Search NASA⌕ Search

SEARCH · Search NASA

Results for “LEED”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Wynkoop Building Performance Measurement: Water

This report is a summary of the water analysis performance for the Denver, Colorado Wynkoop Building. The Wynkoop Building (Figure 1) was built in 2006 as the Environmental Protection Agency (EPA) Region 8 Headquarters intended to house over 900 occupants in the 301,292 gross square feet (248,849 rentable square feet). The building was built on a brownfield in the Lower Downtown Historic District as part of an urban redevelopment effort. The building was designed and constructed through a public-private partnership with the sustainable design elements developed jointly by General Services Administration (GSA) and EPA. That partnership is still active with all parties still engaged to optimize building operations and use the building as a Learning Laboratory. The building design achieved U.S. Green Building Council Leadership in Energy and Environmental Design for New Construction (LEED-NC) Gold Certification in 2008 (Figure 2) and a 2008 EPA Energy Star Rating of 96 with design highlights that include: (1) Water use was designed to use 40% less than a typical design baseline. The design included low flow fixtures, waterless urinals and dual flush toilets; (2) Native and adaptive vegetation were selected to minimize the need for irrigation water for landscaping; and (3) Energy use intensity was modeled at 66.1 kBtus/gross square foot, which is 39% better than ASHRAE 90.1 1999. The Wynkoop Building water use (10 gallons/square foot) was measured at lower than industry average (15 gallons/square foot) and GSA goals (13 gallons/square foot), however, it was higher than building management expected it would be. The type of occupants and number of occupants can have a significant impact on fixture water use. The occupancy per floor varied significantly over the study time period, which added uncertainty to the data analysis. Investigation of the fixture use on the 2nd, 5th, and 7th floors identified potential for water use reduction if the flush direction of the dual-flush toilet handles was reversed. The building management retrofitted the building's toilets with handles that operated on reduced flush when pushed down (0.8 gallons) and full flush when pulled up (1.1 gallons). The water pressure on the 5th floor (< 30 psi) is less than half the pressure on the 7th floor (>80 psi). The measured water savings post-retrofit was lower on the 5th floor than the 7th floor. The differences in water pressure may have had an impact on the quantity of water used per floor. The second floor water use was examined prior to and following the toilet fixture retrofit. This floor is where conference rooms for non-building occupants are available for use, thus occupancy is highly variable. The 3-day average volume per flush event was higher post-retrofit (0.79 gallons per event), in contrast to pre-retrofit (0.57 gallons per event). There were 40% more flush events post retrofit, which impacted the findings. Water use in the third floor fitness center was also measured for a limited number of days. Because of water line accessibility, only water use on the men's side of the fitness center was measured and from that the total fitness center water use was estimated. Using the limited data collected, the fitness center shower water use is approximately 2% of the whole building water use. Overall water use in the Wynkoop Building is below the industry baseline and GSA expectations. The dual flush fixture replacement appears to have resulted in additional water savings that are expected to show a savings in the total annual water use.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Value of Energy Performance and Green Attributes in Buildings: A Review of Existing Literature and Recommendations for Future Research

Labels, certifications, and rating systems for energy efficiency performance and “green” attributes of buildings have been available in the U.S. for over 10 years, and used extensively in the European Union and Australia for longer. Such certifications and ratings can make energy efficiency more visible, and could help spur demand for energy efficiency if these designations are shown to have a positive impact on sales or rental prices. This policy brief discusses the findings and methodologies from recent studies on this topic, and suggests recommendations for future research. Although there have been just a handful of studies within the last 10 years that have investigated these effects, a few key findings emerge: To maximize sales price impact, label or rating information must be disclosed early and visibly in the sales process; The approach to evaluating energy efficiency labels (e.g., ENERGY STAR) and general “green” certifications (e.g., LEED or GreenPoint Rated) may need to be different, depending on the type, vintage and market penetration of the label; Collaborative efforts to promote label adoption and build a large dataset of labeled buildings will be required to produce reliable study results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fox Ridge Energy and Education Institute Project Development Final Report

Faith is located in the northeast corner of Meade County South Dakota. The economy is agricultural; principally large cattle operations on sizeable ranches. As with most rural communities, the economy is under pressure with inadequate taxes and few economic development opportunities. In 2004 the single school house, constructed in the early 1900s, was condemned by the state fire marshal. The school serves K-12 and the school board had to locate, acquire and install modular trailers to support the children; population about 200. The state has not, and will not, provide funds to construct a new school as the political agenda is to focus on higher education. While a new school is being constructed, the Fox Ridge participants believe that the new school provides less than optimum services and facilities for the students. Fox Ridge Energy and Educational Institute has dedicated significant development funds and time in attempting to expand the public education system through the proceeds of this wind farm A group of concerned citizens formed a 501C-3 tax exempt entity to examine methods of obtaining the capital to increase the capabilities of the school. In considering the resources available to the community, it was clear that the wind resource was excellent and with the continuing growth of the commercial wind industry, the group focused on wind energy as the primary opportunity to create a successful economic enterprise. The group lobbied for and received an ear mark from Congress in 2005 for $\$$500,000 to conduct feasibility and project development studies for the project. Matching funds of $\$$125,000 were required, which were raised locally along with an additional $\$$700,000. The community has provided additional support letters. Affected landowners also supported Fox Ridge. Three (3) fifty meter anemometers were installed in September 2005. Planning began for finance structures that would provide the targeted funds for the construction of a LEED certified school of about $\$$20 million. Further, the group has a goal of obtaining about $\$$2 million per year to support the operation of the school, including increased pay for teachers and restoration of educational programs which had to be reduced. The Faith School currently remains accredited through the use of distance learning for some of its core classes. The group has requested that Dale Osborn, Manager of Disgen Holdings, LLC (Disgen), an experienced wind energy developer, provide assistance in this opportunity. Osborn has agreed and is the author of this paper.

17 WIND ENERGY↗

100% DD Energy Model Update

The Miami Science Museum energy model has been used during DD to test the building's potential for energy savings as measured by ASHRAE 90.1-2007 Appendix G. This standard compares the designed building's yearly energy cost with that of a code-compliant building. The building is currently on track show 20% or better improvement over the ASHRAE 90.1-2007 Appendix G baseline; this performance would ensure minimum compliance with both LEED 2.2 and current Florida Energy Code, which both reference a less strict version of ASHRAE 90.1. In addition to being an exercise in energy code compliance, the energy model has been used as a design tool to show the relative performance benefit of individual energy conservation measures (ECMs). These ECMs are areas where the design team has improved upon code-minimum design paths to improve the energy performance of the building. By adding ECMs one a time to a code-compliant baseline building, the current analysis identifies which ECMs are most effective in helping the building meet its energy performance goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2014 First Quarterly Report

The CRADA between PNNL, Autodesk, Toyota and Magna has been effective since October 28th, 2013. The whole team including CRADA and subcontract partners kicked off the project technically on November 1st, 2013. This report describes work performed during the first quarter of FY 2014. The following technical progresses have been made toward project milestones: 1) The project kickoff meeting was organized at PlastiComp, Inc. in Winona on November 13th, 2013 involving all the project partners. During this meeting the research plan and Gantt chart were discussed and refined. The coordination of the research activities among the partners was also discussed to ensure that the deliverables and timeline will be met. 2) Autodesk delivered a research version of ASMI to PNNL for process modeling using this tool under the project. PNNL installed this research version on a PNNL computer and tested it. Currently, PNNL is using ASMI to prepare the models for PlastiComp plaques. 3) PlastiComp has compounded long carbon-fiber reinforced polypropylene and polyamide 6,6 compounds for rheological and thermal characterization tests by the Autodesk laboratories in Melbourne, Australia. 4) Initial mold flow analysis was carried out by PlastiComp to confirm that the 3D complex part selected by Toyota as a representative automotive part is moldable. 5) Toyota, Magna, PlastiComp and PNNL finalized the planning for molding the Toyota 3D complex part. 6) Purdue University worked with PNNL to update and specify the test matrix for characterization of fiber length/orientation. 7) Purdue University developed tools to automate the data collection and analysis of fiber length and orientation measurements. 8) Purdue University designed and specified equipment to replace the need for equipment using the technology established by the University of Leeds at General Motors.

42 ENGINEERING↗

Analysis of the Chinese Market for Building Energy Efficiency

China will account for about half of the new construction globally in the coming decade. Its floorspace doubled from 1996 to 2011, and Chinese rural buildings alone have as much floorspace as all of U.S. residential buildings. Building energy consumption has also grown, increasing by over 40% since 1990. To curb building energy demand, the Chinese government has launched a series of policies and programs. Combined, this growth in buildings and renovations, along with the policies to promote green buildings, are creating a large market for energy efficiency products and services. This report assesses the impact of China’s policies on building energy efficiency and on the market for energy efficiency in the future. The first chapter of this report introduces the trends in China, drawing on both historical analysis, and detailed modeling of the drivers behind changes in floorspace and building energy demand such as economic and population growth, urbanization, policy. The analysis describes the trends by region, building type and energy service. The second chapter discusses China’s policies to promote green buildings. China began developing building energy codes in the 1980s. Over time, the central government has increased the stringency of the code requirements and the extent of enforcement. The codes are mandatory in all new buildings and major renovations in China’s cities, and they have been a driving force behind the expansion of China’s markets for insulation, efficient windows, and other green building materials. China also has several other important policies to encourage efficient buildings, including the Three-Star Rating System (somewhat akin to LEED), financial incentives tied to efficiency, appliance standards, a phasing out of incandescent bulbs and promotion of efficient lighting, and several policies to encourage retrofits in existing buildings. In the third chapter, we take “deep dives” into the trends affecting key building components. This chapter examines insulation in walls and roofs; efficient windows and doors; heating, air conditioning and controls; and lighting. These markets have seen significant growth because of the strength of the construction sector but also the specific policies that require and promote efficient building components. At the same time, as requirements have become more stringent, there has been fierce competition, and quality has at time suffered, which in turn has created additional challenges. Next we examine existing buildings in chapter four. China has many Soviet-style, inefficient buildings built before stringent requirements for efficiency were more widely enforced. As a result, there are several specific market opportunities related to retrofits. These fall into two or three categories. First, China now has a code for retrofitting residential buildings in the north. Local governments have targets of the number of buildings they must retrofit each year, and they help finance the changes. The requirements focus on insulation, windows, and heat distribution. Second, the Chinese government recently decided to increase the scale of its retrofits of government and state-owned buildings. It hopes to achieve large scale changes through energy service contracts, which creates an opportunity for energy service companies. Third, there is also a small but growing trend to apply energy service contracts to large commercial and residential buildings. This report assesses the impacts of China’s policies on building energy efficiency. By examining the existing literature and interviewing stakeholders from the public, academic, and private sectors, the report seeks to offer an in-depth insights of the opportunities and barriers for major market segments related to building energy efficiency. The report also discusses trends in building energy use, policies promoting building energy efficiency, and energy performance contracting for public building retrofits.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Panels on Hudson County Facilities

This project involved the installation of an 83 kW grid-connected photovoltaic system tied into the energy management system of Hudson County's new 60,000 square foot Emergency Operations and Command Center and staff offices. Other renewable energy features of the building include a 15 kW wind turbine, geothermal heating and cooling, natural daylighting, natural ventilation, gray water plumbing system and a green roof. The County intends to seek Silver LEED certification for the facility.

Photovoltaic↗

Comparative Policy Study for Green Buildings in U.S. and China

Prominent barriers facing the U.S. green building industry include the fact that government bodies that supervise health, fire safety, land, and other public operations are slow to revise codes to accommodate green building (regulatory barrier). In China, the lack of a green building professional accreditation process similar to the Leadership in Energy and Environmental Design (LEED) AP process limits the green building workforce capacity development (informational barrier). The main policies highlighted in this report to tackle these barriers are 1) comprehensive codes and labeling plan (informational, institutional), 2) government-led targets and demonstrations (risk), 3) education and awareness programs (informational), 4) fiscal policy that supports green building investment (financial), and 5) integrated design promotion (institutional, financial).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Predictive Engineering Tools for Injection-molded Long-Carbon-Fiber Thermoplastic Composites - FY 2014 Third Quarterly Report

This report describes the technical progresses made during the third quarter of FY 2014: 1) Autodesk introduced the options for fiber inlet condition to the 3D solver. These options are already available in the mid-plane/dual domain solver. 2) Autodesk improved the accuracy of 3D fiber orientation calculation around the gate. 3) Autodesk received consultant services from Prof. C.L. Tucker at the University of Illinois on the implementation of the reduced order model for fiber length, and discussed with Prof. Tucker the methods to reduce memory usage. 4) PlastiComp delivered to PNNL center-gated and edge-fan-gated 20-wt% to 30-wt% LCF/PP and LCF/PA66 (7”x7”x1/8”) plaques molded by the in-line direct injection molding (D-LFT) process. 5) PlastiComp molded ASTM tensile, flexural and impact bars under the same D-LFT processing conditions used for plaques for Certification of Assessment and ascertaining the resultant mechanical properties. 6) Purdue developed a new polishing routine, utilizing the automated polishing machine, to reduce fiber damage during surface preparation. 7) Purdue used a marker-based watershed segmentation routine, in conjunction with a hysteresis thresholding technique, for fiber segmentation during fiber orientation measurement. 8) Purdue validated Purdue’s fiber orientation measurement method using the previous fiber orientation data obtained from the Leeds machine and manually measured data by the University of Illinois. 9) PNNL conducted ASMI mid-plane analyses for a 30wt% LCF/PP plaque and compared the predicted fiber orientations with the measured data provided by Purdue University at the selected locations on this plaque. 10) PNNL put together the DOE 2014 Annual Merit Review (AMR) presentation with the team and presented it at the AMR meetings on June 17, 2014. 11) PNNL built ASMI dual domain models for the Toyota complex part and commenced mold filling analyses of the complex part with different wall thicknesses in order to support part molding. 12) Toyota and Magna discussed with PNNL on tool modification for molding the complex part. Toyota sent the CAD files of the complex part to PNNL to build ASMI models of the part for mold filling analysis to provide guidance to tooling and part molding.

Injection molding, long-fiber thermoplastic, carbo↗

Keeping Energy Savings in the LOOP

Mesa Lane Partners (MLP) partnered with the U.S. Department of Energy (DOE) to develop and implement solutions to a build a new, low-energy mixed-use building that consumes at least 50% less energy than requirements set by Energy Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of America (IESNA), as part of DOE’s Commercial Building Partnerships (CBP)3 Program. Lawrence Berkeley National Laboratory (LBNL) provided technical expertise in support of this DOE program. The privately developed 46,000-square-foot LOOP project, which is intended to provide affordable off-campus student housing in an underserved community next to University of California at Santa Barbara, will contain more than 7,000 square feet of retail space, a roof deck, an event space, a gym, and 48 apartments. The project developer, MLP, is aiming to exceed CBP requirement, targeting energy consumption that is at least 65% less than that required by the standard. If the LOOP meets this goal, it is expected to achieve Leadership in Energy and Environmental Design (LEED) Gold certification. To meet this goal, the project design incorporates a variety of energy efficiency measures (EEMs) that address the needs of the multiple use types that the project will house.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pecan Street Grid Demonstration Program. Final technology performance report

This document represents the final Regional Demonstration Project Technical Performance Report (TPR) for Pecan Street Inc.’s (Pecan Street) Smart Grid Demonstration Program, DE-OE-0000219. Pecan Street is a 501(c)(3) smart grid/clean energy research and development organization headquartered at The University of Texas at Austin (UT). Pecan Street worked in collaboration with Austin Energy, UT, Environmental Defense Fund (EDF), the City of Austin, the Austin Chamber of Commerce and selected consultants, contractors, and vendors to take a more detailed look at the energy load of residential and small commercial properties while the power industry is undergoing modernization. The Pecan Street Smart Grid Demonstration Program signed-up over 1,000 participants who are sharing their home or businesses’s electricity consumption data with the project via green button protocols, smart meters, and/or a home energy monitoring system (HEMS). Pecan Street completed the installation of HEMS in 750 homes and 25 commercial properties. The program provided incentives to increase the installed base of roof-top solar photovoltaic (PV) systems, plug-in electric vehicles with Level 2 charging, and smart appliances. Over 200 participants within a one square mile area took advantage of Austin Energy and Pecan Street’s joint PV incentive program and installed roof-top PV as part of this project. Of these homes, 69 purchased or leased an electric vehicle through Pecan Street’s PV rebate program and received a Level 2 charger from Pecan Street. Pecan Street studied the impacts of these technologies along with a variety of consumer behavior interventions, including pricing models, real-time feedback on energy use, incentive programs, and messaging, as well as the corresponding impacts on Austin Energy’s distribution assets.The primary demonstration site was the Mueller community in Austin, Texas. The Mueller development, located less than three miles from the Texas State Capitol, is a 711-acre LEED Neighborhood Development mixed-use, urban infill redevelopment on the site of Austin’s former airport, currently under development through a public-private project between the City of Austin, and Catellus Austin LLC. Currently, Mueller is less than 50% complete and more than 3,500 people live or work at Mueller. At full build-out, the project will include more than 3 million square feet of commercial and institutional space, more than 13,000 residents from approximately 5,700 single-family and multi-family dwelling units. Figure 1 shows a Google Map image of the Mueller community, zoomed in on the residential streets participating in the project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Project Management Plan/Progress Report: UT/GTKS Training Program Development for Commercial Building Operators (Final Report)

Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation standards established by UT and will complete the contact hours required of training to apply to the Certification on Energy Management (CEM) offered by the Association of Energy Engineers (AEE). The CBO training program consists of a combination of theory (classroom), online & computer simulation, laboratory & hands on (onsite) training lessons. The training is addressed four basic learning elements: (1) Learn the Technology; (2) Practice Skills with hands-on the Energy Simulation Builder program; (3) Final Project and Presentation; and, (4) Accreditation and Certifications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Testing of Compartmentalization Methods for Multifamily Construction

The 2012 IECC has an airtightness requirement of 3 air changes per hour at 50 Pascals test pressure for both single-family and multifamily construction in Climate Zones 3-8. Other programs (LEED, ASHRAE 189, ASHRAE 62.2) have similar or tighter compartmentalization requirements, driving the need for easier and more effective methods of compartmentalization in multifamily buildings. Builders and practitioners have found that fire-resistance rated wall assemblies are a major source of difficulty in air sealing/compartmentalization, particularly in townhouse construction. This problem is exacerbated when garages are “tucked in” to the units and living space is located over the garages. In this project, Building Science Corporation examined the taping of exterior sheathing details to improve air sealing results in townhouse and multifamily construction, when coupled with a better understanding of air leakage pathways. Current approaches are cumbersome, expensive, time consuming, and ineffective; these details were proposed as a more effective and efficient method. The effectiveness of these air sealing methods was tested with blower door testing, including “nulled” or “guarded” testing (adjacent units run at equal test pressure to null out inter-unit air leakage, or “pressure neutralization”). Pressure diagnostics were used to evaluate unit-to-unit connections and series leakage pathways (i.e., air leakage from exterior, into the fire-resistance rated wall assembly, and to the interior).

42 ENGINEERING↗

Virtual Design Studio (VDS) - Development of an Integrated Computer Simulation Environment for Performance Based Design of Very-Low Energy and High IEQ Buildings

Executive Summary The objective of this study was to develop a “Virtual Design Studio (VDS)”: a software platform for integrated, coordinated and optimized design of green building systems with low energy consumption, high indoor environmental quality (IEQ), and high level of sustainability. This VDS is intended to assist collaborating architects, engineers and project management team members throughout from the early phases to the detailed building design stages. It can be used to plan design tasks and workflow, and evaluate the potential impacts of various green building strategies on the building performance by using the state of the art simulation tools as well as industrial/professional standards and guidelines for green building system design. Engaged in the development of VDS was a multi-disciplinary research team that included architects, engineers, and software developers. Based on the review and analysis of how existing professional practices in building systems design operate, particularly those used in the U.S., Germany and UK, a generic process for performance-based building design, construction and operation was proposed. It distinguishes the whole process into five distinct stages: Assess, Define, Design, Apply, and Monitoring (ADDAM). The current VDS is focused on the first three stages. The VDS considers building design as a multi-dimensional process, involving multiple design teams, design factors, and design stages. The intersection among these three dimensions defines a specific design task in terms of “who”, “what” and “when”. It also considers building design as a multi-objective process that aims to enhance the five aspects of performance for green building systems: site sustainability, materials and resource efficiency, water utilization efficiency, energy efficiency and impacts to the atmospheric environment, and IEQ. The current VDS development has been limited to energy efficiency and IEQ performance, with particular focus on evaluating thermal performance, air quality and lighting environmental quality because of their strong interaction with the energy performance of buildings. The VDS software framework contains four major functions: 1) Design coordination: It enables users to define tasks using the Input-Process-Output flow approach, which specifies the anticipated activities (i.e., the process), required input and output information, and anticipated interactions with other tasks. It also allows task scheduling to define the work flow, and sharing of the design data and information via the internet. 2) Modeling and simulation: It enables users to perform building simulations to predict the energy consumption and IEQ conditions at any of the design stages by using EnergyPlus and a combined heat, air, moisture and pollutant simulation (CHAMPS) model. A method for co-simulation was developed to allow the use of both models at the same time step for the combined energy and indoor air quality analysis. 3) Results visualization: It enables users to display a 3-D geometric design of the building by reading BIM (building information model) file generated by design software such as SketchUp, and the predicted results of heat, air, moisture, pollutant and light distributions in the building. 4) Performance evaluation: It enables the users to compare the performance of a proposed building design against a reference building that is defined for the same type of buildings under the same climate condition, and predicts the percent of improvements over the minimum requirements specified in ASHRAE Standard 55-2010, 62.1-2010 and 90.1-2010. An approach was developed to estimate the potential impact of a design factor on the whole building performance, and hence can assist the user to identify areas that have most pay back for investment. The VDS software was developed by using C++ with the conventional Model, View and Control (MVC) software architecture. The software has been verified by using a simple 3-zone case building. The application of the VDS concepts and framework for building design and performance analysis has been illustrated by using a medium-sized, five story office building that received LEED Platinum Certification from USGBC.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Looking For Value in All The Wrong Places. Toward Expanded Consideration of Green and High Performance Attributes in Non-residential Property Appraisals in the United States

Large numbers of commercial buildings have sought to improve their energy and environmental performance, with half of all leasable U.S. offices now designated at some level of “green”. All proper/es fall somewhere on the green/high-­performance spectrum (above and below average) whether or not they bear a formal label or ra/ng.1 Variations in the level of performance can either positively or negatively influence value. This component of value can be shaped by many factors, from utility costs to tenant/owner preferences that translate into income (rent levels, vacancy rates, lease-­up /mes, etc.). Occupant perceptions of indoor environmental quality are another potential influence on value. While there has been little uptake of this thinking by practicing appraisers, the increased prevalence of green/HP practices combined with concerns about appraiser competency are compelling the industry to adapt their traditional techniques to this new driver of value. However, the overly narrow focus of policymakers on appraisal of labeled or rated exemplary buildings (e.g., LEED or ENERGY STAR Certified) represents a significant missed opportunity. Any level of green or energy performance can in fact influence value, including below-­average performance (a.k.a. “brown discount”), irrespec/ve of whether or not the building has been formally rated. Another surmountable challenge is the limitations to non-­appraisers’ understanding of the appraisal process (and constraints therein). A crucial byproduct of this is unrealistic expectations of what appraisers can and will do in the marketplace. This report identifies opportunities for catalyzing improvement of the green/HP appraisal process, which apply to all involved actors—from owner, report-­ordering client, the appraiser, and the appraisal reviewer—and fostering more demand for appraisals that recognize green/HP property attributes. The intended audience is primarily the public policy community and other stakeholders outside the formal appraisal community who can contribute to the broader effort to advance professional practces. The discussion begins with a descripton of the appraisal process and the points at which green/HP consideratons can enter the analysis. A series of major barriers to better practces are identfied along with approaches to reducing them.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A New Appraisal- Lessons from the History of Efforts to Value Green and High-Performance Home Attributes in the United States

Rigorous consideration of green and high-performance (“green/HP”) features is rarely included in the property valuation process._ To help illuminate why this is the case, this report takes stock of the history of efforts to improve practices, and identifies barriers that have emerged and opportunities for overcoming them. Particular emphasis is placed on what energy and environmental policymakers and other stakeholders outside the appraisal community can contribute to the broader effort to advance professional practices. The history has unfolded in parallel with turbulent periods in the housing market for which appraisers and their customers are deemed to share responsibility, followed by cycles of regulations, siloing of appraisers in the name of professional integrity, and commoditization of the valuation process itself. This pattern has important ramifications for aspirations that appraisers engage more fully in identifying and valuing the green/HP characteristics of homes. On the one hand, it is legally and ethically incumbent on appraisers to do so, yet on the other hand it is perceived as a risky avenue to follow. Risks arise where findings can be challenged as either over- or under-stating value, together with a market environment in which the complexity of their assignments increases despite downward pressure on appraiser fees. While efforts to address green/HP considerations date back to the early 1980s, the vast majority of activity has taken place within the past five years. Many players have engaged in the efforts to promote improved valuation practices. These include the Appraisal Foundation, The Appraisal Institute, Colorado Energy Office, Earth Advantage, EcoBroker, Elevate Energy, Fannie Mae, Federal Housing Administration, Home Innovation Research Labs, The Institute for Market Transformation, Northwest Energy Efficiency Alliance, National Association of Homebuilders, National Association of State Energy Officials, National Association of Appraisers, RESNET, USEPA, USDOE and its National Laboratories, the U.S. Green Buildings Council, and the Vermont Green Homes Alliance. Many activities have resulted, ranging from trainings, to data-gathering instruments, and the emergence of a literature attempting to statistically isolate the effects of green/HP characteristics on home values. In some cases, the results of studies have been overgeneralized and oversold, and embodied flawed methods. Although the green/HP community has encouraged appraisers to focus on exemplary buildings (e.g., LEED or ENERGY STAR Certified), any level of green or energy performance can in fact influence value, including below-average performance (a.k.a. “brown discount”), irrespective of whether or not the building has been formally rated. This overly narrow focus represents a significant missed opportunity. Other surmountable challenges include limitations to non-appraisers’ understanding of the appraisal process (and practical constraints therein). A byproduct of this can be unrealistic expectations of what appraisers can and will do in the marketplace. These challenges notwithstanding, the environment for moving forward has improved. There is better data today (a critical need); expanded efforts to disclose energy use information (characteristics, consumption, bills); improved and more pervasive building energy codes, building rating and labeling initiatives; and a host of federal, state, and local policies that have collectively brought green/HP practices much more into the mainstream. Meanwhile, a renewed focus on professional standards of care and competency for assessing green/HP homes make it increasingly important for appraisers to consider these factors in their assignments. Despite the past four decades of studies, there is little if any discernible uptake of these practices by the appraisal practice at large. It would behoove interested parties to step back and consider what new strategies might be productive. A key element of any new plan should be to reset the nature of interactions with the industry, with the goal a more collaborative, two-way discussion to help improve outsiders’ understanding of the valuation process. It is not only the appraiser that needs to be engaged and could benefit from awareness raising. Homeowners, builders, lenders, utilities, insurance companies should also provide input on how green/HP factors impact property valuations and ways to accurately reflect these considerations in appraisals and real estate transactions more broadly. Given extensive inertia within the appraisal industry and a mixed history of interactions with the non-appraisal stakeholders, it is unlikely that the status quo will achieve much unless followed with more coordinated and persistent efforts. Workshops, studies, and memoranda of understanding will not on their own have much impact, and do not address deeper structural issues. Expectations are often unrealistic and not attentive to real-world constraints faced by appraisers. The report identifies key barriers impeding more thorough consideration of green/HP factors in residential real estate appraisals, and solutions for mitigating them. Barriers • Although industry standards of practice caution against bias of any sort, a skeptical predisposition towards “green” is reinforced by information deficiencies. • Information deficiencies result from the lack or difficulty of obtaining usable data on green/HP features in subject properties as well as valid sales comparisons or cashflow analyses. • Competency deficiencies, such as lack of conversancy in relevant technical topics, leads to oversights, and disjointed treatment of relevant information. • Time/cost pressure and process commoditization (e.g., template-based approaches) result from highly constrained budgets, quick turn-around times expected of appraisers, and standardized practices that were not developed with green/HP considerations in mind. • Professional differences between appraisers and sustainability professionals include divergent objectives, the former being market observers and the latter market influencers. • Risk aversion arises from multiple concerns including veracity, accuracy, and persistence of energy data, impacts of operational choices, new sources of appraiser liability associated with green/HP assessments, industry pressures not to over-value buildings or suggestion of bias, and concern about spending non-billable time on complex assignments. • A public policy vacuum has been created by disjointed and uncoordinated efforts from public-sector stakeholders, insufficient efforts to discuss and understand the appraisal industry and process, and a perception by some valuation professionals that green/HP is oversold. Opportunities • Elevating the competency of appraisers can be achieved through a combination of improved industry standards of care and equal-access training and professional development offerings. • Development of better information resources must focus on building-level information that provides robust documentation as well as aggregate sales-comparison data and other contextual information such as local codes, typical upgrade costs, energy prices, etc. • Improved energy benchmarking and rating tools could provide appraisers with information more well-adapted to their particular needs, which differ from those of typical audiences such as energy managers. • Better characterizing and managing risk will enable appraisers to cope with uncertainties in performance information, and help identify where risks may be introduced or mitigated by green/HP features, including higher costs or obsolescence of poorly-performing buildings. • Integrating disaster resilience and sustainability in appraisals would recognize important synergisms among these features, including durability and ability of green/HP buildings to better withstand external hazards. • Mitigating the problem of additional time/cost for performing assignments is an essential need that can be addressed by providing easier access to information and analytic procedures, perhaps coupled with new resources to defray the associated costs. • Enhancing demand for improved appraisals is a fundamental need, and depends on owners, developers, lenders, and others soliciting competent appraisers to perform scopes that expressly call out green/HP considerations, and to critically review the work product for compliance before acceptance. • Engaging new market participants, such as energy utilities and insurance companies can ensure fuller representation and participation of market stakeholders already engaged in green/HP activities and capable of furnishing valuable data and managing associated risks. Cutting across these individual activities, there is a need for outside stakeholders to formulate and follow a roadmap instead of piecemeal initiatives, bridging the professional/cultural divide between appraisers and green/HP communities, and tracking progress in order to know what is working. A more coherent communication and training strategy is needed, as the appraisal industry is highly fragmented, with two-thirds of appraisers opting out of membership in trade associations. In sum, while there is no silver bullet for advancing the practice of valuing green/HP features, there are concrete opportunities. Parties seeking solutions must identify barriers they wish to address and select from among potential initiatives that map to those barriers. Close collaboration with the appraisal community is critical, as non-appraisers have historically obtained limited traction with this industry due to lack of understanding of the nuances involved in the valuation profession. Large organizations and agencies should have a united approach; the perception or reality of a fragmented and uncoordinated strategy is unsettling for prospective partners in the appraisal industry. This requires improved communication and education within and among these communities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High-Efficiency Housing at the Fort Peck Indian Reservation: Opportunities and Lessons Learned

This project was initiated to provide design assistance in an effort to maximize energy performance for affordable housing at the Fort Peck Indian Reservation near Poplar, Montana. The Make It Right Foundation (MIRF) built 20 high performing homes (LEED Platinum) in 2015 and 2016 with three (3) different design options. NREL and EPA set out to provide energy analysis along with measurement and verification (M and V) of the homes to characterize energy use and provide clarity for future decision making with regard to tribal housing options. The results included herein summarize the energy end uses and documents projected energy impacts from various aspects of the MIRF home designs and construction. This report includes an analysis of energy use in 5 MIRF homes, comparing energy use across the different styles and configurations. Energy models were created for the 2 styles of MIRF homes, including renewable energy assessment for photovoltaic (PV) systems. Existing tribal housing has also been analyzed, with 5 housing units being analyzed for energy use and an energy model being created for 1 housing unit. The findings of this study highlight many of the challenges that arise when attempting to construct high performance housing in a region where such construction practices are still relatively rare. Homes in Poplar are well designed and, for the most part, and include climate specific design considerations appropriate for northeastern Montana. The most significant issues identified in MIRF homes were related to the work done to put the homes on the foundation, insulate the crawlspaces, and do final connection with the utilities. The Taxed II Credit homes are well designed and well suited to northeastern Montana, and with slight modifications to the design and construction could be very efficient. All occupant comfort and energy usage issues that were identified during the site visits can be remedied through retrofit measures that are relatively inexpensive. Energy efficiency opportunities were found that can be implemented in each of the homes. These retrofits are generally inexpensive and have a quick return on investment. While the MIRF houses as well as the Taxed II Credit homes can achieve high levels of energy performance with modest retrofits. Similar houses built in the future could achieve even better performance with minor design changes, and generally low incremental cost. Renewable energy systems are economically feasible in this area, but the payback is on the high side of what would likely be acceptable to homeowners. If the price of solar comes down to $2/watt installed, the systems will achieve a simple payback of 13 years, which is likely a return on investment that is attractive to homeowners. If the homes are made sufficiently tight to be high performance, energy recovery ventilators will be necessary to maintain acceptable indoor air quality. The Taxed II Credit homes are already equipped with heat recovery ventilators (HRVs), and they seem to function well. As PV prices continue to decline, start implementing projects as they become cost effective.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Building 725 Expansion

In October 2017, Sandia broke ground for a new computing center dedicated to High Performance Computing. The east expansion of Building 725 was entirely conceived of, designed, and built in less than 18 months and is a certified LEED Gold design building, the first of its kind for a data center in the State of New Mexico. This 15,000 square-foot building, with novel energy and water-saving technologies, will house Astra, the first in a new generation of Advanced Architecture Prototype Systems to be deployed by the NNSA and the first of many HPC systems in Building 725 East.

99 GENERAL AND MISCELLANEOUS↗