Search NASA⌕ Search

SEARCH · Search NASA

Results for “Plant Protection System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

10 000-hr Cyclic Oxidation Behavior of 68 High-Temperature Co-, Fe-, and Ni- Base Alloys Evaluated at 982 deg. C (1800 deg. F)

Power systems with operating temperatures in the range of 815 to 982 C (1500 to 1800 F) frequently require alloys that can operate for long times at these temperatures. A critical requirement is that these alloys have adequate oxidation resistance. The alloys used in these power systems require thousands of hours of operating life with intermittent shutdown to room temperature. Intermittent power plant shutdowns, however, offer the possibility that the protective scale will tend to spall (i.e., crack and flake off) upon cooling, increasing the rate of oxidative attack in subsequent heating cycles. Thus, it is critical that candidate alloys be evaluated for cyclic oxidation behavior. It was determined that exposing test alloys to ten 1000-hr cycles in static air at 982 10 000-hr Cyclic Oxidation Behavior of 68 High-Temperature Co-, Fe-, and Ni-Base Alloys Evaluated at 982 C (1800 F) could give a reasonable simulation of long-time power plant operation. Iron- (Fe-), nickel- (Ni-), and cobalt- (Co-) based high-temperature alloys with sufficient chromium (Cr) and/or aluminum (Al) content can exhibit excellent oxidation resistance. The protective oxides formed by these classes of alloys are typically Cr2O3 and/or Al2O3, and are usually influenced by their Cr, or Cr and Al, content. Sixty-eight Co-, Fe-, and Ni-base high-temperature alloys, typical of those used at this temperature or higher, were used in this study. At the NASA Lewis Research Center, the alloys were tested and compared on the basis of their weight change as a function of time, x-ray diffraction of the protective scale composition, and the physical appearance of the exposed samples. Although final appearance and x-ray diffraction of the final scale products were two factors used to evaluate the oxidation resistance of each alloy, the main criterion was the oxidation kinetics inferred from the specific weight change versus time data. These data indicated a range of oxidation behavior including parabolic (typical of isothermal oxidation), paralinear, linear, and mixed-linear kinetics.

Barrett, Charles A.↗

Economic Feasibility of Electrochemical Caustic Recycling at the Hanford Site

This report contains a review of potential cost benefits of NaSICON Ceramic membranes for the separation of sodium from Hanford tank waste. The primary application is for caustic recycle to the Waste Treatment and Immobilization Plant (WTP) pretreatment leaching operation. The report includes a description of the waste, the benefits and costs for a caustic-recycle facility, and Monte Carlo results obtained from a model of these costs and benefits. The use of existing cost information has been limited to publicly available sources. This study is intended to be an initial evaluation of the economic feasibility of a caustic recycle facility based on NaSICON technology. The current pretreatment flowsheet indicates that approximately 6,500 metric tons (MT) of Na will be added to the tank waste, primarily for removing Al from the high-level waste (HLW) sludge (Kirkbride et al. 2007). An assessment (Alexander et al. 2004) of the pretreatment flowsheet, equilibrium chemistry, and laboratory results indicates that the quantity of Na required for sludge leaching will increase by 6,000 to 12,000 MT in order to dissolve sufficient Al from the tank-waste sludge material to maintain the number of HLW canisters produced at 9,400 canisters as defined in the Office of River Protection (ORP) System Plan (Certa 2003). This additional Na will significantly increase the volume of LAW glass and extend the processing time of the Waste Treatment and Immobilization Plant (WTP). Future estimates on sodium requirements for caustic leaching are expected to significantly exceed the 12,000-MT value and approach 40,000-MT of total sodium addition for leaching (Gilbert, 2007). The cost benefit for caustic recycling is assumed to consist of four major contributions: 1) the cost savings realized by not producing additional immobilized low-activity waste (ILAW) glass, 2) caustic recycle capital investment, 3) caustic recycle operating and maintenance costs, and 4) research and technology costs needed to deploy the technology. In estimating costs for each of these components, several parameters are used as inputs. Due to uncertainty in assuming a singular value for each of these parameters, a range of possible values is assumed. A Monte Carlo simulation is then performed where the range of these parameters is exercised, and the resulting range of cost benefits is determined.

36 MATERIALS SCIENCE↗

Cesium Removal from 5.5 and 7.0 M Na AP-105 Using Crystalline Silicotitanate

The Tank Side Cesium Removal (TSCR) system, currently operational by Washington River Protection Solutions LLC (WRPS), prepares initial low-activity Hanford waste tank supernate feeds for the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility. In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange, allowing contact handling of the liquid effluent product at the WTP as governed by a waste acceptance criterion (WAC). Specific to 137 Cs, this requirement is < 3.18E-5 Ci 137 Cs/mole of Na. Crystalline silicotitanate (CST) ion exchange media, manufactured by Honeywell UOP, LLC (product IONSIVTM R9140-B), has been selected as the ion exchange media for TSCR. CST is a non-elutable inorganic material that has demonstrated robust chemical, physical, and radiation tolerance while maintaining functionality. However, testing to date on actual tank waste samples has been limited to Na concentrations between 5 and 6 M Na (Fiskum et al. 2019a, 2021b and Westesen et al. 2021a, 2021b, 2022) while actual tank conditions can reach upwards of 9 M Na. Testing with feed from Hanford tank AP-105 incorporated testing at both 5.5 and 7 M Na in order to evaluate the impact of Na concentration on volume of waste processed before reaching the WAC. A 6-L volume of 5.5 M Na AP-105 and an 8-volume of 7 M Na AP-105 was processed through the Radioactive Waste Test Platform system, established at Pacific Northwest National Laboratory to support small-scale waste qualification efforts. The columns consisted of 6- to 9-mL CST beds (CST Lot 2002009604, sieved to screen out >30-mesh particles) placed in 1.5-cm-inner-diameter columns. Feed was processed at 1.9 bed volumes (BV) per hour; the flowrate, in terms of contact time with the CST bed, matched the expected flowrate at TSCR. Table S.1 and Figure S.1 summarize the measured AP-105 Cs load performance for each feed condition.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

Emergency Cooling of Nuclear Power Plant Reactors With Heat Removal By a Forced-Draft Cooling Tower

The feasibility of heat removal during emergency cooling of a reactor by a forced-draft cooling tower with accumulation of the peak heat release in a volume of precooled water is evaluated. The advantages of a cooling tower over a spray cooling pond are demonstrated: it requires less space, consumes less material, employs shorter lines in the heat removal system, and provides considerably better protection of the environment from wetting by entrained moisture.

42 ENGINEERING↗

Development of Seismic Isolation Systems Using Periodic Materials

Advanced fast nuclear power plants and small modular fast reactors are composed of thin-walled structures such as pipes; as a result, they do not have sufficient inherent strength to resist seismic loads. Seismic isolation, therefore, is an effective solution for mitigating earthquake hazards for these types of structures. Base isolation, on which numerous studies have been conducted, is a well-defined structure protection system against earthquakes. In conventional isolators, such as high-damping rubber bearings, lead-rubber bearings, and friction pendulum bearings, large relative displacements occur between upper structures and foundations. Only isolation in a horizontal direction is provided; these features are not desirable for the piping systems. The concept of periodic materials, based on the theory of solid-state physics, can be applied to earthquake engineering. The periodic material is a material that possesses distinct characteristics that prevent waves with certain frequencies from being transmitted through it; therefore, this material can be used in structural foundations to block unwanted seismic waves with certain frequencies. The frequency band of periodic material that can filter out waves is called the band gap, and the structural foundation made of periodic material is referred to as the periodic foundation. The design of a nuclear power plant, therefore, can be unified around the desirable feature of a periodic foundation, while the continuous maintenance of the structure is not needed. In this research project, three different types of periodic foundations were studied: one-dimensional, two-dimensional, and three-dimensional. The basic theories of periodic foundations are introduced first to find the band gaps; then the finite element methods are used, to perform parametric analysis, and obtain attenuation zones; finally, experimental programs are conducted, and the test data are analyzed to verify the theory. This procedure shows that the periodic foundation is a promising and effective way to mitigate structural damage caused by earthquake excitation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Engineering concepts for inflatable Mars surface greenhouses

A major challenge of designing a bioregenerative life support system for Mars is the reduction of the mass, volume, power, thermal and crew-time requirements. Structural mass of the greenhouse could be saved by operating the greenhouse at low atmospheric pressure. This paper investigates the feasibility of this concept. The method of equivalent system mass is used to compare greenhouses operated at high atmospheric pressure to greenhouses operated at low pressure for three different lighting methods: natural, artificial and hybrid lighting. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

NASA Discipline Life Support Systems↗

Seismic risk management solution for nuclear power plants

Nuclear power plants should safely operate during normal operations and maintain core-cooling capabilities during off-normal events, including external hazards (such as flooding and earthquakes). Management of external hazards to expectable levels of risk is critical to maintaining nuclear facility and nuclear power plant safety. Seismic risk is determined by convolving the seismic hazard with seismic fragilities (capacity of systems, structures, and components). Seismic isolation (SI) is one protective measure showing promise to minimize seismic risk. Current SI designs (used in commercial industry) reduce horizontal earthquake loads and protect critical infrastructure from the potentially destructive effects of large earthquakes. The benefit of SI application in the nuclear industry is being recognized and SI systems have been proposed in American Society of Civil Engineer Standard 4, ASCE-4, to be released in the winter of 2014, for light water reactors facilities using commercially available technology. The intent of ASCE-4 is to provide criteria for seismic analysis of safety related nuclear structures such that the responses to design basis seismic events, computed in accordance with this standard, will have a small likelihood of being exceeded. The U.S. nuclear industry has not implemented SI to date; a seismic isolation gap analysis meeting was convened on August 19, 2014, to determine progress on implementing SI in the U.S. nuclear industry. The meeting focused on the systems and components that could benefit from SI. As a result, this article highlights the gaps identified at this meeting.

99 GENERAL AND MISCELLANEOUS↗

Ion Exchange Processing of AP-105 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System (Rev.1)

The Tank Side Cesium Removal (TSCR) system, under development by Washington River Protection Solutions LLC (WRPS), will send initial low-activity Hanford waste tank supernate feeds to the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility. In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange, allowing contact handling of the liquid effluent product at the WTP. Crystalline silicotitanate (CST) ion exchange media, manufactured by Honeywell UOP, LLC (product IONSIVTM R9140-B), was selected as the ion exchange media at TSCR. CST is a non-elutable inorganic material that has demonstrated robust chemical, physical, and radiation tolerance while maintaining functionality. However, exchange kinetics of Cs onto CST is slow, resulting in low utilization of the CST Cs load capacity before unacceptable Cs breakthrough. Two process flow designs have been tested, as follows. 1. Lead-lag column processing: The lead column was removed after the lag column effluent reached the waste acceptance criteria (WAC) limit, the lag column was moved into the lead position, and a new lag column was installed. This format used ~52% Cs load capacity on the lead column. 2. Lead-lag-polish column processing: The processing was stopped when the polish column effluent reached the WAC limit. This format resulted in 81% Cs load capacity on the lead column. Testing with diluted feed from Hanford tank AP-105 (AP-105DF) incorporated a nuanced change to the lead-lag-polish column system where the polish column was inserted when the lag column effluent reached WAC limit. A 10.9-L volume of AP-105DF (diluted to 5.6 M Na) was processed through the Direct Feed Test Platform system, established at Pacific Northwest National Laboratory to support small-scale waste qualification efforts. The columns consisted of 10-mL CST beds (CST Lot 2002009604, sieved to screen out >30-mesh particles) placed in 1.5-cm-inner-diameter columns. Feed was processed at 1.83 bed volumes (BV) per hour; the flowrate, in terms of contact time with the CST bed, matched the expected flowrate at TSCR. The <30-mesh CST sieve cut was expected to provide appropriate performance scaling to a full-height column. The installation of the polish column later in processing (after processing 523 BVs) did not appear to fundamentally change the utilization of the lead column for Cs exchange nor did it extend the total feed processing volume when compared to the previous test with AP-107 feed. Table ES.1 and Figure ES.1 summarize the measured AP-105DF Cs load performance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Similar local, but different systemic, metabolomics responses of closely related pine subspecies to folivory by caterpillars of the processionary moth

Plants respond locally and systemically to herbivore attack. Most of the research conducted on plant-herbivore relationships at elemental and molecular levels have focused on nutrients or/and certain molecular compounds or specific families of defensive metabolites showing that herbivores tend to select plant individuals or species with higher nutrient concentrations and to avoid those with higher levels of phenolics and terpenes. Unfortunately, the defensive role of phenolics in conifers is still unclear. We performed stoichiometric and metabolomics, local and systemic, analyses in two subspecies of Pinus sylvestris under the herbivorous attack by the caterpillars of the pine processionary moth, an important pest in the Mediterranean Basin. Herbivorous attack was not associated with any of the elements analyzed. Both pine subspecies responded locally to folivory mainly by increasing the concentrations of various terpenes and phenolics. Systemic responses differed between subspecies and most of the metabolites presented intermediate concentrations between those of the affected parts and unattacked trees. Contrary as usually thought, foliar nutrient concentrations did not show to be a main factor of an alleged plant selection by adult female processionary moths for oviposition. Local increases in phenolics were more associated with antioxidant function for protection against oxidative damage produced by folivory. On the other hand, terpenes were directly related to defense against herbivores. Herbivory attack produced a general systemic shift in pines, including both primary and secondary metabolisms, that was, however, less intense and chemically different from the local responses. Subspecies responded similarly locally but differently to folivory at systemic level.

Environmental Molecular Sciences Laboratory↗

Microbial Monitoring Challenges and Needs for Mars Applications

The monitoring of microorganisms will be an important part of a mission to Mars. Microbial monitoring equipment will be needed to look for the presence of microorganisms on the planet, to confirm that planetary protection measures are working, to monitor the health of plants, bioreactors and humans living in a habitat and to monitor the performance of the life support systems that will keep them alive during their stay on Mars. Coordinating the different microbial monitoring needs during the early days of mission planning, can provide NASA with equipment that could meet more than one need while also providing complementary analysis options, which can enhance the research capabilities. The early coordination between the different NASA groups that will need microbial monitoring equipment on the surface of Mars, could also make the mission more affordable, as development of the needed equipment could be potentially cost shared.

Roman, M. C.↗

SIW21-95: Hybridizing Synchronous Condensers with Grid-Forming Battery Energy Storage Systems

One of the main challenges associated with deployment of high shares of inverter-based resources (IBRs) in power grid is not only reduced system inertia but also degrading system strength that may cause severe stability impacts. A minimum level of system strength is needed for the power system to remain stable under normal conditions and to return to a steady state condition following a system disturbance. Significant system strength reduction is expected in almost all planned areas for solar and wind generation deployment. Synchronous condensers (SC) have been considered as one main technology to address the system strength issues for the areas with high levels of IBRs. SCs can help improving reliability and resiliency of power system but they do not provide the full range of services needed by power systems for reliable and economic integration of high shares of inverter-coupled variable generation such as PV generation. Services related to active power controls cannot be provided by SCs due to lack of prime mover. Even for provision of reactive power SCs have certain constraints based on their thermal and stability limits. NREL has been conducting research on a hybridized concept that combines SCs with grid forming (GFM) battery energy storage systems (BESS). This super flexible AC transmission system (SuperFACTS) that combines these two technologies in a single plant under the same controller offers a unique scalable set of services to the power system at all levels (transmission, sub-transmission, distribution, islands and isolated microgrids). Depending on use cases, SuperFACTS can be controlled to provide fully dispatchable and flexible operation using energy storage component, provide a full range of existing and future ancillary and reliability services to the grid (similar or better than conventional sources), maintain adequate levels of grid strength and inertia, and provide fault current for proper operation of protection systems. Therefore, this economic and easy to commercialize solution has potential for significant impacts on certain segments of global energy sector. All types of gird services (market based, reliability and resiliency) can be provided by SuperFACTS plants. GFM BESS can act as a self-black start source for each SuperFACTS module, which in turn can act a black start resource for co-located PV and wind power plants, segments of transmission and distribution networks, for conventional power plants, etc. The issue of in-rush currents during black start is addressed by overcurrent capability of SCs. In this paper we describe the results of modeling for SuperFACTS concept.

grid forming↗

Total Integrated Dose to Spent Fuel Pool Level Instrument Probes and Refueling Floor Personnel Dose Rates Meeting NRC Order EA-12-051 for a Typical Boiling Water Reactor - Paper 22

In reviewing the events after the March 11, 2011 Fukushima accident, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051, Reference 1, requiring new reliable spent fuel pool (SFP) instrumentation for pool level determination under beyond design basis event conditions. In 2013, URS prepared a calculation for a typical Boiling Water Reactor to determine the Total Integrated Dose (TID) potentially to be imparted to radiation sensitive underwater probes (one primary and one backup) planned for meeting this Order. Additionally, URS calculated the radiological dose rates to an individual standing on the refueling floor for various SFP fill levels. NEI 12-02, Reference 2, defines the levels at which SFP condition identification is necessary as the following: Level 1 - level that is adequate to support operation of the normal fuel pool cooling system. Level 1 represents the higher of the following two points: - The level at which reliable suction loss occurs due to uncovering of the coolant inlet pipe, weir or vacuum breaker (depending on the design), or - The level at which the water height, assuming saturated conditions, above the centerline of the cooling pump suction provides the required net positive suction head specified by the pump manufacturer or engineering analysis. Level 2 - level that is adequate to provide substantial radiation shielding for a person standing on the spent fuel pool operating deck. Level 2 is based on either of the following: - 10 feet (+/- 1 foot) above the highest point of any fuel rack seated in the spent fuel pools, or - A designated level that provides adequate radiation shielding to maintain personnel radiological dose levels within acceptable limits while performing local operations in the vicinity of the pool. This level shall be based on either plant-specific or appropriate generic shielding calculations, considering the emergency conditions that may apply at the time and the scope of necessary local operations, including installation of portable SFP instrument channel components. Level 3 - level where fuel remains covered and actions to implement make-up water addition should no longer be deferred. Level 3 corresponds nominally (i.e. +/- 1 foot) to the highest point of any fuel rack seated in the spent fuel pool. The URS calculation did not define these levels or determine instrumentation setpoints. However, it determined refueling floor dose rates that could be used as a tool to determine the appropriate water depths for these levels. In determining the TID for the SFP probes and the radiological dose rates to the individual, the following radioactive sources were considered: 1. Spent Nuclear Fuel (SNF) stored in the spent fuel storage racks, 2. Local Power Range Monitors (LPRMs) stored above the top of the racks on hangers on the SFP walls 3. Radioactive material laden filters stored on platforms on top of the racks, and 4. Control Rod Blades (CRBs) stored above the top of the racks on hangers on the SFP walls. The TID for the SFP probes includes both the dose from normal operation (pool full of water) for the remaining plant life (an assumed 40 years, conservatively including an allowance for lifetime extension SFP loading) and, consistent with the NEI 12-02 guidelines, Reference 2, the assumed drop in elevation of the pool water level to the top of the spent fuel racks for a 6 hour period. The acceptable TID for the radiation-sensitive probe as defined by the manufacturer was 2x10{sup 9} rad. The individual on the pool deck was assumed to be standing on the edge of the pool with an unobstructed view of its contents, as a worst case scenario. Dose rates to this individual determined from direct shine from the same 4 sources were determined for SFP water levels varying from 1 ft above the SNF racks to 21 ft above the racks in one foot increments. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Safeguards Lessons Learned from the Rokkasho Reprocessing Plant - 19502

Once operational, the Rokkasho Reprocessing Plant (RRP) will have an operating throughput of 800 MT of uranium in irradiated LWR fuel per year. In order to establish effective and efficient safeguards at RRP, the safeguards discussion with the IAEA was initiated in 1988. However, at that time there were no available models or guidelines that could be used as a reference and multiple difficulties were recognized for the implementation of safeguards into a large scale reprocessing plant. Therefore, from 1988 to 1992, a multinational forum, referred to as LASCAR (Large Scale Reprocessing Plant Safeguards) [1], provided the recommendations on how an effective safeguards approach could be implemented into a large scale reprocessing plant while efficiently using existing resources. During the course of safeguards discussions between the IAEA, the State, and JNFL, the use of operator's equipment and measurement systems (by signal splitting with authentication) for inspections was studied. JNFL also examined incorporating inspection requirements into the process design: to reduce the costs associated with system installation and future system maintenance and to ensure effective, efficient, and credible safeguards implementation into the RRP (this approach has essentially become the 'Safeguards by Design (SBD)' process). From these studies and JNFL's experience of implementing safeguards into a new plant [2], JNFL established and applied signal splitting from operator's equipment as a means for providing inspectors required safeguards information. In addition, the LASCAR findings were utilized to establish the safeguards implemented into the RRP. Safeguards implementation into RRP commenced March 31, 2006. On June 4, 2008, the IAEA approved the 'integrated safeguards approach' for RRP. This paper provides a high level overview of the major safeguards implemented at RRP and the lessons learned from this implementation that can be applied to existing or future similar facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AI-based Detection and Defense Against Cyberattacks in Distributed Energy Resources

This study will provide comprehensive artificial intelligence (AI)-based solution tools for network security, malware prevention, and sensor data anomaly detection for distributed energy resource (DER) research, development, and demonstration. DER technologies are energy systems (e.g., solar panels, wind turbines, and energy storage systems) that are often connected to the internet and thus vulnerable to cyberattacks. Cybersecurity should be of primary concern for DERs, which is why we propose an integrated multi-layer cyber-defense system for DERs. This system encompasses risk assessments, network security, malware prevention, and detection of anomalies in the sensor data. Implementation of a comprehensive risk assessment with an overview of the model architecture should be the primary step, and should include the potential impact of experiencing, at a given time, one or more cyberattacks on the system. The second step is to ensure that the network security includes firewalls, intrusion detection, and malware prevention. The third step is to provide solution tools that enable sensor data anomaly detection for DERs. By incorporating these considerations into DER research, development, and demonstration, organizations can help ensure the safety and security of their systems and protect against potential cyberattacks.

20 FOSSIL-FUELED POWER PLANTS↗

An Adaptive Approach to Energy Security and Assurance

The North American power network has been called the world s largest, most complex machine. This network represents an enormous continent-wide investment, including over 15,000 generators in 10,000 power plants, and miles of transmission lines, distribution networks, and control systems. It has long been recognized that existing power-delivery systems are vulnerable to natural disasters and adversarial attack. The next generation of control systems must simultaneously protect against these disruptions while integrating new generation sources and maintaining active, automated control of the grid. The grid s interconnectedness needed to provide smart grid control also increases its vulnerability to interconnect-wide disruptions that are initiated locally. While strong centralized control is essential to reliable operations, this control requires multiple, high-data-rate, two-way communication links, a powerful central computing facility, and an elaborate operation-control center, all of which present vulnerabilities. It is clearly impossible to completely protect such a widespread and complex system. The key to maintaining the integrity of this network lies in the ability to identify its critical elements and to then effectively protect these elements. This identification and targeted protection will enable parts of the network to remain operational and even automatically reconfigure in the event of local failures or threats of failure, providing dependable continuity of service. The bold concept proposed here is the communication, predictive models and fast controls that eliminate the need to protect all components from emergent contingencies, but to reconfigure actively to maintain critical functions. The transformation from laboratory applications to larger than micro grid areas will require the next generation of energy technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ECAR-7365 Rev 0 MARVEL Over Pressure Protection Report

This ECAR encompasses and documents compliance to the pressure safety requirements of the Microreactor Applications Research Validation and Evaluation (MARVEL) Reactor Primary Coolant Boundary (referred to herein as the Primary Coolant System, or PCS, which includes the outer boundary of the Central Insurance Absorber (CIA)) as a Class A system (equivalent to a Section III Division 1 Class 1 system) for high temperature reactors subjected to elevated temperature service.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗