Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR VESSELS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Power peaking with small modular reactors to support deep penetration of renewable energy sources - 192

As inherently intermittent sources of renewable energy more fully penetrate the US grid, peaking power is largely being supplied by carbon-emitting natural gas turbines. Significant greenhouse gas emissions can be avoided if these plants are replaced with carbon-neutral nuclear facilities to provide peaking power to complement renewable generation and meet overall power demand. There is a great deal of previous work regarding reactor power shaping with control rod movement for both currently operating nuclear power plants and proposed plants, but the literature on load-following to meet less predictable, more rapidly varying power demand is less comprehensive. We have chosen the Westinghouse IRIS integral PWR as our candidate for modeling, simulation, and control studies. A nodal model of the IRIS integral PWR, partially adapted from a MATLAB/Simulink model constructed by prior students at the University of Tennessee in Knoxville, has been constructed in Modelica. Currently the model includes the reactor vessel and steam generator system and simple assumptions for the balance of plant. The control scheme for the load-following operation of an IRIS integral PWR model would ultimately lead to the development of real operational mechanisms and principles in a grid with significant renewables capacity. In the future the model will be integrated with sophisticated grid and hybrid energy systems. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Sensitivity of ultrasonic nonlinearity to irradiated, annealed, and re-irradiated microstructure changes in RPV steels

The planned life extension of nuclear reactors throughout the US and abroad will cause reactor vessel and internals materials to be exposed to more neutron irradiation than was originally intended. A nondestructive evaluation (NDE) method to monitor radiation damage would enable safe and cost-effective continued operation of nuclear reactors. Radiation damage in reactor pressure vessel (RPV) steels causes microstructural changes that leave the material in an embrittled state. Nonlinear ultrasound is an NDE technique quantified by the measurable acoustic nonlinearity parameter, which is sensitive to microstructural changes in metallic materials such as dislocations, precipitates and their combinations. Recent research has demonstrated the sensitivity of the acoustic nonlinearity parameter to increasing neutron fluence in representative RPV steels. The current work considers nonlinear ultrasonic experiments conducted on similar RPV steel samples that had a combination of irradiation, annealing, re-irradiation, and/or re-annealing to a total neutron fluence of 0.5 5 1019 n/cm2 (E > 1 MeV) at an irradiation temperature of 290 C. The acoustic nonlinearity parameter generally increased with increasing neutron fluence, and consistently decreased from the irradiated to the annealed state over different levels of neutron fluence. Results of the measured acoustic nonlinearity parameter are compared with those from previous measurements on other RPV steel samples. This comprehensive set of results illustrates the dependence of the measured acoustic nonlinearity parameter on neutron fluence, material composition, irradiation temperature and annealing.

Matlack, Katie↗

Fit for Purpose Remote Technology Decommissioning Solutions - 18630

The Magnox Decommissioning Project is actively progressing clean-up and decommissioning of 12 reactor sites across England, Scotland and Wales. Funded and directed by the United Kingdom's Nuclear Decommissioning Authority (NDA) and managed by the Cavendish Fluor Partnership (CFP), the Magnox Decommissioning Project introduces a wide range of radiological and industrial hazards warranting deployment of remote technologies to safely de-inventory, decontaminate and decommission a vast array of nuclear facilities. The Magnox Decommissioning Project encompasses 22 former Magnox nuclear power production reactors across 10 reactor sites and five research/test reactors at two former research sites. Decommissioning activities have been underway at some sites for nearly 20 years with early focus on retrieving and stabilising wastes and draining and stabilising spent fuel ponds. The Magnox decommissioning strategy invokes a programme perspective to drive consistency in tackling similar decommissioning and waste challenges across multiple sites. Programme central teams have worked with technology suppliers to foster learning from industry experience to develop and deploy tooling and robotics. The programme approach has also facilitated learning from one site to the next. In many cases, this central programme approach has promoted an evolution of technologies resulting in optimisation of simple remote tooling. In other instances, collaboration with suppliers is producing state-of-the-art technologies to tackle more unique challenges including, most recently, early demonstration of laser cutting for reactor vessel dismantling. This paper will outline the programme management approach and the scalable optioneering process Magnox employs to select the engineered controls and technologies used in decommissioning and waste management activities. It will provide an overview of the broad range of remote tooling and robotics deployed across the 12 Magnox sites by exploring some specific examples. Lastly, the paper will summarise key lessons learned in the now extensive history of selecting and using remote technologies to decommission Magnox nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ultrasonic imaging in liquid sodium

The fourth generation of nuclear reactor can use liquid sodium as the core coolant. When the reactor is operating, sodium temperatures can reach up to 600 deg. C. During maintenance periods, when the reactor is shut down, the coolant temperature is reduced to 200 deg. C. Because molten sodium is optically opaque, ultrasonic imaging techniques are developed for maintenance activities. Under-sodium imaging aims at i) checking the health of immersed structures. It should also allow ii) to assess component degradation or damage as cracks and shape defects as well as iii) the detection of lost objects. The under-sodium imaging system has to sustain high temperature (up to 300 deg. C) and hostility of the sodium environment. Furthermore, specific constraints such as transducers characteristics or the limited sensor mobility in the reactor vessel have to be considered. This work focuses on developing a methodology for detecting damages such as crack defects with ultrasound devices. Surface-breaking cracks or deep cracks are sought in the weld area, as welds are more subject to defects. Traditional methods enabled us to detect emerging cracks of submillimeter size with sodium-compatible high-temperature transducer. The presented approach relies on making use of prior knowledge about the environment through the implementation of differential imaging and time-reversal techniques. Indeed, this approach allows to detect a change by comparison with a reference measurement and by focusing back to any change in the environment. It is a means of analysis and understanding of the physical phenomena making it possible to design more effective inspection strategies. Difference between the measured signals reveals the acoustic field scattered by a perturbation (a crack for instance), which may occur between periodical measurements. The imaging method relies on the adequate combination of two computed ultrasonic fields, one forward and one adjoint. The adjoint field, which carries the information about the defects, is analogous to a time-reversal operation. One of the interests of the presented method is that the time-reversal operation is not done experimentally but numerically. Numerical simulations have been carried out to validate the practical relevance of this approach. The preliminary numerical results show a nice agreement between the guessed and the actual positions of the defect. After water-tests, in sodium-tests must be done in order to validate the water/sodium transposition. For this purpose, an under-sodium device is under development, which can move the transducers with four degrees of freedom in a 1.5 m{sup 3} sodium pot. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Advanced Remote Cutting Technology for Reactor Internals Segmentation - 18274

Since the Three Mile Island decommissioning in the 1980's, Westinghouse has been involved in dismantling and segmentation of commercial reactors. With dozens of components segmented and packaged across the globe, Westinghouse has continued to evaluate the state of the art cutting technologies for their applications in the nuclear industry. While there have been well documented issues of certain cutting technologies in field applications, there are advancements of these technologies which prove them applicable for specific areas of the decommissioning process. During 2017, Westinghouse embarked on a revision of its plasma arc cutting (PAC) technology as part of an extensive innovation program for reactor internals segmentation. While these systems were used in Yankee Rowe and Three Mile Island, new plasma arc cutting systems improve the versatility and have much better precision of cutting. While bringing this technology into the future, Westinghouse is adapting the mounting and application so that it is compatible with the existing mechanical cutting portfolio. This means that in the event that a mechanical cutting technique is unable to perform as intended, a plasma cutting alternative will be available with minimal time to switch cutting methods. A test program for underwater PAC was performed, and the test gave a good reference of cutting speed and handling in different plate thicknesses which can be used when evaluating the use of the new cutting technology for future projects. PAC technology has proven that it could have a future in reactor vessel internals segmentation projects as a complement to the existing mechanical cutting methods under water. Thicknesses up to at least 25 mm can be cut with a much higher speed than the existing mechanical cutting methods in use. This and other cutting technology developments as part of the innovation program provide exciting new possibilities for dismantling and segmentation projects. While each of the techniques presents definite benefits for operators and, more importantly, customers, there are risks that need to be mitigated through engineered processes and controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on the decommissioning of Zion nuclear generating station

The decommissioning of the twin 1040 MWe PWRs at Zion, near Chicago USA is a ground breaking programme. The original owner, Exelon Nuclear Corporation, transferred the full responsibility for reactor dismantling and site license termination to a subsidiary of EnergySolutions. The target end state of the Zion site for return to Exelon will be a green field with the exception of the dry fuel storage pad. In return, ZionSolutions has access to the full value of the decommissioning trust fund. There are two potential attractions of this model: lower overall cost and significant schedule acceleration. The Zion programme which commenced in September 2010 is designed to return the cleared site with an Independent Spent Fuel Storage Installation (ISFSI) pad in 2020, 12 years earlier than planned by Exelon. The overall cost, at $500 M per full size power reactor is significantly below the long run trend of $750 M+ per PWR. Implementation of the accelerated programme has been underway for nearly three years and is making good progress. The programme is characterised by numerous projects proceeding in parallel. The critical path is defined by the inspection and removal of fuel from the pond and transfer into dry fuel storage casks on the ISFSI pad and completion of RPV segmentation. Fuel loading is expected to commence in mid- 2013 with completion in late 2014. In parallel, ZionSolutions is proceeding with the segmentation of the Reactor Vessel (RV) and internals in both Units. Removal of large components from Unit 1 is underway. Numerous other projects are underway or have been completed to date. They include access openings into both containments, installation of heavy lift crane capacity, rail upgrades to support waste removal from the site, radiological characterization of facilities and equipment and numerous related tasks. As at February 2013, the programme is just ahead of schedule and within the latest budget. The paper will provide a fuller update. The first two years of the Zion programme offer some interesting learning opportunities. The critical importance of leadership and project control systems will be emphasised in the paper. Strong supplier relationships and good community cooperation are essential. A learning and adaptable team, incentivised to meet schedule and budget, drives affordability of the whole programme. Our key lessons so far concern organisation and people as much as engineering and technology. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Code Validation of a SBLOCA test in SMART Integral Test Loop

Integrated small modular reactors (iSMRs) are favored because of their unique characteristics, such as enhanced safety without any large break loss of coolant accidents (LBLOCAs), low initial construction costs, and multi-use of desalination and electricity generation. Many iSMRs have been developed thus far. In Korea, an iSMR called SMART was developed after a thorough validation of the components and systems, and finally received its design certificate in 2012 for the first time in the world. To ensure the performance of its safety systems, an integral test loop, SMART-ITL, is constructed. It contains the primary system, secondary system, passive safety systems, and an auxiliary system. The passive safety systems include a passive residual heat removal system (PRHRS), passive injection system with a core makeup tank (CMT) and a safety injection tank (SIT), and an automatic depressurization system (ADS). The height is preserved while the diameter is scaled down to 1:7. A series of SBLOCA tests have been performed with 4 trains of PRHRS, 1 train of CMT and SIT, and ADS. In parallel with the experiments, simulation of a representative test has been conducted to track the underlying thermal hydraulics. SMART-ITL is an integral test loop for SMART and a series of SBLOCA tests for confirming the performance of passive safety systems have been conducted. In this paper, a system code simulation on a SBLOCA test using SMART-ITL is presented. The reactor vessel water level, break flow rate, and CMT and SIT water levels are predicted well. (authors)

42 ENGINEERING↗

Dismantlement of the TSF-SNAP Reactor Assembly

This paper describes the dismantlement of the Tower Shielding Facility (TSF)?Systems for Nuclear Auxiliary Power (SNAP) reactor, a SNAP-10A reactor used to validate radiation source terms and shield performance models at Oak Ridge National Laboratory (ORNL) from 1967 through 1973. After shutdown, it was placed in storage at the Y-12 National Security Complex (Y-12), eventually falling under the auspices of the Highly Enriched Uranium (HEU) Disposition Program. To facilitate downblending of the HEU present in the fuel elements, the TSF-SNAP was moved to ORNL on June 24, 2006. The reactor assembly was removed from its packaging, inspected, and the sodium-potassium (NaK) coolant was drained. A superheated steam process was used to chemically react the residual NaK inside the reactor assembly. The heat exchanger assembly was removed from the top of the reactor vessel, and the criticality safety sleeve was exchanged for a new safety sleeve that allowed for the removal of the vessel lid. A chain-mounted tubing cutter was used to separate the lid from the vessel, and the 36 fuel elements were removed and packaged in four U.S. Department of Transportation 2R/6M containers. The fuel elements were returned to Y-12 on July 13, 2006. The return of the fuel elements and disposal of all other reactor materials accomplished the formal objectives of the dismantlement project. In addition, a project model was established for the handling of a fully fueled liquid-metal?cooled reactor assembly. Current criticality safety codes have been benchmarked against experiments performed by Atomics International in the 1950s and 1960s. Execution of this project provides valuable experience applicable to future projects addressing space and liquid-metal-cooled reactors.

36 MATERIALS SCIENCE↗

Computational Fluid Dynamics of Bioreactors with Micro-Aeration

Recent work has probed the potential for using Zymomonas mobilis as a flexible platform for the production of advanced fuels and intermediates. One set of recombinant organisms requires a micro-aerobic environment to promote the production of the desired product (2,3-BDO), but the economics and process-control implications of this approach are uncertain at industrial scale. Computational multi-physics models have the potential to describe the fermentation in detail at multiple scales, reducing the risk of scale-up. A two-phase Euler-Euler CFD model is used alongside a simple model of oxygen uptake to describe this bioreaction. A few reactor vessels, including airlift and CSTR bioreactors, are analyzed at multiple scales, regions of oxygen-depletion and over-oxygenation are characterized, and the bioreactors are compared. We show that it is difficult to achieve homogenous oxygen concentrations in industrial-scale CSTR reactors and that advanced bioreactor designs are needed for economical operation.

09 BIOMASS FUELS↗

Analysis of COBRA-TF Critical Heat Flux Models for Triangular Fuel Assembly Pitch

The Coolant Boiling in Rod Arrays-Two Fluid (COBRA-TF) code is a best estimate code which is used to perform thermal-hydraulic analyses of a light water reactor vessel. The COBRA-TF heat transfer package has models calculating the critical heat flux (CHF). In order to verify code's predictive capability for CHF for triangular nuclear fuel assembly pitch, experiment results and system parameters of KS-1 test facility that is single loop model of the VVER primary system located in Kurchatov Institute were simulated using COBRA-TF. In order to calculate CHF for triangular nuclear fuel assembly pitch there is a look-up table generated. In addition, there are some correction factors for critical heat flux values listed the table. In this study, once KS-1 experiment results were simulated using COBRA-TF, correction factors were used to correct CHF results from COBRA-TF calculations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The High Capacity Type B Waste Transport Cask to Serve Dismantling Project - 18344

The United States have already announced around 20 reactor shutdown and many more in the next 10 year. Financial constraints on plant operators and the low cost of fossil energy contribute to accelerate the shutdown of additional reactors. The industry has been gaining experience with reactor dismantling and is continuously trying to improve the cost efficiency of the upcoming projects. To do so, larger and more capacitive transport casks are needed to transport increasing volume of Low Level Waste (LLW) at a more attractive cost. Waste disposal is also a major cost element in a dismantling project. Consequently, the capacity to segment, package and transport the waste in the most optimized configuration will result in significant cost savings. While for LLW, the constraints for package requirements are limited, activated waste resulting mainly from reactor vessel and vessel internals segmentation require additional shielding to meet disposal and transportation regulations. The key element to succeed is the availability on the market of a licensed type B transport package with a larger payload that allows at the same time an optimization of the waste segmentation. AREVA TN has designed and licensed versatile high capacity type B casks for the transport of spent fuel canisters as part of the NUHOMS{sup R} system that can also be used to transport radioactive waste. While it will take a few more years to transport spent fuel to a consolidated interim storage facility and even more to a repository, the type B casks can be used to transport activated LLW from dismantled reactors to disposal sites. A first of a kind project will be performed with AREVA's partner NorthStar at Vermont Yankee Nuclear Power Plant. AREVA's team will perform the reactor segmentation and package the material into an AREVA's large capacity type B cask. This unmatched cask capacity is expected to significantly decrease the LLW disposal costs, as well as the onsite operations costs, while optimizing the schedule. The package will be transported by rail to waste disposal facilities. This paper will present the main characteristics of the package, provide an update of the overall schedule, and explain the innovations that contribute to simpler and more cost effective transport and operation. Finally, it will emphasize the benefits of using larger type B casks for immediate and future transportation needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upfront Update on Barsebaeck 1-2 Reactor Internals Segmentation Project - 17382

Westinghouse is currently executing a contract, awarded in June 2015 from Barsebaeck Kraft AB, to segment all the reactor vessel (RV) internal parts in the two units 1 and 2. The scope of work covers the dismantling and segmentation of the RV internals under water, including the upfront engineering studies and equipment manufacturing and qualification. It also includes the loading of the segmented parts into waste cassettes, handling the cassettes, reactor internals sampling (73 samples), complementary water filtration system to catch the segmentation chips and contribute to maintaining water clarity during the segmentation work. Before leaving the site, the pool environment must be restored to the initial condition and all equipment will be decontaminated and shipped off site. The site work started in August 2016 with the mobilization on the Unit 2 and the actual cutting of the first component (steam dryer) started in September. Cutting will be performed with different types of Westinghouse designed cutting equipment. This paper presents the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Barsebaeck, including the planning, methodology, equipment, waste management and packaging strategy. A first feedback on the site work will be provided for the segmentation of the Unit 2 reactor internals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Fast Modular Reactor Conceptual Design

The Fast Modular Reactor (FMR) is a 100-MW(thermal) gas-cooled fast reactor being developed by General Atomics Electromagnetic System with the goal of developing a FMR for flexible and dispatchable power to the U.S. electricity market in the mid-2030s. The conceptual design aims to develop and verify simplified design features. These include an inert helium gas coolant, pellet-loaded fuel rods, installations with air cooling as ultimate heat sink, and small and passive heat removal systems. The goal is to ensure the development of a safe, maintainable, cost-effective, and distributed nuclear energy-generating station. The baseline technologies selected to achieve this goal are a helium coolant that is an inert gas with no chemical reaction with structural components, not activated, single phase, enabling high-temperature operation and a high thermal efficiency Brayton cycle; conventional uranium dioxide (UO 2 ) fuel, which is the most widely used and well-known fuel material, capable of high burnup (100 MWd/kg) and a long fuel life; and silicon carbide composite (SiGA®) cladding and internal structures that are chemically inert in the helium environment, exceptionally radiation tolerant, and being derisked by accident tolerant fuel technology development. Further, the reactor was specifically designed with passive safety features, including high-temperature in-core materials and a reactor vessel cooling system consisting of cooling panels of naturally circulating water. The passive safety of the core was confirmed for the depressurized loss-of–forced cooling accident, which showed the peak cladding temperature at ~1600°C during the transient, which is below the current design limit of 1800°C. The conceptual design of the FMR has been conducted for the reactor system, vessel system, generator and turbomachine, instrumentation and control, residual heat removal system, plant service system, and containment, as well as pre-application licensing documents.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Decommissioning of the high flux beam reactor at Brookhaven Lab

The high-flux beam reactor (HFBR) at the Brookhaven National Laboratory was a heavy water cooled and moderated reactor that achieved criticality on Oct. 31, 1965. It operated at a power level of 40 megawatts. An equipment upgrade in 1982 allowed operations at 60 megawatts. After a 1989 reactor shutdown to reanalyze safety impact of a hypothetical loss of coolant accident, the reactor was restarted in 1991 at 30 megawatts. The HFBR was shut down in December 1996 for routine maintenance and refueling. At that time, a leak of tritiated water was identified by routine sampling of groundwater from wells located adjacent to the reactor's spent fuel pool. The reactor remained shut down for almost three years for safety and environmental reviews. In November 1999 the United States Dept. of Energy decided to permanently shut down the HFBR. The decontamination and decommissioning of the HFBR complex, consisting of multiple structures and systems to operate and maintain the reactor, were complete in 2009 after removing and shipping off all the control rod blades. The emptied and cleaned HFBR dome, which still contains the irradiated reactor vessel, is presently under 24/7 surveillance for safety. Detailed dosimetry performed for the HFBR decommissioning during 1996-2009 is described in the paper. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CFD Model Development and validation for High Temperature Gas Cooled Reactor Cavity Cooling System (RCCS) Applications

The Reactor Cavity Cooling Systems (RCCS) is a passive safety system that will be incorporated in the VTHR design. The system was designed to remove the heat from the reactor cavity and maintain the temperature of structures and concrete walls under desired limits during normal operation (steady-state) and accident scenarios. A small scale (1:23) water-cooled experimental facility was scaled, designed, and constructed in order to study the complex thermohydraulic phenomena taking place in the RCCS during steady-state and transient conditions. The facility represents a portion of the reactor vessel with nine stainless steel coolant risers and utilizes water as coolant. The facility was equipped with instrumentation to measure temperatures and flow rates and a general verification was completed during the shakedown. A model of the experimental facility was prepared using RELAP5-3D and simulations were performed to validate the scaling procedure. The experimental data produced during the steady-state run were compared with the simulation results obtained using RELAP5-3D. The overall behavior of the facility met the expectations. The facility capabilities were confirmed to be very promising in performing additional experimental tests, including flow visualization, and produce data for code validation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Control and Protection system Design Methods for Modular HTGRs

The project supported the Nuclear Regulatory Commission (NRC) in identifying and evaluating the regulatory implications concerning the control and protection systems proposed for use in the Department of Energy's (DOE) Next-Generation Nuclear Plant (NGNP). The NGNP, using modular high-temperature gas-cooled reactor (HTGR) technology, is to provide commercial industries with electricity and high-temperature process heat for industrial processes such as hydrogen production. Process heat temperatures range from 700 to 950 C, and for the upper range of these operation temperatures, the modular HTGR is sometimes referred to as the Very High Temperature Reactor or VHTR. Initial NGNP designs are for operation in the lower temperature range. The defining safety characteristic of the modular HTGR is that its primary defense against serious accidents is to be achieved through its inherent properties of the fuel and core. Because of its strong negative temperature coefficient of reactivity and the capability of the fuel to withstand high temperatures, fast-acting active safety systems or prompt operator actions should not be required to prevent significant fuel failure and fission product release. The plant is designed such that its inherent features should provide adequate protection despite operational errors or equipment failure. Figure 1 shows an example modular HTGR layout (prismatic core version), where its inlet coolant enters the reactor vessel at the bottom, traversing up the sides to the top plenum, down-flow through an annular core, and exiting from the lower plenum (hot duct). This research provided NRC staff with (a) insights and knowledge about the control and protection systems for the NGNP and VHTR, (b) information on the technologies/approaches under consideration for use in the reactor and process heat applications, (c) guidelines for the design of highly integrated control rooms, (d) consideration for modeling of control and protection system designs for VHTR, and (e) input for developing the bases for possible new regulatory guidance to assist in the review of an NGNP license application. This NRC project also evaluated reactor and process heat application plant simulation models employed in the protection and control system designs for various plant operational modes and accidents, including providing information about the models themselves, and the appropriateness of the application of the models for control and protection system studies. A companion project for the NRC focused on the potential for new instrumentation that would be unique to modular HTGRs, as compared to light-water reactors (LWRs), due to both the higher temperature ranges and the inherent safety features.

08 HYDROGEN↗

Irradiated stainless steel 347 and irradiated, welded, and hydrogen charged Zircaloy-4 property data for the target solution vessel and support lines of SHINE

In support of the reactor-vessel development effort of SHINE medical technologies, irradiation of its structural materials and post-irradiation testing have been performed in the High Flux Isotope Reactor at Oak Ridge National Laboratory. This irradiation was performed on welded and unwelded AISI 347 steel and Zircaloy-4 samples at low temperature (~60°C) in contact with the reactor coolant. Hardness, Charpy, and tensile data have been taken from all cases of unirradiated specimens, while post-irradiation tensile and hardness data have been taken from AISI 347 base metal and Zircaloy-4 base metal and weld specimens so far. Additionally, 3-point bend data have been taken from explosion-welded specimens. The expected changes to hardness, yield strength, ultimate tensile strength, uniform elongation, and total elongation as a result of the low temperature and low dose neutron irradiation are reported here.

36 MATERIALS SCIENCE↗

A Scoping Analysis Of The Impact Of SiC Cladding On Late-Phase Accident Progression Involving Core–Concrete Interaction

The overall objective of the current work is to carry out a scoping analysis to determine the impact of ATF on late phase accident progression; in particular, the molten core-concrete interaction portion of the sequence that occurs after the core debris fails the reactor vessel and relocates into containment. This additional study augments previous work by including kinetic effects that govern chemical reaction rates during core-concrete interaction. The specific ATF considered as part of this study is SiC-clad UO 2 .

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗