Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mission planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Options and Uncertainties in Planetary Defense: Mission Planning and Vehicle Design for Flexible Response

This paper is part of an integrated study by NASA and the NNSA to quantitatively understand the response timeframe should a threatening Earth-impacting near-Earth object (NEO) be identified. The two realistic responses considered are the use of a spacecraft functioning as either a kinetic impactor or a nuclear explosive carrier to deflect the approaching NEO. The choice depends on the NEO size and mass, the available response time prior to Earth impact, and the various uncertainties. Whenever practical, the kinetic impactor is the preferred approach, but various factors, such as large uncertainties or short available response time, reduce the kinetic impactor's suitability and, ultimately, eliminate its sufficiency. Herein we examine response time and the activities that occur between the time when an NEO is recognized as being a sufficient threat to require a deflection and the time when the deflection impulse is applied to the NEO. To use a kinetic impactor for successful deflection of an NEO, it is essential to minimize the reaction time and maximize the time available for the impulse delivered to the NEO by the kinetic impactor to integrate forward in time to the eventual deflection of the NEO away from Earth impact. To shorten the response time, we develop tools to survey the profile of needed spacecraft launches and the possible mission payloads. We further present a vehicle design capable of either serving as a kinetic impactor, or, if the need arises, serving as a system to transport a nuclear explosive to the NEO. These results are generated by analyzing a specific case study in which the simulated Earth-impacting NEO is modeled very closely after the real NEO known as 101955 Bennu (1999 RQ36). Bennu was selected for our case study in part because it is the best-studied of the known NEOs. It is also the destination of NASA's OSIRIS-REx sample return mission, which is, at the time of this writing, enroute to Bennu following a September 2016 launch.

Brent W. Barbee↗

Integrated payload and mission planning, phase 3. Volume 2: Logic/Methodology for preliminary grouping of spacelab and mixed cargo payloads

The logic and methodology for a preliminary grouping of Spacelab and mixed-cargo payloads is proposed in a form that can be readily coded into a computer program by NASA. The logic developed for this preliminary cargo grouping analysis is summarized. Principal input data include the NASA Payload Model, payload descriptive data, Orbiter and Spacelab capabilities, and NASA guidelines and constraints. The first step in the process is a launch interval selection in which the time interval for payload grouping is identified. Logic flow steps are then taken to group payloads and define flight configurations based on criteria that includes dedication, volume, area, orbital parameters, pointing, g-level, mass, center of gravity, energy, power, and crew time.

Rodgers, T. E.↗

Planetary mission planning for the next decade

This paper reflects NASA's philosophy in the further exploration of the solar system. The philosophy entails the continuing reconnaissance of unexplored bodies in the solar system, while at the same time performing in-depth science investigations with respect to those bodies where the major science issues can be annunciated. The tactic in implementing this strategy will of necessity vary from year to year as a consequence of the varying budget restraints imposed on planetary exploration. However, the strategy will yield the greatest increment of knowledge in a given time frame.

Herman, D. H.↗

Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE). Volume 1: User's guide

An interactive computer program for automatically generating traffic models for the Space Transportation System (STS) is presented. Information concerning run stream construction, input data, and output data is provided. The flow of the interactive data stream is described. Error messages are specified, along with suggestions for remedial action. In addition, formats and parameter definitions for the payload data set (payload model), feasible combination file, and traffic model are documented.

Dupnick, E.↗

Mission planning for large microwave radiometers

Earth orbiting, remote sensing platforms that use microwave radiometers as sensors are susceptible to data interpretation difficulties. The capability of the large microwave radiometer (LMR) was augmented with the inclusion of auxillary sensors that expand and enhance the LMR capability. The final system configuration demonstrates a holistic approach in the design of future orbiting remote sensing platforms that use a LMR as the core instrument.

Schartel, W. A.↗

Ka-band (32 GHz) benefits to planned missions

The benefits of using 32 GHz downlinks for a set of deep space missions, as well as the implications to radio science and the Deep Space Network (DSN) are documented. The basic comparison is between the use of the current X-band (8.4 GHz) and a 32 GHZ (Ka-band) downlink. There was shown to be approximately an 8 dB (about 600%) link advantage for 32 GHz. This 8 dB advantage would be able to either reduce mission cost or improve mission science return. Included here are studies on how the 8 dB advantage would be used for the Cassini and Mars Sample Return missions. While the work is preliminary, it shows that the 8 dB advantage can be exploited to provide large benefits to future deep space missions. There can be significant mass and/or power savings to the spacecraft, which can translate into cost savings. Alternatively, the increased downlink telecommunications performance can provide a greater science return.

Hansen, D. M.↗

Applications of artificial intelligence to mission planning

The following subject areas are covered: object-oriented programming task; rule-based programming task; algorithms for resource allocation; connecting a Symbolics to a VAX; FORTRAN from Lisp; trees and forest task; software data structure conversion; software functionality modifications and enhancements; portability of resource allocation to a TI MicroExplorer; frontier of feasibility software system; and conclusions.

Ford, Donnie R.↗

SATCOP mission planning software package

As the CDSLR Network grows into the 1990's, it is undergoing many changes in both its capabilities and requirements. On the one hand, great progress has been made in terms of increasing the SLR systems' performance. Upgrades to the onsite computer and improved laser ranging hardware have greatly increased the number of satellite passes which can be acquired during an operating shift by reducing the amount of time needed for operations other than actual ranging. On the other hand, more requirements have been placed on the systems. Many more satellites have become available, with more scheduled for launch, thus, increasing the likelihood of simultaneous satellite visibility. In addition, the possible scenarios required for ranging these many satellites are changing frequently, with conflicting priorities and needs. It became apparent that some tools needed to be developed to assist the planners in determining Network ranging priorities. Such tools have been developed at Bendix under the direction of NASA's Dynamics of the Solid Earth Project (DOSE) for both long range planning and routine operations to maximize the amount of data collected. This paper reviews some of these tools and describe their uses.

Bucey, Steve↗

Interactive visualization of numerical simulation results: A tool for mission planning and data analysis

We report on the development of an interactive system for visualizing and analyzing numerical simulation results. This system is based on visualization modules which use the Application Visualization System (AVS) and the NCAR graphics packages. Examples from recent simulations are presented to illustrate how these modules can be used for displaying and manipulating simulation results to facilitate their comparison with phenomenological model results and observations.

Berchem, J.↗

Distribution of a Generic Mission Planning and Scheduling Toolkit for Astronomical Spacecraft

Work is progressing as outlined in the proposal for this contract. A working planning and scheduling system has been documented and packaged and made available to the WIRE Small Explorer group at JPL, the FUSE group at JHU, the NASA/GSFC Laboratory for Astronomy and Solar Physics and the Advanced Planning and Scheduling Branch at STScI. The package is running successfully on the WIRE computer system. It is expected that the WIRE will reuse significant portions of the SWAS code in its system. This scheduling system itself was tested successfully against the spacecraft hardware in December 1995. A fully automatic scheduling module has been developed and is being added to the toolkit. In order to maximize reuse, the code is being reorganized during the current build into object-oriented class libraries. A paper describing the toolkit has been written and is included in the software distribution. We have experienced interference between the export and production versions of the toolkit. We will be requesting permission to reprogram funds in order to purchase a standalone PC onto which to offload the export version.

Kleiner, Steven C.↗

Distribution of a Generic Mission Planning and Scheduling Toolkit for Astronomical Spacecraft

This 2-year report describes the progress made to date on the project to package and distribute the planning and scheduling toolkit for the SWAS astronomical spacecraft. SWAS was scheduled to be launched on a Pegasus XL vehicle in fall 1995. Three separate failures in the launch vehicle have delayed the SWAS launch. The researchers have used this time to continue developing scheduling algorithms and GUI design. SWAS is expected to be launched this year.

Kleiner, Steven C.↗