Anchor loads for shallow water mooring of a 15 MW floating wind turbine — Part I: Chain catenary moorings for single and shared anchor scenarios
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Resource adequacy (RA) is an important component of bulk power system reliability that addresses whether there are sufficient resources available to meet electricity demand at all times. RA analysis is used to assess whether the planned power system will provide reliable electricity to consumers while accounting for equipment outages, weather variability, and load uncertainty. Coordination between regions can enable resource sharing to meet RA needs if sufficient transmission capacity exists. Transmission's role in RA coordination can be particularly pronounced for large power systems like the U.S. electricity grid which contains geographically diverse demand and weather-dependent resources. Depending on the level of coordination desired, existing inter-regional transmission capacity may not be sufficient. This study is designed to assess optimal pathways for the development of inter-regional transmission in the U.S. under varying levels of RA coordination. Results can inform long-term grid infrastructure planning and provide insights into potential benefits of greater coordination for generation and transmission planning between regional U.S. power systems.
The CMS experiment has been utilizing vectorization, or SIMD, in parts of its data processing applications for over a decade. On x86 platforms the vectorization level is still SSE3. In the past attempts to use wider vector instruction sets such as AVX or AVX-512 have, in practice, not resulted in improvements in the overall event processing throughput, because the CPUs scale down their frequency when processing AVX instructions. In addition, a notable part of the global pool of CMS’ resources has been old systems either not supporting AVX, or where the CPU frequency downscaling impacts all cores of the CPU. CMS has nevertheless continued to vectorize more of its application code, and in this work we review profiling methods we have found effective to find out pieces of code that would benefit from vectorization, and techniques to transform those codes such that the GCC compiler is able to auto-vectorize those codes. The build system used for CMSSW, Scram, has also been enha nced to be able to build code for multiple CPU microarchitectures such that the shared libraries of desired microarchitecture level can be loaded based on the CPU of the system. This multi-microarchitecture setup is invisible to the workflow management system, which makes its deployment straightforward. We describe in detail how this multi-microarchitecture build is set up, and measure the impact of using wider vector units than SSE3 on the event processing throughput of CMS applications such as simulation and reconstruction on recent x86 CPUs.
Dynamic wireless charging of electric vehicles (EV) is an emerging technology with the potential to address range anxiety and reduce the size of batteries or provide charge-sustaining operation. Charging demand for dynamic wireless charging systems (DWCS) varies greatly in response to location-specific traffic behaviors including the number and speed of vehicles. This paper highlights the potential reduction of load variation with speed compensation and simulates opportunities to maximize the number of cars charged concurrently through “power sharing” or altering power output to slower cars while maintaining a maximum delivered energy. An improved sub-minute model for synthetic traffic is proposed to effectively model DWCS load on high speed roadways and a power electronics model is created based on an existing prototype developed by ORNL to investigate the potential for power sharing. Reductions in the average speed of traffic can greatly increase instantaneous DWCS load by as much as 26%, complicating capacity sizing. Parametric studies with a LCC-S power electronics model shows feasible power reduction of more than 20%, while maintaining a maximum achievable efficiency greater than 90%. Speed compensation on a roadway with large speed variation can reduce average power expected by 21% and increase the maximum number of cars charged simultaneously by 30%. The application of power sharing may significantly reduce load variability due to speed, allow for increased car hosting capability, and guarantee a maximum energy delivered.
Maintaining and supporting an aircraft fleet, in a climate of reduced manpower and financial resources, dictates effective utilization of robotics and automation technologies. To help develop a winning robotics and automation program the Air Force Logistics Command created the Robotics and Automation Center of Excellence (RACE). RACE is a command wide focal point. Race is an organic source of expertise to assist the Air Logistic Center (ALC) product directorates in improving process productivity through the judicious insertion of robotics and automation technologies. RACE is a champion for pulling emerging technologies into the aircraft logistic centers. One of those technology pulls is shared control. Small batch sizes, feature uncertainty, and varying work load conspire to make classic industrial robotic solutions impractical. One can view ALC process problems in the context of space robotics without the time delay. The ALC's will benefit greatly from the implementation of a common architecture that supports a range of control actions from fully autonomous to teleoperated. Working with national laboratories and private industry, we hope to transition shared control technology to the depot floor. This paper provides an overview of the RACE internal initiatives and customer support, with particular emphasis on production processes that will benefit from shared control technology.
Real-time hybrid simulation (RTHS) is an enabling technology that has transformed engineering experimentation and helped researchers expand modeling capabilities. However, breakthroughs are necessary to expand the range of hybrid simulation methods and, thus, enable experiments with loading conditions representing multiple hazards. This paper discusses the development of a new thermomechanical RTHS framework and a systematic approach to determining RTHS control requirements. First, the framework is established using a representative finite element model of a layered structural system subjected to thermal loading. A complete two-layer system model serves as the reference system, and it is then partitioned into a numerical layer and an experimental layer that share interface conditions. Next, a thermal actuator is introduced to impose dynamic thermal loading on the experimental subsystem, serving as a transfer system. Finally, control and performance metrics are defined to evaluate the realization of interface boundary conditions and map this to the RTHS execution. Through an illustrative example considering the influence of temperature on a lunar habitat, we demonstrate how to establish controller requirements for RTHS and demonstrate that this approach can be used to conduct RTHS on structures with thermomechanical loading.
This article presents a restoration technique using grid-forming inverters in an islanded microgrid during pulse load and plug-in events. In a microgrid powered by droop-controlled inverters, frequency is the variable that is accessible to all inverters for adjusting their power contributions. The problem is that the microgrid frequency deviates from its nominal value after a load change. The presented method enables the inverters to restore the frequency to the nominal value and regulate their bus voltage amplitudes. The frequency and voltage restorations are performed without communication while achieving the desired power-sharing between grid-forming inverters. The restoration is activated after detecting any active or reactive power changes. In this article, the dynamic model of an inverter equipped with enabled restoration paths is developed to verify the stability of the inverter controller under various conditions. The frequency and voltage restorations are examined during pulse load and plug-in events. Furthermore, this study is performed using a laboratory-scale islanded microgrid powered by two 208 V, 60 Hz, 5 kVA inverters.
The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.
The use of the Space Shuttle for land remote sensing will grow significantly during the 1980's. The main use will be for general land cover and geological mapping purposes by worldwide users employing specialized sensors such as: high resolution film systems, synthetic aperture radars, and multispectral visible/IR electronic linear array scanners. Because these type sensors have low Space Shuttle load factors, the user's preference will be for shared flights. With this strong preference and given the present prognosis for Space Shuttle flight frequency as a function of orbit inclination, the strongest demand will be for 57 deg orbits. However, significant use will be made of lower inclination orbits. Compared with freeflying satellites, Space Shuttle mission investment requirements will be significantly lower. The use of the Space Shuttle for testing R and D land remote sensors will replace the free-flying satellites for most test programs.
Many electrified aircraft configurations consist of a number of power components operating on the same shared electrical bus. Understanding the impedance performance of electrical loads and sources is key to understanding, and designing for, acceptable overall vehicle power quality and power system stability. This paper discusses impedance measurements made on the NASA Electric Aircraft Testbed (NEAT) Electrical Power System (EPS) at NASA Glenn Research Center. First, an overall discussion of the NEAT facility configuration during testing is presented. Then, details of the impedance measurement approach and the various testing configurations are discussed. Next, input impedance measurements at NEAT, including sources (DC supplies) and loads (multiple motor drives, electric machines, and resistive load banks, with long interconnecting cable leads), are performed under a number of conditions, and results, including load model comparisons and stability analysis, are presented and discussed.
Many electrified aircraft configurations consist of a number of power components operating on the same shared electrical bus. Understanding the impedance performance of electrical loads and sources is key to understanding, and designing for, acceptable overall vehicle power quality and power system stability. This paper discusses impedance measurements made on the NASA Electric Aircraft Testbed (NEAT) Electrical Power System (EPS) at NASA Glenn Research Center. First, an overall discussion of the NEAT facility configuration during testing is presented; then details of the impedance measurement approach and the various testing configurations are discussed. Next, input impedance measurements at NEAT, including sources (DC supplies) and loads (multiple motor drives, electric machines, and resistive load banks, with long interconnecting cable leads), are performed under a number of conditions, and results, including load model comparisons and stability analysis, are presented and discussed.
Many electrified aircraft configurations consist of a number of power components operating on the same shared electrical bus. Understanding the impedance performance of electrical loads and sources is key to understanding, and designing for, acceptable overall vehicle power quality and power system stability. To enable these measurements, personnel at NASA’s Glenn Research Center have designed and built the Scaled Power ElEctrified Drivetrain (SPEED) Testbed. This paper will present data taken in the SPEED lab, including impedance measurements of a DC supply (source) and a motor drive and electric machine (load) under a number of conditions. Impacts of load power, drive controller tuning, and field-weakening on load impedance are measured, presented, and discussed; as are source impedance data, stability, and DC bus current spectra at different loading levels.
Many electrified aircraft configurations consist of a number of power components operating on the same shared electrical bus. Understanding the impedance performance of electrical loads and sources is key to understanding, and designing for, acceptable overall vehicle power quality and power system stability. To enable these measurements, personnel at NASA’s Glenn research Center have designed and built the Scaled Power ElEctrified Drivetrain (SPEED) Testbed. This paper will present data taken in the SPEED lab, including impedance measurements of a DC supply (source) and a motor drive and electric machine (load) under a number of conditions. Impacts of load power, drive controller tuning, and field weakening on load impedance are measured, presented, and discussed; as are source impedance data, and DC bus current spectra at different loading levels.
The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.
Hear about the tools and technical assistance National Labs can offer to co-ops and other rural utilities seeking to build or enhance hybrid generation projects combining multiple technologies including wind, solar, battery storage, and others resources. These hybrids can deliver additional value by combining complimentary resources and by increasing reliability and resilience, including as part of a microgrid to serve a local load or community. Experienced cooperative and lab experts will share their perspectives on the opportunities there are to make use of their advanced modeling capabilities and expertise to scope, design, and implement these emerging hybrid solutions. Key takeaways for participants will include better understanding of the resilience benefits distributed hybrid systems provide, awareness of National Laboratory assistance programs and resources, tips for successful federal funding applications for these types of projects, and peer-to-peer learning through shared experiences and discussion.
Analysis and test results show that phasor-regulated, Mapham-derived resonant inverters can be paralleled to provide standardizing interfaces for multiple sources on a utility-type, aerospace power distribution bus. The basic sources do not require matching in any way, and may have grossly different characteristics. Fully stable system architectures with multiple sources, parallel/redundant distribution buses, and a wide variety of loads can be easily constructed and controlled. The commands and parameters available for system control allow for tight tolerance bus voltage control, and absolute power-sharing control from the various sources over the full range of possible source and load variations. That level of control enables simplified load power processing hardware and the distribution of losses to optimally load the source thermal control system. Positive control of all system performance and allocation of losses are not required by all missions or vehicles, and overall vehicle considerations do not always require the loads on vehicle energy sources and thermal control systems to be balanced. In those cases, power system control can be simplified, and a hierarchical set of defaults can be substituted for computer-generated or supervisory input commands to allow for stable, fully autonomous system operation.
The rapid increase of renewable generation and its anticipated continued growth requires greater operational flexibility in modern power systems. Previous studies explored the addition of more flexible resources to improve system flexibility, but this may also be achieved at lower cost by enhancing existing power plants via flexibility retrofits. Potential flexibility upgrades to existing thermal plants include modifications that enable faster ramp rates, increase maximum load levels, decrease minimum load levels, and provide faster and lower cost startup operations. In this paper, we focus on improvements to existing natural gas combined cycle generators, and apply a unit commitment model to analyze the impact that each specific upgrade has on their operational dynamics and profitability from both the system perspective and from the asset owner perspective. We show that the value of each type of flexibility improvement varies depending on the capacity factor and usage pattern of the generator before the upgrade, and that the relative benefit of each type of flexibility varies. We demonstrate diminishing returns to increased flexibility when upgrading multiple generators simultaneously. Sensitivity tests for several shares of renewable generation, different generation mixes and different net load realizations confirm the generality of the results shown.
A computer program automatically generates plans for a group of robotic vehicles (rovers) engaged in geological exploration of terrain. The program rapidly generates multiple command sequences that can be executed simultaneously by the rovers. Starting from a set of high-level goals, the program creates a sequence of commands for each rover while respecting hardware constraints and limitations on resources of each rover and of hardware (e.g., a radio communication terminal) shared by all the rovers. First, a separate model of each rover is loaded into a centralized planning subprogram. The centralized planning software uses the models of the rovers plus an iterative repair algorithm to resolve conflicts posed by demands for resources and by constraints associated with the all the rovers and the shared hardware. During repair, heuristics are used to make planning decisions that will result in solutions that will be better and will be found faster than would otherwise be possible. In particular, techniques from prior solutions of the multiple-traveling- salesmen problem are used as heuristics to generate plans in which the paths taken by the rovers to assigned scientific targets are shorter than they would otherwise be.