Hardware Verification and Validation for a Navigation Sensor Software Model in Support of Flight Vehicle Performance Analysis

… or, “It’s in the details, how to make complicated software perform like complicated hardware.” In attempts to minimize development time and quickly build an operational vehicle, NASA’s Space Launch System (SLS) has had to be intentional about integrated testing. Constraints on budget and schedule have required balance between testing needs and the desire for an integrated flight vehicle as soon as possible. To provide key insights early in design and analysis cycles, a large amount of effort has shifted into maturing and validating models at the component level with integrated testing as a means to validate their integration. In terms of SLS Navigation, this, and the model-based design approach have pushed explicit requirements for sensor models to be validated against flight hardware to high precision. This paper covers the approach taken to verify and validate the models for the two key navigation sensors on the SLS vehicle, the Redundant Inertial Navigation Sensor and the Rate Gyro Assembly. These models are used in performance evaluation, fault detection, and operations development extensively. Using a mix of data from hardware vendor documentation and testing reports, limited in-house testing, and integration activities, these models were able to be validated against flight hardware at multiple levels, from the internal software design to statistical behavior at the raw sensor and integrated box levels. The high level of insight into the hardware elements is instrumental to support flight certification activities and building confidence in SLS Navigation capability. Focused testing enabled additional insight and validation that proved invaluable and the resulting insights were used to focus and mature models. Additionally, of having validated performance-based hardware models enables a wide breadth of activities including detailed fault detection studies and integration into future vehicle frameworks, such as an upper stage and provide a valuable asset to continued SLS analysis and design.

Evan J Anzalone↗

Hardware Verification and Validation for a Navigation Sensor Software Model in Support of Flight Vehicle Performance Analysis

… or, “It’s in the details, how to make complicated software perform like complicated hardware.” In attempts to minimize development time and quickly build an operational vehicle, NASA’s Space Launch System (SLS) has had to be intentional about integrated testing. Constraints on budget and schedule have required balance between testing needs and the desire for an integrated flight vehicle as soon as possible. To provide key insights early in design and analysis cycles, a large amount of effort has shifted into maturing and validating models at the component level with integrated testing as a means to validate their integration. In terms of SLS Navigation, this, and the model-based design approach have pushed explicit requirements for sensor models to be validated against flight hardware to high precision. This paper covers the approach taken to verify and validate the models for the two key navigation sensors on the SLS vehicle, the Redundant Inertial Navigation Sensor and the Rate Gyro Assembly. These models are used in performance evaluation, fault detection, and operations development extensively. Using a mix of data from hardware vendor documentation and testing reports, limited in-house testing, and integration activities, these models were able to be validated against flight hardware at multiple levels, from the internal software design to statistical behavior at the raw sensor and integrated box levels. The high level of insight into the hardware elements is instrumental to support flight certification activities and building confidence in SLS Navigation capability. Focused testing enabled additional insight and validation that proved invaluable and the resulting insights were used to focus and mature models. Additionally, of having validated performance-based hardware models enables a wide breadth of activities including detailed fault detection studies and integration into future vehicle frameworks, such as an upper stage and provide a valuable asset to continued SLS analysis and design.

Thomas Park↗

A unique integrated flight testing facility for advanced control/display research

NASA is engaged in programs aimed at developing avionic concepts and systems technology for air transportation systems of the 1980's and beyond. A part of these programs is related to the development of advanced concepts and avionics technology for integrated displays and controls. In support of these efforts an interactive Flight Display Research System (FDRS) has been developed as an integral part of integrated flight test facilities which have been used in evaluation studies of integrated display and control concepts in support of a VTOL Approach and Landing Technology (VALT) program and current Terminal Configured Vehicle (TCV) program. A description is provided of several of the advanced integrated display and control concepts that have evolved within the VALT, TCV, and general aviation programs, as well as the integrated flight test facilities.

Batson, V. M.↗

Mars Pathfinder Flight System Integration and Test

...This paper verviews the system design and the results of the system integration and test activities, including the entry, descent and landing subsystem elements. System test experiences including science instruments, the microrover, Sojourner, and software are discussed.

pathfinder↗

The MIST /MIUS Integration and Subsystems Test/ laboratory - A testbed for the MIUS /Modular Integrated Utility System/ program

The MIUS (Modular Integrated Utility System) concept is to be an energy-conserving, economically feasible, integrated community utility system to provide five necessary services: electricity generation, space heating and air conditioning, solid waste processing, liquid waste processing, and residential water purification. The MIST (MIUS Integration and Subsystem Test) integrated system testbed constructed at the Johnson Space Center in Houston includes subsystems for power generation, heating, ventilation, and air conditioning (HVAC), wastewater management, solid waste management, and control and monitoring. The key design issues under study include thermal integration and distribution techniques, thermal storage, integration of subsystems controls and displays, incinerator performance, effluent characteristics, and odor control.

Beckham, W. S., Jr.↗

Integration and Testing of LCS Software

Kennedy Space Center is in the midst of developing a command and control system for the launch of the next generation manned space vehicle. The Space Launch System (SLS) will launch using the new Spaceport Command and Control System (SCCS). As a member of the Software Integration and Test (SWIT) Team, command scripts, and bash scripts were written to assist in integration and testing of the Launch Control System (LCS), which is a component of SCCS. The short term and midterm tasks are for the most part completed. The long term tasks if time permits will require a presentation and demonstration.

Command Script↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight in fiscal year 2020. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-1 (EM-1). This work included shipping the first major flight hardware element to the launch site. Current work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45 metric tons (t) to trans-lunar injection (TLI). The advantages of this mass - as well as volume - are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery.

Honeycutt, John↗

SITE project. Phase 1: Continuous data bit-error-rate testing

The Systems Integration, Test, and Evaluation (SITE) Project at NASA LeRC encompasses a number of research and technology areas of satellite communications systems. Phase 1 of this project established a complete satellite link simulator system. The evaluation of proof-of-concept microwave devices, radiofrequency (RF) and bit-error-rate (BER) testing of hardware, testing of remote airlinks, and other tests were performed as part of this first testing phase. This final report covers the test results produced in phase 1 of the SITE Project. The data presented include 20-GHz high-power-amplifier testing, 30-GHz low-noise-receiver testing, amplitude equalization, transponder baseline testing, switch matrix tests, and continuous-wave and modulated interference tests. The report also presents the methods used to measure the RF and BER performance of the complete system. Correlations of the RF and BER data are summarized to note the effects of the RF responses on the BER.

Fujikawa, Gene↗

Reactor Simulator Testing Overview

OBJECTIVE: Integrated testing of the TDU components TESTING SUMMARY: a) Verify the operation of the core simulator, the instrumentation and control system, and the ground support gas and vacuum test equipment. b) Thermal test heat regeneration design aspect of a cold trap purification filter. c) Pump performance test at pump voltages up to 150 V (targeted mass flow rate of 1.75 kg/s was not obtained in the RxSim at the originally constrained voltage of 120 V). TESTING HIGHLIGHTS: a) Gas and vacuum ground support test equipment performed effectively for NaK fill, loop pressurization, and NaK drain operations. b) Instrumentation and control system effectively controlled loop temperature and flow rates or pump voltage to targeted settings. c) Cold trap design was able to obtain the targeted cold temperature of 480 K. An outlet temperature of 636 K was obtained which was lower than the predicted 750 K but 156 K higher than the cold temperature indicating the design provided some heat regeneration. d) ALIP produce a maximum flow rate of 1.53 kg/s at 800 K when operated at 150 V and 53 Hz.

Schoenfeld, Michael P.↗

Dc pin-to-pin testing of integrated circuits

External pin-to-pin nondestructive testing procedure measures the electrical characteristics of each element in an integrated circuit. The procedure involves choosing specific pairs of pins and applying appropriate test voltages to them.

Thomas, E. F.↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

The ST5 payload, part of NASA s New Millennium Program headquartered at JPL, consisted of three micro satellites (approx. 30 kg each) deployed into orbit from the Pegasus XL launch. ST5 was a technology demonstration mission, intended to test new technologies for potential use for future missions. In order to meet the launch date schedule of ST 5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The I&T phase was planned for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 in tandem. A team of engineers and technicians planned and executed the integration of all three spacecraft emphasizing versatility and commonality. They increased their knowledge and efficiency through spacecraft #1 integration and testing and utilized their experience and knowledge to safely execute I&T for spacecraft #2 and #3. Each integration team member could perform many different roles and functions and thus better support activities on any of the three spacecraft. The I&T campaign was completed with STS s successful launch on March 22,2006

Sauerwein, Timothy A.↗

SPE propulsion electrolyzer for NASA's integrated propulsion test article

Hamilton Standard has delivered a 3000 PSI SPE Propulsion Electrolyzer Stack and Special Test Fixture to the NASA Lyndon B. Johnson Space Center (JSC) Integrated Propulsion Test Article (IPTA) program in June 1990, per contract NAS9-18030. This prototype unit demonstrates the feasibility of SPE-high pressure water electrolysis for future space applications such as Space Station propulsion and Lunar/Mars energy storage. The SPE-Propulsion Electrolyzer has met or exceeded all IPTA program goals. It continues to function as the primary hydrogen and oxygen source for the IPTA test bed at the NASA/JSC Propulsion and Power Division Thermochemical Test Branch.

Source record↗

Integrated Modal Test of the Artmis I Launch Vehicle

The dynamic testing campaign for the Artemis I launch vehicle culminated in the Integrated Modal Test (IMT). The IMT consisted of the Space Launch System with a mass simulator of Orion (MSO) on top of the SLS stack, which rested on the deck of the mobile launcher (ML) and mount mechanisms. The modal testing met the goal to capture a set of target modes under 7Hz, in two test configurations, using 298 accelerometer locations and 472 accelerometer channels. Overall the model of the test matched very well with the data without tuning the model with the exception of the first torsion mode, which was measured at a much lower frequency than predicted at when excited at higher levels.

Dan Lazor↗

SDO FlatSat Facility

The goal of the Solar Dynamics Observatory (SDO) is to understand and, ideally, predict the solar variations that influence life and society. It's instruments will measure the properties of the Sun and will take hifh definition images of the Sun every few seconds, all day every day. The FlatSat is a high fidelity electrical and functional representation of the SDO spacecraft bus. It is a high fidelity test bed for Integration & Test (I & T), flight software, and flight operations. For I & T purposes FlatSat will be a driver to development and dry run electrical integration procedures, STOL test procedures, page displays, and the command and telemetry database. FlatSat will also serve as a platform for flight software acceptance and systems testing for the flight software system component including the spacecraft main processors, power supply electronics, attitude control electronic, gimbal control electrons and the S-band communications card. FlatSat will also benefit the flight operations team through post-launch flight software code and table update development and verification and verification of new and updated flight operations products. This document highlights the benefits of FlatSat; describes the building of FlatSat; provides FlatSat facility requirements, access roles and responsibilities; and, and discusses FlatSat mechanical and electrical integration and functional testing.

Amason, David L.↗

An environment for the integration and test of the Space Station distributed avionics systems

An approach to supplying an environment for the integration and test of the Space Station distributed avionics systems is described. Background is included on the development of this concept including the lessons learned from Space Shuttle experience. The environment's relationship to the process flow of the Space-Station verification, from systems development to on-orbit verification, is presented. The uses of the environment's hardware implementation, called Data Management System (DMS) kits, are covered. It is explained how these DMS kits provide a development version of the space-station operational environment and how this environment allows system developers to verify their systems performance, fault detection, and recovery capability. Conclusions on how the use of the DMS kits, in support of this concept, will ensure adequate on-orbit test capability are included.

Barry, Thomas↗

The Building Blocks for JWST I and T (Integrations and Test) to Operations - From Simulator to Flight Units

The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.

Fatig, Curtis↗