Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

U.S. DOE Southwest CHP TAP Final Report

The objective of the Department of Energy’s Southwest Combined Heat and Power Technical Assistance Partnership (Southwest CHP TAP) is to provide essential support to continue the market penetration of CHP’s suite of technologies and to substantially contribute to the national goal of 40 GW of new CHP installations by 2020. The CHP TAP work is designed to assist CHP installations by providing technology and fuel-neutral technical assistance to potential end-users, and, to a lesser degree, providing education and engagement to a variety of stakeholders including end-users (commercial, industrial, institutional and more), electric and gas utilities, trade associations, non-profit organizations, and policymakers. This assistance includes evaluating the economic, energy savings, reliability, and environmental value of proposed CHP systems and conveying this value to encourage CHP installations. The CHP TAPs represent multi-state regions and are DOE’s CHP experts providing fact-based, unbiased information on CHP, including technologies, project development, project financing, local electric and natural gas utility interfaces, and related best practice policies. CHP applications (including WHP) can be both stand-alone as well as in District Energy or Microgrid configurations and the CHP TAPs will encourage the installation of CHP in these various configuration types as appropriate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enabling Particulate Materials Processing Science for High-Consequence, Small-Lot Precision Manufacturing

This Laboratory Directed Research and Development project developed and applied closely coupled experimental and computational tools to investigate powder compaction across multiple length scales. The primary motivation for this work is to provide connections between powder feedstock characteristics, processing conditions, and powder pellet properties in the context of powder-based energetic components manufacturing. We have focused our efforts on multicrystalline cellulose, a molecular crystalline surrogate material that is mechanically similar to several energetic materials of interest, but provides several advantages for fundamental investigations. We report extensive experimental characterization ranging in length scale from nanometers to macroscopic, bulk behavior. Experiments included nanoindentation of well-controlled, micron-scale pillar geometries milled into the surface of individual particles, single-particle crushing experiments, in-situ optical and computed tomography imaging of the compaction of multiple particles in different geometries, and bulk powder compaction. In order to capture the large plastic deformation and fracture of particles in computational models, we have advanced two distinct meshfree Lagrangian simulation techniques: 1.) bonded particle methods, which extend existing discrete element method capabilities in the Sandia-developed , open-source LAMMPS code to capture particle deformation and fracture and 2.) extensions of peridynamics for application to mesoscale powder compaction, including a novel material model that includes plasticity and creep. We have demonstrated both methods for simulations of single-particle crushing as well as mesoscale multi-particle compaction, with favorable comparisons to experimental data. We have used small-scale, mechanical characterization data to inform material models, and in-situ imaging of mesoscale particle structures to provide initial conditions for simulations. Both mesostructure porosity characteristics and overall stress-strain behavior were found to be in good agreement between simulations and experiments. We have thus demonstrated a novel multi-scale, closely coupled experimental and computational approach to the study of powder compaction. This enables a wide range of possible investigations into feedstock-process-structure relationships in powder-based materials, with immediate applications in energetic component manufacturing, as well as other particle-based components and processes.

36 MATERIALS SCIENCE↗

Development of flat conductor cable for commercial and residential wiring

The overall spectrum of the space technology spin-off development project: development of Flat Conductor Cable (FCC) for commercial and residential wiring, is presented. A discussion of the background, program milestones, industry participants, system outgrowth, hardware availability, cost estimates, and overall status of the program is presented for the 1970-to-present time period.

Carden, J. R.↗

Synthetic Aperture Radar Initial Development and Project Scope

Development of a proof-of-concept solution consisting of a network of radars to identify and discriminate an object based on its fixed position and reports on its movement with the resolution of a few centimeters. This includes scaling the solution, addressing other critical requirements (multi-look radar to overcome occlusions and obstructions, interference), and also the ability to scale up to large warehouses. Finally, improved higher-dimensional resolution will be developed.

47 OTHER INSTRUMENTATION↗

Coal Power Plant Reinvestment Visualization Tool

This tool, available at https://energycommunities.gov/coal-power-plant-reinvestment-visualization-tool/, serves as a public database and map for the purposes of enabling state and local economic development officials, project developers, and power plant owners to identify and pursue opportunities for plant and community reinvestment. The Coal Power Plant Reinvestment Visualization Tool focuses on coal power plants that have been closed or set-to-retire, alongside key infrastructure characteristics that are relevant for potential redevelopment reinvestment opportunities, including the opportunity to query these data based off pre-defined or user-set queries to identify opportunities for coal power facility reinvestment to support solar, wind, manufacturing, and nuclear. These Data for visualization and query include, but are not limited to: • Electric Transmission Lines • EPA Brownfield Sites (assessed with Federal funding) • Petroleum Terminals • Ports • Railroads • Others The tool will be updated periodically to provide relevant information to enable state and local economic development officials, project developers, and power plant owners to identify and pursue opportunities for economic revitalization and community reinvestment. Within this application data are focused on U.S. power plants with coal generation, where at least one on-site generator utilizes or utilized coal as a fuel source, including planned retirements through 2058 (EIA, 2024). Additional information on energy communities and revitalization opportunities can be accessed on the Interagency Working Group on Coal & Power Plant Communities & Economic Revitalization Energy Communities website (https://energycommunities.gov).

Closures↗

Advanced Software Development Workstation Project

The Advanced Software Development Workstation Project, funded by Johnson Space Center, is investigating knowledge-based techniques for software reuse in NASA software development projects. Two prototypes have been demonstrated and a third is now in development. The approach is to build a foundation that provides passive reuse support, add a layer that uses domain-independent programming knowledge, add a layer that supports the acquisition of domain-specific programming knowledge to provide active support, and enhance maintainability and modifiability through an object-oriented approach. The development of new application software would use specification-by-reformulation, based on a cognitive theory of retrieval from very long-term memory in humans, and using an Ada code library and an object base. Current tasks include enhancements to the knowledge representation of Ada packages and abstract data types, extensions to support Ada package instantiation knowledge acquisition, integration with Ada compilers and relational databases, enhancements to the graphical user interface, and demonstration of the system with a NASA contractor-developed trajectory simulation package. Future work will focus on investigating issues involving scale-up and integration.

Lee, Daniel↗

Long-duration Energy Storage Technology Analysis and Development

This project develops a new low-cost and flexible long-duration energy storage (LDES) technology based on simultaneous regeneration technology. In lieu of the technology development, the project team also conducts a complete cost analysis for LDES based on various currently available technologies, as well as grid economic and environmental benefits analysis for LDES. There are three tasks in this project: Task 1. Fe-H2 flow cell fabrication, testing, demonstration; Task 2. Dynamic modeling, simulation and control architecture of power system; Task 3. Cost and grid analysis.

25 ENERGY STORAGE↗

NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

Reid, Concha M.↗

Geothermal FIT Design: International Experience and U.S. Considerations

Developing power plants is a risky endeavor, whether conventional or renewable generation. Feed-in tariff (FIT) policies can be designed to address some of these risks, and their design can be tailored to geothermal electric plant development. Geothermal projects face risks similar to other generation project development, including finding buyers for power, ensuring adequate transmissioncapacity, competing to supply electricity and/or renewable energy certificates (RECs), securing reliable revenue streams, navigating the legal issues related to project development, and reacting to changes in existing regulations or incentives. Although FITs have not been created specifically for geothermal in the United States to date, a variety of FIT design options could reduce geothermalpower plant development risks and are explored. This analysis focuses on the design of FIT incentive policies for geothermal electric projects and how FITs can be used to reduce risks (excluding drilling unproductive exploratory wells).

15 GEOTHERMAL ENERGY↗

Efforts to Streamline Permitting of Geothermal Projects in the United States

Geothermal permitting timelines in the United States can be a deterrent to new investment, with geothermal project development taking as long as seven to ten years. The Energy Policy Act of 2005 (EPAct 2005) in part aimed to streamline aspects of the geothermal permitting process on federally managed public lands. This article summarizes the general regulatory process for developing geothermal projects in the United States and thereafter discusses efforts proposed or undertaken by the U.S. Congress, U.S. Forest Service, U.S. Bureau of Land Management, state governments, and project developers to increase permitting efficiency.

15 GEOTHERMAL ENERGY↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Development of a surface ionization source for the SPIRAL 2 project

Development of new radioactive beams, and thus of new target ion sources (TISs) for isotope-separator-on-line production systems are in progress at GANIL for the SPIRAL 2 project. The efficiency and time response measurements of each step in the production process are crucial to predict and maximize the available yields, in particular, for short lived isotopes. This paper presents a method for measuring these quantities that makes use of a stable alkali chopped beam of controlled intensity. This method was applied to surface ionization source test for high efficiency. Results of recent experiments are presented that include ionization efficiency measurements for Cs, Rb, K, Na, and Li with a graphite and rhenium ionizer and dwell time of these alkalis on graphite. The results enabled to design a first surface ionization source prototype which will be installed in the SPIRAL 2 TIS.

43 PARTICLE ACCELERATORS↗

The advanced software development workstation project

The Advanced Software Development Workstation (ASDW) task is researching and developing the technologies required to support Computer Aided Software Engineering (CASE) with the emphasis on those advanced methods, tools, and processes that will be of benefit to support all NASA programs. Immediate goals are to provide research and prototype tools that will increase productivity, in the near term, in projects such as the Software Support Environment (SSE), the Space Station Control Center (SSCC), and the Flight Analysis and Design System (FADS) which will be used to support the Space Shuttle and Space Station Freedom. Goals also include providing technology for development, evolution, maintenance, and operations. The technologies under research and development in the ASDW project are targeted to provide productivity enhancements during the software life cycle phase of enterprise and information system modeling, requirements generation and analysis, system design and coding, and system use and maintenance. On-line user's guides will assist users in operating the developed information system with knowledge base expert assistance.

Fridge, Ernest M., III↗

DOE's Tribal Energy Program Offers Resources

This handbook is an accessible reference for those who are new to tribal energy project development or who seek a refresher on key development issues as they navigate the project development process. Building upon the wealth of feedback and experiences shared by tribal and other participants in tribal energy workshops conducted by the National Renewable Energy Laboratory, it is designed to provide tribal leaders, tribal economic and energy enterprises, and those supporting them with a general overview of the renewable energy project development process. It includes information on how to structure a renewable energy project transaction to protect tribal interests, with an emphasis on joint project development efforts undertaken with nontribal parties; a general overview of key energy development agreements, including power sale agreements, transmission and interconnection agreements, and land leases; and a detailed discussion of ways tribes can finance renewable energy projects, the sources of funding or financing that may be available, the types of investors that may be available, and federal tax incentives for renewable energy projects. The guide also includes a glossary of some of the most commonly used technical terms.

Biomass↗

Finding relationships between effort and other variables in the SEL

Estimating the amount of effort required for a software development project is one of the major aspects of resource estimation for that project. In this study, the relationship between effort and other variables for 23 Software Engineering Laboratory (SEL) projects that were developed for NASA/Goddard Space Flight Center was examined. These variables fell into two categories: those which can be determined in the early stages of project development and may therefore be useful in a baseline equation for predicting effort in future projects, and those which can be used mainly to characterize or evaluate effort requirements and thus enhance the understanding of the software development process in this environment. Some results of the analyses are presented.

Basili, Victor R.↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

Advanced Stirling Convertor (ASC) Development for NASA RPS

Sunpower's Advanced Stirling Convertor (ASC) initiated development under contract to the NASA Glenn Research Center (GRC) and after a series of successful demonstrations, the ASC began transitioning from a technology development project to flight development project. The ASC has very high power conversion efficiency making it attractive for future Radioisotope Power Systems (RPS) in order to make best use of the low plutonium-238 fuel inventory in the U.S. In recent years, the ASC became part of the NASA-Department of Energy Advanced Stirling Radioisotope Generator (ASRG) Integrated Project. Sunpower held two parallel contracts to produce ASC convertors, one with the Department of Energy/Lockheed Martin to produce the ASC-F flight convertors, and one with NASA GRC for the production of ASC-E3 engineering units, the initial units of which served as production pathfinders. The integrated ASC technical team successfully overcame various technical challenges that led to the completion and delivery of the first two pairs of flight-like ASC-E3 by 2013. However, in late Fall 2013, the DOE initiated termination of the Lockheed Martin ASRG flight development contract driven primarily by budget constraints. NASA continues to recognize the importance of high efficiency ASC power conversion for RPS and continues investment in the technology including the continuation of ASC-E3 production at Sunpower and the assembly of the ASRG Engineering Unit #2. This paper provides a summary of ASC technical accomplishments, overview of tests at GRC, plans for continued ASC production at Sunpower, and status of Stirling technology development.

Power Efficiency↗