Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Division”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Geospatial Characterization of Low-Temperature Heating and Cooling Demand in the United States

Geothermal resources at temperatures below 150 degrees C have great potential as energy sources for various direct-use applications including heating and cooling in residential and commercial buildings. This study geospatially quantifies U.S. heating and cooling demand in residential, commercial, and manufacturing sectors; heating demand in the agricultural sector; and cooling demand in data centers at the county level through end-use energy consumption, expenditure, and commissioned power analyses. Heating and cooling demand in the residential sector was estimated using energy consumption data obtained from the U.S. Energy Information Administration accounting for different U.S. climate zones. For commercial sector analysis, the end-use major fuel energy intensity at the census division level was disaggregated to the county level with respect to principal building activities. Heating and cooling demand analysis for the manufacturing sector was based on end-use energy consumption for direct-use total process categorized by the North America Industry Classification System. Fuel expenditures in the U.S. Department of Agriculture Farm Production Expenditures were examined for heating demand analysis in the agricultural sector, particularly for the greenhouse, nursery, and floriculture production category. Lastly, commissioned power for data centers in the United States were explored for cooling demand analysis. Results indicated a significant fraction of U.S. primary energy consumption is used for low-temperature heating and cooling applications. Heating and cooling demand in residential and commercial sectors is significantly affected by the number of housing units and climate zone designations, while heating and cooling demand in manufacturing and agricultural sectors and data centers are mainly dependent on the number of facilities and their locations. Maps were generated visualizing where heating and cooling demand is high and, overlain with geothermal resource maps, can indicate locations where geothermal energy can supply this heating and cooling demand.

cooling demand↗

A low-power, high-throughput maximum-likelihood convolutional decoder chip for NASA's 30/20 GHz program

It is pointed out that the NASA 30/20 GHz program will place in geosynchronous orbit a technically advanced communication satellite which can process time-division multiple access (TDMA) information bursts with a data throughput in excess of 4 GBPS. To guarantee acceptable data quality during periods of signal attenuation it will be necessary to provide a significant forward error correction (FEC) capability. Convolutional decoding (utilizing the maximum-likelihood techniques) was identified as the most attractive FEC strategy. Design trade-offs regarding a maximum-likelihood convolutional decoder (MCD) in a single-chip CMOS implementation are discussed.

Mccallister, R. D.↗

Delay-Line Anode For Microchannel-Plate Spectrometer

Photon-counting read-out system for microchannel-plate spectrometer includes delay line and timing circuit to measure wavelength coordinate and wedge/wedge charge-division system to measure orthogonal spatial coordinate. System proves advantageous for portable two-dimensional spectrometers having large image planes and for which design requirements include simplicity, reliability, low power consumption, and low mass.

Lampton, M.↗

Space Technology for the Iron Foundry

Electric Power Research Institute (EPRI) initiated development of a plasma melter intended to solve a major problem in the U.S. foundry industry. EPRI is a non-profit organization that manages research and development for some 600 electric utility member companies. For the plasma melter program, EPRI enlisted as co-sponsors Westinghouse Electric's Environmental Systems and Services Division, General Motors Corporation, and Modern Equipment Company, supplier of equipment and services to the foundry industry. General Motor's plasma melter, first in the U.S., is an advanced technology system designed to improve the efficiency of coke-burning cupolas that melt iron to produce automotive castings. The key elements are six Westinghouse plasma torches. Electrically-powered plasma torch creates an ionized gas that superheats air entering the cupola to 10,000 degrees Fahrenheit. That great heat, three times higher than that attainable by oil or natural gas systems, is the key to making iron cheaper, cleaner, and faster. System offers an environmental bonus in reduced cupola emissions. Plasma torches increase GM's electric bill at Defiance, but that cost is more than compensated by the savings in charge material. The EPRI-sponsored Center for Materials Production (CMP) is evaluating the potential of plasma cupola technology.

Source record↗

Turbine Manufacture

The machinery pictured is a set of Turbodyne steam turbines which power a sugar mill at Bell Glade, Florida. A NASA-developed computer program called NASTRAN aided development of these and other turbines manufactured by Turbodyne Corporation's Steam Turbine Division, Wellsville, New York. An acronym for NASA Structural Analysis Program, NASTRAN is a predictive tool which advises development teams how a structural design will perform under service use conditions. Turbodyne uses NASTRAN to analyze the dynamic behavior of steam turbine components, achieving substantial savings in development costs. One of the most widely used spinoffs, NASTRAN is made available to private industry through NASA's Computer Software Management Information Center (COSMIC) at the University of Georgia.

Source record↗

Dividends in Safety

Automated fire weather stations developed by NASA and now being used by the California Division of Forestry provide a means of predicting where a forest fire might occur. The stations I employ aerospace sensors and a combination of solar energy, wind energy and commercial power. To avoid interference by trees and mountains, weather data is relayed by satellite from outlying stations to a central fire protection office.

Source record↗

Multiplexing Technology for Acoustic Emission Monitoring of Aerospace Vehicles

The initiation and propagation of damage mechanisms such as cracks and delaminations generate acoustic waves, which propagate through a structure. These waves can be detected and analyzed to provide the location and severity of damage as part of a structural health monitoring (SHM) system. This methodology of damage detection is commonly known as acoustic emission (AE) monitoring, and is widely used on a variety of applications on civil structures. AE has been widely considered for SHM of aerospace vehicles. Numerous successful ground and flight test demonstrations have been performed, which show the viability of the technology for damage monitoring in aerospace structures. However, one significant current limitation for application of AE techniques on aerospace vehicles is the large size, mass, and power requirements for the necessary monitoring instrumentation. To address this issue, a prototype multiplexing approach has been developed and demonstrated in this study, which reduces the amount of AE monitoring instrumentation required. Typical time division multiplexing techniques that are commonly used to monitor strain, pressure and temperature sensors are not applicable to AE monitoring because of the asynchronous and widely varying rates of AE signal occurrence. Thus, an event based multiplexing technique was developed. In the initial prototype circuit, inputs from eight sensors in a linear array were multiplexed into two data acquisition channels. The multiplexer rapidly switches, in less than one microsecond, allowing the signals from two sensors to be acquired by a digitizer. The two acquired signals are from the sensors on either side of the trigger sensor. This enables the capture of the first arrival of the waves, which cannot be accomplished with the signal from the trigger sensor. The propagation delay to the slightly more distant neighboring sensors makes this possible. The arrival time from this first arrival provides a more accurate source location determination. The multiplexer also identifies which channels are acquired by encoding TTL logic pulses onto the latter portion of the signals. This prototype system was demonstrated using pencil lead break (Hsu-Neilsen) sources on an aluminum plate. It performed as designed providing rapid low noise trigger based switching with encoded channel identification. this multiplexing approach is not limited to linear arrays, but can be easily extended to monitor sensors in planar ot three dimensional arrays. A 32 channel multiplexing system is under development that will allow arbitrary sensor placement. Another benefit of this multiplexing system is the reduction in the expense of data acquisition hardware. In addition, the reduced weight and power requirements are of extreme importance for proposed AE systems on aerospace vehicles.

Prosser, William↗

Solar salt pond potential site survey for electrical power generation

A solar salt gradient pond acts as a passive heat sink or thermal battery in which energy can be recovered through the conversion of thermal energy into electrical energy. Here, a condensation of a larger report that focused on the identification of potential salt gradient pond sites in the United States using in-situ resources is presented. It is shown that there are at least 24 states that lie in a primary or secondary potential site category. Fourteen states are assigned as primary states and ten are assigned as secondary. The division is subjectively based on the severity of winter weather. The most promising states are those that lie in the southern half of the country. When the primary and secondary category states are combined with the other states that may be able to support a pond, a total of 38 states exhibit the possibility of supporting power generation sites of various size.

Hurick, M. G.↗

Control concepts for large space structures

A comprehensive program to develop the required control technology was started at Rockwell International's Space Division. A few of the concepts under consideration for attitude, figure, and vibration control of large, flexible space systems are highlighted. In addition, an overview of the Space Division's independent research and development (IR&D) is presented. The direction of the IR&D program was influenced by requirements for electro-optical systems, shuttle erectable structures and satellite power stations.

Quartararo, R. C.↗

Gear systems for advanced turboprops

A new generation of transport aircraft will be powered by efficient, advanced turboprop propulsion systems. Systems that develop 5,000 to 15,000 horsepower have been studied. Reduction gearing for these advanced propulsion systems is discussed. Allison Gas Turbine Division's experience with the 5,000 horsepower reduction gearing for the T56 engine is reviewed and the impact of that experience on advanced gear systems is considered. The reliability needs for component design and development are also considered. Allison's experience and their research serve as a basis on which to characterize future gear systems that emphasize low cost and high reliability.

Wagner, Douglas A.↗

Expert system for on-board satellite scheduling and control

An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.

Barry, John M.↗

Simulation and analysis of an intermediate frequency (IF) distribution system with applications for Space Station

Simulation and analysis results are described for a wideband fiber optic intermediate frequency distribution channel for a frequency division multiple access (FDMA) system where antenna equipment is remotely located from the signal processing equipment. The fiber optic distribution channel accommodates multiple signals received from a single antenna with differing power levels. Performance parameters addressed are intermodulation degradations, laser noise, and adjacent channel interference, as they impact the overall system design. Simulation results showed that the laser diode modulation level can be allowed to reach 100 percent without considerable degradation. The laser noise must be controlled as to provide a noise floor of less than -90 dBW/Hz. The fiber optic link increases the degradation due to power imbalance yet diminishes the effects of the transmit amplifier nonlinearity. Overall, optimal operation conditions can be found to yield a degradation level of about .1 dB caused by the fiber optic link.

Costello, Thomas A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

On board processing for future satellite communications systems: Comparison of FDM, TDM and hybrid accessing schemes

Several satellite uplink and downlink accessing schemes for customer premises service are compared. Four conceptual system designs are presented: satellite-routed frequency division multiple access (FDMA), satellite-switched time division multiple access (TDMA), processor-routed TDMA, and frequency-routed TDMA, operating in the 30/20 GHz band. The designs are compared on the basis of estimated satellite weight, system capacity, power consumption, and cost. The systems are analyzed for fixed multibeam coverage of the continental United States. Analysis shows that the system capacity is limited by the available satellite resources and by the terminal size and cost.

Berk, G.↗

Quantum Sensing and Communications Being Developed for Nanotechnology

An interdisciplinary quantum communications and sensing research effort for application in microdevices has been underway at the NASA Glenn Research Center since 2000. Researchers in Glenn's Instrumentation and Controls, Communications Technology, and Propulsion and Turbomachinery Divisions have been working together to study and develop techniques that utilize quantum effects for sensing and communications. The emerging technology provides an innovative way to communicate faster and farther using less power and to sense, measure, and image environmental properties in ways that are not possible with existing technology.

Lekki, John D.↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2019

This report was prepared by Argonne National Laboratory in support of a financial analysis of the Glen Canyon Dam high-flow experimental release that is intended to mobilize the sand in the Colorado River with high-volume water releases from the dam and redeposit it downstream as sandbars along the river. These sandbars serve, among other things, as habitat for wildlife. This experimental release was conducted during the period from November 5 to November 8, 2018. This analysis was funded by the Colorado River Storage Project (CRSP) Office of the U.S. Department of Energy Western Area Power Administration (WAPA). CRSP markets electricity produced by hydroelectric facilities collectively known as the Salt Lake City Area Integrated Projects including dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Staff members in Argonne’s Energy Systems Division prepared this technical report with assistance from the WAPA CRSP and Energy Marketing and Management Offices.

13 HYDRO ENERGY↗