Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Resource”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

SupportU: Smart UAS Program for the Population by Offering Resources and Tools to the Unhoused

Global warming, challenging economic conditions, the opioid epidemic, and other widespread problems, have impacted people globally, particularly over the past several years. Preventable diseases like the common cold and the effects of heat stroke have become increasingly prevalent due to these issues. It is estimated that 150 million people of the world’s population are unhoused globally, with many dwelling in unsafe and unsanitary conditions while lacking access to basic hygienic items and other essentials. Unsanitary conditions coupled with this lack of access exacerbates and prolongs health problems and harms quality of life. Traditional methods of aid, such as homeless shelters and meal programs, face numerous challenges such as having limited reach and resources. To address these problems, the Smart UAS Program for the Population by Offering Resources and Tools to the Unhoused (SUPPORT U) utilizes Uncrewed Aircraft Systems (UAS) to deliver resources to the unhoused and those in need of basic aid, prior to and during extreme temperature conditions, and after natural disasters in rural, suburban, and urban areas. The UA is envisioned to be an autonomous aircraft capable of efficiently distributing essential supplies, including blankets, water, food, and medicine. The UAS fleet relies on advanced navigation and communication technologies to accurately identify unhoused people and efficiently and safely distribute materials to them. This will be done through a machine learning algorithm. By focusing on identified “homeless clusters”, places where unhoused individuals are concentrated, the UAS network increases access to critical resources, thereby helping to mitigate some of the external risks to the health of unhoused individuals. The UA can also be used during crises, such as by transporting supplies to medical tents that are stationed in difficult-to-reach areas suffering from natural disasters.

Samuel Beard↗

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗

Risk-Based Probabilistic Approach to Aeropropulsion System Assessment

In an era of shrinking development budgets and resources, where there is also an emphasis on reducing the product development cycle, the role of system assessment, performed in the early stages of an engine development program, becomes very critical to the successful development of new aeropropulsion systems. A reliable system assessment not only helps to identify the best propulsion system concept among several candidates, it can also identify which technologies are worth pursuing. This is particularly important for advanced aeropropulsion technology development programs, which require an enormous amount of resources. In the current practice of deterministic, or point-design, approaches, the uncertainties of design variables are either unaccounted for or accounted for by safety factors. This could often result in an assessment with unknown and unquantifiable reliability. Consequently, it would fail to provide additional insight into the risks associated with the new technologies, which are often needed by decision makers to determine the feasibility and return-on-investment of a new aircraft engine. In this work, an alternative approach based on the probabilistic method was described for a comprehensive assessment of an aeropropulsion system. The statistical approach quantifies the design uncertainties inherent in a new aeropropulsion system and their influences on engine performance. Because of this, it enhances the reliability of a system assessment. A technical assessment of a wave-rotor-enhanced gas turbine engine was performed to demonstrate the methodology. The assessment used probability distributions to account for the uncertainties that occur in component efficiencies and flows and in mechanical design variables. The approach taken in this effort was to integrate the thermodynamic cycle analysis embedded in the computer code NEPP (NASA Engine Performance Program) and the engine weight analysis embedded in the computer code WATE (Weight Analysis of Turbine Engines) with the fast probability integration technique (FPI). FPI was developed by Southwest Research Institute under contract with the NASA Glenn Research Center. The results were plotted in the form of cumulative distribution functions and sensitivity analyses and were compared with results from the traditional deterministic approach. The comparison showed that the probabilistic approach provides a more realistic and systematic way to assess an aeropropulsion system. The current work addressed the application of the probabilistic approach to assess specific fuel consumption, engine thrust, and weight. Similarly, the approach can be used to assess other aspects of aeropropulsion system performance, such as cost, acoustic noise, and emissions. Additional information is included in the original extended abstract.

Tong, Michael T.↗

Probabilistic Risk-Based Approach to Aeropropulsion System Assessment Developed

In an era of shrinking development budgets and resources, where there is also an emphasis on reducing the product development cycle, the role of system assessment, performed in the early stages of an engine development program, becomes very critical to the successful development of new aeropropulsion systems. A reliable system assessment not only helps to identify the best propulsion system concept among several candidates, it can also identify which technologies are worth pursuing. This is particularly important for advanced aeropropulsion technology development programs, which require an enormous amount of resources. In the current practice of deterministic, or point-design, approaches, the uncertainties of design variables are either unaccounted for or accounted for by safety factors. This could often result in an assessment with unknown and unquantifiable reliability. Consequently, it would fail to provide additional insight into the risks associated with the new technologies, which are often needed by decisionmakers to determine the feasibility and return-on-investment of a new aircraft engine.

Tong, Michael T.↗

Application of Regolith Polymer Composite FFF Construction in Simulated Lunar Conditions

NASA’s Artemis program has the lofty goal of creating a sustained lunar presence to provide unprecedented opportunities for scientific discovery and to ensure American industry’s access to the unlimited resources and commercial potential in space. To achieve this goal, NASA must incrementally develop and expand its capabilities beyond the short lunar stays of the Apollo program to a robust continued presence with infrastructure and equipment to reduce mission risk by providing safer and more reliable access to the surface, its resources, and protection from the environment. Kennedy Space Center’s Swamp Works Granular Mechanics and Regolith Operations laboratory has partnered with AI SpaceFactory to develop the architectural and structural design of a robotically constructable unpressurized shelter. The shelter, called Lina is designed to protect astronauts and surface assets from radiation, meteoroid impact, moon quakes and thermal gradients. A Fused Filament Fabrication (FFF) construction process using regolith polymer composites was developed. The construction system and associated print parameters are discussed along with the environmental simulation equipment and a summary of test conditions. Test samples were printed in simulated lunar dirty thermal vacuum conditions (~-180 C, ~10-3 torr) and subjected to a series of tests. The resulting strength properties are summarized here, the full details of the material characteristics are provided in a related paper. Lina’s structural design criteria and the resulting initial structure design are detailed in two related papers, this paper presents an update to Lina’s design based on the achieved material strength properties. Finally, a scaled down version of the updated Lina was built on a regolith simulant surface using a novel anchoring technique in simulated lunar vacuum conditions.

lunar infrastructure↗

In-Situ Resource Utilization (ISRU) Development Program

The question "Why In-Situ Resource Utilization (ISRU)?" is addressed in this presentation. The reasons given concentrate on Cost reduction, Mass reduction, Risk reduction, the expansion of human exploration and presence and the enabling of industrial exploitation. A review of the Martian and Lunar resources available for ISRU is presented. Other ISRU concepts (i.e., In-Situ Consumable production (ISCP) and In-Situ Propellant Production (ISPP)) are introduced and further explained. The objectives of a Mars ISRU System Technology (MIST) include (1) the characterization of technology and subsystem performance for mission modeling and technology funding planning, (2) reduce risk and concerns arising from sample return and human missions utilizing ISRU, and (3) demonstrate the environmental suitability of ISRU components/processes and systems. A proof of concept demonstration schedule and a facility overview for MIST is presented.

Sanders, Jerry↗

Spaceflight Medical Evacuation Risk Assessment Principles - A Qualitative Investigation

BACKGROUND Future human space exploration beyond Low Earth Orbit (LEO) will require innovative solutions in many areas, primarily those that provide direct medical support to crew on long-duration missions and optimize their health and performance. The associated challenges therein will be numerous, including but not necessarily limited to extended one-way or "asynchronous" communication delays, minimal to non-existent resupply, and a prolonged transit time to "definitive care" ranging from 3-days to 9-months. At the same time, long-duration exploration spacecraft and crew will face restrictions on mass, power, volume, and data far more significant than that seen in current LEO settings. Given these limitations, medical risk assessment is of primary importance, especially evaluating the implications of a medical evacuation of an ill or injured crewmember. Such evacuations are complicated, potentially dangerous, and well may be impossible in certain phases of the mission. Regardless, such issues must be weighed against the risks of the injured crew remaining aboard a spacecraft with limited medical resources. OBJECTIVE This qualitative study drew from the experiences of subject matter experts (SMEs) in spaceflight and appropriate analog environments (i.e., military, disaster, and extreme environment fields) to identify unique principles common amongst medical evacuation considerations helpful in informing future risk assessment tools. Appropriate analog environments included austere operational settings where multiple factors (weather, logistics/limited resupply, denied/extreme environments, and patient condition) resulted in a limited ability to provide definitive local medical care. The fundamental principles in question revolved around scenarios where evacuation became a complicating yet necessary consideration and where life-threatening medical concerns had to be weighed against critical mission objective(s). The primary authors collected semi-structured data gathered through in-depth interviews with 16 subject matter experts (SMEs). Interview questions investigated how these SMEs consider and weigh the attendant risks present in medical evacuation scenarios. Among the critical questions posed were those that sought to understand how the SME balanced the challenges and requirements of medical evacuation (or keeping an injured patient "on-site" aka: "prolonged field care") against the evacuation operation's risks on impacting overarching mission success. The team analyzed interview transcripts for common themes and principles using the qualitative methods of thematic analysis based on consensus, co-occurrence, and comparison. As a result, nine primary risk consideration themes and nine contributing factor themes emerged, all of which will ideally inform future medical evacuation decision-making tools and operational decision-making for exploration class missions. Specific aims for this study included: 1. Identification of common principles used to assess risks and benefits of medical evacuations in extreme environments 2. Identification of common points of friction or complication and challenges in extreme environment evacuations

A T Almand↗

NASA Electronic Parts and Packaging (NEPP) Program: Resources for SmallSats on EEE Parts

From the outside looking in, the NEPP program supports NASA's traditional approach to providing electrical, electronic, and electromechanical (EEE) assurance for space missions. Standards (military and commercial) for EEE parts are based on risk averse methodologies, drive higher costs and schedules, and, in general, provide devices that significantly lag behind commercial devices in performance aspects (speed, power efficiency, etc...). This is NOT the model most small missions realistically can use. However, when you look behind the curtain, NEPP has been considering the risk trade space for small missions for over five years and has consistently provided resources that the small mission regime would find useful. In this paper, we provide a brief overview of these resources as well as NEPP's current research/development efforts that are relevant. While we'll primarily discuss radiation assurance related issues such as data availability and usage, assurances processes for not only the radiation effects side, but also the EEE parts reliability will be touched upon.

Electrical↗

NASA Electronic Parts and Packaging (NEPP) Program - Resources for SmallSats on EEE Parts

From the outside looking in, the NEPP program supports NASA's traditional approach to providing electrical, electronic, and electromechanical (EEE) assurance for space missions. Standards (military and commercial) for EEE parts are based on risk averse methodologies, drive higher costs and schedules, and, in general, provide devices that significantly lag behind commercial devices in performance aspects (speed, power efficiency, etc...). This is NOT the model most small missions realistically can use. However, when you look behind the curtain, NEPP has been considering the risk trade space for small missions for over five years and has consistently provided resources that the small mission regime would find useful. In this paper, we provide a brief overview of these resources as well as NEPP's current research/development efforts that are relevant. While we'll primarily discuss radiation assurance related issues such as data availability and usage, assurances processes for not only the radiation effects side, but also the EEE parts reliability will be touched upon.

Parts assurance↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Artemis IV

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D Hilmers↗

Medical Risk Estimates and Clinical Capability Needs for A Long Duration Artemis Mission

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. DISCUSSION: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for an extended duration Artemis mission of approximately 9 months, with phases including outbound transit, 3 months on the Lunar Gateway space station, 3 months on the Lunar surface with EVAs, 3 months on Gateway (simulating the return phase of a Mars mission), and transit back to Earth. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk.

W Thompson↗

Medical Risk Estimates and Clinical Capability Needs for a Late Artemis Mission

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. DISCUSSION: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for an extended duration Artemis mission of approximately 9 months, with phases including outbound transit, 3 months on the Lunar Gateway space station, 3 months on the Lunar surface with EVAs, 3 months on Gateway (simulating the return phase of a Mars mission), and transit back to Earth. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care –RTDC), and an estimate of crew time list due to medical conditions (Task Time Lost –TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk.

A Anderson↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Late Artemis Missions

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D. Hilmers↗

Rapidly Evolving Aerosol Emissions Are A Dangerous Omission From Near-Term Climate Risk Assessments

Anthropogenic aerosol emissions are expected to change rapidly over the coming decades, driving strong, spatially complex trends in temperature, hydroclimate, and extreme events both near and far from emission sources. Under-resourced, highly populated regions often bear the brunt of aerosols' climate and air quality effects, amplifying risk through heightened exposure and vulnerability. However, many policy-facing evaluations of near-term climate risk, including those in the latest Intergovernmental Panel on Climate Change assessment report, underrepresent aerosols' complex and regionally diverse climate effects, reducing them to a globally averaged offset to greenhouse gas warming. We argue that this constitutes a major missing element in society's ability to prepare for future climate change. We outline a pathway towards progress and call for greater interaction between the aerosol research, impact modeling, scenario development, and risk assessment communities.

anthropogenic aerosol↗

The Evolution of the NASA Commercial Crew Program Mission Assurance Process

In 2010, the National Aeronautics and Space Administration (NASA) established the Commercial Crew Program (CCP) in order to provide human access to the International Space Station and low Earth orbit via the commercial (non-governmental) sector. A particular challenge to NASA has been how to determine that the Commercial Provider's transportation system complies with programmatic safety requirements. The process used in this determination is the Safety Technical Review Board which reviews and approves provider submitted hazard reports. One significant product of the review is a set of hazard control verifications. In past NASA programs, 100% of these safety critical verifications were typically confirmed by NASA. The traditional Safety and Mission Assurance (S&MA) model does not support the nature of the CCP. To that end, NASA S&MA is implementing a Risk Based Assurance process to determine which hazard control verifications require NASA authentication. Additionally, a Shared Assurance Model is also being developed to efficiently use the available resources to execute the verifications.

Mission Assurance↗

Moon to Mars In Situ Resource Utilization (ISRU) Status Update

In 2017, NASA initiated the Artemis program to send astronauts back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface. While much of NASA’s plans for the Artemis program currently focus on the Human Lunar Return and the ability for astronauts to explore the lunar surface for limited durations each year, the longer-term vision for the Artemis program is to enable sustained human exploration and commercial operations in cis-lunar space and the lunar surface. An important aspect of achieving this long-term vision, is to better understand and characterize the resources on the Moon and Mars and learn how to extract and use these resources. Known as In Situ Resource Utilization (ISRU), the identification, mapping, extraction, and processing of space resources has the potential to greatly reduce the cost and risk of human exploration. These are achieved by reducing what needs to be delivered from Earth and the dependency on these supplies, lowering costs through commercial operations, and expanding infrastructure for safer and more capable exploration and surface operations. To guide development of ISRU technologies and systems on the ground and demonstrate these capabilities on the Moon and Mars, the NASA Space Technology Mission Directorate (STMD) created and released the ISRU Envisioned Future Priorities (EFP) strategic plan in 2022 and updated it in 2023. While lunar ISRU technology development had already started, these publicly released strategic plans have been used to guide and prioritize technology development, and assess the progress in achieving the vision. Since the release of the ISRU EFP, there have been several significant activities/events that have occurred with respect to human lunar exploration, surface infrastructure, and ISRU. This presentation will provide an overview and status of on-going technology and system development activities, an update of ISRU into the Artemis campaign, an update on ISRU-related activities.

NASA↗

Update on NASA’s ISRU Development and Mission Plans for the Artemis Program

In 2017, NASA initiated the Artemis program to send astronauts back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface. While much of NASA’s plans for the Artemis program currently focus on the Human Lunar Return and the ability for astronauts to explore the lunar surface for limited durations each year, the longer-term vision for the Artemis program is to enable sustained human exploration and commercial operations in cis-lunar space and the lunar surface. An important aspect of achieving this long-term vision, is to better understand and characterize the resources on the Moon and Mars and learn how to extract and use these resources. Known as In Situ Resource Utilization (ISRU), the identification, mapping, extraction, and processing of space resources has the potential to greatly reduce the cost and risk of human exploration. These are achieved by reducing what needs to be delivered from Earth and the dependency on these supplies, lowering costs through commercial operations, and expanding infrastructure for safer and more capable exploration and surface operations. To guide development of ISRU technologies and systems on the ground and demonstrate these capabilities on the Moon and Mars, the NASA Space Technology Mission Directorate (STMD) created and released the ISRU Envisioned Future Priorities (EFP) strategic plan in 2022 and updated it in 2023. While lunar ISRU technology development had already started, these publicly released strategic plans have been used to guide and prioritize technology development, and assess the progress in achieving the vision. Since the release of the ISRU EFP, there have been several significant activities/events that have occurred with respect to human lunar exploration, surface infrastructure, and ISRU. One was the release of the Artemis Architecture Definition Document Revision 1 that included ISRU as a sub-architecture. The second was the release of several STMD solicitations including the Announcement of Collaborative Opportunities (ACO) and Tipping Point (TP). The third was the release of a Request for Information for the Lunar Infrastructure Foundational Technology-1 (LIFT-1) mission with the primary objective of extracting oxygen from lunar regolith. The fourth was the release of STMD technology and capability Shortfalls, and the review, ranking by numerous stakeholders and individuals, and subsequent prioritization of the Shortfalls that will be utilized in future solicitation and development plans. This paper will provide an overview and status of on-going technology and system development activities, an update of ISRU into the Artemis campaign, an update on ISRU-related mission, and the impacts of the Shortfall prioritization.

NASA↗

Helium-3 blankets for tritium breeding in fusion reactors

It is concluded that He-3 blankets offers considerable promise for tritium breeding in fusion reactors: good breeding potential, low operational risk, and attractive safety features. The availability of He-3 resources is the key issue for this concept. There is sufficient He-3 from decay of military stockpiles to meet the International Thermonuclear Experimental Reactor needs. Extraterrestrial sources of He-3 would be required for a fusion power economy.

Steiner, Don↗