Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

IMPACT - Information for the Development of Human Health and Performance Systems

IMPACT is a suite of computational and systems engineering tools. Currently being developed for NASA Exploration Medical Capabilities (ExMC) and could be extended to other Human Research Program (HRP) elements. The purpose is to provide a data-driven means to inform human health and performance risk mitigation during exploration missions considering resource constraints in the medical system. IMPACT enables systematic trade studies to evaluate options. IMPACT uses Probabilistic Risk Assessment (PRA) as a systematic methodology to evaluate risks. IMPACT is currently under development to inform decision-makers the risks involved with trade-options that have likelihoods and consequences backed by scientific research in a medical evidence library. IMPACT supports multi-segment analysis to determine probabilities and risks in different mission segments. There are currently 122 medical conditions and 900 resources in the IMPACT Medical Database. IMPACT modeling is using mission segments and multiple vehicles for the NASA Artemis campaign and could support future complex missions in deep space.

IMPACT PRA↗

Probabilistic Modeling Of Ocular Biomechanics In VIIP: Risk Stratification

Visual Impairment and Intracranial Pressure (VIIP) syndrome is a major health concern for long-duration space missions. Currently, it is thought that a cephalad fluid shift in microgravity causes elevated intracranial pressure (ICP) that is transmitted along the optic nerve sheath (ONS). We hypothesize that this in turn leads to alteration and remodeling of connective tissue in the posterior eye which impacts vision. Finite element (FE) analysis is a powerful tool for examining the effects of mechanical loads in complex geometries. Our goal is to build a FE analysis framework to understand the response of the lamina cribrosa and optic nerve head to elevations in ICP in VIIP. To simulate the effects of different pressures on tissues in the posterior eye, we developed a geometric model of the posterior eye and optic nerve sheath and used a Latin hypercubepartial rank correlation coef-ficient (LHSPRCC) approach to assess the influence of uncertainty in our input parameters (i.e. pressures and material properties) on the peak strains within the retina, lamina cribrosa and optic nerve. The LHSPRCC approach was repeated for three relevant ICP ranges, corresponding to upright and supine posture on earth, and microgravity [1]. At each ICP condition we used intraocular pressure (IOP) and mean arterial pressure (MAP) measurements of in-flight astronauts provided by Lifetime Surveillance of Astronaut Health Program, NASA Johnson Space Center. The lamina cribrosa, optic nerve, retinal vessel and retina were modeled as linear-elastic materials, while other tissues were modeled as a Mooney-Rivlin solid (representing ground substance, stiffness parameter c1) with embedded collagen fibers (stiffness parameters c3, c4 and c5). Geometry creationmesh generation was done in Gmsh [2], while FEBio was used for all FE simulations [3]. The LHSPRCC approach resulted in correlation coefficients in the range of 1. To assess the relative influence of the uncertainty in an input parameter on the peak strains, we ranked and then normalized these coefficients, considering that normalized values 0.5 implied a substantial influence on the range of the peak strains in the optic nerve head (ONH). IOP and ICP were found to have a major influence on the peak strains in the ONH, as did optic nerve and LC stiffness. Interestingly, the stiffness of the sclera far from the scleral canal did not have a large influence on peak strains in ONH tissues; however, the collagen fiber stiffness in the peripapillary sclera and annular ring both influenced the peak strains within the ONH. We have created a physiologically relevant model that incorporated collagen fibers to study the effects of elevated ICP. Elevated ICP resulted in strains in the optic nerve that are not predicted to occur on earth: the upright or supine conditions. We found that IOP, ICP, lamina cribrosa stiffness and optic nerve stiffness had the highest association with these extreme strains in the ONH. These extreme strains may activate mechanosensitive cells that induce tissue remodeling and are a risk factor for the development of VIIP.

biomechanics↗

Preliminary Approach to Assess the Seismic Hazard on a Lunar Site

The passive seismic network deployed on the Moon during the Apollo missions operated for eight years and allowed the observation of seismic activity. More than 12500 seismic events were registered, where 28 were classified as shallow moonquakes with moment magnitudes up to 4.1. Seismic events of this nature pose a significant risk to future long-term lunar habitats; thus, these events must be carefully studied and considered in the seismic design of these structures. This paper proposes a preliminary seismic hazard assessment imposed by shallow moonquakes. The hazard assessment is performed using the Probabilistic Seismic Hazard Analysis (PSHA) methodology, considering previous studies and theories regarding the seismic environment of the Moon. The study zone covers ~860 km2 of the Taurus-Littrow Valley, containing the Apollo 17 landing site and the Lee-Lincoln lobate scarp as the considered seismic source. The seismic hazard is quantified in terms of peak ground acceleration (PGA) and spectral acceleration (5% damped pseudo-acceleration, PSA). Seismic hazard deaggregation scenarios, Uniform Hazard Spectra (UHS) for different hazard levels, and a Conditional Mean Spectrum (CMS) for a target period of 0.2 s are obtained to quantify the seismic hazard on a specific site on the Moon. The developed seismic hazard assessment provides a preliminary approach for realistic scenarios to conduct structural designs that ensure the seismic performance of fully operational long-term lunar structures.

Moonquake↗

Probabalistic Risk Analysis and Thermal Margin Process for an Inflatable Aeroshell

Uncertainties always exist in atmospheric entry aeroheating environments and the thermal response of thermal protection system (TPS) material. These uncertainties are mitigated in the design by ap-plying margin and factors of safety to the TPS. Entry vehicle TPS is often conservatively over-sized for the heat loads that are experienced along the entry trajectory by stacking worst-case scenarios together. Additionally, the current TPS design and margin process used by NASA offers very little insight into the risk of over-temperature during flight and the reliability of the heat shield performance [1,3]. A probabilistic margin process can be used to calculate the amount of TPS margin necessary to survive a given entry heat load at a specified level of risk [2,3,4]. The vehicle’s initial entry state (entry velocity, flight path angle, and entry mass) determines the expected atmospheric entry environmental conditions and resulting heat load that the entry vehicle will experience. If there is flexibility in the entry state, then this process can be used to select an appropriate combination of entry state parameters and TPS size to target a desired reentry reliability. This probabilistic margin process allows engineers to make informed aeroshell design, entry-trajectory design, and TPS performance risk trades while preventing excessive TPS margin from being applied. The probabilistic TPS margin process has been performed to determine TPS thickness and entry heating constraints given an acceptable risk level for the Low Earth Orbit Flight Experiment of an Inflatable Decelerator (LOFTID) flight project. The process is used in a manner to size the entry heat load for a given flexible TPS (FTPS) thickness so that it meets project reliability standards while allowing the FTPS and the underlying inflatable structure (IS) to be pushed to adequately high temperatures. Since the LOFTID project is an experimental flight demonstration, it is de-sired to drive the FTPS and IS to temperatures that cover a large range of their thermal response models’ applicability. This will allow the thermal response models to be better improved and validated post-flight using LOFTID’s extensive instrumentation embedded within the aeroshell. The presentation demonstrates how uncertainty analysis is carried out using an end-to-end Monte Carlo process where three separate Monte Carlo simulations are run in sequence. The first Monte Carlo simulation operates on the entry trajectory model to generate trajectory parameter dispersions that are fed into the second Monte Carlo simulation. The second Monte Carlo simulation operates on the aerothermodynamics model to generate aeroheating parameter dispersions that are fed into the third Monte Carlo simulation. The third Monte Carlo simulation operates on the FTPS material thermal response model to generate the final FTPS/IS thermal response dispersions. The end-to-end Monte Carlo simulation propagates the uncertainties of each model into the next to quantify the resulting uncertainty of the FTPS/IS thermal response. The fractional contributions of the uncertain parameters in the trajectory, aerothermal, and thermal response models to the variance in the FTPS/IS thermal response is determined as a byproduct of the Monte Carlo analysis. The structural uncertainty of the FTPS thermal response model is evaluated by flight relevant ground testing and model error analysis using test measurements. This probabilistic TPS margin process had never been applied to an entry vehicle and it is one of the LOFTID project’s goals to demonstrate its merits.

Steven A. Tobin↗

Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Industrial Facilities

This report provides a roadmap and toolkit for site-specific risk assessments across a broad range of industrial customers co-located with nuclear power plants (NPPs). This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Plant Operation and Generation Pathway that presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors co-located with hydrogen production facilities. The report expands the hazards assessments to include other industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, and wood pulp and paper mills. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the NPP by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. The probabilistic analysis consisted of three sizes of HESs modeled in a PRA to assess the impact on the initiating events (IE) and results of the PRA. The PRA results conclude that the resulting increases in IE frequencies are below the limits required for small changes to existing NPPs under 10 CFR 50.59.

08 HYDROGEN↗

An Extreme-Value Approach to Anomaly Vulnerability Identification

The objective of this paper is to present a method for importance analysis in parametric probabilistic modeling where the result of interest is the identification of potential engineering vulnerabilities associated with postulated anomalies in system behavior. In the context of Accident Precursor Analysis (APA), under which this method has been developed, these vulnerabilities, designated as anomaly vulnerabilities, are conditions that produce high risk in the presence of anomalous system behavior. The method defines a parameter-specific Parameter Vulnerability Importance measure (PVI), which identifies anomaly risk-model parameter values that indicate the potential presence of anomaly vulnerabilities, and allows them to be prioritized for further investigation. This entails analyzing each uncertain risk-model parameter over its credible range of values to determine where it produces the maximum risk. A parameter that produces high system risk for a particular range of values suggests that the system is vulnerable to the modeled anomalous conditions, if indeed the true parameter value lies in that range. Thus, PVI analysis provides a means of identifying and prioritizing anomaly-related engineering issues that at the very least warrant improved understanding to reduce uncertainty, such that true vulnerabilities may be identified and proper corrective actions taken.

Everett, Chris↗

Investigating Risks Due to Artemis EVA Tempo Via Probabilistic Risk Assessment

Spaceflight operations pose unique challenges to crew health, safety, and resource management. As space agencies and private companies continue to push the boundaries of human exploration, it is essential to understand the risks associated with Extravehicular Activities (EVAs) and develop strategies to mitigate them. The tempo at which EVAs are conducted – the total number and frequency of these activities – can have a profound impact on medical risks, resource consumption, and overall mission success. Probabilistic risk assessment (PRA) provides a powerful framework for evaluating complex systems and identifying potential hazards. Our work employs the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) [1] to simulate mission events, occurrence and treatment of medical conditions, and track the utilization of resources. Coupled with the Evidence Library [2], a medical evidence base for exploration-class missions developed by the Exploration Medical Capability within NASA’s Human Research Program, we can estimate these risks with increased fidelity and optimize medical kit contents to meet specific mission requirements. This presentation provides a detailed examination of how EVA tempo influences medical risk estimates for a lunar surface design reference mission. A comprehensive analysis is conducted to assess the additional mass and volume burden imposed on medical kits required to maintain adequate levels of risk mitigation. Furthermore, we estimate the distribution of the number of successful EVAs completed based on the level of task impairment imposed by medical events and flight rules related to specific medical events, such as decompression sickness.

Modeling↗

A Comprehensive Reliability Methodology for Assessing Risk of Reusing Failed Hardware Without Corrective Actions with and Without Redundancy

This paper deals with the development of a reliability methodology to assess the consequences of using hardware, without failure analysis or corrective action, that has previously demonstrated that it did not perform per specification. The subject of this paper arose from the need to provide a detailed probabilistic analysis to calculate the change in probability of failures with respect to the base or non-failed hardware. The methodology used for the analysis is primarily based on principles of Monte Carlo simulation. The random variables in the analysis are: Maximum Time of Operation (MTO) and operation Time of each Unit (OTU) The failure of a unit is considered to happen if (OTU) is less than MTO for the Normal Operational Period (NOP) in which this unit is used. NOP as a whole uses a total of 4 units. Two cases are considered. in the first specialized scenario, the failure of any operation or system failure is considered to happen if any of the units used during the NOP fail. in the second specialized scenario, the failure of any operation or system failure is considered to happen only if any two of the units used during the MOP fail together. The probability of failure of the units and the system as a whole is determined for 3 kinds of systems - Perfect System, Imperfect System 1 and Imperfect System 2. in a Perfect System, the operation time of the failed unit is the same as that of the MTO. In an Imperfect System 1, the operation time of the failed unit is assumed as 1 percent of the MTO. In an Imperfect System 2, the operation time of the failed unit is assumed as zero. in addition, simulated operation time of failed units is assumed as 10 percent of the corresponding units before zero value. Monte Carlo simulation analysis is used for this study. Necessary software has been developed as part of this study to perform the reliability calculations. The results of the analysis showed that the predicted change in failure probability (P(sub F)) for the previously failed units is as high as 49 percent above the baseline (perfect system) for the worst case. The predicted change in system P(sub F) for the previously failed units is as high as 36% for single unit failure without any redundancy. For redundant systems, with dual unit failure, the predicted change in P(sub F) for the previously failed units is as high as 16%. These results will help management to make decisions regarding the consequences of using previously failed units without adequate failure analysis or corrective action.

Putcha, Chandra S.↗

PROBABALISTIC RISK ANALYSIS AND THERMAL MARGIN PROCESS FOR AN INFLATABLE AEROSHELL

Atmospheric entry vehicle thermal protection systems (TPS) are margined due to the uncertainties that exist in entry aeroheating environments and the thermal response of the materials and structures. Traditional approaches typically over-margin TPS and offer very little insight into the risk of over-temperature during flight. A probabilistic margin process can be used to apply thermal margin to an aeroshell based on a rigorously calculated risk of failure. This probabilistic margin process allows engineers to make informed aeroshell design, entry-trajectory modifications, and risk trades while preventing excessive margin from being applied. This methodology can also be applied to other TPS applications, hot structures, and other engineering disciplines.

Steven A Tobin↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Risk Management of NASA Projects

Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

Sarper, Hueseyin↗

Probabilistic/Fracture-Mechanics Model For Service Life

Computer program makes probabilistic estimates of lifetime of engine and components thereof. Developed to fill need for more accurate life-assessment technique that avoids errors in estimated lives and provides for statistical assessment of levels of risk created by engineering decisions in designing system. Implements mathematical model combining techniques of statistics, fatigue, fracture mechanics, nondestructive analysis, life-cycle cost analysis, and management of engine parts. Used to investigate effects of such engine-component life-controlling parameters as return-to-service intervals, stresses, capabilities for nondestructive evaluation, and qualities of materials.

Watkins, T., Jr.↗

An Example of Risk Informed Design

NASA Engineering requested a Probabilistic Risk Assessment (PRA) to compare the difference in the risk of Loss of Crew (LOC) and Loss of Mission (LOM) between different designs of a fluid assembly. They were concerned that the configuration favored by the design team was more susceptible to leakage than a second proposed design, but realized that a quantitative analysis to compare the risks between the two designs might strengthen their argument. The analysis showed that while the second design did help improve the probability of LOC, it did not help from a probability of LOM perspective. This drove the analysis team to propose a minor design change that would drive the probability of LOM down considerably. The analysis also demonstrated that there was another major risk driver that was not immediately obvious from a typical engineering study of the design and was therefore unexpected. None of the proposed alternatives were addressing this risk. This type of trade study demonstrates the importance of performing a PRA in order to completely understand a system's design. It allows managers to use risk as another one of the commodities (e.g., mass, cost, schedule, fault tolerance) that can be traded early in the design of a new system.

Banke, Rick↗

Probabilistic Blast Damage Modeling Uncertainties and Sensitivities

Blast overpressure is the predominant source of ground damage posed by potentially hazardous asteroid strikes. Estimates of the extent, severity, and likelihoods of potential blast damage regions will be one of the key metrics needed to mount civil defense or disaster response plans in the face of an impending impact. However, there are many inherent sources of uncertainty in evaluating the damage, both in characterizing the properties of the incoming object and in the approaches used to model the entry/impact and resulting damage, which make it difficult to produce a single ‘accurate’ or ‘best guess’ prediction of ground damage. The current 2021 PDC hypothetical impact scenario poses a particular challenge due to its short warning time. The need for rapid disaster response to prepare for an immanent impact, combined with lack of observational opportunities to refine basic knowledge about the object’s basic size and properties, make understanding the range and relative likelihood of consequences particularly critical. The potential damage caused by these blasts can be evaluated using a range of modeling and simulation approaches and levels of fidelity. Fast-running engineering-level models can be used to run large numbers of probabilistically sampled cases covering wide variations of uncertain properties or parameters. High-fidelity simulations, on the other hand, can capture more detailed/accurate blast physics, but can only be performed for a small selection of specific cases, requiring many assumptions to be made about the initial object and its unpredictable entry/breakup characteristics. In order to provide a more complete picture of the potential threat for effective disaster response, both types of analysis need to be employed together. In this approach, high-fidelity simulations are used to refine and anchor engineering models, and the probabilistic engineering models are used to evaluate broad parameters spaces and guide selection of the most pertinent simulation cases for a given scenario. This presentation expands upon the probabilistic asteroid impact risk assessments being performed as part of the 2021 PDC hypothetical impact exercise, focusing on key aspects of blast damage modeling uncertainties and sensitivities. We review the current modeling and simulation approaches employed in the current assessment, compare the relative levels of uncertainty stemming from each main element of the problem (i.e., knowledge of the asteroid properties, modeling of the atmospheric entry/breakup and airburst, and estimates of the ground damage from the resulting blasts waves), and highlight any notable trends and sensitivities for the current scenario case.

SMD↗

Light Water Reactor Sustainability Program: Upgrade of EMRALD to a Modern JavaScript-based Framework

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at Idaho National Laboratory for researching the capabilities of dynamic probabilistic risk assessment. It provides a simple interface to represent complex interactions often seen when developing dynamic models. EMRALD can also interface with other applications by modifying inputs, running, and using their results within EMRALD for dynamic and integrated assessment. This report goes over the work performed as part of the Risk-Informed Systems Analysis Pathway under the Light Water Reactor Sustainability program to upgrade the EMRALD software.

97 MATHEMATICS AND COMPUTING↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Space Policy Directive-1 has led to NASA partnerships with commercial entities on procurement which includes the development of the Human Landing System (HLS) [1]. With the goal of delivering human crew to the lunar surface by 2024, system uncertainties become an important obstacle to the maturation of multiple new, driving technologies and mission concepts of the HLS program. As unmitigated uncertainties have previously led to failed development programs, these risks and their impacts must be understood and handled to ensure program success [2]. Sources of uncertainty include novel engine designs and configurations, increased reliance on cryogenic fluid management(CFM), and refueling technologies—which propagate as high-level performance metrics such as overall propellant mass and engine performance. Also, the occurrence of operational uncertainties—e.g. launch conditions or need to abort during the mission—can cause cascading effects on the rest of the mission that are difficult to definitively quantify, and are outside the scope of control. These concrete examples and other occurrences can be categorized as either epistemic or aleatory uncertainties.Epistemic uncertainty arises due to a lack of knowledge and can be alleviated with design and program maturation. Aleatory uncertainty is due to the inherent randomness of the system and cannot be directly reduced, unlike epistemic uncertainty. Robust design and probabilistic methods can compensate for aleatory effects. A taxonomy of uncertainty is referred to for this work [3]. In this paper, a probabilistic methodology to handle uncertainties has been demonstrated on a three-element HLS concept [1, 4], which allows tracking of current best estimates of the concept and assessment of concept design robustness against uncertainties. A sample case has been completed for this abstract, and an expansion on the methodology will be included in the final paper. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. This abstract will cover the basics of the approach used, and further details and justifications will be in the final paper.The mission profile associated with this three-element concept (Fig 1) was modeled as a set of mission events that facilitated mass changes, idles, or spacecraft maneuvers. The mission profile scope starts with each element’s NRHO orbit insertion and aggregation and ends at post-sortie rendezvous with Orion. More detail on the mission profile will be in the final paper. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as the physics framework to model the HLS architecture for applying the probabilistic methodology [5, 6]. Specifically, a parametric representation of the lander, ascent, and transfer elements and the mission profile of each element was established, with vehicle and mission parameters available as inputs to allow for a dynamic model. Each vehicle stage was modeled with high-level performance metrics, using Isp and propellant mass fraction (PMF) to remain parametric. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. These parameters were frozen at their nominal values for the purposes of baselining architecture performance and sizing the vehicle appropriately based on reference documentation [1]. Range estimating—a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities—is traditionally used with Mass Equipment Lists (MELs), but has been adapted with operational parameters as well as vehicle parameters in theDYREQT model to capture mission uncertainty alongside vehicle uncertainty [7, 3]. This method was selected due to its application and insight on a system from a bottom-up perspective, independence from historical rules of thumb, and ability to generate sensitivities based on design decisions and uncertainties. As a sample case for the abstract, the boiloff rates of the vehicle elements and the loiter times during the mission (simulating launch time variations and changing window of opportunities) were used with range estimating to provide preliminary results. To perform the range estimation portion of this methodology (depicted in Fig. 3, further details in final paper), the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the sample set of uncertainty parameters; 5,000 cases via Latin Hypercube Sampling were computed on the DYREQT architecture model. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Range estimating was applied to the surrogates instead of the actual models, which saves computational expense due to the bulk of cases needed for the Monte Carlo simulation as part of range estimating. Uncertainty parameters were sampled independently from triangular distributions using the DoE ranges as ‘min’ and ‘max’, and the nominal value as ‘most likely’. Based engineering intuition, some uncertainty parameters are correlated—e.g. if the main propellant has a high boil-off rate, the oxidizer should follow suit as both are related to CFM technology.While a Monte Carlo simulation samples all inputs as independent, the results would show model correlations; thus, it is efficient to sample the inputs as correlated. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo. A table for the DoE ranges and probability distribution parameters is shown in Table 1, and more details on Correlated Monte Carlo Simulations will be discussed in the final paper. The model’s resulting DoE showed that multivariate polynomial equations fit via least squares method captured its behavior accurately for the sample case. For the Correlated Monte Carlo Simulation, a positive correlation between fuel and oxidizer boiloff rates was used as a demonstration. 10,000 cases were computed with the surrogates and the launched masses for each vehicle element was collated. The results can be displayed in a probability density function (PDF), showing the impact of the uncertainty parameters chosen. Integrating the PDFs will yield a cumulative distribution function (CDF) that shows the cumulative probability of a given value on the x-axis. For the sample case, the elements’ launch mass margin was calculated and represented in as CDFs, as a demonstrated representation of figures of merit for the HLS concept. For the lander and ascent elements, the NRHO mass insertion limit is 16t; the transfer element has a limit of 30t [1]. It can be seen with Figure 2 that this probabilistic methodology can provide insight into mass margin with respect to the uncertainties being modeled. Currently, the results show that the lander (descent) vehicle element has the most restrictive design space; it is the only element to show a 10% probability of negative margin. Further analysis on the Monte Carlo results will show sensitivities for driving constraints and parameters for architecture feasibility, which can lead to establishing potential mission rules.The combination of range estimating with a parametric architecture model for HLS demonstrated the capability of this probabilistic methodology in a sample case. As the HLS development progresses, this methodology has the potential for keeping current best estimates of architecture performance for awarded concepts due to the flexibility in DYREQT’s modeling framework and its parametric nature. Concept maturation and increased epistemic knowledge can be injected into the model probabilistic modeling, and thus continue to track probability of mission success.

Stephanie Y Zhu↗

Statistical Prediction of Solar Particle Event Frequency Based on the Measurements of Recent Solar Cycles for Acute Radiation Risk Analysis

Large solar particle events (SPEs) present significant acute radiation risks to the crew members during extra-vehicular activities (EVAs) or in lightly shielded space vehicles for space missions beyond the protection of the Earth's magnetic field. Acute radiation sickness (ARS) can impair performance and result in failure of the mission. Improved forecasting capability and/or early-warning systems and proper shielding solutions are required to stay within NASA's short-term dose limits. Exactly how to make use of observations of SPEs for predicting occurrence and size is a great challenge, because SPE occurrences themselves are random in nature even though the expected frequency of SPEs is strongly influenced by the time position within the solar activity cycle. Therefore, we developed a probabilistic model approach, where a cumulative expected occurrence curve of SPEs for a typical solar cycle was formed from a non-homogeneous Poisson process model fitted to a database of proton fluence measurements of SPEs that occurred during the past 5 solar cycles (19 - 23) and those of large SPEs identified from impulsive nitrate enhancements in polar ice. From the fitted model, the expected frequency of SPEs was estimated at any given proton fluence threshold (Phi(sub E)) with energy (E) >30 MeV during a defined space mission period. Corresponding Phi(sub E) (E=30, 60, and 100 MeV) fluence distributions were simulated with a random draw from a gamma distribution, and applied for SPE ARS risk analysis for a specific mission period. It has been found that the accurate prediction of deep-seated organ doses was more precisely predicted at high energies, Phi(sub 100), than at lower energies such as Phi(sub 30) or Phi(sub 60), because of the high penetration depth of high energy protons. Estimates of ARS are then described for 90th and 95th percentile events for several mission lengths and for several likely organ dose-rates. The ability to accurately measure high energy protons (50-300 MeV) in real-time is shown to be a crucial issue for crew protection.

Myung-Hee, Y. Kim↗