Search NASA⌕ Search

SEARCH · Search NASA

Results for “James Webb Space Telescop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Design and Lessons Learned on the Development of a Cryogenic Pupil Select Mechanism used in the Testing and Calibration of the Integrated Science Instrument Module (ISIM) on the James Webb Space Telescope (JWST)

Calibration and testing of the instruments on the Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST) is being performed by the use of a cryogenic, full-field, optical simulator that was constructed for this purpose. The Pupil Select Mechanism (PSM) assembly is one of several mechanisms and optical elements that compose the Optical Telescope Element SIMulator, or OSIM. The PSM allows for several optical elements to be inserted into the optical plane of OSIM, introducing a variety of aberrations, distortions, obscurations, and other calibration states into the pupil plane. The following discussion focuses on the details of the design evolution, analysis, build, and test of this mechanism along with the challenges associated with creating a sub arc-minute positioning mechanism operating in an extreme cryogenic environment. In addition, difficult challenges in the control system design will be discussed including the incorporation of closed-loop feedback control into a system that was designed to operate in an open-loop fashion.

Mitchell, Alissa↗

Breaking the Cost Curve: Applying Lessons Learned from the James Webb Space Telescope Development to Build More Cost-Effective Large Space Telescopes in the Future

This paper looks at the key programmatic and technical drivers of the James Webb Space Telescope and assesses ways to building more cost-effective telescopes in the future. The paper evaluates the top level programmatics for JWST along with the key technical drivers from design through integration and testing. Actual data and metrics from JWST are studied to identify what ultimately drove cost on JWST. Finally, the paper assesses areas where applying lessons learned can reduce costs on future observatories and will provide better insights into critical areas to optimize for cost.

ATLAST↗

Thermal System Verification and Model Validation for NASA's Cryogenic Passively Cooled James Webb Space Telescope (JWST)

A thorough and unique thermal verification and model validation plan has been developed for NASA s James Webb Space Telescope. The JWST observatory consists of a large deployed aperture optical telescope passively cooled to below 50 Kelvin along with a suite of several instruments passively and actively cooled to below 37 Kelvin and 7 Kelvin, respectively. Passive cooling to these extremely low temperatures is made feasible by the use of a large deployed high efficiency sunshield and an orbit location a! !he L2 Lagrange p~in!. Another enabling feature is the scale or size of the observatory that allows for large radiator sizes that are compatible with the expected power dissipation of the instruments and large format Mercury Cadmium Telluride (HgCdTe) detector arrays. This passive cooling concept is simple, reliable, and mission enabling when compared to the alternatives of mechanical coolers and stored cryogens. However, these same large scale observatory features, which make passive cooling viable, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone to most space missions thermal verification plan. JWST is simply too large in its deployed configuration to be properly thermal balance tested in the facilities that currently exist. This reality, when combined with a mission thermal concept with little to no flight heritage, has necessitated the need for a unique and alternative approach to thermal system verification and model validation. This paper describes the thermal verification and model validation plan that has been developed for JWST.

Parrish, Keith↗

Seasonal Variations of the James Webb Space Telescope Orbital Dynamics

While spacecraft orbital variations due to the Earth's tilt and orbital eccentricity are well-known phenomena, the implications for the James Webb Space Telescope present unique features. We investigate the variability of the observatory trajectory characteristics, and present an explanation of some of these effects using invariant manifold theory and local approximation of the dynamics in terms of the restricted three-body problem.

launch windows↗

Equitable and Inclusive Public Outreach with the James Webb Space Telescope: Combining Art, Science, and Technology

This archived content may contain outdated information or references that may not reflect current policy or programs. NASA’s James Webb Space Telescope revealed its first images on July 12, 2022 and has been used for groundbreaking science since. Scientific exploration transcends international borders, making a mission like Webb feasible with collaborators including the European Space Agency (ESA), and Canadian Space Agency (CSA). Communication about NASA’s discoveries about the universe, so essential for involving the public, likewise needs to be inclusive to all. Art is a tool for cutting across the boundaries of language, culture, and ability, and serves as a bridge between the technical and non-technical communities. Art makes the beauty and nuance of science and engineering accessible in ways that may not be readily perceived to those outside of those communities of practice. Equitable and inclusive outreach endeavors are challenging to implement while considering language translations, culture context, sensory methods, and technology capabilities. Formats including “Unfolding the Universe'' virtual reality platform has allowed for a wider audience to interact with the Webb images including sounds, visual aids, and talks by the scientists and engineers who worked on Webb. This VR platform has been expanded to highlight the ESA contributors to the mission and will be showcased internationally. The Webb first images were also translated into sounds as a method of inclusion for anyone with sight disabilities. We will explore some successful outreach methods and suggestions for inclusivity in future.

Outreach↗

Equitable and Inclusive Public Outreach with the James Webb Space Telescope: Combining Art, Science, and Technology

This archived content may contain outdated information or references that may not reflect current policy or programs. NASA’s James Webb Space Telescope revealed its first images on July 12, 2022 and has been used for groundbreaking science since. Scientific exploration transcends international borders, making a mission like Webb feasible with collaborators including the European Space Agency (ESA), and Canadian Space Agency (CSA). Communication about NASA’s discoveries about the universe, so essential for involving the public, likewise needs to be inclusive to all. Art is a tool for cutting across the boundaries of language, culture, and ability, and serves as a bridge between the technical and non-technical communities. Art makes the beauty and nuance of science and engineering accessible in ways that may not be readily perceived to those outside of those communities of practice. Equitable and inclusive outreach endeavors are challenging to implement while considering language translations, culture context, sensory methods, and technology capabilities. Formats including “Unfolding the Universe'' virtual reality platform has allowed for a wider audience to interact with the Webb images including sounds, visual aids, and talks by the scientists and engineers who worked on Webb. This VR platform has been expanded to highlight the ESA contributors to the mission and will be showcased internationally. The Webb first images were also translated into sounds as a method of inclusion for anyone with sight disabilities. We will explore some successful outreach methods and suggestions for inclusivity in future.

Outreach↗

Mid-Course Correction Contingency Analysis for the James Webb Space Telescope

This investigation details two analyses performed as part of an early orbit contingency operations study related to the James Webb Space Telescope’s limited ability to maneuver in a sunward direction. First, contingency planning developed by the Flight Dynamics Team and shared with the Science and Operations Center to quickly assess the available timeline in the event of a delayed mid-course correction maneuver is presented. Second, the methods for recovering from a maneuver over-burn using observatory geometry to exploit the solar radiation pressure perturbation contributions from the large sunshield as well as adjusting the maneuver campaign to recover the observatory are examined.

JWST↗

Creating the Thermal Environment for Safely Testing the James Webb Space Telescope at the Johnson Space Center's Chamber A

Chamber A is the largest thermal vacuum chamber at the Johnson Space Center and is one of the largest space environment chambers in the world. The chamber is 19.8 m (65 ft) in diameter and 36.6 m (120 ft) tall and is equipped with cryogenic liquid nitrogen panels (shrouds) and gaseous helium shrouds to create a simulated space environment. The chamber was originally built to support testing of the Apollo Service and Command Module for lunar missions, but underwent major modifications to be able to test the James Webb Space Telescope in a simulated deep space environment. To date seven tests have been performed in preparation of testing the flight optics for the James Webb Space Telescope (JWST). Each test has had a uniquie thermal profile and set of thermal requirements for cooling down and warming up, controlling contamination, and releasing condensed air. These range from temperatures from 335K to 15K, with tight uniformity and controllability for maintining thermal stability and pressure control. One unique requirement for two test was structurally proof loading hardware by creating thermal gradients at specific temperatures. This paper will discuss the thermal requirements and goals of the tests, the original requirements of the chamber thermal systems for planned operation, and how the new requirements were met by the team using the hardware, system flexiblilty, and engineering creativity. It will also discuss the mistakes and successes to meet the unique goals, especially when meeting the thermal proof load.

Homan, Jonathan L.↗

The Integration and Test Program of the James Webb Space Telescope

With the delivery of its flight scientific instruments and the completion of all telescope optics both scheduled to occur later this year, the James Webb Space Telescope (JWST) will enter into a challenging integration and test (I&T) program. Highlights of that program include cryo-vacuum tests of the Integrated Science Instrument Module (ISIM) at Goddard Space Flight Center, ambient integration of the ISIM and the Optical Telescope Element (OTE) at Goddard, and an end-to-end cryo-vacuum test of the OTE + ISIM system at Johnson Space Center. We review the overall flow of the I&T program, highlighting the key activities and the critical verifications to be performed at each step.

Randy, Kimble↗

Creating the Required Deep Space Environments for Testing the James Webb Space Telescope (JWST) at NASA Johnson Space Center's Chamber A

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2021. NASA was directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. This paper will discuss the thermal vacuum test of the Optical Telescope Element (OTE) plus Integrated Science Instrument Module (ISIM) (OTIS) as well as the extensive series of tests that were performed to incrementally validate the operations and performance of the Chamber and Ground Support Equipment (GSE). Each test required a unique thermal vacuum profile for cool down and warm up, steady state operations, GSE testing and contamination control. Select results will be presented on Facility Functional Testing, Chamber Bake-out, GSE Cryo-Proof Testing, Chamber Commissioning, the Optical Ground Support Equipment (OGSE) Test series and the final thermal vacuum test of the OTIS with respect to facility operations to meet JWST program test requirements.

Francis, Andrew↗

Integrated Modeling Activities for the James Webb Space Telescope: Optical Jitter Analysis

This is a continuation of a series of papers on the integrated modeling activities for the James Webb Space Telescope(JWST). Starting with the linear optical model discussed in part one, and using the optical sensitivities developed in part two, we now assess the optical image motion and wavefront errors from the structural dynamics. This is often referred to as "jitter: analysis. The optical model is combined with the structural model and the control models to create a linear structural/optical/control model. The largest jitter is due to spacecraft reaction wheel assembly disturbances which are harmonic in nature and will excite spacecraft and telescope structural. The structural/optic response causes image quality degradation due to image motion (centroid error) as well as dynamic wavefront error. Jitter analysis results are used to predict imaging performance, improve the structural design, and evaluate the operational impact of the disturbance sources.

Hyde, T. Tupper↗

High Speed Interferometry for James Webb Space Telescope Testing

High speed interferometry (HSI) was one of the enabling technologies to the successful development and testing of the James Webb Space Telescope (JWST) optical system that consists of a 6.5 meter diameter, segmented, lightweight primary mirror and lightweight carbon fiber composite structure. This paper reviews the interferometry that was used first to demonstrate that the lightweight mirror and lightweight composite structure technologies were ready for JWST and later to verify performance of the fully assembled primary mirror and the telescope at cryogenic temperature. The tools and techniques developed for JWST are being advanced to benefit future missions that require stable mirrors, precision metering structures, active controls and diagnostic metrology.

B Saif↗

Expanding Impact with the James Webb Space Telescope: Combining Art, Science, and Technology for Public Outreach

This archived content may contain outdated information or references that may not reflect current policy or programs. NASA’s James Webb Space Telescope revealed its first images on July 12, 2022 and has been used for groundbreaking science since. Scientific exploration transcends international borders, making a mission like Webb feasible with collaborators including the European Space Agency (ESA), and Canadian Space Agency (CSA). Communication about NASA’s discoveries about the universe, so essential for involving the public, likewise needs to be inclusive to all. Art is a tool for cutting across the boundaries of language, culture, and ability, and serves as a bridge between the technical and non-technical communities. Art makes the beauty and nuance of science and engineering accessible in ways that may not be readily perceived to those outside of those communities of practice. Equitable and inclusive outreach endeavors are challenging to implement while considering language translations, culture context, sensory methods, and technology capabilities. Formats including “Unfolding the Universe'' virtual reality platform has allowed for a wider audience to interact with the Webb images including sounds, visual aids, and talks by the scientists and engineers who worked on Webb. This VR platform has been expanded to highlight the ESA contributors to the mission and will be showcased internationally. The Webb first images were also translated into sounds as a method of inclusion for anyone with sight disabilities. We will explore some successful outreach methods and suggestions for inclusivity in future.

Outreach↗

Navigation Concepts for the James Webb Space Telescope

This paper evaluates the performance that can be achieved using candidate ground and onboard navigation approaches for operation of the James Webb Space Telescope, which will be in an orbit about the Sun-Earth L2 libration point. The ground navigation approach processes standard range and Doppler measurements from the Deep Space Network The onboard navigation approach processes celestial object measurements and/or ground-to- spacecraft Doppler measurements to autonomously estimate the spacecraft s position and velocity and Doppler reference frequency. Particular attention is given to assessing the absolute position and velocity accuracy that can be achieved in the presence of the frequent spacecraft reorientations and momentum unloads planned for this mission. The ground navigation approach provides stable navigation solutions using a tracking schedule of one 30-minute contact per day. The onboard navigation approach that uses only optical quality celestial object measurements provides stable autonomous navigation solutions. This study indicates that unmodeled changes in the solar radiation pressure cross-sectional area and modeled momentum unload velocity changes are the major error sources. These errors can be mitigated by modeling these changes, by estimating corrections to compensate for the changes, or by including acceleration measurements.

Long, Anne↗

An Overview of the James Webb Space Telescope Project

The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

Sabelhaus, Phillip A.↗

Wavefront Sensing with the Fine Guidance Sensor for James Webb Space Telescope

An analysis is presented that utilizes the Fine Guidance Sensor (FGS) for focal-plane wavefront sensing (WFS) for the James Webb Space Telescope (JWST). WFS with FGS increases the number of wavefront measurements taken in field of the telescope, but has many challenges over the other JWST instruments that make it unique, such as; less sampling of the Point Spread Function (PSF), a smaller diversity-defocus range, a smaller image detector size, and a polychromatic object or source. Additionally, presented is an analysis of sampling for wavefront sensing. Results are shown based on simulations of flight and the cryogenic optical testing at NASA Johnson Space Center.

Smith, J. Scott↗

James Webb Space Telescope Integrated Science Instrument Module Calibration and Verification of High-Accuracy Instrumentation to Measure Heat Flow in Cryogenic Testing

The James Webb Space Telescope (JWST) is an upcoming flagship observatory mission scheduled to be launched in 2018, Three of the four science instruments are passively cooled to their operational temperature range of 36K to 40K, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. The requirement for multiple thermal zones results in the instruments being thermally connected to five external radiators via individual high purity aluminum heat straps. Thermal-vacuum and thermal balance testing of the flight instruments at the Integrated Science Instrument Module (ISIM) element level will take place within a newly constructed shroud cooled by gaseous helium inside Goddard Space Flight Center's (GSFC) Space Environment Simulator (SES). The flight external radiators are not available during ISIM-Ievel thermal vacuum/thermal testing, so they will be replaced in test with stable and adjustable thermal boundaries with identical physical interfaces to the flight radiators. Those boundaries are provided on specially designed test hardware which measures the heat flow within each of the five heat straps to an accuracy of less than 2 m W, which is less than 5% of the minimum predicted heat flow values. This is essential to ISIM thermal model correlation, since thermal models are more accurately correlated when temperature data is supplemented by accurate knowledge of heat flows. Devices that measure heat flow in this manner have historically been referred to as "Q-meters". Perhaps the most important feature of the design of the Q-meters is that it does not depend on the absolute accuracy of its temperature sensors, but rather on a difference in heater power, for which a table is empirically developed during a calibration campaign in a small chamber at GSFC. This paper discusses the Q-meter calibration procedure including calibration chamber modifications and accommodations, the handling of differing conditions between calibration and usage, the calibration process itself, and the results of the tests used to determine if the calibration is successful.

Comber, Brian↗