Search NASA⌕ Search

SEARCH · Search NASA

Results for “JPL projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Environmental testing of block 2 solar cell modules

The testing procedures and results of samples of the LSA Project Block 2 procurement of silicon solar cell modules are described. Block 2 was the second large scale procurement of silicon solar cell modules made by the JPL Low-cost Solar Array Project with deliveries in 1977 and early 1978. The results showed that the Block 2 modules were greatly improved over Block 1 modules. In several cases it was shown that design improvements were needed to reduce environmental test degradation. These improvements were incorporated during this production run.

Griffith, J. S.↗

The NASA Deep Space Network (DSN) Array

The DSN Array Project is currently working with Senior Management at both JPL and NASA to develop strategies towards starting a major implementation project. Several studies within NASA are concluding, all of which recommend that any future DSN capability include arraying of antennas to increase performance. Support of Deep Space, Lunar, and CEV (crewed exploration vehicle) missions is possible. High data rate and TDRSS formatting is being investigated. Any future DSN capacity must include Uplink. Current studies ongoing to investigate and develop technologies for uplink arraying; provides advantages in three ways: 1) N2 effect. EIRP grows as N2(-vs-N for a downlink array); 2) Improved architectural options (can separate uplink and downlink); and 3) Potential for more cost effective transmitters for fixed EIRP.

communications↗

Large area silicon sheet by EFG

Work carried out on the JPL Flat Plate Solar Array Project, for the purpose of developing a method for silicon ribbon production by Edge-defined Film-fed Growth (EEG) for use as low-cost substrate material in terrestrial solar cell manufacture, is described. A multiple ribbon furnace unit that is designed to operate on a continuous basis for periods of at least one week, with melt replenishment and automatic ribbon width control, and to produce silicon sheet at a rate of one square meter per hour, was constructed. Program milestones set for single ribbon furnace operation to demonstrate basic EEG system capabilities with respect to growth speed, thickness and cell performance were achieved for 10 cm wide ribbon: steady-state growth at 4 cm/min and 200 micron thickness over periods of an hour and longer was made routine, and a small area cell efficiency of 13+% demonstrated. Large area cells of average efficiency of 10 to 11%, with peak values of 11 to 12% were also achieved. The integration of these individual performance levels into multiple ribbon furnace operation was not accomplished.

Kalejs, J. P.↗

Long-life, lightweight solar array testing

A long duration test is in progress for comparing various methods of attaching interconnects to solar cells for near-earth-orbit spacecraft. This JPL- and NASA-sponsored project has been cycling modules at between -80 C and + 80 C since June 1983. As of April 1984, 29,000 cycles have been completed, and the cycling is continuing. Modules include examples of parallel gap and ultrasonic welding and of soldering as fabricated by the Space and Communications Group, Hughes Aircraft Company and by Spectroblab. Evaluation of module integrity has been made at periodic intervals. No measurable degradation has been detected to date.

Stofel, E. J.↗

A highly redundant robot system for inspection

The work on the serpentine inspection system at JPL is described. The configuration of the inspection system consists of 20 degrees of freedom in total. In particular, the design and development of the serpentine micromanipulator end-effector tool which has 12 degrees of freedom is described. The inspection system is used for application in JPL's Remote Surface Inspection project and as a research tool in redundant manipulator control.

Lee, Thomas S.↗

Qualification of Bonding Process of Temperature Sensors to Extreme Temperature Deep Space Missions

A process has been explored based on the state-of-the-art technology to bond the platinum resistance thermometer (PRT) on to potential aerospace material such as a flat aluminum surface and a flexible copper tube to simulate coaxial cable for the flight applications. Primarily, PRTs were inserted into a metal plated copper braid to avoid stresses on the sensor while attaching the sensor with braid to the base material for long duration deep space missions. Appropriate pretreatment has been implemented in this study to enhance the adhesion of the PRTs to the base material. NuSil product has been chosen in this research to attach PRT to the base materials. The resistance (approx.1.1 k(Omega)) of PRTs has been electrically monitored continuously during the qualification thermal cycling testing from -150 C to +120 C and -100 C to -35 C. The test hardware has been thermal cycled three times the mission life per JPL design principles for JUNO project. No PRT failures were observed during and after the PRT thermal cycling qualification test for extreme temperature environments. However, there were some failures associated with staking of the PRT pig tails as a result of thermal cycling qualification test.

Extreme temperatures↗

MarCO: Interplanetary Mission Development on a CubeSat Scale

Mars Cube One (MarCO) is a twin CubeSat mission developed by the NASA Jet Propulsion Laboratory (JPL) to accompany the InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) Mars mission lander. MarCO's primary mission objective is to launch with InSight and independently fly to Mars to serve as a communications relay during InSight's entry, descent, and landing (EDL) phase. MarCO represents a new type of deep space mission: CubeSats at Mars. Building on the development of JPL's first interplanetary CubeSat project, the Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment (INSPIRE), MarCO further refined the approach to hardware, software, and ground architecture development to solve the challenges of quickly building low-budget spacecraft to fly to Mars. The greatest constraint, beyond others typical of CubeSat missions, was time. The duration between MarCO's conception to completion of spacecraft assembly was less than two years - an unprecedented schedule for any planetary mission to date. Through necessity, MarCO has built on previous experience, procedures, systems, and development methodologies, defining a new niche for supporting larger primary missions. The MarCO spacecraft are poised to write a new chapter in deep space exploration.

Schoolcraft, Josh↗

MarCO: Interplanetary Mission Development on a CubeSat Scale

Mars Cube One (MarCO) is a twin CubeSat mission developed by the NASA Jet Propulsion Laboratory (JPL) to accompany the InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) Mars mission lander. MarCO's primary mission objective is to launch with InSight and independently fly to Mars to serve as a communications relay during InSight's entry, descent, and landing (EDL) phase. MarCO represents a new type of deep space mission: CubeSats at Mars. Building on the development of JPL's first interplanetary CubeSat project, the Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment (INSPIRE), MarCO further refined the approach to hardware, software, and ground architecture development to solve the challenges of quickly building low-budget spacecraft to fly to Mars. The greatest constraint, beyond others typical of CubeSat missions, was time. The duration between MarCO's conception to completion of spacecraft assembly was less than two years - an unprecedented schedule for any planetary mission to date. Through necessity, MarCO has built on previous experience, procedures, systems, and development methodologies, defining a new niche for supporting larger primary missions. The MarCO spacecraft are poised to write a new chapter in deep space exploration.

Schoolcraft, Josh↗

A Highly Redundant Robot System for Inspection

The work on the serpentine inspection system at JPL is described. The configuration of the inspection system consists of 20 DOF in total. In particular, the design and development of the serpentine micromanipulator end-effector tool which has 12 DOF is described. The inspection system is used for application in JPL's Remote Surface Inspection project and as a research tool in redundant manipulator control.

robot↗

Laser Illuminated Feature Position Determination and Calibration Approach for PIXL

This paper describes several approaches for the calibration of translational and rotational alignment errors between a camera and a set of laser illuminators for a position determination system. Detailed algorithms are derived and covariance of calibration residuals in both error state and target position determination accuracy are obtained. An example with system design parameters is given to demonstrate the effectiveness of the approaches. The algorithm can be used for any terrestrial or space position determination instruments employing a camera/laser triangulation system and is proposed, as one application, for the PIXL instrument of JPL’s MARS 2020 Rover project.

Liu, John Y.↗

SP-100, a project manager's view

Born to meet the special needs of America's space effort, the SP-100 Program testifies to the cooperation among government agencies. The Department of Energy (DOE), the National Aeronautics and Space Administration (NASA), and the Defense Advanced Research Projects Agency (DARPA) are working together to produce a 100-kW power system for use in outer space. At this point in the effort, it is appropriate to review: The approach to meet program goals; the status of activities of the Project Office, managed by the Jet Propulsion Laboratory (JPL); and, because this is a meeting on materials, answers beings developed by the Project Office to vital questions on refractory alloy technology.

Truscello, Vincent C.↗

Parallel Rendering of Large Time-Varying Volume Data

Interactive visualization of large time-varying 3D volume datasets has been and still is a great challenge to the modem computational world. It stretches the limits of the memory capacity, the disk space, the network bandwidth and the CPU speed of a conventional computer. In this SURF project, we propose to develop a parallel volume rendering program on SGI's Prism, a cluster computer equipped with state-of-the-art graphic hardware. The proposed program combines both parallel computing and hardware rendering in order to achieve an interactive rendering rate. We use 3D texture mapping and a hardware shader to implement 3D volume rendering on each workstation. We use SGI's VisServer to enable remote rendering using Prism's graphic hardware. And last, we will integrate this new program with ParVox, a parallel distributed visualization system developed at JPL. At the end of the project, we Will demonstrate remote interactive visualization using this new hardware volume renderer on JPL's Prism System using a time-varying dataset from selected JPL applications.

Garbutt, Alexander E.↗

First Results From the GeoSAR Mapping Instrument

Geosynchronous Synthetic Aperture Radar (GeoSAR) is a consortium project consisting of The Jet Propulsion Laboratory (JPL), Calgis (a small GIS company based in Fresno, CA) and the California Department of Conservation with funding provided by Defense Research Projects Agency (DARPA) started in November 1996. The two main objectives of the GeoSAR Program are: 1) To develop a state of the art dual frequency interferometric radar mapping instrument capable of mapping the true ground surface height beneath the vegetation canopy; and 2) To transition this mapping technology to a commercial company, Calgis. JPL, the technical lead, has the following program deliverables at program completion in November 1999 include radar design and radar hardware for X-band (3 cm) and P-band (83 cm) radars, processor software, hardware and documentation, and calibrated X-band radar.

Hensley, Scott↗

JPL Space Telecommunications Radio System Operating Environment

A flight-qualified implementation of a Software Defined Radio (SDR) Operating Environment for the JPL-SDR built for the CoNNeCT Project has been developed. It is compliant with the NASA Space Telecommunications Radio System (STRS) Architecture Standard, and provides the software infrastructure for STRS compliant waveform applications. This software provides a standards-compliant abstracted view of the JPL-SDR hardware platform. It uses industry standard POSIX interfaces for most functions, as well as exposing the STRS API (Application Programming In terface) required by the standard. This software includes a standardized interface for IP components instantiated within a Xilinx FPGA (Field Programmable Gate Array). The software provides a standardized abstracted interface to platform resources such as data converters, file system, etc., which can be used by STRS standards conformant waveform applications. It provides a generic SDR operating environment with a much smaller resource footprint than similar products such as SCA (Software Communications Architecture) compliant implementations, or the DoD Joint Tactical Radio Systems (JTRS).

Lux, James P.↗

Defect measurement and analysis of JPL ground software: a case study

Ground software systems at JPL must meet high assurance standards while remaining on schedule due to relatively immovable launch dates for spacecraft that will be controlled by such systems. Toward this end, the Software Quality Improvement (SQI) project's Measurement and Benchmarking (M&B) team is collecting and analyzing defect data of JPL ground system software projects to build software defect prediction models. The aim of these models is to improve predictability with regard to software quality activities. Predictive models will quantitatively define typical trends for JPL ground systems as well as Critical Discriminators (CDs) to provide explanations for atypical deviations from the norm at JPL. CDs are software characteristics that can be estimated or foreseen early in a software project's planning. Thus, these CDs will assist in planning for the predicted degree to which software quality activities for a project are likely to deviation from the normal JPL ground system based on pasted experience across the lab.

defects↗

Ion Thruster Used to Propel the Deep Space 1 Spacecraft to Comet Encounters

The NASA Solar Electric Propulsion Technology Applications Readiness (NSTAR) Project provided a xenon ion propulsion system to the Deep Space 1 (DS1) spacecraft to validate the propulsion system as well as perform primary propulsion for asteroid and comet encounters. The On-Board Propulsion Branch of the NASA Glenn Research Center at Lewis Field developed engineering model versions of the 30-cm-diameter ion thruster and the 2.5-kW power processor unit (PPU). Glenn then transferred the thruster and PPU technologies to Hughes Electron Dynamics and managed the contract, which supplied two flight sets of thrusters and PPU s to the Deep Space 1 spacecraft and to a ground-based life verification test at the Jet Propulsion Laboratory (JPL). In addition to managing the DS1 spacecraft development, JPL was responsible for the NSTAR Project management, thruster life tests, the feed system, diagnostics, and propulsion subsystem integration. The ion propulsion development team included NASA Glenn, JPL, Hughes Electronics, Moog Inc., and Spectrum Astro Inc. The overall NSTAR subsystem dry mass, including thruster, PPU, controller, cables, and the xenon storage and feed system, is 48 kg. The mass of the xenon stored onboard DS1 was about 81 kg, and the spacecraft wet mass was approximately 500 kg.The DS1 spacecraft was launched on October 24, 1998, and on July 29, 1999, it flew within 16 miles of the small asteroid Braille (formerly 1992KD) at a relative speed of 35,000 mph. As of November 1999, the ion propulsion system had performed flawlessly for nearly 149 days of thrusting. NASA has approved an extension to the mission, which will allow DS1 to continue thrusting to encounters with two comets in 2001. The DS1 optical and plasma diagnostic instruments will be used to investigate the comet and space environments. The spacecraft is scheduled to fly past the dormant comet Wilson- Harrington in January 2001 and the very active comet Borrelly in September 2001, at which time approximately 500 days of ion engine thrusting will have been completed.

Sovey, James S.↗

V&V on a NASA Technology Demonstration Project: Low Density Supersonic Decelerator

Given their smaller budgets, but higher allowed risk posture, technology demonstration missions face different Verification and Validation (V&V) challenges than typical NASA missions. Despite these challenges, the Low Density Supersonic Decelerator (LDSD) project, managed by NASA’s Jet Propulsion Laboratory (JPL), has been extremely successful in testing new supersonic atmospheric decelerator technologies. A contribution to the project’s success is the unique V&V program that emphasized efficiency and flexibility. This paper will provide an overview of LDSD test objectives, Supersonic Flight Dynamics Tests (SFDT) performed so far, unique requirements structure and V&V processes implemented. The paper will focus on the V&V of the SFDT test architecture. Furthermore, lessons learned will also be presented at the end of the paper to aid future technology demonstration projects.

Murry, Michael L.↗

Free-Flying Magnetometer Data System

The Free-Flying Magnetometer (FFM) is an autonomous "sensorcraft" developed at the Jet Propulsion Laboratory (JPL) for the Enstrophy sounding rocket mission. This mission was a collaborative project between the University of New Hampshire, Cornell University and JPL. The science goal of the mission was the study of current filamentation phenomena in the northern auroral region through multipoint measurements of magnetic field. The technical objective of the mission was the proof of concept of the JPL FFM design and the demonstration of an in-situ multipoint measurement technique employing many free-flying spacecraft. Four FFMs were successfully deployed from a sounding rocket launched from Poker Flats, Alaska on February 11, 1999. These hockey-puck-sized (80 mm diameter, 38 mm. height, 250 gram mass) free flyers each carry a miniature 3-axis flux-gate magnetometer that output +/- 2 V signals corresponding to a +/- 60,000 nT measurement range for each axis. The FFM uses a synchronized four-channel Sigma(Delta) Analog-to-Digital Converter (ADC) having a dynamic range of +/- 2.5V and converting at a rate of 279 samples/second/channel. Three channels are used to digitize the magnetometer signals to 17-bit (1.144 nT/bit) resolution. The fourth ADC channel is multiplexed for system monitoring of four temperature sensors and two battery voltages. The FFM also contains two sun sensors, a laser diode which emits a fan-shaped beam, a miniature S-band transmitter for direct communication to the ground station antennas, an ultra-stable Temperature Compensated Crystal Oscillator (TCXO) clock, an integrated data subsystem implemented in a Field-Programmable Gate Array (FPGA), a 4 Mbit Static Random Access Memory (SRAM) for data storage and Lithium Thionyl Chloride batteries for power. Communicating commands to the FFM prior to deployment is achieved with an infrared (IR) link. The FFM IR receiver responds to 9-bit pulse coded signals that are generated by an IR Light Emitting Diode (LED) in the payload for turning FFM power on or off and placing the FFM in a test mode or flight mode. The IR links are also used to synchronize (zero) the clocks onboard all the FFMs through a reset pulse originating from the payload GPS receiver that is issued when the FFMs are in flight mode. The FPGA based data subsystem manages continuous data collection from the four ADC channels and sun sensors, formatting and storing the data to SRAM, and controlling downlink transmission. The transmitter is powered only after a 2547 frame SRAM buffer has been filled (approx. 5 minutes of data). The data is Viterbi encoded and sent to the S-band transmitter via a First-In-First-Out (FIFO) buffer who's output is clocked at 100 bits/second. After the 26-second transmission, the transmitter is turned off to reduce noise coupling to the sensitive magnetometer. The data subsystem control consists of a master state machine that performs data flow management and is interfaced through a prioritized interrupt scheme to state machines that service the ADC, sun sensors and transmitter FIFO. Continuous data collection prevents the missing of data during transmission and provides implicit time tagging of the data acquired by the ADC because of synchronization with the TCXO clock.

Blaes, B.↗