Search NASA⌕ Search

SEARCH · Search NASA

Results for “Return Period”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Bone and muscle - The structural system in long duration space missions

Losses of bone mineral and muscle mass have been observed, and in varying degrees measured, following all long duration missions in space. These observations portend an unacceptable threat to the crews' ability to return to earth, without protracted rehabilitation, following periods of a year or more in microgravity. The impact to crew capabilities and productivity in space is not well understood. Past research has dealt with bone loss and muscle atrophy as two separate problems with little discernible relationship. This paper reviews the available information on both and suggests a combined structural approach for future research.

Buchanan, Paul↗

Measurement of the Forces Acting on Gliders in Towed Flight

The magnitude, the direction, and the fluctuations of tow forces exerted upon gliders by towing them aloft behind an automobile were measured under a variety of conditions covering a range from gentle to severe types of operation. For these tests, the glider towing force did not exceed 1.6 of the gross weight of the glider. V-G records obtained during the towed-flight period as well as during the subsequent return glide to earth showed accelerations in the range from 3 to -1 g. The results of preliminary airplane tow tests are also presented.

Klenperer, W B↗

Geophysical Probes of the Icy Satellites of Jupiter

This paper presents a discussion on the structure and dynamic processes of the interiors of the icy satellites of Jupiter. Although such measurements as global gravity and magnetic fields, high precision altimetry and radar sounding can be made from the Jupiter Icy Moons Orbiter (JIMO) satellite, there are certain seismic and heat flow measurements which must be made from the surface to clearly understand the geophysics of a planet such as Jupiter. The possibility of a geophysical probe that can be released into orbit about a satellite to return potential field data for a sufficient period of time is discussed.

Banerdt, W. B.↗

Ball tonometry: a rapid, nondestructive method for measuring cell turgor pressure in thin-walled plant cells

In this article we describe a new method for the determination of turgor pressures in living plant cells. Based on the treatment of growing plant cells as thin-walled pressure vessels, we find that pressures can be accurately determined by observing and measuring the area of the contact patch formed when a spherical glass probe is lowered onto the cell surface with a known force. Within the limits we have described, we can show that the load (determined by precalibration of the device) divided by the projected area of the contact patch (determined by video microscopy) provides a direct, rapid, and accurate measure of the internal turgor pressure of the cell. We demonstrate, by parallel measurements with the pressure probe, that our method yields pressure data that are consistent with those from the pressure probe. Also, by incubating target tissues in stepped concentrations of mannitol to incrementally reduce the turgor pressure, we show that the pressures measured by tonometry accurately reflect the predicted changes from the osmotic potential of the bathing medium. The advantages of this new method over the pressure probe are considerable, however, in that we can move rapidly from cell to cell, taking measurements every 20 s. In addition, the nondestructive nature of the method means that we can return to the same cell repeatedly for periodic pressure measurements. The limitations of the method lie in the fact that it is suitable only for superficial cells that are directly accessible to the probe and to cells that are relatively thin walled and not heavily decorated with surface features. It is also not suitable for measuring pressures in flaccid cells.

NASA Discipline Plant Biology↗

Delivering the Power to Explore the Moon, Mars, and Beyond

As part of the United State's vision for space exploration, NASA is preparing the next Space Launch Vehicles. The presentation will address the overall approach to arriving to and establishing a long-term presence on Mars through experience gained by returning to the moon for an extended period of time, developing technologies needed for opening the space frontier, and conducting fundamental science. The design philosophy for the exploration mission success will be discussed and the importance of learning from lessons of the past will be addressed.

Rodriquez, Pete↗

Curious Behavior of Sunspot Umbrae in the First Half of the 20th Century

We examined the behavior of the areas of sunspot umbrae and penumbrae as reported daily by the Royal Observatory, Greenwich (RGO) from May 1874 to December 1976. We calculated the ratio of the umbral area to the penumbral area (corrected for foreshortening as observed on the solar disc) for each sunspot group and for each day. We found: 1) that this ratio is about 0.2 on average, 2) that larger sunspot groups have slightly smaller ratios, 3) that there is a weak dependence on the phase of the solar cycle, 4) that there is no dependence on the latitude of the sunspot groups, and curiously 5) that for the smaller sunspot groups this ratio increased dramatically from about 1910 to 1930 and then returned to "normal" from 1930 to 1950. We examined other sunspot records to determine whether this behavior was an artifact of the RGO data and find evidence to indicate that the behavior was real. For the smaller sunspots (constituting the vast majority in both number and total area), the proportional size of the sunspot umbrae slowly increased by more than 50% and then returned to "normal" over this 40-year period.

Hathaway, D. H.↗

Variations in Sleep and Performance by Duty Start Time in Short Haul Operations

Prior studies have confirmed that commercial airline pilots experience circadian phase shifts and short sleep duration following travel with layovers in different time zones. Few studies have examined the impact of early and late starts on the sleep and circadian phase of airline pilots who return to their domicile after each duty period. We recruited 44 pilots (4 female) from a short-haul commercial airline to participate in a study examining sleep and circadian phase over four duty schedules (baseline, early starts, mid-day starts, late starts). Each duty schedule was five days long, separated by three rest days. Participants completed the rosters in the same order. Sleep outcomes were estimated using wrist-borne actigraphy (Actiware Software, Respironics, Bend, OR) and daily sleep diaries. Thirteen participants volunteered to collect urine samples for the assessment of 6-sulfatoxymelatonin (aMT6s). Urine samples were collected in four-hourly bins during the day and eight-hourly bins during sleep episodes, for 24 hours immediately following each experimental duty schedule. The aMT6s results were fit to a cosine in order to obtain the acrophase to estimate circadian phase. Univariate statistics were calculated for acrophase changes, schedule start times and sleep times. All statistical analyses were computed using SAS software (Cary, IN).

fatigue↗

Variation in Sleep Duration and Circadian Phase by Duty Start Time Among Short-Haul Commercial Airline Pilots

Prior studies have confirmed that commercial airline pilots experience circadian phase shifts and short sleep duration following travel with layovers in different time zones. Few studies have examined the impact of early and late starts on the sleep and circadian phase of airline pilots who return to their domicile after each duty period. We recruited 44 pilots (4 female) from a short-haul commercial airline to participate in a study examining sleep and circadian phase over four duty schedules (baseline, early starts, mid-day starts, late starts). Each duty schedule was five days long, separated by three rest days. Participants completed the rosters in the same order. Sleep outcomes were estimated using wrist-borne actigraphy (Actiware Software, Respironics, Bend, OR) and daily sleep diaries. Thirteen participants volunteered to collect urine samples for the assessment of 6-sulfatoxymelatonin (aMT6s). Urine samples were collected in four hourly bins during the day and eight-hourly bins during sleep episodes, for 24 hours immediately following each experimental duty schedule. The aMT6s results were fit to a cosine in order to obtain the acrophase to estimate circadian phase. Univariate statistics were calculated for acrophase changes, schedule start times and sleep times. All statistical analyses were computed using SAS software (Cary, IN).The mean duty start times varied as expected (baseline 10:17 [ 3:50], early starts 5:24 [ 0:30], mid-day starts 13:52 [ 1:20], late starts 16:33 [ 1:33]). Actigraphy-derived sleep duration varied between schedule types, with the shortest average sleep durations occurring during the early starts and night duty. Mean circadian phase was similar during each schedule type (baseline 26:14 [ 3:22], early starts 25:29 [2:13], mid-day starts 26:20 [ 3:16], late starts 25:49 [ 4:28]), but there were wide inter-individual differences in phase shifting from the beginning to the end of the study, with phase shifts ranging from a 5.98 hour phase advance to an 11.34 hour phase delay. Our preliminary findings suggest that early and late starts are associated with reduced sleep duration. The dispersion in inter-individual differences in circadian phase across shifting duty schedules should be further evaluated to determine how schedule-induced phase shifts may affect operational performance.

Flynn-Evans, Erin↗

Large Dust Aerosol Sizes Seen During the 2018 Martian Global Dust Event by the Curiosity Rover

Mars' atmosphere typically supports dust aerosol with an effective radius near 1.5 μm, varying from ~1 μm during low dust times near northern summer solstice to ~2 μm during higher dust times in southern spring and summer. After global dust events, size variations outside this range have not previously been observed. We report on imaging and spectral observations by the Curiosity rover through the 2018 global dust event. These observations show that the dust effective radius was seasonally normal prior to the local onset of increased opacity, increased rapidly above 4 μm with increasing opacity, remained above 3 μm over a period of ~50 Martian solar days, then returned to seasonal values before the opacity did so. This demonstrates lifting and regional‐scale transport of a dust population ~3 times the size of typical dust aerosol.

Lemmon, M. T.↗

Intracranial Effects of Artificial Gravity: A 3T MRI Study

INTRODUCTION Spaceflight associated neuro-ocular syndrome (SANS) is characterized by the development of optic disc edema, posterior globe flattening, choroidal/retinal folds and hyperopic refractive errors1. SANS is hypothesized to be a result of headward fluid shifts that invariably occurs in the microgravity environment. As a countermeasure, artificial gravity (AG) through centrifugation has been proposed to reduce this headward fluid shift, however there is no current proof of benefit. The goal of this study was to determine if the application of AG can prevent or reduce known changes in brain volumetry, internal carotid artery (ICA) stroke volume and cerebral spinal fluid (CSF) flow velocity that occurs during simulated chronic headward fluid shift using head down tilt bed rest (HDTBR) methodology2 as an indicator of countermeasure efficacy. METHODS Healthy volunteers were recruited for an IRB approved HDTBR study performed at the German Aerospace Center in Cologne, Germany. Strict six-degree HDTBR was used as a spaceflight analog to induce a continuous headward fluid shift. HDTBR was carried out for 60 days for all subjects. Short-arm centrifugation was utilized to generate AG equating to ~0.3g of acceleration at the level of the eye. The subjects were divided equally into three groups: NoAG (control; n=8), daily intermittent AG (6 x 5 min iAG; n=8), and daily continuous 30 min (cAG; n=8). All studies were performed on a single dedicated 3T MRI Scanner. Pulse-gated MRI phase-contrast flow imaging was used to quantify ICA stroke volume and peak-to-peak CSF flow velocity in the mid cerebral aqueduct. 3D-SPGR was acquired for volumetric segmentation of the brain and CSF spaces. MRI acquisitions were obtained at baseline (BDC), 14 days into HDTBR (HDTBR14), 52 days into HDTBR (HDTBR52) and 3-5 days after HDTBR (recovery, R+3/5).The data were analyzed by the mixed model, which included intervention and time (BDC, HDTBR 14, HDTBR 52, R+3/5) as the fixed effects and included subject as the random effect.RESULTS24 healthy subject volunteers (16 men, 8 women, mean age = 33 years ± 9 [standard deviation] and mean BMI = 24.3 kg/m2 ± 2.0) successfully completed all phases of the study. Strict six-degree HDTBR was characterized by progressive and statistically significant (p<.01) increases in mean combined brain and CSF volumes and mean aqueductal CSF peak-to-peak flow velocity, as well as statistically significant (p<.01) progressive decrease in mean ICA stroke volume from baseline to 52 days post intervention (Figs. 1-3). Compared to baseline, only combined brain and CSF volumes did not return to baseline values in the recovery period (p=NS). Neither iAG nor cAG exerted any significant effects on the measured MRI brain parameters as compared to HDTBR alone (p=NS). CONCLUSION Our results indicate that HDTBR at 6-degrees was effective in producing alterations in ICA stroke volume, aqueductal CSF flow velocity, and combined brain and CSF volumetric change that is associated with chronic headward fluid shift. Short duration, 30-min daily exposure to either iAG or cAG appears to be insufficient in preventing or reducing the effects of chronic HDTBR and thus may not be a suitable countermeasure as currently deployed. AG protocol modifications, including increased duration and magnitude of exposure, should be considered for future research.

L A Kramer↗

Internship Programs - Mutual Benefits for Employers and Students - 19074

An Internship program can be a mutual benefit to both students and employers when successfully managed. It affords students with the opportunity to enhance specialized skills in their selected profession while also gaining tangible experience, knowledge, and financial support in a true professional work setting. In addition, it can provide an employer a return on investment by receiving a trial period with potential up-and-coming talent. It is an opportunity for employers to introduce new and diversified ideas while reducing recruitment costs. This paper attempts to demonstrate how having an Internship Program can positively influence both students and employers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The efficacy of periodic +Gz exposure in the prevention of bedrest induced orthostatic intolerance

What is the most efficient dosage of periodic exposure to positive 1G(z) during microgravity to maintain a functional upright position after returning to a positive 1G(z) environment? The answer has implications for the type of countermeasures astronauts will be required to perform during long term space flight. Methods: Nine males were subjected to four different positive 1G exposure protocols plus a control protocol ('zero G(z)') during four days of continuous bedrest. The four positive 1G(z) exposures consisted of periodic standing or walking, each for a total period of two or four hours. Each subject was returned for bedrest on five different occasions over a period of approximately one year to obtain data on each of the nine subjects across all four positive 1G(z) treatments and the control. A 30 min tilt test was used to measure orthostatic response during pre and post bedrest. Results: In terms of survival rate (percentage of subjects who did not faint after 30 sec of tilt), four hours of intermittent standing was the only protocol that maintained a rate comparable to pre bedrest levels (87.5 percent). Although the other three positive 1G(z) protocols performed better than the 'zero G(z) control (22.2 percent), only the four hour standing returned post bedrest survival rates to pre bedrest levels. Conclusions: The results will need to be evaluated with regards to a variety of other physiological systems which are known to decondition during microgravitry.

Ludwig, D. A.↗

Dust Trails of SP/Tuttle and the Unusual Outbursts of the Ursid Shower

Halley-type comets tend to have a series of dust trails that remain spatially correlated for extended periods of time, each dating from a specific return of the comet. Encounters with 1 - 9 revolution old individual dust trails of 55P/Tempel-Tuttle have led to well recognized Leonid shower maxim, the peak time of which was well predicted by recent models. Now. we used the same model to calculate the position of dust trails of comet Shuttle, a Halley-type comet in an (approximately) 13.6 year orbit passing just outside of Earth's orbit. We discovered that the meteoroids tend to be trapped in the 14:12 mean motion resonance with Jupiter, while the comet librates in a slightly shorter period orbit around the 13:15 resonance. It takes six centuries to change the orbit enough to intersect Earth's orbit. During that time, the meteoroids and comet separate in mean anomaly by six years. thus explaining the unusual aphelion occurrences of Ursid outbursts. The resonances also prevent dispersion, so that the dust trail encounters (specifically, from dust trails of AD 1378 - 1405) occur only in one year in each orbit. We predicted enhanced activity on December 22, 2000, at around 7:29 and 8:35 UT (universal time) from dust trails dating to the 1405 and 1392 return, respectively. This event was observed from California using video and photographic techniques. At the same time, five Global-MS-Net stations in Finland, Japan and Belgium counted meteors using forward meteor scatter. The outburst peaked at 8:06:07 UT, December 22, at Zenith Hourly Rate (approx.) 90 per hour. The Ursid rates were above half peak intensity during 4.2 hours. This is only the second Halley type comet for which a meteor outburst can be dated to a specific return of the parent comet, and traces their presence back form 9 to at least 45 revolutions of the comet. New orbital elements of Ursid meteoroids are presented. We find that most orbits do scatter around the anticipated positions, confirming the link with comet Shuttle and the epoch of ejection. The 1405 and.1392 dust trails appear to have contributed similar amounts to the activity profile. Some orbits provide a hint of much older debris being present as well. Some of the dispersion in the radiant position may reflect a true variation in inclinations, with two groupings at low and high values, which is not understood at present.

Jenniskens, Peter↗

Gamma-Ray Spectra and Variability of Cygnus Z-1 Observed by BATSE

We present new BATSE earth occultation observations of the 25 keV-1.8 MeV spectrum and variability of Cygnus X-1 made between August 1993 and May 1994. We observed that the normal soft gamma ray spectrum (gamma2) of Cygnus X-1 has two components: a Comptonized part seen below 300 keV, and a high-energy tail in the 0.3 - 2 MeV range. We interpret it in terms of a two-layer region, consisting of a high-energy core (with an equivalent electron temperature of approximately 210-250 keV) near the event horizon, embedded in an about 50 keV corona. In this scenario, the observed 25-300 keV photons were produced by Compton scattering of soft photons (about 0.5 keV) by the hot electrons in the outer corona. These same hard x rays were further up-scattered by a population of energetic electrons in the inner core, producing the spectral tail above 300 keV. Cygnus X-1 went through an extended sequence of transitions between August 1993 and May 1994, when the 45-140 keV flux first decreased steadily from approximately gamma2 to roughly one-quarter of its intensity over a period of about 140 days. The flux remained at this low level for about 40 days before returning, swiftly (approximately 20 days) to approximately the initial gamma2 level. During the transition, the spectrum evolved to a shape consistent with either a power law with photon index of about 2.6 or a single temperature Compton model with electron temperature kT = 110 +/- 11 keV, and optical depth t = 0.40 +/- 0.06, and then returned essentially to the original gamma2 spectrum at the end of the active period. The overall cooling of the system during the low flux period may be due to an increase in the soft photon population which effectively quenched the hot electrons in these regions through Compton scattering.

Ling, J. C.↗

The Effect of Age in the Alteration in Fluid Balance of Rats in Response to Centrifugation

With an increase in gravity load induced by centrifugation or upon return to Earth following spaceflight, there is a period of adjustment in fluid balance in rats. With centrifugation there is a reduced fluid intake with maintenance of the rate of urine excretion. Following spaceflight there is an increase in urine output and maintenance of fluid intake. The initial period of acclimation to hypergravity is associated with a net loss of fluids. In the present study in response to centrifugation at 2.0 G this period of acclimation is present in mature rats for a longer period of time, about 24 hours. Following this initial response a period of over compensation has previously been reported. In the present study this was not observed. The net effect of these alterations in water intake and output in response to centrifugation for 14 days was slight increase in the percent total body water, with effective compensation seen in both young and mature rats. Older rats have been shown to have a reduced relative thirst and compensatory renal function in response to hypohydration, hyperosmolality and pharmacological stimuli. Responsiveness to these stimuli are delayed and/or attenuated in older animals. Similar findings were noted in the present study in the initial response to centrifugation. The older animal had a delayed return of fluid intake to control levels. The delay of one day did not appear to effect long-term fluid homeostasis, as there was difference in the response of percent total body water at the end of 14 days of centrifugation with both age groups having a slight but significant increase. This increase has been attributed to the increase in lean body mass induced by centrifugation.

Fuller, Charles A.↗

A Free-Return Earth-Moon Cycler Orbit for an Interplanetary Cruise Ship

A periodic circumlunar orbit is presented that can be used by an interplanetary cruise ship for regular travel between Earth and the Moon. This Earth-Moon cycler orbit was revealed by introducing solar gravity and modest phasing maneuvers (average of 39 m/s per month) which yields close-Earth encounters every 7 or 10 days. Lunar encounters occur every 26 days and offer the chance for a smaller craft to depart the cycler and enter lunar orbit, or head for a Lagrange point (e.g., EM-L2 halo orbit), distant retrograde orbit (DRO), or interplanetary destination such as a near-Earth object (NEO) or Mars. Additionally, return-to-Earth abort options are available from many points along the cycling trajectory.

Interplanetary cruise ship↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Evaluation of a Reverse Gradient Garment for prevention of bed-rest deconditioning

A Reverse Gradient Garment (RGG) was used to intermittently induce venous pooling in the extremities of a magnitude similar to that seen in going from a lying to standing position during the course of a 15-d period of horizontal bed rest. Venous pooling failed to improve bed-rest-induced losses in +2.5 Gz and +3.0 Gz centrifugation tolerance or to prevent increased heart-rate responses to lower-body negative pressure (LBNP). Four subjects served as controls, four were treated. Tests during the 7-d recovery period showed fluid/electrolyte and body composition values to have returned to pre-bed-rest levels with continued depression of acceleration tolerance times (56% decreased at +2.5 Gz and 74% decreased at +3.0 Gz compared to pre-bed-rest levels) and exaggerated blood insulin response on glucose tolerance testing (blood insulin for treated group increased 95% at 1 h before bed rest and 465% during recovery). This study demonstrates that the physiologic changes after bed rest persist for significant periods of time. Acceleration tolerance time proved to be a sensitive test for the deconditioning process.

Sandler, H.↗