Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

A White Paper: Disposition Options for a High-Temperature Gas-Cooled Reactor

The high-temperature gas-cooled reactor (HTGR) is a uranium-fueled, graphite-moderated, gas-cooled nuclear reactor design concept capable of producing very high core outlet temperatures. Both types of HTGR have the tristructural isotropic (TRISO) fuel kernel at the heart of the fuel design. For the prismatic block-type HTGR, the TRISO particles are overcoated with a resinated graphitic matrix and pressed into fuel compacts, which are then heat treated and placed in the fuel channels of the prismatic-block-shaped fuel assemblies. For the pebble-bed-type HTGR, the TRISO particles are dispersed in a graphitic-matrix sphere, which is the basic unit for the reactor core. Despite having very different fuel designs, both types of HTGR are graphite-moderated, gas-cooled, thermal reactors using many of the same materials. As a result, both prismatic-block-type and pebble-bed-type HTGRs have similar radioactive waste streams, all of which require safe and secure storage and eventual disposition. Modern HTGR designs are based on a long and rich operating history of several different graphite-moderated, gas-cooled, thermal reactors. Several of these reactors have been shut down, the fuel has been placed in safe storage, and they have undergone some degree of decommissioning. As such, there is significant experience in the management of the spent nuclear fuel (SNF) and radioactive wastes associated with operating these reactors. This white paper will, (1) identify the definitions and regulations that apply to the safe and secure management, storage, and disposal of radioactive waste; and (2) identify the key radioactive waste streams from HTGRs and their characteristics. Idaho National Laboratory (INL) has significant experience in the management of SNF from HTGR predecessors. This experience should form the basis for the management and disposition efforts of the radioactive waste from any new HTGR-type small modular reactor, or microreactor intended for deployment at the INL site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Preliminary Radiological Risk Assessment Model for Disposition of Remote-Handled Transuranic Wastes at Los Alamos National Laboratory Area G - 20116

The U.S. Department of Energy (DOE) operates a low-level radioactive waste (LLW) disposal site at Material Disposal Area G, in Los Alamos, New Mexico, USA. Area G has been the primary LLW disposal site for Los Alamos National Laboratory (LANL) since the 1960's. In addition to LLW, Area G is host to a variety of other wastes, the disposition of which must be determined before closure of the site. A probabilistic Radiological Risk Assessment (RRA) for Area G is used in order to support decision making regarding some wastes that are not addressed in the extant Area G Performance Assessment (PA) and Composite Analysis (CA). Between 1979 and 1987, 33 special shafts were augered into the Bandelier Tuff at Area G. This volcanic tuff is present across Pajarito Plateau on the eastern slopes of the Jemez Mountains, and varies widely in its consistency, from weakly indurated non-welded layers to welded layers that uphold the mesa cliffs of the Plateau. These mesas are home to LANL, Area G, and the townsites of Los Alamos and White Rock, with residences about 1400 m from Area G. The 33 Shafts were lined with steel casing, and contain remote-handled (RH) transuranic wastes (TRU) resulting from experiments and analysis performed in special glove boxes at the Chemistry and Metallurgy Research (CMR) facility at LANL. Some of these wastes originated as used nuclear fuel. The purpose of the Area G RRA is to evaluate the potential future risk to humans and the environment from the RH TRU in the 33 Shafts in the context of the risk associated with the surrounding wastes at Area G. The analysis is responsive to expectations outlined in DOE Order 458.1, Radiation Protection of the Public and the Environment, and is informed by the Manual and Guidance accompanying DOE O 435.1, Radioactive Waste Management. Because the waste meets the definition of TRU, the regulatory context necessarily takes into consideration the regulation governing the disposal of TRU from the U.S. Environmental Protection Agency (EPA): 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Given the broader regulatory context for the RRA, the analysis is subject to different assumptions from those made in the existing DOE O 435.1 PA and CA, such as allowing for future occupation of the site. The analysis begins with a comprehensive evaluation of features, events, processes, and exposure scenarios (FEPS) for Area G and the wastes it contains. These FEPSs are screened to eliminate from further consideration those of extremely low probability and/or consequence, and a conceptual site model (CSM) is subsequently developed. The scope and structure of the Area G RRA Model is informed by this CSM, and the Area G RRA Model is developed using the GoldSim systems analysis modeling platform. This paper presents the initial version of a defensible, transparent, and reasonably realistic model, which is based on the state of knowledge of the wastes, the site, and the FEPSs that govern contaminant transport from wastes into the environment and subsequent exposures to humans and other biota. Probabilistic model input distributions represent uncertainties inherent in the real and modeled systems. The results of the Area G RRA Model inform decisions regarding the disposition of the RH TRU in the 33 Shafts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radionuclide Inventory Threshold for Trench 31 and 34 Located Within the 200 West Area Low-Level Burial Grounds

Trenches 31 and 34 located in the 200 West Area Low-Level Burial Ground (LLBG) are authorized for disposal of low-level and mixed low-level radioactive waste under DOE Order 435.1, Radioactive Waste Management. A revised Disposal Authorization Statement was issued in October 2023 following approval of the performance assessment (PA) and supporting technical basis documents. To be consistent with approved PA calculations, the waste acceptance criteria (WAC) needs to be updated to include concentration limits for Category 1 (CAT1) and Category 3 (CAT3) waste along with the inventory limits. This environmental calculation file (ECF) provides the inventory limits for Category 1 and Category 3 waste disposal of radionuclides at Trench 31 and 34 based on the PA calculations. The concentration limits are not calculated as they are provided in the PA itself. The inventory thresholds (or limits) are calculated for only those radionuclides that are identified in the PA as the primary dose contributors. The primary dose contributors for the groundwater pathway are technetium-99, iodine-129, niobium-94, chlorine-36, molybdenum-93, and niobium-93m while those for the air pathway are tritium and carbon-14.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2025

The U.S. Department of Energy (DOE) requires the performance assessment (PA) (Department of Energy Idaho Operations Office [DOE-ID] 2018a), composite analysis (CA) (DOE-ID 2012), and CA addendum (DOE-ID 2018b) for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility at the Idaho National Laboratory (INL) Site shall be maintained to evaluate changes that could affect the performance, design, and operating basis for the facility (DOE Manual 435.1-1 Change 3, “Radioactive Waste Management Manual,” Section IV.P. [4]). The RHLLW Disposal Facility became operational in September 2018 after the completion of operational readiness activities required by DOE Order 425.1D, “Verification of Readiness to Start Up or Restart Nuclear Facilities,” and the issuance of the startup authorization by the Startup Approval Authority (Boston 2018). The first waste disposals at the RHLLW Disposal Facility began in Fiscal Year (FY) 2019. In Fiscal Year (FY) 2025, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. This FY 2025 annual summary report (ASR) documents the continued adequacy of the PA, CA, operating disposal authorization statement (ODAS) (ODAS 2018), ODAS technical-basis documents, and the radioactive waste management basis (RWMB) (INL 2024a) to meet DOE Order 435.1, “Radioactive Waste Management,” performance objectives for the RHLLW Disposal Facility. Annual review of the adequacy of the PA and CA at the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of DOE Order 435.1.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Forty years of durability assessment of nuclear waste glass by standard methods

Abstract Standard methods to assess the durability of vitrified radioactive waste were first developed in the 1980’s and, over the last 40 years, have evolved to yield a range of responses depending on experimental conditions and glass composition. Mechanistic understanding of glass dissolution has progressed in parallel, enhancing our interpretation of the data acquired. With the implementation of subsurface disposal for vitrified radioactive waste drawing closer, it is timely to review the available standard methodologies and reflect upon their relative advantages, limitations, and how the data obtained can be interpreted to support the post-closure safety case for radioactive waste disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Algebraic expressions for estimating the impact depths of a surface barrier over a homogeneous soil

Engineered surface barriers are used to isolate subsurface contaminants for effective long-term containment of municipal solid waste, other nonhazardous solid and liquid waste, hazardous and toxic wastes, and radioactive waste. The impact depths of a surface barrier are affected by the pre-barrier recharge rate and the properties of the soil beneath the barrier. In this paper, the pore-size-specific (PSS) water velocity is defined and an algebraic expression of PSS velocity is derived based on the stream tube concept and the Brooks and Corey hydraulic retention model. Algebraic expressions are developed to estimate drainage velocities and barrier impact depths after the emplacement of a surface barrier. Four impact depth terms are used to convey the protective effect: drainage front, average drainage, the location with 50% impact, and drainage tail. The drainage front depth is the deepest point at which the barrier has a detectable impact at a specific time (also called the near zero-impact depth). The average-impact depth is the depth at which average drainage occurs. At the 50% impact depth, the water flux rate is reduced by half because of the surface barrier. Lastly, the drainage tail depth (also called the full-impact depth) is the deepest depth at which the water conditions above it are in equilibrium with the barrier. The algebraic expressions show that the average-impact depth is no more than 1/3 of near zero-impact depth, while the 50% impact depth is slightly larger than 1/2 of the near zero-impact depth. The full-impact depth, depending on the final recharge rate from the surface barrier, is usually much smaller than the other impact depths. These differences lead to a very large transition zone beneath a surface barrier. Numerical simulations were conducted to replicate the same conditions. The numerical results corroborated the analytical models by predicting very similar water content profiles and near zero-, average-, 50%, and full-impact depths. The algebraic expressions provided in this paper are useful for quickly identifying sites where the depth of the existing contaminants could be beyond the protection of a surface barrier.

54 ENVIRONMENTAL SCIENCES↗

Panel Session 79: Challenges and Lessons Learned in Radwaste Packaging, Transportation, Compliance, and Receipt

This panel focused on challenges and lessons learned in radioactive waste packaging, transportation, compliance, and receipt for fabricators of radioactive waste packaging. World-wide companies are urged to participate. Participants provided their perspectives and suggestions on how to increase efficiencies through eliminating inconsistencies between specifications and other requirements to provide products at a reasonable cost and enhance communication to enable better service. Panelists with presentations: PACTEC (Bill Smart); Waste Packaging Strategy and Challenges at Whiteshell (Miles Smith); Challenges and Lessons Learned in Radwaste Packaging, Transportation, Compliance and Receipt (Dan Payne)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Declaration of the Chemical Composition of Waste-products for the German Repository Konrad Using Substance Vectors - 20500

The waste acceptance criteria of the German repository Konrad require beside a radiological declaration a compositional declaration to be able to avoid negative impact on the groundwater by a presumed leakage into the groundwater after complete corrosion of the containers in the future. The declaration of the composition has to specify compounds and substances not element analyses, because the chemical behavior and toxicity especially of organic compounds varies strongly The relevant compounds have to be described and quantified using defined substance codes provided by the operator. For simple waste types like pure concrete or steel components, the definition of the composition is rather simple. The composition of more complex waste streams is generally declared using producer specific material vectors, which can be derived for defined waste types (e.g. grouted fluids, ash from combustion, super-compacted mixed waste etc.). Additional substance vectors exist for containers, drums and grout, which together with the waste composition yield the total composition of the waste packages. The substance vectors for homogeneous waste streams like cementitious demolition waste, solidified fluids and ash are mostly based on analyses provided by the waste owner. In some cases, analyses from non-radioactive analogues or data sheets can also be used to demonstrate the composition. For each qualified treatment of radioactive waste streams the material composition is described and balanced on the basis of specific material vectors, which are composed of material codes from the material and cask list provided by the Federal company for radioactive waste disposal. For mixed waste streams like super-compacted or grouted mixed waste or materials simply packed in containers an analyses cannot be used. In these cases, the compositional information from the bookkeeping can be used for the entire waste stream to calculate a mean composition including a compositional range (min / max composition). Only waste packages with an approved material description can be delivered to Konrad. Therefore, the material declaration of all waste streams and the resulting waste products is crucial for all waste owners in Germany to be able to have enough waste packages ready, when the repository is going to open in 2027. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The German Site Selection Process - Implementation and Challenges - 20528

Federal Company for Radioactive Waste Disposal (Bundesgesellschaft fuer Endlagerung mbH; hereinafter referred to as BGE) is a state-owned company established in September 2016 following the 'Act on the Organisational Restructuring in the Field of Radioactive Waste Storage'. 'Repository Site Selection Act' (hereinafter referred to as StandAG) defines the site selection procedure, aiming to ensure the best possible safety for storing high-level radioactive waste in Germany for the duration of one million years. The selection procedure is a participatory, transparent, learning and self-questioning process based on scientific expertise. Possible repository sites are sought all over Germany, without excluding or predetermining any potential site at the beginning. The procedure consists of three phases. After each phase, the legislative decides on the regions for further consideration in the next phase of the site selection procedure. The current first phase (Phase I) is divided into two steps. Objective of Step 1 is to determine subareas of favorable geological conditions based on available data. Step 2 of Phase I will lead to identification of specific regions that are considered for further surface-based geoscientific and geophysical exploration. Potential host rocks are rock salt, clay rock and crystalline rock. As part of the site selection procedure, an overview of the status of the planning and implementation of R and D activities is given. Topics of particular interest are, for example, the adaptation of the maximum temperature of 100 deg. C at the container surface, the impact of long-term climate variations as well as minimally invasive exploration methods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Utility of Waste Tank Historical Reviews in Bulk Waste Removal Operations at the Savannah River Site – 25271

SRMC is actively working to remove, treat, and dispose radioactive waste generated by the separation facilities at SRS since their initial operations in the 1950s. The separation facilities at SRS have produced nuclear materials for a variety of purposes, particularly national defense, and continue to support the disposition of spent fuel through the Accelerated Basin Deinventory program. In almost 70 years of operation, nearly 625,000 m3 (165 million gallons) of radioactive waste have been generated and transferred to the tank farm facilities at SRS [1]. As a result of volume reduction (e.g., evaporation) and waste solidification (e.g., vitrification), approximately 127,000 m3 (33.5 million gallons) of material remain as of June 30, 2024 [2]. This liquid waste has since been stored in 51 large underground waste tanks present on the site. These waste tanks may contain up to 4,921 m3 (1.3 million gallons) of radioactive waste each in the form of saltcake or sludge. SRMC’s contract is to treat and dispose of this waste, clean the tanks, and operationally close them. To date, 8 of the 51 waste tanks have been operationally closed. Waste retrieval and tank closure activities are ongoing in an additional 17 tanks through either operations in the field or in design [3].

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Process Technology for Nuclear Applications - 20379

ANSTO's Synroc technology has been developed to provide a safe, secure matrix for the immobilization and final disposal of radioactive waste. Synroc technology will be used to manage radioactive wastes from the production of the radioisotope Molybdenum-99 (Mo-99). This paper shall outline various stages of the process development with specific reference to the thermal treatment technology of calcination. Calcination is a key step in the Synroc process [1-2].The rotary thermal processing system includes: an advanced heating element design for increased robustness and ease of remote operation and maintenance, an enhanced modular design of components for ease of remote maintenance in a hot cell and in compliance with hot cell radioactive environment requirements for safety, reliability and maintainability. In addition to thermal treatment of waste from nuclear medicine production, this technology provides solutions for a variety of nuclear materials processing applications including sintering UO{sub 2} pellets for reactor fuel rods, oxidation of UO{sub 2} pellets, swarf, and powder to U{sub 3}O{sub 8}, de-nitration of Uranyl nitrate and hydrofluorination of UO{sub 2} pellets. The paper will also discuss thermal processing solutions for a range of nuclear applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 14: US NRC - Current and Emerging US NRC Regulatory Topics

This panel focused on several current and emerging US Nuclear Regulatory Commission (NRC) regulatory issues impacting the commercial radioactive waste arena in the US. The panelists provided different perspectives on key issues such as the revision of 10 Code of Federal Regulations Part 61 'Licensing Requirements For Land Disposal Of Radioactive Waste', the scoping study on very low-level waste, the consolidated interim storage of spent nuclear fuel and other timely regulatory topics. Panelists with presentations: Overview of NRC Low-Level Radioactive Waste Activities and Initiatives (Patricia Holahan); US Nuclear Power Plant Waste Management - US LLW Disposal Issues (Joe Weismann); Decommissioning Rule (Vern C. Rogers); What is TRU? Definition, Legislation, and Rulemaking (David Carlson); LLRW Regulatory Topics of Interest in Texas (Bobby Janecka); International Low Level Waste Management Practices (Richard McGrath)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Advances in Corrosion Science Applicable To Disposal of High-Level Nuclear Waste

High level radioactive waste is accumulating at temporary storage locations around the world and will eventually be placed in deep geological repositories. Many different types of geological formation are under consideration, but all will eventually allow water to contact the metallic waste containers considering that the period of performance required to allow sufficient decay of dangerous radionuclides is on the order of 105 – 106 years. Corrosion of the containers and waste forms in the aqueous repository environment is therefore a concern. This review describes the recent advances of the field of materials corrosion based on the work of the Center for Performance and Design of Nuclear Waste Forms and Containers (WastePD) to address the issues associated with the long-term performance assessment and the design of materials with improved performance, where performance is defined as resistance to aqueous corrosion. Glass, crystalline ceramics, and metals are discussed separately, and then the near field interactions of these different materials classes are addressed. Recommendations for future directions are provided.

Frankel, Gerald↗

Progress on TRANSCEND Theme 1: Integrated Waste Management - 20194

The management of radioactive waste includes mobilisation, processing, packaging, storage, transport and final disposal. Research in the Integrated Waste Management theme of TRANSCEND focuses on underpinning science and engineering in areas of relevance to hazard reduction and decommissioning and the objectives are to: (1) develop new materials for effluent decontamination; (2) demonstrate predictive modelling of sludge/slurry removal, underpinned by experimental data; (3) transform understanding of radiation-driven processes in nuclear waste sludges; and (4) provide underpinning studies to develop innovative processes and wasteform materials. This paper gives overviews of the 16 research projects that will be done over the next 3 years in this theme. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparing Legacy Waste Management to Advanced Reactor Waste Management

The Nuclear Energy Agency (NEA) and Natural Resources Canada (NRCan) are organizing an international workshop on the implementation of radioactive waste management and decommissioning strategies in small modular reactors (SMRs) and advance reactor technologies. The event will take place in Ottawa, Canada on 7-10 November 2022. The workshop will convene participants from various fields of expertise in the areas of radioactive waste management, decommissioning, nuclear science and development, transportation, as well as young professionals, communication experts and researchers. The goal of the workshop is to devise a guideline document that will serve implementers in understanding key issues in decommissioning and waste management of new reactors from the design perspective, aiding in the licensing process and in future decommissioning and waste management activities. DOE has invested considerably in the innovation of advanced reactors. Interaction in this workshop allows INL and DOE to articulate the importance of looking at the back-end of the fuel cycle for advanced reactors. The back-end of the fuel cycle is important to the success of advanced reactors, and DOE may need to manage this material in the future after it is discharged from reactors. I have been asked to present at the track titled "Operational and Design Optimization Consideration Related to Decommissioning and Radioactive Waste Management for SMRs/Advanced Reactors".

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Overview of R and D on Retrievability and Retrieval Technology in Germany - 20462

Retrievability is a term that is included in most radioactive waste management programs around the world. Although national definitions vary, the overall understanding of retrievability concerns the ability to recover waste packages from the repository mine after their emplacement. Different countries may implement retrievability in very different ways, ranging from a built-in reversibility into the emplacement process to the stipulation that retrievability may in no way impede passive safety in the post-closure phase. Germany takes a middle course such that retrievability in a HLW repository (repository for high level radioactive waste) may have no significant detrimental effect on passive safety. In Germany, the current siting process considers rock salt, clay rock, and crystalline rock as potential host rocks. Therefore, Research and Development (R and D) has been investigating repository concepts and retrievability in all host rocks. After introduction of retrievability in 2010, existing repository concepts were modified to facilitate retrieval. The changes made comprised, for example, equipping boreholes with steel liners, developing new technologies, and modifying existing emplacement devices. Apart from retrieval of HLW, retrieval of other wastes from underground repositories that were designed and operated without retrievability in mind, poses major technical and scientific challenges. Currently, studies are under way to investigate the feasibility and costs of partial retrieval of waste from an underground repository for hazardous and highly toxic waste in France, Stocamine. With regard to retrieval, the rock-mechanical conditions are deteriorating rapidly, so time is of the essence. In the Asse II mine in Germany, about 126,500 waste casks with low and intermediate level waste await retrieval. The repository mine suffers from difficult rock-mechanical conditions and inflow of brine, locally into emplacement areas. The Federal Company for Radioactive Waste Disposal (BGE) is legally required to retrieve all wastes from the Asse. Due to the specific challenges, R and D is needed to develop technical solutions for the safe retrieval from each of the emplacement chambers. R and D on retrievability and retrieval technology does not only address challenges in radioactive or toxic waste retrieval but may also help to germinate innovation to better master complex underground situations in general, e.g. in deep mining, tunneling, or repository construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗