IpexT: Integrated Planning and Execution for Military Satellite Tele-Communications

The next generation of military communications satellites may be designed as a fast packet-switched constellation of spacecraft able to withstand substantial bandwidth capacity fluctuation in the face of dynamic resource utilization and rapid environmental changes including jamming of communication frequencies and unstable weather phenomena. We are in the process of designing an integrated scheduling and execution tool which will aid in the analysis of the design parameters needed for building such a distributed system for nominal and battlefield communications. This paper discusses the design of such a system based on a temporal constraint posting planner/scheduler and a smart executive which can cope with a dynamic environment to make a more optimal utilization of bandwidth than the current circuit switched based approach.

Plaunt, Christian↗

Choosing Mars-Time: Analysis of the Mars Exploration Rover Experience

This paper focuses on the Mars Exploration Rover (MER) mission decision to work on Mars Time and the implications of that decision on the tactical surface operations process as personnel planned activities and created a new command load for work on each Martian sol. The paper also looks at tools that supported the complexities of Mars Time work, and makes some comparisons between Earth and Mars time scheduling.

Bass, Deborah S.↗

Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

Source record↗

Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

Source record↗

Lunar RFC Reliability Testing for Assured Mission Success

NASA's Constellation program has selected the closed cycle hydrogen oxygen Polymer Electrolyte Membrane (PEM) regenerative Fuel Cell (RFC) as its baseline solar energy storage system for the lunar outpost and manned rover vehicles. Since the outpost and manned rovers are "human-rated", these energy storage systems will have to be of proven reliability exceeding 99 percent over the length of the mission. Because of the low (TRL=5) development state of the closed cycle hydrogen oxygen PEM RFC at present, and because there is no equivalent technology base in the commercial sector from which to draw or infer reliability information from, NASA will have to spend significant resources developing this technology from TRL 5 to TRL 9, and will have to embark upon an ambitious reliability development program to make this technology ready for a manned mission. Because NASA would be the first user of this new technology, NASA will likely have to bear all the costs associated with its development. When well-known reliability estimation techniques are applied to the hydrogen oxygen RFC to determine the amount of testing that will be required to assure RFC unit reliability over life of the mission, the analysis indicates the reliability testing phase by itself will take at least 2 yr, and could take up to 6 yr depending on the number of QA units that are built and tested and the individual unit reliability that is desired. The cost and schedule impacts of reliability development need to be considered in NASA's Exploration Technology Development Program (ETDP) plans, since life cycle testing to build meaningful reliability data is the only way to assure "return to the moon, this time to stay, then on to Mars" mission success.

Bents, David J.↗

Lunar Regenerative Fuel Cell (RFC) Reliability Testing for Assured Mission Success

NASA's Constellation program has selected the closed cycle hydrogen oxygen Polymer Electrolyte Membrane (PEM) Regenerative Fuel Cell (RFC) as its baseline solar energy storage system for the lunar outpost and manned rover vehicles. Since the outpost and manned rovers are "human-rated," these energy storage systems will have to be of proven reliability exceeding 99 percent over the length of the mission. Because of the low (TRL=5) development state of the closed cycle hydrogen oxygen PEM RFC at present, and because there is no equivalent technology base in the commercial sector from which to draw or infer reliability information from, NASA will have to spend significant resources developing this technology from TRL 5 to TRL 9, and will have to embark upon an ambitious reliability development program to make this technology ready for a manned mission. Because NASA would be the first user of this new technology, NASA will likely have to bear all the costs associated with its development.When well-known reliability estimation techniques are applied to the hydrogen oxygen RFC to determine the amount of testing that will be required to assure RFC unit reliability over life of the mission, the analysis indicates the reliability testing phase by itself will take at least 2 yr, and could take up to 6 yr depending on the number of QA units that are built and tested and the individual unit reliability that is desired. The cost and schedule impacts of reliability development need to be considered in NASA's Exploration Technology Development Program (ETDP) plans, since life cycle testing to build meaningful reliability data is the only way to assure "return to the moon, this time to stay, then on to Mars" mission success.

Bents, David J.↗

Multi-Element Integrated Project Planning at Kennedy Space Center

This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

Mullon, Robert↗

Planning air transport network in Appalachia

Main issues to be considered in designing an air transport system are discussed, and a model for the selection of an optimal air network for a region is presented. It was desired to have the ability to consider a dense network of nodes and air routes and variations in schedules on routes, which in combination would represent virtually all conceivable alternatives. Linear and integer programming were chosen as the most promising analysis methodologies. Integer programming was found to be intractable, while linear programming provided efficient solutions. The model was applied to studying the feasibility of a STOL network in West Virginia. Based on allowable paths, an examination of intercity demands, and established growth points, desired levels of service expressed as minimum flights were determined for certain city pairs.

Carter, E. C.↗

Dynamic Testing of the NASA Hypersonic Project Combined Cycle Engine Testbed for Mode Transition Experiments

NASA is interested in developing technology that leads to more routine, safe, and affordable access to space. Access to space using airbreathing propulsion systems has potential to meet these objectives based on Airbreathing Access to Space (AAS) system studies. To this end, the NASA Fundamental Aeronautics Program (FAP) Hypersonic Project is conducting fundamental research on a Turbine Based Combined Cycle (TBCC) propulsion system. The TBCC being studied considers a dual flow-path inlet system. One flow-path includes variable geometry to regulate airflow to a turbine engine cycle. The turbine cycle provides propulsion from take-off to supersonic flight. The second flow-path supports a dual-mode scramjet (DMSJ) cycle which would be initiated at supersonic speed to further accelerate the vehicle to hypersonic speed. For a TBCC propulsion system to accelerate a vehicle from supersonic to hypersonic speed, a critical enabling technology is the ability to safely and effectively transition from the turbine to the DMSJ-referred to as mode transition. To experimentally test methods of mode transition, a Combined Cycle Engine (CCE) Large-scale Inlet testbed was designed with two flow paths-a low speed flow-path sized for a turbine cycle and a high speed flow-path designed for a DMSJ. This testbed system is identified as the CCE Large-Scale Inlet for Mode Transition studies (CCE-LIMX). The test plan for the CCE-LIMX in the NASA Glenn Research Center (GRC) 10- by 10-ft Supersonic Wind Tunnel (10x10 SWT) is segmented into multiple phases. The first phase is a matrix of inlet characterization (IC) tests to evaluate the inlet performance and establish the mode transition schedule. The second phase is a matrix of dynamic system identification (SysID) experiments designed to support closed-loop control development at mode transition schedule operating points for the CCE-LIMX. The third phase includes a direct demonstration of controlled mode transition using a closed loop control system developed with the data obtained from the first two phases. Plans for a fourth phase include mode transition experiments with a turbine engine. This paper, focusing on the first two phases of experiments, presents developed operational and analysis tools for streamlined testing and data reduction procedures.

Source record↗

Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

Source record↗

An Updated Process for Automated Deepspace Conjunction Assessment

There is currently a high level of interest in the areas of conjunction assessment and collision avoidance from organizations conducting space operations. Current conjunction assessment activity is mainly focused on spacecraft and debris in the Earth orbital environment [1]. However, collisions are possible in other orbital environments as well [2]. This paper will focus on the current operations of and recent updates to the Multimission Automated Deep Space Conjunction Assessment Process (MADCAP) used at the Jet Propulsion Laboratory for NASA to perform conjunction assessment at Mars and the Moon. Various space agencies have satellites in orbit at Mars and the Moon with additional future missions planned. The consequences of collisions are catastrophically high. Intuitive notions predict low probability of collisions in these sparsely populated environments, but may be inaccurate due to several factors. Orbits of scientific interest often tend to have similar characteristics as do the orbits of spacecraft that provide a communications relay for surface missions. The MADCAP process is controlled by an automated scheduler which initializes analysis based on a set timetable or the appearance of new ephemeris files either locally or on the Deep Space Network (DSN) Portal. The process then generates and communicates reports which are used to facilitate collision avoidance decisions. The paper also describes the operational experience and utilization of the automated tool during periods of high activity and interest such as: the close approaches of NASA's Lunar Atmosphere & Dust Environment Explorer (LADEE) and Lunar Reconnaissance Orbiter (LRO) during the LADEE mission. In addition, special consideration was required for the treatment of missions with rapidly varying orbits and less reliable long term downtrack estimates; in particular this was necessitated by perturbations to MAVEN's orbit induced by the Martian atmosphere. The application of special techniques to non-operational spacecraft with large uncertainties is also studied. Areas for future work are also described. Although the applications discussed in this paper are in the Martian and Lunar environments, the techniques are not unique to these bodies and could be applied to other orbital environments.

collision↗

A Spatial-Temporal Analysis of Travel Time Gap and Inequality between Public Transportation and Personal Vehicles

The increased use of personal vehicles presents environmental challenges, prompting the exploration of public transportation as an affordable, eco-friendly alternative. However, obstacles like fixed schedules, limited routes, and extended travel times impede widespread adoption. This study investigates the temporal evolution of spatial inequality in the travel time gap between public transportation and personal vehicles, reflecting disparities across states and time periods. Analyzing Census Transportation Planning Program data for six northeastern states in 2010 and 2016 reveals no significant increase in the travel time gap, but notable growth in inequality in a few urban and disadvantaged communities. Comprehending these trends is vital for fostering equitable advancements in transportation infrastructure and enhancing public transportation competitiveness.

Pan, Melrose↗

Multi-Timescale Optimal Operation Framework for Integrated Economic and Reliability Analysis of Hybrid Power Plants

This paper introduces a hierarchical modeling framework for hybrid power plants (HPP) to facilitate the operation of HPP in power systems similar to conventional generators (Congens) in the integrated multi-timescale optimal operation framework. To consider the uncertainties of HPP renewable power in the day-ahead scheduling, distributionally robust optimization (DRO) is used. To ensure that the state-of-charge (SOC) of energy storage systems in HPPs aligns closely with the planned value for long-term reliability, real-time SOC management is incorporated. In addition, an adjustable real-time control is designed for the robust delivery of HPP real-time services. Case studies performed on a revised IEEE 39-bus system demonstrate the effectiveness of the proposed framework for HPP operation. Simulation results highlight that the proposed framework not only can help operators schedule HPP similar to Congens in varying weather conditions but can also maintain the frequency reliability of the system.

frequency stability↗

The development of an augmentor wing jet STOL research aircraft (modified C-8A). Volume 2: Analysis of contractor's flight test

The initial flight test phase of the modified C-8A airplane was conducted. The primary objective of the testing was to establish the basic airworthiness of the research vehicle. This included verification of the structural design and evaluation of the aircraft's systems. Only a minimum amount of performance testing was scheduled; this has been used to provide a preliminary indication of the airplane's performance and flight characteristics for future flight planning. The testing included flutter and loads investigations up to the maximum design speed. The operational characteristics of all systems were assessed including hydraulics, environmental control system, air ducts, the vectoring conical nozzles, and the stability augmentation system (SAS). Approaches to stall were made at three primary flap settings: up, 30 deg and 65 deg, but full stalls were not scheduled. Minimum control speeds and maneuver margins were checked. All takeoffs and landings were conventional, and STOL performance was not scheduled during this phase of the evaluation.

Skavdahl, H.↗

Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

Source record↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and detection and responses that can be tested in VMET and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM. The plan for VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Apollo experience report: Guidance and control systems. Engineering simulation program

The Apollo Program experience from early 1962 to July 1969 with respect to the engineering-simulation support and the problems encountered is summarized in this report. Engineering simulation in support of the Apollo guidance and control system is discussed in terms of design analysis and verification, certification of hardware in closed-loop operation, verification of hardware/software compatibility, and verification of both software and procedures for each mission. The magnitude, time, and cost of the engineering simulations are described with respect to hardware availability, NASA and contractor facilities (for verification of the command module, the lunar module, and the primary guidance, navigation, and control system), and scheduling and planning considerations. Recommendations are made regarding implementation of similar, large-scale simulations for future programs.

Gilbert, D. W.↗

Optimized Trajectory Correction Burn Placement for NRHO Orbit Maintenance

NASA's future Artemis missions plan to utilize a near rectilinear halo orbit (NRHO) in the lunar vicinity to facilitate access to the lunar surface and place other critical assets to support human exploration. This exploration architecture requires a vehicle to remain in the NRHO for long periods of time ranging from several days, to weeks, to months, and even years. Consequently, periodic orbit maintenance burns become essential to ensure the spacecraft follows the desired reference trajectory in an efficient yet effective manner despite crew activity, navigation uncertainty, maneuver execution errors, disturbance accelerations, orbit insertion dispersions, and other system limitations. This work introduces a targeting algorithm that can be utilized to analyze a variety of targeting constraints and parameters that maximizes overall performance. Techniques associated with robust trajectory optimization are used to identify the optimized number and placement for NRHO trajectory correction (NTC) burns that accounts for the mission schedule, both a primary and backup navigation system, targeting strategies and burn plan configurations, vehicle venting, thruster selection, and integrated GN\&C performance. A notional scenario extracted from the NASA Artemis III mission is used to motivate and demonstrate these concepts and performance results.

Linear Covariance Analysis↗