221 records · Page 13

Risk-Informed MultiPphysics BestEestimate Plus Uncertainties (BEPU) Application Development of RELAP5-3D Perturbation Model

The United States nuclear industry is facing a strong challenge to ensure maximum safety while enhancing economic benefit. Safety is a key parameter to all aspects related to light water reactor (LWR) nuclear power plants (NPPs), especially cost savings. Since the goal is to extend the lifetimes of these NPPs, the traditional deterministic safety concept may not guarantee a current economic asset. The Light Water Reactor Sustainability (LWRS) Program has been promoting a wide range of research and development (R&D) in this field to maximize the safety, economics, and performance of these NPPs through improved scientific understanding. One of the best practices to achieve this goal is to identify and optimize safety margins, which can lead to cost reduction. To do this, under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway will focus on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. The RISA Pathway will provide enhanced capabilities for analyzing and characterizing LWR systems performance by developing and demonstrating methods, tools, and data to enable risk-informed margins management (RIMM). The goals of the RISA Pathway are twofold: (1) deploy the risk-informed tools and methods that enable better representation of safety margins and factors that contribute to cost and safety; and (2) conduct advanced risk assessment applications with industry to support margin management strategies that enable more cost-effective plant operation. The tools and methods provided by the RISA Pathway will support effective margin management for both active and passive safety systems, structures, and components (SSC) of an NPP. The tools and methods used in the RISA Pathway should have high confidence and highest technical maturity for and implementation to industry at its current setting. They should also have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway will, therefore, perform a comprehensive assessment of verification and validation (V&V) status of RISA Toolkit to enhance credibility RISA Toolkit which be used by industry. This report summarizes RELAP5-3D development activities for best estimated and uncertainty (BEPU) capability to support ongoing RISA Pathway pilot projects for risk informed uncertainty quantification applications. Work scope includes (1) development of initial perturbation model for selected closure laws and (2) testing of suitable probability distribution functions (PDF) for the selected correlations. Developed BEPU modules are tested with selected separate effect cases and compared with conventional thermal-hydraulics model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Plasma Wall Interaction with 3-D Plasma Boundaries

The interaction of the edge plasma and the material surfaces is one of the most critical challenges on the path to harness fusion power as new, fundamental energy source. This challenge typically combines the thrust to reach high density, low temperature (detached) plasmas in front of the divertor target plates as well as understanding the plasma material interaction (PMI) in particular in this regime. The combination of both research thrusts represents an extraordinarily challenging subject encompassing spatial scales spanning nanometers to meters in all states of matter and across a broad energy range. Modeling capabilities, which help to interpret data from nowadays experiments and enable extrapolation to future devices are urgently required. This is in particular true for toroidal magnetic confinement devices with three-dimensional (3D) plasma boundaries. Such plasma boundary geometries occur in tokamaks, when small amplitude magnetic perturbations are used to stabilize the unruly edge plasma or in stellarators, that are inherently 3D plasma confinement devices. In this project, the impact of 3D plasma boundaries on the plasma material interaction (PMI) was assessed. This work focused on plasma boundary conditions, in which high-density conditions at the material surfaces yield mitigation of the otherwise immense heat and particle loads that these materials would see. These so-called high recycling and eventually detached plasma regimes are of great interest for future reactor operation. In the project, key features that are unique to 3D boundaries were explored in comparison to canonically assumed axisymmetric plasma edge situations in tokamaks. In particular, the relevance of the 3D boundary situation in the extrapolation to the plasma boundary solution at ITER, the next step fusion energy experiment under construction as a multi-national, world-wide large-science experiment in southern France, has been explored. The EMC3-EIRENE plasma edge fluid and kinetic neutral transport code has been advanced to cope with the challenging and unprecedented conditions in the ITER boundary plasma including 3D fields that are planned to be used to suppress harmful edge instabilities, the so-called edge localized modes. This is a vital integration challenge for ITER and the results from this grant have provide a leading capability for this assessment. It was shown that the detachment process in a 3D edge solution for ITER follows the recycling regimes that are known from axisymmetric solutions, but that multiple plasma exhaust channels connected to the material surfaces are established which feature individual recycling characteristics. Because these channels touch the material surfaces in the divertor in a 3D geometry, the compatibility with the plasma material interaction (PMI), including erosion and impurity generation has been found to be an important part of the integration challenge. To address this, the fully 3D plasma material interaction code ERO2 has been adapted to these ITER specific geometries and a homogeneous mixing model was implemented, that allows to consider the mixing of Be and Was used at ITER in the PMI modeling. This model enhancement has been used to study non-local migration of Be in the JET ITER like wall configuration and it has been shown that with this model such complex migration processes in ITER relevant plasma shapes and with ITER relevant plasma boundary conditions can be addressed. The combined modeling approach using EMC3-EIRENE as a plasma boundary transport code and the ERO2 specialized PMI model will be an asset for the continued preparations of ITER operation as well as for Fusion Pilot Plant efforts that have emerged in the U.S. during the evolution of this grant. The predictive capability of this numerical tool has been validated at the DIII-D US national fusion facility. Here, dedicated plasma edge diagnostics were implemented to measure the impurity household around a 3D edge plasma during ELM suppression by 3D fields. Dedicated experiments with local material probes using these diagnostics and the state-of-the-art suite of boundary measurements at DIII-D have shown that the 3D perturbation of the plasma edge that is excreted by such 3D control fields yield a perturbation of the plasma boundary flux structure and hence also of the resulting PMI. The 3D boundary plasma is composed out of helical magnetic flux channels that intersect the divertor targets at an angle relative to the main guiding field, i.e., the toroidal magnetic field component of the tokamak. A similar effect has been measured as well on limiter surfaces during the startup campaign at the new stellarator experiment Wendelstein 7-X. These experiments ad initial analysis with the ERO plasma material interaction model, suggested that the place of erosion for a given particle from the surface and its re-deposition can be different in such 3D field geometries yielding potentially a significant level of net-erosion. This is not the case for axisymmetric solutions, where it was shown in the past that the eroded particles are effectively re-deposited into gaps produced by erosion at the same position and hence the net-erosion levels are small. For ITER, the quest to suppress the ELMs and at the same time maintain the integrity of the divertor is an issue, which these fundamental findings will help to resolve. The coupling of this work to the extrapolation in the ITER program has been addressed by both the PI and the lead numerical scientist being ITER Science Fellows in the duration of the contract and forward. A second focus in the exploration of 3D boundary effects on tokamaks and stellarators has been set on the measurement of helium exhaust features with such 3D fields. This is important because He represents the ash of the fusion process and needs to be exhausted. It was shown that 3D field application compatible with suppression of ELMs yields an increase of the helium exhaust performance. The ratio of the effective helium confinement time over the energy confinement time was reduced by almost 50% which demonstrated that the impact of helium accumulation in the plasma core with respect to the confinement of energy to sustain the fusion reaction is significantly improved with such 3D control fields. It was shown that this is the case for tokamaks as well as stellarators. At the Large helical Device in Japan, a similar enhancement of the helium exhaust features when small amplitude additional 3D fields were applied was measured. This is an important additional function of 3D field application and its impact on ITER is presently being studied in combination with investigations of helium exhaust in 3D field geometries of stellarator devices.

3D plasma edge transport↗

Efficient ECCD non-inductive plasma current start-up, ramp-up, and sustainment for an ST fusion reactor

The elimination of the need for an Ohmic heating solenoid may be the most impactful design driver for the realization of economical compact fusion tokamak reactor systems. However, this would require fully non-inductive start-up and current ramp-up from zero plasma current and low electron temperature of sub-keV to the full plasma current of ~10–15 MA at 20–30 keV electron temperature. To address this challenge, an efficient solenoid-free start-up and ramp-up scenario utilizing a low-field-side-launched extraordinary mode at the fundamental electron cyclotron harmonic frequency (X–I) is proposed, which has more than two orders of magnitude higher electron cyclotron current drive (ECCD) efficiency than the conventional ECCD for the sub-keV start-up regime. A time dependent model was developed to simulate the start-up scenarios. For the Spherical Tokamak Advanced Reactor (STAR) (Menard et al 2023 Next-Step Low-Aspect-Ratio Tokamak Design Studies (IAEA)), it was found that to fully non-inductively ramp-up to 15 MA, it would take about 25 MW of EC power at 170 GHz. Because of the relatively large plasma volume of STAR, radiation losses must be considered. It is important to make sure that high Z impurities are kept sufficiently low during the early current start-up phase where the temperature is sub-keV range. Since the initial current ramp up takes place at a factor of ten lower density compared to the sustained regimes, it is important to transition into a higher bootstrap fraction discharge at lower density to minimize the ECCD power requirement during the densification. For the sustainment phase an array of eight gyrotron launchers with a total of about 60 MW of fundamental O-mode was found to be sufficient to provide the required axis-peaked external current drive. High efficiencies between 19–57 kA MW –1 were found with optimal aiming, and these were resilient to small changes in aiming angles and density and temperature profiles.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Demonstration of Electrolyzer Operation at a Nuclear Plant to Allow for Dynamic Participation in an Organized Electricity Market and In-House Hydrogen Supply

This document details the execution of Cooperative Agreement DE-EE0008849, “demonstration of electrolyzer operation at a nuclear plant to allow for dynamic participation in an organized electricity market and in-house hydrogen supply” during the performance period of 10/1/2019 – 9/30/2024. The project was funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). Constellation Energy Generation, LLC (formerly Exelon Generation Company, LLC) is the prime recipient of the award. Other members of the project team are INL, NREL, ANL and Nel Hydrogen. The main project objective was to demonstrate an end-to-end integrated grid-scale carbon-free H 2 production, storage and utilization pilot plant at a nuclear generating facility. The project also aimed to evaluate market opportunities and regulatory requirements related to the participation of integrated hydrogen production and nuclear plant facilities in organized power markets, by demonstrating dynamic control and operation of the electrolyzer and assessing the economics of dynamic participation combined with the revenue streams from hydrogen production. On March 7th , 2023 Constellation started hydrogen production at it’s Nine Mile Point Nuclear Plant in Oswego, New York. The PEM electrolyzer operating at Nine Mile Point uses 1.25 megawatt of nuclear electricity to produce 560 kilograms of clean hydrogen per day, more than enough to meet the plant’s operational hydrogen use. It will also help set the stage for possible large-scale deployments at other clean energy centers in Constellation’s fleet that would couple clean hydrogen production with storage and other on-site uses. Employing the lessons learned from the 1.25 MW demonstration-scale, nuclear-powered clean hydrogen production facility at Nine Mile Point, Constellation was a major participant in the MachH2 hydrogen hub recently selected for up to $\$$1 billion by the Department of Energy (DOE) as part of the bipartisan Infrastructure Investment and Jobs Act. Constellation will use a portion of the hub funding to build the world’s largest nuclear-powered clean hydrogen production facility at its LaSalle Clean Energy Center in Illinois. The project was featured in a number of news articles and press releases and received 2 awards. At the 2023 DOE HFTO’s Annual Merit Review meeting, the P.I. Dr. Uuganbayar Otgonbaatar and project manager Robert Beaumont were recognized for “outstanding achievements in the development and demonstration of a first-of-a-kind clean hydrogen production facility, powered by carbon-free nuclear energy, at the Nine Mile Point Nuclear Station in Oswego, New York.” The project was also awarded 2023 Nuclear Energy Institute’s Top Innovative Practice award.

08 HYDROGEN↗