At least 235 records · Page 13

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Renewable Resource Allocation and Load Scheduling of Resilient Communities

This paper presents a methodology for enhancing community resilience through optimal renewable resource allocation and load scheduling in order to minimize unserved load and thermal discomfort. The proposed control architecture distributes the computational effort and is easier to be scaled up than traditional centralized control. The decentralized control architecture consists of two layers: The community operator layer (COL) allocates the limited amount of renewable energy resource according to the power flexibility of each building. The building agent layer (BAL) addresses the optimal load scheduling problem for each building with the allowable load determined by the COL. Both layers are formulated as a model predictive control (MPC) based optimization. Simulation scenarios are designed to compare different combinations of building weighting methods and objective functions to provide guidance for real-world deployment by community and microgrid operators. The results indicate that the impact of power flexibility is more prominent than the weighting factor to the resource allocation process. Allocation based purely on occupancy status could lead to an increase of PV curtailment. Further, it is necessary for the building agent to have multi-objective optimization to minimize unserved load ratio and maximize comfort simultaneously.

model predictive control↗

Integrated Transmission-Distribution Multi-Period Switching for Wildfire Risk Mitigation: Improving Speed and Scalability with Distributed Optimization: Preprint

With increasingly severe wildfire conditions driven by climate change, utilities must manage the risk of wildfire ignitions from electric power lines. During "public safety power shutoff'" events, utilities de-energize power lines to reduce wildfire ignition risk, which may result in load shedding. Distributed energy resources provide flexibility that can help support the system to reduce load shedding when lines are de-energized. We investigate a coordinated transmission-distribution optimization problem that balances wildfire risk mitigation and load shedding. We model distribution systems that include battery energy storage systems which may support loads when transmission lines are de-energized. This multi-period integrated transmission-distribution optimal switching problem jointly optimizes line switching decisions, the generators' setpoints, load shedding, and the batteries' states of charge, resulting in significant computational challenges. To improve scalability, we decompose the problem over both space and time and apply a distributed optimization algorithm. Using a large-scale synthetic California test case with realistic distribution models and real wildfire risk data, we show that distributed optimization can solve large-scale multi-period switching problems that are otherwise intractable for centralized solvers. We also discuss challenges and future directions for improving the distributed algorithm's convergence performance as the number of time periods increases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Approximate Mixed-Integer Programming Solution with Machine Learning Technique and Linear Programming Relaxation

Security constrained unit commitment (SCUC) is solved in the day-ahead electricity market to determine electricity generation schedule for the following date. The associated mixed integer programming (MIP) problem is known computationally hard. Heuristics like rounding can be computationally efficient for solving large MIP problems however often produces lower quality solutions due to discrepancy between MIP solution and linear programming relaxation (LPR) solution, i.e., variables taking different discrete values between MIP and LPR solutions. In this work, we applied the machine learning-based algorithms—Classification and Regression Tree (CART) model and random forest (RF) model—to obtain an LPR-based approximation that close to an MIP solution without actually solving the MIP problem. By computing feature importance derived from the CART and RF models, we assessed the link between coefficients in the MIP model, the LPR solution, and the optimal solution of the MIP problem. We applied the CART and RF approaches to solve SCUC problems using day-ahead energy market cases from Midcontinent Independent System Operator. The results show that our method is computationally efficient and could achieve an approximation sufficiently close to the SCUC solution with <0.15% error and ~78% reduction in the discrepancies between LPR and MIP solutions.

Lin, Xinming↗

A Bi-Level Formulation And Solution Method For The Integration Of Process Design And Scheduling

Design and operation decisions of manufacturing plants can often be expressed within a hierarchical structure, where optimal decisions at lower operating level provide constraints for the decision raking at a higher decision level. In this work, we are addressing the case of a hierarchical design and scheduling optimization problem. The integration of design and scheduling decisions can play a big role in designing economically profitable plants and improving their operational performance. This problem can be expressed as a bi-level problem, where design related decisions occur at the upper level and operational scheduling decisions at the lower level. Since discrete decisions are involved in both optimization levels, the resulting formulation typically corresponds to bi-level mixed-integer programming problems (B-MIP). The solution of B-MIP problems is very challenging, and typically requires the use of global optimization techniques, with many algorithms not able to guarantee feasibility. To overcome the challenges in solving this class of problems we propose the use of a multi-parametric based algorithm for the solution of bi-level mixed-integer linear and quadratic programming problems, capable of providing the exact and global solution. The main idea of this approach is to treat the lower scheduling problem as a multi-parametric programming problem in which the design decisions are considered as parameters. Here, the resulting parametric solutions can then be substituted into the upper level design problem, which can be solved as a set of single-level deterministic programming problems. Through the developed formulation and algorithm we are able to supply the decision makers with the exact solution of the integrated design and scheduling problem.

42 ENGINEERING↗

Optimal placement of data concentrators for expansion of the smart grid communications network

Evolving power systems with increasing renewables penetration, along with the development of the smart grid, calls for improved communication networks to support these distributed generation sources. Automatic and optimal placement of communication resources within the advanced metering infrastructure is critical to provide a high‐performing, reliable, and resilient power system. Three network design formulations based on mixed‐integer linear and non‐linear programming approaches are proposed to minimise network congestion by optimising residual buffer capacity through the placement of data concentrators and network routeing. Results on a case study show that the proposed models improve network connectivity and robustness, and increase average residual buffer capacity. Maximising average residual capacity alone, however, results in both oversaturated and underutilised nodes, while maximising either minimum residual capacity or total reciprocal residual capacity can yield much‐improved network load allocation. Consideration of connection redundancy improves network reliability further by ensuring quality‐of‐service in the event of an outage. Analysis of multi‐period network expansion shows that the models do not deviate significantly from optimal when used progressively (within 5% deviation), and are effective for utility planners to use for smart grid expansion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

Physics-based modeling and information-theoretic sensor and settings selection for tool wear detection in precision machining

Precision machining of metals is an energy intensive process with applications and impacts across the manufacturing industry. The energy efficiency, product yield, and maintenance of the precision machine require a digital twin that can assist with prognostics and health management. In this report a physics-based model is developed and validated against face milling data, and then used for the timely and precise inference of machining faults that cannot be measured directly. Computer numerical control (CNC) measurements of power and force are used through this physics-based machining model to predict deviations of the outputs of power consumption and cutting forces during normal operation. A model-based fault detection and isolation methodology is applied to determine the optimal (traditional and available) sensor suite and the test settings (admissible input values) that improve the inference of tool wear in face milling. The optimal sensor suite and input test settings are obtained by solving a mixed integer non-linear program that optimizes information-theoretic metrics relevant to the detection and isolation of tool wear from steady-state or transient machining measurements. Dynamic time warping and k—NN classification are then used to validate the robustness of the optimal design for fault detection test design, including the optimal sensor suite.

42 ENGINEERING↗

ACOPF Transmission Switching Using Open-Source MINLP Solvers

The optimal transmission switching (OTS) problem with AC physics represents a mixed integer non-linear non-convex optimization problem which can provide benefits to transmission level power system operations. In this paper we benchmark a set of open-source mixed integer non-linear programming (MINLP) solvers on the OTS problem with AC physics using the pglib set of power system test cases. Results characterizing the performance of the different solvers are reported and discussed.

ACOPF↗

Power system load flexibility forecasting

The example embodiments are directed to a system and method for forecasting load flexibility of a power grid. In one example, the method includes receiving temperature values associated with temperature set points of a plurality of loads that are included on a power grid, forecasting a flexibility of the plurality of loads using a polynomial-time mixed-integer non-linear programming (MINLP) optimization based on the received temperature values for the plurality of loads, and outputting information about the forecasted flexibility for display to a display device. The MINLP optimization performs the forecasting of the load flexibility on a fine-grained basis in comparison to conventional methods and is still fast enough that it can be computed in real-time.

Genc, Sahika↗

A robust offering strategy for wind producers considering uncertainties of demand response and wind power

This paper proposes a risk-constrained decision-making approach for a wind power producer participating in the day-ahead market. In the developed model, a flexible demand response trading scheme between the wind power producer and different customers is employed. Through the proposed demand response mechanism, the wind power producer is able to trade demand response resource internally with different customers, and then trade energy externally with the market to increase the expected profit and the wind energy utilization. The uncertainties in the wind power and demand response are modeled by using the information gap decision theory approach from risk averse (robust) and risk-seeking (opportunistic) perspectives. The objective of the robust model is to maximize the robust level while satisfying the desired profit, whereas the opportunistic model aims to evaluate the possibility of achieving windfall profits with favorable uncertainties. The overall offering strategy problem is modeled as a bi-objective mixed integer nonlinear programming, which is linearized by proper techniques and solved efficiently by using the normal boundary intersection technique. In this work, simulation results show that utilizing demand response resource to mitigate wind power deviations can increase a wind power producer's profit and reduce potential risks. In addition, the results demonstrate that the proposed bi-objective optimization approach enables the wind power producer to select appropriate offering decisions with respect to uncertainties.

17 WIND ENERGY↗

SimCCS: An open-source tool for optimizing CO 2 capture, transport, and storage infrastructure

Commercial-scale carbon capture and storage (CCS) technology will involve deploying infrastructure on a massive and costly scale. This effort will require careful and comprehensive planning to ensure that capture locations, storage sites, and the dedicated CO 2 distribution pipelines are selected in a robust and cost-effective manner. Presented in 2009, SimCCS is an optimization model for integrated system design that enables researchers, stakeholders, and policy makers to design CCS infrastructure networks. SimCCS 2.0 is a complete, ground-up redesign that is now a portable software package, useable and shareable by the CCS research, industrial, policy, and public communities. SimCCS 2.0 integrates multiple new capabilities including a refined optimization model, novel candidate network generation techniques, and optional integration with high-performance computing platforms. Accessing user-provided CO 2 source, sink, and transportation data, SimCCS 2.0 creates candidate transportation routes and formalizes an optimization problem that determines the most cost-effective CCS system design. This optimization problem is further solved either through a high-performance computing interface, or through third-party software on a local desktop computing platform. Finally, SimCCS 2.0 employs an open-access geographic information system framework to enable analysis and visualization capabilities. SimCCS 2.0 is written in Java and is publicly available via GitHub to encourage collaboration, modification, and community development.

42 ENGINEERING↗

Reassessing the Market—Computation Interface to Enhance Grid Security and Efficiency

The goal of this project is to reconsider core market and reliability processes that can potentially yield to transformative advances in power grid security, reliability, and efficiency. Current electric power market designs are strongly a function of computing capabilities and limitations that were available in the mid-to-late 1990s, circa deregulation. This includes constructs such as: (1) a 2-tiered day-ahead/real-time market construct; and (2) linearized (“DC”) real power flow approximations in dispatch and pricing. At that time, state-of-the-art computational capabilities could at the limit address deterministic mixed-integer programming formulations of unit commitment (UC) and linear programming formulations of economic dispatch (ED) at limited fidelity and scale. Such constraints forced limited look-ahead time-horizons, crude approximations of AC power flow physics and operations, and artificial partitioning between day-ahead markets, hour(s)-ahead reliability processes, and real-time markets. Consequently, these limitations have resulted in limited security and reliability with increasing out-of-market payments, particularly as uncertainty associated with renewables and distributed energy resources grows.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A matheuristic for design and dispatch of a utility-connected distributed energy system

Modeling distributed power generation systems often requires complicated mathematical expressions that present challenges for commercial optimization solvers. Here, this paper presents a matheuristic to solve a mixed-integer optimization model that informs decisions regarding the design and dispatch of a utility-connected microgrid. We deploy a genetic algorithm to search the system design space and a linear program to solve the economic dispatch problem. The model is a component of a web tool that requires solutions within a few minutes. Our method yields objective function values within 5% of an exogenously produced optimal in fewer than 30 seconds for 90% of our test cases compared to only 10% of our test cases by a traditional optimization solver in the same amount of time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Optimization Competition on Synthetic and Industrial Power Systems

This paper summarizes a grid optimization (GO) competition effort in the United States to find the best solution strategies for up to interconnect-scale power system networks with around 32,000 buses. The optimization problem is a mixedinteger, non-convex non-linear problem, (MINLP) and includes discrete variables such as unit commitment and line switching, control settings (transformer taps and phase shifters with impedance correction tables), and bus shunts. The case study includes six actual industry grids as well as 16 realistic synthetic grids created by three different dataset teams. The winners are selected and ranked based on scoring criteria, which consider the solution quality (such as objective functions) within time limits. Nine winner teams are selected from 26 competitor teams. The results achieved by different teams are described and the performance of different algorithms on synthetic grids and actual industry grids are compared and analyzed.

mixed-integer non-linear programming↗

Managing time-substitutable electricity usage using dynamic controls

A predictive-control approach allows an electricity provider to monitor and proactively manage peak and off-peak residential intra-day electricity usage in an emerging smart energy grid using time-dependent dynamic pricing incentives. The daily load is modeled as time-shifted, but cost-differentiated and substitutable, copies of the continuously-consumed electricity resource, and a consumer-choice prediction model is constructed to forecast the corresponding intra-day shares of total daily load according to this model. This is embedded within an optimization framework for managing the daily electricity usage. A series of transformations are employed, including the reformulation-linearization technique (RLT) to obtain a Mixed-Integer Programming (MIP) model representation of the resulting nonlinear optimization problem. In addition, various regulatory and pricing constraints are incorporated in conjunction with the specified profit and capacity utilization objectives.

Ghosh, Soumyadip↗

Mapping Spiking Neural Networks to Heterogeneous Crossbar Architectures using Integer Linear Programming

Advances in novel hardware devices and architectures allow Spiking Neural Network (SNN) evaluation using ultra-low power, mixed-signal, memristor crossbar arrays. As individual network sizes quickly scale beyond the dimensional capabilities of single crossbars, networks must be mapped onto multiple crossbars. Crossbar sizes within modern Memristor Crossbar Architectures (MCAs) are determined predominately not by device technology but by network topology; more, smaller crossbars consume less area thanks to the high structural sparsity found in larger, brain-inspired SNNs. Motivated by continuing increases in SNN sparsity due to improvements in training methods, we propose utilizing heterogeneous crossbar sizes to further reduce area consumption. This approach was previously unachievable as prior compiler studies only explored solutions targeting homogeneous MCAs. Our work improves on the state-of-the-art by providing Integer Linear Programming (ILP) formulations supporting arbitrarily heterogeneous architectures. By modeling axonal interactions between neurons, our methods produce better mappings while removing inhibitive a priori knowledge requirements. We first show a 16.7-27.6% reduction in area consumption for square-crossbar homogeneous architectures. Then, we demonstrate 66.9-72.7% further reduction when using a reasonable configuration of heterogeneous crossbar dimensions. Next, we present a new optimization formulation capable of minimizing the number of inter-crossbar routes. When applied to solutions already near-optimal in area, an 11.9-26.4% routing reduction is observed without impacting area consumption. Finally, we present a profile-guided optimization capable of minimizing the number of runtime spikes between crossbars. Compared to the best-area-then-route optimized solutions, we observe a further 0.5-14.8% inter-crossbar spike reduction while requiring 1–3 orders of magnitude less solver time.

Pohl, Devin [ORNL] (ORCID:0009000040149027)↗