as a data relay link for a maximum of 20 hydrologic stations in the basin, including streamgaging, reservoir level, ground water level,and water quality monitoring stations. This experiment has the potential for reducing the timelag between data collection and dissemination to less than 12 hours. At present there is a significant timelag between the time when the data are recorded at a monitoring site and the water resources agencies receive the data. The timelag exists because most of these instruments operate in remote locations without telementry, and the data records are removed manually, generally at a weekly frequency. For most water quality monitoring, the data do not reach water resources agencies for a period of 2 weeks to 2 months.

Paulson, R. W.↗

South Asia Group for Energy - Bhutan

Bhutan's electricity system is already low-carbon through the use of hydropower. However, generation from hydroelectric plants is reduced during the dry winter months and will be impacted by climate change and other extreme weather events. Bhutan is mitigating these risks by diversifying their energy mix with clean energy resources. Bhutan is exploring photovoltaic (PV) solar energy development to enhance its energy system's overall resilience. To ensure efficient grid planning and solar integration, Bhutan's power generator, Druk Green Power Corporation, and the transmission and distribution utility, Bhutan Power Corporation, are partnering with the South Asia Group for Energy (SAGE) to develop their solar capabilities, integrate solar energy into the grid, and strengthen Bhutan's energy infrastructure and efficiency.

Bhutan↗

Cyber-Informed Engineering (CIE) Guide for States

The Cyber-Informed Engineering (CIE) Guide for States provides state energy offices, public utility commissions, and partner organizations with a structured framework for integrating cyber-resilient engineering practices into energy planning, grantmaking, interconnection processes, and workforce development. As grid digitalization and the adoption of distributed energy resources accelerate, states face expanding cyber-physical risks that traditional cybersecurity measures alone cannot fully address. CIE offers a proactive, consequence-focused engineering methodology that emphasizes eliminating or mitigating high-impact failure modes through design, physical controls, and operational safeguards. The guide outlines the 12 core CIE principles, demonstrates their application through state-focused use cases—including grant evaluation rubrics, interconnection reviews, allow-list development, and training programs—and provides practical tools such as scoring frameworks, impact assessment methods, and implementation checklists. It also highlights pathways for state–utility collaboration and opportunities for technical assistance from national laboratories. By adopting CIE, states can enhance grid reliability, reduce lifecycle costs, strengthen supply-chain assurance, and foster a security-aware engineering culture that aligns with broader resilience and modernization goals. November 2025

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cyber-Informed Engineering (CIE) Guide for States

The Cyber-Informed Engineering (CIE) Guide for States provides state energy offices, public utility commissions, and partner organizations with a structured framework for integrating cyber-resilient engineering practices into energy planning, grantmaking, interconnection processes, and workforce development. As grid digitalization and the adoption of distributed energy resources accelerate, states face expanding cyber-physical risks that traditional cybersecurity measures alone cannot fully address. CIE offers a proactive, consequence-focused engineering methodology that emphasizes eliminating or mitigating high-impact failure modes through design, physical controls, and operational safeguards. The guide outlines the 12 core CIE principles, demonstrates their application through state-focused use cases—including grant evaluation rubrics, interconnection reviews, allow-list development, and training programs—and provides practical tools such as scoring frameworks, impact assessment methods, and implementation checklists. It also highlights pathways for state–utility collaboration and opportunities for technical assistance from national laboratories. By adopting CIE, states can enhance grid reliability, reduce lifecycle costs, strengthen supply-chain assurance, and foster a security-aware engineering culture that aligns with broader resilience and modernization goals. November 2025

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Representative Period Selection for Robust Capacity Expansion Planning in Low-carbon Grids

With the increasing urgency to decarbonize power systems, while mitigating extreme events, capacity expansion models can play a vital role in reliably planning the expansion of power systems and facilitating the integration of renewable energy sources. Optimizing capacity expansion generally involves selecting surrogate representative days from forecasts of load and the generation profiles of variable renewable energy resources. To properly select those representative days, we propose a novel input-based approach in combination with the k-means clustering algorithm that utilize three unique operational inputs: load shedding, renewable curtailment, and transmission congestion. The proposed method allows for more robust and cost-effective capacity planning. The method is validated using a capacity expansion model and a production cost model based on California Independent System Operator (CAISO)'s decarbonization goals, and results in reduced costs and drastically lower load shedding.

Anderson, Osten P.↗

2022 FORCE Development Status Update

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Framework for Optimization of Resources and Economics (FORCE) is a tool suite developed at Idaho National Laboratory and is dedicated to making robust analyses of IESs easier for analysts and researchers. The report summarizes the improvements and updates to FORCE during the most recent development cycle. Particularly, we demonstrate improvements to user accessibility, stochastic time-series analysis, and vertical integration with the software tools provided in FORCE.

97 MATHEMATICS AND COMPUTING↗

Supporting multiple hardware architectures at CMS: the integration and validation of POWER9

Computing resources in the Worldwide LHC Computing Grid (WLCG) have been based entirely on the x86 architecture for more than two decades. In the near future, however, heterogeneous non-x86 resources, such as ARM, POWER and Risc-V, will become a substantial fraction of the resources that will be provided to the LHC experiments, due to their presence in existing and planned world-class HPC installations. The CMS experiment, one of the four large detectors at the LHC, has started to prepare for this situation, with the CMS software stack (CMSSW) already compiled for multiple architectures. In order to allow for a production use, the tools for workload management and job distribution need to be extended to be able to exploit heterogeneous architectures. Profiting from the opportunity to exploit the first sizable IBM Power9 allocation available on Marconi100 HPC system at CINECA, CMS developed all the needed modifications to the CMS workload management system. After a successful proof of concept, a full physics validation has been performed in order to bring the system in production. The experiences are of very high value, when it comes to commissioning of the similar (even larger) Summit HPC system at Oak Ridge, where CMS is also expecting a resource allocation. Moreover the compute power of those systems is being provided also via GPUs and this represents an extremely valuable opportunity to exploit the offloading capability already implemented in CMSSW. The status of the current integration including the exploitation of the GPUs, the results of the validation as well as the future plans will be shown and discussed.

Boccali, Tommaso [INFN, Pisa]↗

Hydropower Resilience Database for Assessing Microgrid Formation Capability and Enhancing Power Grid Resilience

In the face of increasing frequency of extreme events, enhancing resilience and reliability of energy infrastructure demands innovative solutions. Hydropower, with its inherent generation flexibility and grid-forming capability, offers significant potential for enhancing power grid resilience through the establishment of microgrids. To enable informed decision-making and strategic planning, we present the Hydropower Resilience Database (HRD) that integrates data from various sources such as Oakridge National Laboratory (ORNL) HydroSource, National Inventory of Dams, and US Western Grid database. By integrating relevant information on hydropower plant characteristics, including dams, reservoirs, and connected electrical grid, this resource enables hydropower plant owners, utilities, and community stakeholders to identify and evaluate the feasibility of using hydropower resources in microgrids to support nearby communities and critical infrastructure in various challenging scenarios. Using HRD, a set of metrics are evaluated to quantify the capability of hydropower plants to support essential microgrid functions. An interactive tool is developed using ArcGIS, enabling the visualization and analysis using HRD. Our research contributes to strategic planning efforts for fortifying energy infrastructure, ensuring reliable power supply during disruptions, and advancing the development of robust and resilient energy systems in regions susceptible to grid vulnerabilities.

13 HYDRO ENERGY↗

Hydropower Resilience Database for Assessing Microgrid Formation Capability and Enhancing Power Grid Resilience

In the face of increasing frequency of extreme events, enhancing resilience and reliability of energy infrastructure demands innovative solutions. Hydropower, with its inherent generation flexibility and grid-forming capability, offers significant potential for enhancing power grid resilience through the establishment of microgrids. To enable informed decision-making and strategic planning, we present the Hydropower Resilience Database (HRD) that integrates data from various sources such as Oakridge National Laboratory (ORNL) HydroSource, National Inventory of Dams, and US Western Grid database. By integrating relevant information on hydropower plant characteristics, including dams, reservoirs, and connected electrical grid, this resource enables hydropower plant owners, utilities, and community stakeholders to identify and evaluate the feasibility of using hydropower resources in microgrids to support nearby communities and critical infrastructure in various challenging scenarios. Using HRD, a set of metrics are evaluated to quantify the capability of hydropower plants to support essential microgrid functions. An interactive tool is developed using ArcGIS, enabling the visualization and analysis using HRD. Our research contributes to strategic planning efforts for fortifying energy infrastructure, ensuring reliable power supply during disruptions, and advancing the development of robust and resilient energy systems in regions susceptible to grid vulnerabilities.

13 HYDRO ENERGY↗

NASA LCLUC Program: An Integrated Forest Monitoring System for Central Africa

Central Africa has the second largest unfragmented block of tropical rain forest in the world; it is also one of the largest carbon and biodiversity reservoirs. With nearly one-third of the forest currently allocated for logging, the region is poised to undergo extensive land-use change. Through the mapping of the forests, our Integrated Forest Monitoring System for Central Africa (INFORMS) project aims to monitor habitat alteration, support biodiversity conservation, and promote better land-use planning and forest management. Designed as an interdisciplinary project, its goal is to integrate data acquired from satellites with field observations from forest inventories, wildlife surveys, and socio-economic studies to map and monitor forest resources. This project also emphasizes on collaboration and coordination with international, regional, national, and local partners-including non-profit, governmental, and commercial sectors. This project has been focused on developing remote sensing products for the needs of forest conservation and management, insuring that research findings are incorporated in forest management plans at the national level. The societal impact of INFORMS can be also appreciated through the development of a regional remote sensing network in central Africa. With a regional office in Kinshasa, (www.OSFAC.org), the contribution to the development of forest management plans for 1.5 million hectares of forests in northern Republic of Congo (www.tt-timber.com), and the monitoring of park encroachments in the Albertine region (Uganda and DRC) (www.albertinerift.org).

Laporte, Nadine↗

Oak Ridge National Laboratory Roane and Anderson Counties, Tennessee Historic Architectural Resource Survey June 2018

From February through September 2017, Cultural Resource Analysts, Inc. personnel completed a historic architectural resource survey of the Oak Ridge National Laboratory in Roane and Anderson Counties, Tennessee. The survey was completed at the request of UT-Battelle, LLC, the private not-for-profit company that manages and operates Oak Ridge National Laboratory for the U.S. Department of Energy. The purpose of the survey was to assist the Department of Energy in complying with the National Historic Preservation Act of 1966, as amended, by providing updated recommendations regarding the National Register of Historic Places eligibility of historic architectural resources at Oak Ridge National Laboratory. The survey included the entirety of Oak Ridge National Laboratory’s main campus that occupies approximately 1,100 acres in Bethel and Melton Valleys and on Chestnut Ridge. Based on Facilities Information Management System data and guidance provided by UT-Battelle, LLC, preservation and modernization staff, the survey team developed a list of resources for inclusion in the survey. The list included all substantial buildings constructed in or before 1980 in order to provide sufficient coverage of buildings that will turn 50 years of age within the next decade. Only those buildings with recorded area over 100 sq ft were included in the survey. Additionally, the UT-Battelle team identified 15 buildings for more intensive survey because such buildings are central to Oak Ridge National Laboratory’s future mission needs and are expected to undergo renovations in the foreseeable future. These building were subject to both exterior and interior documentation with particular focus on identifying character-defining features, and thus were subject to more detailed analysis than the other resources included in the survey. The findings of this historic resource survey build on the conclusions of the 1994 survey by DuVall & Associates, Inc., as well as the survey updates completed by Thomason and Associates in 2004 and 2015 in support of the Oak Ridge National Laboratory Historic Preservation Plan. Within 12 distinct areas of Oak Ridge National Laboratory, as well as outlying areas, the survey recorded 195 buildings and structures constructed in or before 1980. In consideration of the role and significance of each area and each individual resource within the context of Oak Ridge National Laboratory, and in light of their current integrity and condition, each recorded resource was evaluated to determine if it is eligible for listing in the National Register of Historic Places.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A shared-world conceptual model for integrating space station life sciences telescience operations

Mental models of the Space Station and its ancillary facilities will be employed by users of the Space Station as they draw upon past experiences, perform tasks, and collectively plan for future activities. The operational environment of the Space Station will incorporate telescience, a new set of operational modes. To investigate properties of the operational environment, distributed users, and the mental models they employ to manipulate resources while conducting telescience, an integrating shared-world conceptual model of Space Station telescience is proposed. The model comprises distributed users and resources (active elements); agents who mediate interactions among these elements on the basis of intelligent processing of shared information; and telescience protocols which structure the interactions of agents as they engage in cooperative, responsive interactions on behalf of users and resources distributed in space and time. Examples from the life sciences are used to instantiate and refine the model's principles. Implications for transaction management and autonomy are discussed. Experiments employing the model are described which the authors intend to conduct using the Space Station Life Sciences Telescience Testbed currently under development at Ames Research Center.

Johnson, Vicki↗