Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Based Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Application of Proliferation Resistance Optimization (PRO-X) Methodology to a Generic Research Reactor

The Proliferation Resistance Optimization Program (PRO-X) has been established by the NNSA to provide a framework for evaluating and integrating proliferation resistance into nuclear reactor system (core, fuel, and auxiliary facilities) designs that also maintain the safety and peaceful use missions of those systems. The research reactor (PRO-RR) area is the component of PRO-X that supports the program objectives by applying state-of-the-art analysis methods to research reactor systems. This report details the results of using a defined set of analytical tools to evaluate the neutronics, thermal hydraulics and proliferation risk characteristics of a set of parametric cores based on a generic 10 MW materials test reactor that uses a plate-type low enriched uranium (LEU) fuel. The analysis shows that by suitable adjustment of the core size, reflector configuration and power level, mission performance and safety margins can be maintained or improved while reducing the potential for production of special nuclear material.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Low Count and Background Radionuclides Analysis - 20488

The US Department of Energy (DOE) is often faced with the need to evaluate radionuclides at low concentrations. When site sample data are likely to be close to threshold activity concentrations of interest, then the means by which the radiochemical analysis is performed and reported is critical. This situation can occur when differentiating from zero (presence/absence) for radionuclides that do not occur naturally, close comparison with environmental background for naturally occurring radionuclides, close comparison with a risk- or dose-based threshold concentrations of interest, or even comparisons across studies. There are several analytical issues that are of concern, but the two that appear to cause incorrect decisions to be made most often involve establishing detection limits and subtracting ambient background conditions in the laboratory. These issues are not critical when radionuclide activity concentrations are large relative to thresholds of concern, but they seem to be poorly understood when it matters. When the comparisons are important and are likely to be close to a threshold of interest, then the general contract with the analytical laboratories needs to be changed so that the right or appropriate data are obtained. The concern is that important decisions are made incorrectly more often as greater scrutiny is placed on DoE's radionuclide cleanup or monitoring decisions by the public and other stakeholders. Examples are presented of problems that have been observed for different projects, both within and outside the realm of DOE and NRC remediation and radioactive waste disposal problems, and solutions are offered that should lead to better data from which important decisions need to be made. The first example is from Los Alamos National Laboratory (LANL) and involves radionuclide concentrations in soil and rock beneath LANL's Material Disposal Area (MDA) G. An initial review of the data led to a conclusion that americium and plutonium are a long way present beneath MDA G. A more thorough review of the data that accounted properly for ambient background and the detection limits that had been established led to the opposite conclusion. Another example is from the Nevada National Security Site where tritium results from one of the wells were unexpectedly high. Proper understanding and analysis of ambient background led to the conclusion that the increased concentrations were not so obvious, and that a different contract with the analytical laboratory was needed to provide more appropriate data to support a better determination. Other examples are used from regulatory review of projects in Nevada, where background levels and secular equilibrium for naturally occurring radionuclides are not established correctly because of analytical issues. The same basic issues have also been found to create difficulties analyzing historical data from the West Valley Demonstration Project. There is evidence in the data that the apparent lack of secular equilibrium where it is expected to exist is related to ambient background subtraction or other analytical issues. A final example is presented for analysis of Tc-99 in samples of depleted uranium. In this case, two different studies that were performed only three months apart provide quite different results. The US Environmental Protection Agency (EPA) established the data quality objectives (DQO) process in the mid-1980's to establish decision performance criteria for data collection. EPA guidance (EPA G-4, for example) clearly distinguishes between DQOs and measurement performance objectives (MQOs) that should be addressed for laboratory analysis of samples. The language of DQOs and MQOs has become confused over time it seems, and the subsequent effects seem to include a lack of attention to decision performance and a routine approach to measurement quality. In order to better address radionuclide sample analysis when the concentrations are close to thresholds of concern, which might be zero for some radionuclides, background for others, and risk-based thresholds for yet others, it is important that routine laboratory analysis methods are adjusted, and that the project team and the laboratory work closely together to ensure that the data meets the MQO requirements of laboratory analysis and reporting of results, and that the MQOs effectively support project-specific DQOs. This basic approach will be applied in Los Alamos in the coming year to the collection of moisture data from underneath MDA T that will be analyzed for americium and neptunium isotopes. Proper understanding of the radiochemistry methods and reporting, and of appropriate statistical methods is critical to the success of such projects, ensuring that the right decisions are made. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Life Qualification of Hall Thrusters By Analysis and Test

High power Hall thrusters under development for deep space robotic and human exploration missions have demanding lifetime and operational requirements that make thruster life qualification challenging. The required burn times make it infeasible to conduct multiple tests with durations exceeding the life requirement, and complex wearout phenomena and the need for power throttling during missions complicate analyses and testing. The traditional qualification approach, a single life test that typically demonstrates 50 to 100% margin on the required lifetime, does not provide enough information to demonstrate low failure risk. It is a weak source of statistical information about the location of the peak in the failure probability distribution and provides no information on the width of the distribution. Testing does provide information that can be used to validate physics-based models of failure processes, however, and the combination can be used to assess mission risk. Validated, conservative, deterministic analysis can be used to demonstrate that most failure processes have such large margins that more detailed analysis is unnecessary. For a subset of the failure modes a more detailed probabilistic analysis is required. Pole erosion in a 12.5 kW Hall thruster is used as a detailed example of this qualification process.

Brophy, John R.↗

ARCADE Technical Pathway and Industry Impact

The Advanced Reactor Cyber Analysis and Development Environment (ARCADE) simplifies the evaluation and assessment of robustness factor and cyber resilience that support secure-by-design for advanced reactor nuclear power plants. In this manner, ARCADE supports risk-informed performance based (RIPB) evaluations of cybersecurity through its integration of plant physics with high-fidelity emulations of control systems. This cross domain approach enables comprehensive analysis of control system sensitivities, cyber-attack scenarios, and their consequences. ARCADE has been custom developed to meet the demands identified in Tier 1 of the Tiered Cyber Analysis (TCA) as outlined in NRC Draft Regulation Guide (RG) 5.96, which provides a RIPB cybersecurity approach for new reactors.

97 MATHEMATICS AND COMPUTING↗

An Approach for Defining IASMS Services, Functions, and Capabilities

Assuring safety in the NAS with the inclusion of new entrants, such as Advanced Air Mobility (AAM), will require overcoming unique safety challenges that result from combining innovative technologies with novel airspace concepts for moving people and cargo using autonomous vehicles. The focus of the In-time Aviation Safety Management System (IASMS) is to overcome AAM’s safety assurance challenges. The IASMS Concept of Operations (ConOps) describes an interconnected set of services, functions, and capabilities (SFCs) designed to manage operational risks, identify unknown risks, and inform system designs. This paper describes an approach for defining SFCs based on technology trends in research, assessment of known and unknown risks in voluntary safety reports, and causal and contributing factors in aviation accidents and incidents. This approach would identify potential SFCs that further expand the Monitor, Assess, and Mitigate (M-A-M) functionality that represents the enabling framework of the IASMS. Safety implications that will result from integration of AAM in the transformation of the National Airspace System (NAS) were addressed in National Academies committees reports on AAM and IASMS. Development of a ConOps for IASMS was a top recommendation and can be represented as a reframing of safety assurance that builds on real-time alerting such as the Traffic Alert and Collision Avoidance System, and adds the more encompassing in-time temporal parameter in recognition of the different timelines for collecting and assessing safety data for risk mitigations. For example, mining for safety trends from data sources such as the Aviation Safety Information Analysis and Sharing system occurs over a longer time period. Research on AAM operations poses that SFCs can be designed to monitor the safety margin appropriate for AAM including with regards to the distance between current flight parameters and nominal ideal conditions. These in-time comparisons will become more complex as the density of operations increases at least in certain areas and can include planned and actual 4D trajectory, and in-time comparisons having implications on conflict modeling and prediction including expected and actual departure time, fix/waypoint crossing times, and arrival time. These comparisons would be integrated as part of SFCs that redefine and inform new safety margin. An increased safety margin improves management of operational risks while reducing the potential for anomalies. An increased safety margin also has implications for operator confidence in the certainty of its operations and trust in automation. Technology trends in research could be used to refine existing SFCs and define needs for additional SFCs that provide safety improvements to the design and operation of vehicles, airspace design, and operator performance requirements. NASA is developing innovative approaches to safeguard against major accidents and incidents that have occurred in the NAS and those anticipated with the inclusion of envisioned AAM operations. The innovations use operational performance data to monitor, detect, and predict flight variations exceeding safe nominal patterns, such as would be caused by navigational error, severe weather complications, or hijacking of UAS controls. These innovative approaches have high potential to prevent accidents and incidents in the new AAM era. It is anticipated that elements of the innovations will evolve into SFCs for the IASMS. Voluntary safety reports can be monitored to identify anomalies related to design or operational performance risks. Reports could be periodically monitored and assessed for specific topics. Reports might serve as weak signals or precursors indicative of emergent risk such as when combined with other safety information. The architecture could include SFCs that are based on voluntary safety reports recognizing the periodic temporal nature of data analysis. As previously mentioned, aviation accidents with their causal and contributing precursors can inform the need for SFCs in the IASMS. Accidents and incidents at San Francisco International Airport such as Asiana 214 and Air Canada 759 illustrate how combinations of different factors lead to increased risk. These types of precursors and different factors have implications on the types of SFCs that could be needed to monitor and manage different sources and types of design and operational risk. Continuing to assure the safety of AAM as designs and operations gain in complexity can be accompanied by defining SFCs that also increase in complexity. These SFCs can leverage information from findings and recommendations synthesized across on-going research, voluntary safety reports, and accident and incident reports. These SFCs can serve to refine accuracy of algorithms and resolve limitations with current practices. The IASMS architecture represents the framework for the SFCs and their critical role in safety assurance.

In-Time Aviation Safety Management System↗

Incorporating Risk

This presentation is about cost risk identification and estimation which is only a part of risk management. The purpose of this step is to identify common software risks, to assess their impact on the cost estimate, and to make revisions to the estimate based on these impacts.

Risk identifcation↗

Space Shuttle critical function audit

A large fault-tolerance model of the main propulsion system of the US space shuttle has been developed. This model is being used to identify single components and pairs of components that will cause loss of shuttle critical functions. In addition, this model is the basis for risk quantification of the shuttle. The process used to develop and analyze the model is digraph matrix analysis (DMA). The DMA modeling and analysis process is accessed via a graphics-based computer user interface. This interface provides coupled display of the integrated system schematics, the digraph models, the component database, and the results of the fault tolerance and risk analyses.

Sacks, Ivan J.↗

A Geometric Analysis to Protect Manned Assets from Newly Launched Objects - Cola Gap Analysis

A safety risk was identified for the International Space Station (ISS) by The Aerospace Corporation, where the ISS would be unable to react to a conjunction with a newly launched object following the end of the launch Collision Avoidance (COLA) process. Once an object is launched, there is a finite period of time required to track, catalog, and evaluate that new object as part of standard onorbit COLA screening processes. Additionally, should a conjunction be identified, there is an additional period of time required to plan and execute a collision avoidance maneuver. While the computed prelaunch probability of collision with any object is extremely low, NASA/JSC has requested that all US launches take additional steps to protect the ISS during this "COLA gap" period. This paper details a geometric-based COLA gap analysis method developed by the NASA Launch Services Program to determine if launch window cutouts are required to mitigate this risk. Additionally, this paper presents the results of several missions where this process has been used operationally.

Hametz, Mark E.↗

First Stage Solid Propellant Multiply Debris Thermal Analysis

Destruction of a solid rocket stage of a launch vehicle can create a thermal radiation hazard for an aborting crew module. This hazard was assessed for the Constellation Program (Cx) crew and launch vehicle concept. For this concept, if an abort was initiated in first stage flight, the Crew Module (CM) will separate and be pulled away from the malfunctioning launch vehicle via a Launch Abort System (LAS). Having aborted the mission, the launch vehicle will likely be destroyed via a Flight Termination System (FTS) in order to prevent it from errantly traversing back over land and posing a risk to the public. The resulting launch vehicle debris field, composed primarily of first stage solid propellant, poses a threat to the CM. The harsh radiative thermal environment, caused by surrounding burning propellant debris, may lead to CM parachute failure. A methodology, detailed herein, has been developed to address this concern and to quantify the risk of first stage propellant debris leading to the thermal demise of the CM parachutes. Utilizing basic thermal radiation principles, a software program was developed to calculate parachute temperature as a function of time for a given abort trajectory and debris piece trajectory set. Two test cases, considered worst case aborts with regard to launch vehicle debris environments, were analyzed using the simulation: an abort declared at Mach 1 and an abort declared at maximum dynamic pressure (Max Q). For both cases, the resulting temperature profiles indicated that thermal limits for the parachutes were not exceeded. However, short duration close encounters by single debris pieces did have a significant effect on parachute temperature. Therefore while these two test cases did not indicate exceedance of thermal limits, in order to quantify the risk of parachute failure due to radiative effects from the abort environment, a more thorough probability-based analysis using the methodology demonstrated herein must be performed.

Toleman, Benjamin M.↗

First Stage Solid Propellant Multi Debris Thermal Analysis

The crew launch vehicle considered for the Constellation (Cx) Program utilizes a first stage solid rocket motor. If an abort is initiated in first stage flight the Crew Module (CM) will separate and be pulled away from the launch vehicle via a Launch Abort System (LAS) in order to safely and quickly carry the crew away from the malfunction launch vehicle. Having aborted the mission, the launch vehicle will likely be destroyed via a Flight Termination System (FTS) in order to prevent it from errantly traversing back over land and posing a risk to the public. The resulting launch vehicle debris field, composed primarily of first stage solid propellant, poses a threat to the CM. The harsh radiative thermal environment induced by surrounding burning propellant debris may lead to CM parachute failure. A methodology, detailed herein, has been developed to address this concern and quantify the risk of first stage propellant debris leading to radiative thermal demise of the CM parachutes. Utilizing basic thermal radiation principles, a software program was developed to calculate parachute temperature as a function of time for a given abort trajectory and debris piece trajectory set. Two test cases, considered worst-case aborts with regard to launch vehicle debris environments, were analyzed using the simulation: an abort declared at Mach 1 and an abort declared at maximum dynamic pressure (Max Q). For both cases, the resulting temperature profiles indicated that thermal limits for the parachutes were not exceeded. However, short duration close encounters by single debris pieces did have a significant effect on parachute temperature, with magnitudes on the order of 10 s of degrees Fahrenheit. Therefore while these two test cases did not indicate exceedance of thermal limits, in order to quantify the risk of parachute failure due to radiative effects from the abort environment, a more thorough probability-based analysis using the methodology demonstrated herein must be performed.

Toleman, Benjamin M.↗

Risk-based area of review estimation in overpressured reservoirs to support injection well storage facility permit requirements for CO 2 storage projects

This paper by the Energy & Environmental Research Center presents a workflow and modeling approach for delineating a risk-based area of review (AOR) to support a U.S. Environmental Protection Agency (EPA) Class VI permit for a carbon dioxide (CO 2 ) storage project. The approach combines semianalytical solutions for estimating formation fluid leakage through a hypothetical leaky wellbore with the results of numerical reservoir simulations to define the AOR. The modeling utilizes 1) semianalytical solutions from the peer-reviewed literature for formation fluid leakage through abandoned wellbores by Raven (1990) and Avci (1994), 2) a FORTRAN model compiled and described in Cihan et al. (2011, 2012) called ASLMA (Analytical Solution for Leakage in Multilayered Aquifers), and 3) a computational framework for estimating a risk-based AOR first proposed by Oldenburg et al. (2014, 2016). Therefore, the approach builds upon well-established research and underlying hydrogeological principles that have been upheld for nearly three decades. Moreover, the ASLMA model has been broadly applied to an array of storage projects. The work presented herein extends these earlier works using a custom wrapper written in the software environment, R (R Core Team, 2020), which was developed to perform multiple runs of the ASLMA model using given ranges for one or more input parameters. In addition, the current work simulates the pressure buildup within the storage reservoir in response to CO 2 injection using a compositional simulator to better accommodate the temporospatial evolution of pressure buildup within the storage reservoir that is more accurately modeled using a heterogeneous geologic model and a compositional simulator that accounts for the multiphase interactions. The workflow is demonstrated using a case study for a 180,000-metric-ton-per-year storage project located in the PCOR (Plains CO 2 Reduction) Partnership region. For the storage project evaluated here, under the scenario where the leaky wellbore is open to a saline aquifer (thief zone) between the overlying seal (cap rock) and the underground sources of drinking water (USDW), the risk-based AOR essentially collapses to the areal extent of the CO 2 plume in the storage reservoir because the pressure buildup in the storage reservoir beyond the CO 2 plume is insufficient to drive formation fluids up a hypothetical leaky wellbore into the USDW. However, even under the conservative assumption that the leaky wellbore is not open to a thief zone, beyond the areal extent of the CO 2 plume, the incremental leakage is less than 400 m 3 over 20 years, which represents ~0.0001% or less of the total volume of water contained within the USDW rock volume. As discussed in the text, the threshold criterion for defining the risk-based AOR is site-specific and should be informed by the results of the sensitivity analysis and available site characterization data. The approach outlined in this paper is designed to be protective of USDWs and, therefore, comply with the Safe Drinking Water Act requirements and provisions for the U.S. EPA Class VI Underground Injection Control (UIC) Program (Class VI Rule) and North Dakota Administrative Code Chapter 43-05-01.

54 ENVIRONMENTAL SCIENCES↗

Moon, Mars and Minds: Evaluating Parkinson’s disease mortality among U.S. radiation workers and veterans in the million person study of low-dose effects

Background: Radiation is one of the most important stressors related to missions in space beyond Earth’s orbit. Epidemiologic studies of exposed workers have reported elevated rates of Parkinson’s disease. The importance of cognitive dysfunction related to low-dose rate radiation in humans is not defined. A meta-analysis was conducted of six cohorts in the Million Person Study (MPS) of low-dose health effects to learn whether there is consistent evidence that Parkinson’s disease is associated with radiation dose to brain. Materials and methods: The MPS evaluates all causes of death among U.S. radiation workers and veterans, including Parkinson’s disease. Systematic and consistent methods are applied to study all categories of workers including medical radiation workers, industrial radiographers, nuclear power plant workers, atomic veterans, and Manhattan Projects workers at the Los Alamos National Laboratory and at Rocky Flats. Consistent methods for all cohorts are used to estimate organ-specific doses and to obtain vital status and cause of death. Results: The meta-analysis include 6 cohorts within the MPS, consisting of 517,608 workers and 17,219,001 person-years of observation. The mean dose to brain ranged from 6.9 to 47.6 mGy and the maximum dose from 0.76 to 2.7 Gy. Five of the 6 cohorts revealed positive associations with Parkinson’s disease. The overall summary estimate from the meta-analysis was statistically significant based on 1573 deaths due to Parkinson’s disease. The summary excess relative risk at 100 mGy was 0.17 (95% CI: 0.05; 0.29). Conclusions: Parkinson’s disease was positively associated with radiation in the MPS cohorts indicating the need for careful evaluation as to causality in other studies, delineation of possible mechanisms, and assessing possible implications for space travel as well as radiation protection guidance for terrestrial workers.

60 APPLIED LIFE SCIENCES↗

Increasing Mosquito Abundance Under Global Warming

Mosquitoes are a key virus vector that poses significant health threats globally, affecting 700 million individuals and causing 1 million deaths annually. Accurately predicting mosquito abundance and dispersion remains a challenge. Complex interactions between mosquito dynamics and various environmental factors, notably hydrology, contribute to this challenge. Existing models typically focus on precipitation and temperature and often overlook further impacts of hydrological variables within mosquito modeling. In this study, we developed an artificial intelligence‐based model for mosquito dynamics, explicitly accounting for different hydrological variables, such as precipitation, soil moisture and streamflow. Using Toronto, Canada, as a case study, we identified causal relationships between changes in mosquito populations, hydrological factors, vegetation (e.g., leaf area index), and climate variables (e.g., daylight length, precipitation, and temperature). We embedded these relationships into a Long Short‐Term Memory (LSTM) Neural Network Model capable of accurately detecting mosquito dynamics across annual, seasonal, and monthly time scales. The LSTM is able to explain, on average, approximately 40% of the variance in the observed mosquito abundance data. Using the calibrated model, we predicted that the summer season mosquito abundance would increase by ∼16% and ∼19% under an intermediate greenhouse emission scenario, Shared Socioeconomic Pathway (SSP) 2–4.5, and a high greenhouse emission scenario, SSP5‐8.5, respectively. We expect that this model can serve as a valuable tool and inform science‐based decisions affecting mosquito dynamics and public health. It can also build a foundation for future risk analysis at the regional and larger scales.

54 ENVIRONMENTAL SCIENCES↗

Baycal

Bayesian Model Calibration (BayCal) toolkit is a software plugin for Risk Analysis Virtual Environment (RAVEN) framework, arming at inversely quantifying the uncertainties associated with simulation model parameters based on available experiment data. BayCal seeks statistical inference of the uncertain input parameters that are consistent with the available measurement data or observed data. The unique feature of BayCal is the capability to be linked with RAVEN to build corresponding calibration workflows for complex multi-physics simulations. In addition to be able to use the machine learning capability of RAVEN to significantly reduce the computational cost of expensive simulation models, another distinctive feature of BayCal is the capability to deal with high-dimensional correlated model outputs, such as time series observations at multiple locations, via principal component analysis (PCA) technique.

Wang, Congjian↗

Using CubeSats to Monitor Debris Flux

Recent updates to NASA's Orbital Debris Engineering Model (ORDEM 3.0) include a population of small particles (1-2 mm in size) composed of high-density materials (e.g., steel) that drive much of the predicted risk for satellites in the 700-1000 km altitude regime. This modeled population was based on the analysis of returned surfaces of the Shuttle, which flew below 600 km altitude. The cessation of Shuttle missions, plus the lack of in situ data above 600 km means that a data source is being sought to either confirm or modify this high-density population. One possible data source would be a database of anomalous sporadic changes in spacecraft orbit/orientation that might be due to momentum transfer from small particles too small to seriously damage the spacecraft. Because the momentum imparted from an impact would be tiny, it would most likely show up in the orbital behavior of cubesats and other small satellites. While such small satellites were few in number, this was not a particularly attractive option, but now with the proliferation of cubesats in multiple orbit planes and altitudes, the possible collecting area has increased significantly. This presentation will discuss the physics of momentum-transferring impacts from hypervelocity collisions, and make predictions about rates, directions, and locations of such impacts. In addition, it will include recommendations for satellite users on what kind of data might be worth archiving and investigating.

Matney, Mark↗

Advanced Supersonic Parachute Inflation Research Experiment Preflight Trajectory Modeling and Postflight Reconstruction

The Advanced Supersonic Parachute Inflation Research and Experiments (ASPIRE) was a series of sounding rocket flights aimed at understanding the dynamics of supersonic parachutes that are used for Mars robotic applications. The 2012 Mars Science Laboratory (MSL) had a successful deployment of a supersonic parachute, but based on post-flight analysis of parachute margins, the ASPIRE project was created as a risk-reduction program to improve quantification of these margins and qualify a supersonic parachute for Mars 2020, the follow-on mission to MSL. The first sounding rocket (SR01) flight of ASPIRE occurred near Wallops Island, Virginia on Oct. 4, 2017 and demonstrated the successful deployment and inflation of a MSL build-to-print parachute in flight conditions similar to the 2012 MSL mission. The ASPIRE SR02 and SR03 were successful follow-on flights on Mar. 31, 2018 and Sep. 7, 2018 that demonstrated the new, strengthened supersonic parachute designed for the Mars 2020 project. The SR02 and SR03 parachuteswere targeted to 100% and 140% of the expected flight limit load for Mars 2020 to confirm new margins expected from the strengthened parachute. Prior to all flights, a multi-body flight dynamics simulation was developed to predict the parachute dynamics and was used, in conjunction with other tools, to target Mars-relevant flight conditions. After each flight, the on-board data were used to reconstruct the flight trajectory and to validate the pre-flight dynamics simulation. Post-flight analysis showed that all three tests achieved their targeted conditions and pre-flight modeling bounded the key performance metrics for the parachute. This paper describes the flight mechanics simulation, post-flight reconstruction, and the reconciliation process used to validate the flight models.

Soumyo Dutta↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Exploring for Superhot Geothermal Targets in Magmatic Settings: Developing a Methodology

This paper presents preliminary results from a subset of work carried out as part of a multinational research project entitled DErisking Exploration for multiple geothermal Plays in magmatic ENvironments (DEEPEN). One objective of DEEPEN is to develop a customized approach to exploration for superhot geothermal plays in magmatic systems. This paper summarizes key geologic components, risk factors, and exploration methods for geothermal plays in magmatic settings based on a review and comparative analysis of international training sites. As part of a Play Fairway Analysis (PFA) approach to exploring for multiple play types in a single magmatic system, training data were compiled and weights assigned to various evidence layers. Two different approaches for weighting exploration datasets are described in this paper - one based on expert opinions and the other using statistical learning. Weights produced by both approaches will be input into a 3D PFA workflow that combines multiple exploration datasets to generate 3D geothermal favorability models, which will be applied to two international demonstration sites.

GEOTHERMAL ENERGY↗