Results for “Risk acceptability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

SLS-SPEC-159 Cross-Program Design Specification for Natural Environments (DSNE) Revision D

This document is derived from the former National Aeronautics and Space Administration (NASA) Constellation Program (CxP) document CxP 70023, titled "The Design Specification for Natural Environments (DSNE), Revision C." The original document has been modified to represent updated Design Reference Missions (DRMs) for the NASA Exploration Systems Development (ESD) Programs. The DSNE completes environment-related specifications for architecture, system-level, and lower-tier documents by specifying the ranges of environmental conditions that must be accounted for by NASA ESD Programs. To assure clarity and consistency, and to prevent requirements documents from becoming cluttered with extensive amounts of technical material, natural environment specifications have been compiled into this document. The intent is to keep a unified specification for natural environments that each Program calls out for appropriate application. This document defines the natural environments parameter limits (maximum and minimum values, energy spectra, or precise model inputs, assumptions, model options, etc.), for all ESD Programs. These environments are developed by the NASA Marshall Space Flight Center (MSFC) Natural Environments Branch (MSFC organization code: EV44). Many of the parameter limits are based on experience with previous programs, such as the Space Shuttle Program. The parameter limits contain no margin and are meant to be evaluated individually to ensure they are reasonable (i.e., do not apply unrealistic extreme-on-extreme conditions). The natural environments specifications in this document should be accounted for by robust design of the flight vehicle and support systems. However, it is understood that in some cases the Programs will find it more effective to account for portions of the environment ranges by operational mitigation or acceptance of risk in accordance with an appropriate program risk management plan and/or hazard analysis process. The DSNE is not intended as a definition of operational models or operational constraints, nor is it adequate, alone, for ground facilities which may have additional requirements (for example, building codes and local environmental constraints). "Natural environments," as the term is used here, refers to the environments that are not the result of intended human activity or intervention. It consists of a variety of external environmental factors (most of natural origin and a few of human origin) which impose restrictions or otherwise impact the development or operation of flight vehicles and destination surface systems. These natural environments include the following types of environments: Terrestrial environments at launch, abort, and normal landing sites (winds, temperatures, pressures, surface roughness, sea conditions, etc.); Space environments (ionizing radiation, orbital debris, meteoroids, thermosphere density, plasma, solar, Earth, and lunar-emitted thermal radiation, etc.); Destination environments (Lunar surface and orbital, Mars atmosphere and surface, near Earth asteroids, etc.). Many of the environmental specifications in this document are based on models, data, and environment descriptions contained in the CxP 70044, Constellation Program Natural Environment Definition for Design (NEDD). The NEDD provides additional detailed environment data and model descriptions to support analytical studies for ESD Programs. For background information on specific environments and their effects on spacecraft design and operations, the environment models, and the data used to generate the specifications contained in the DSNE, the reader is referred to the NEDD paragraphs listed in each section of the DSNE. Also, most of the environmental specifications in this document are tied specifically to the ESD DRMs in ESD-10012, Revision B, Exploration Systems Development Concept of Operations (ConOps). Coordination between these environment specifications and the DRMs must be maintained. This document should be compatible with the current ESD DRMs, but updates to the mission definitions and variations in interpretation may require adjustments to the environment specifications.

Roberts, Barry C.↗

Development and Testing of Harpoon-Based Approaches for Collecting Comet Samples

Comets, having bright tails visible to the unassisted human eye, are considered to have been known about since pre-historic times. In fact 3,000-year old written records of comet sightings have been identified. In comparison, asteroids, being so dim that telescopes are required for observation, were not discovered until 1801. Yet, despite their later discovery, a space mission returned the first samples of an asteroid in 2010 and two more asteroid sample return missions have already been launched. By contrast no comet sample return mission has ever been funded, despite the fact that comets in certain ways are far more scientifically interesting than asteroids. Why is this? The basic answer is the greater difficulty, and consequently higher cost, of a comet sample return mission. Comets typically are in highly elliptical heliocentric orbits which require much more time and propulsion for Space Craft (SC) to reach from Earth and then return to Earth as compared to many asteroids which are in Earth-like orbits. It is also harder for a SC to maneuver safely near a comet given the generally longer communications distances and the challenge of navigating in the comet's, when the comet is close to perihelion, which turns out to be one of the most interesting times for a SC to get close to the comet surface. Due to the science value of better understanding the sublimation of volatiles near the comet surface, other contributions to higher cost as desire to get sample material from both the comet surface and a little below, to preserve the stratigraphy of the sample, and to return the sample in a storage state where it does not undergo undesirable alterations, such as aqueous. In response to these challenges of comet sample return missions, the NASA Goddard Space Flight Center (GFSC) has worked for about a decade (2006 to this time) to develop and test approaches for comet sample return that would enable such a mission to be scientifically valuable, while having acceptably low risk and an affordable cost. A harpoon-based approach for gathering comet samples appears to offer the most effective way of accomplishing this goal. As described below, with a decade of development, analysis, testing and refinement, the harpoon approach has evolved from a promising concept to a practical element of a realistic comet sample return mission. Note that the following material includes references to videos, all of which are contained in different sections of the video supplement identified in the references. Each video will be identified as "SS##", where "SS" means the supplement section and "##" will be the number of the section.

Purves, Lloyd↗

Guidelines and Suggestions for Balloon Gondola Design

This paper discusses the current gondola design requirements for the Columbia Scientific Balloon Facility (CSBF). The CSBF is responsible for launching and supporting balloon borne scientific instruments and has some current updated guidelines that will be discussed in this presentation. As the sophistication of Payload systems have increased in size and complexity new guidelines have been implemented in order to make these instruments stay within the acceptable launch risks. Additionally, there is a requirement to submit a proper stress analysis report that states the flight design requirements have been met. Suggestions are discussed in this presentation that establish the proper guidelines to submit these.

Guidelines for Balloon Gondola Design↗

Radiation Hardness Assurance (RHA): Challenges and New Considerations

Use of commercial-off-the-shelf (COTS) components and emerging technologies often require space flight missions to accept elevated risk. The Radiation Hardness Assurance (RHA) flow includes environment definition, hazard evaluation, requirements definition, evaluation of design, and design trades to accommodate and mitigate the risk a project or program takes. Depending on the mission profile and environment, different missions may not necessarily benefit from the same risk reduction efforts or cost reduction attempts. While this poses challenges for the radiation engineer, it also presents opportunities to tailor the RHA flow to minimize risk based on the environment or design criticality while remaining within budget. This presentation will focus on an approach to RHA amidst the present challenges, using the same RHA flow as in the past, with examples from recent radiation test results. The current challenges and the types of risk will be identified. How these risks drive requirements development and realization will be explained with examples of device results and data for single event effects (SEE) and in one case total ionizing dose (TID).

Radiation Hardness Assurance (RHA); Risk Managemen↗

SLS-SPEC-159 Cross-Program Design Specification for Natural Environments (DSNE) Revision E

The DSNE completes environment-related specifications for architecture, system-level, and lower-tier documents by specifying the ranges of environmental conditions that must be accounted for by NASA ESD Programs. To assure clarity and consistency, and to prevent requirements documents from becoming cluttered with extensive amounts of technical material, natural environment specifications have been compiled into this document. The intent is to keep a unified specification for natural environments that each Program calls out for appropriate application. This document defines the natural environments parameter limits (maximum and minimum values, energy spectra, or precise model inputs, assumptions, model options, etc.), for all ESD Programs. These environments are developed by the NASA Marshall Space Flight Center (MSFC) Natural Environments Branch (MSFC organization code: EV44). Many of the parameter limits are based on experience with previous programs, such as the Space Shuttle Program. The parameter limits contain no margin and are meant to be evaluated individually to ensure they are reasonable (i.e., do not apply unrealistic extreme-on-extreme conditions). The natural environments specifications in this document should be accounted for by robust design of the flight vehicle and support systems. However, it is understood that in some cases the Programs will find it more effective to account for portions of the environment ranges by operational mitigation or acceptance of risk in accordance with an appropriate program risk management plan and/or hazard analysis process. The DSNE is not intended as a definition of operational models or operational constraints, nor is it adequate, alone, for ground facilities which may have additional requirements (for example, building codes and local environmental constraints). "Natural environments," as the term is used here, refers to the environments that are not the result of intended human activity or intervention. It consists of a variety of external environmental factors (most of natural origin and a few of human origin) which impose restrictions or otherwise impact the development or operation of flight vehicles and destination surface systems.

Roberts, Barry C.↗

Improved Calibration through SMAP RFI Change Detection

Anthropogenic Radio-Frequency Interference (RFI) drove both the SMAP (Soil Moisture Active Passive) microwave radiometer hardware and Level 1 science algorithm designs to use new technology and techniques for the first time on a spaceflight project. Care was taken to provide special features allowing the detection and removal of harmful interference in order to meet the error budget. Nonetheless, the project accepted a risk that RFI and its mitigation would exceed the 1.3-K error budget. Thus, RFI will likely remain a challenge afterwards due to its changing and uncertain nature. To address the challenge, we seek to answer the following questions: How does RFI evolve over the SMAP lifetime? What calibration error does the changing RFI environment cause? Can time series information be exploited to reduce these errors and improve calibration for all science products reliant upon SMAP radiometer data? In this talk, we address the first question.

Passive L-band radiometer↗

Realistic Covariance Generation for the GPM Spacecraft

A covariance realism process for NASA's Global Precipitation Measurement (GPM) spacecraft is detailed. The GPM spacecraft is in a low earth orbit, and performs collision avoidance maneuvers few times a year. Currently GPM is below the International Space Station (ISS). So, in addition to cataloged debris objects, GPM must contend with smallsat/cubesat objects that are deployed from the ISS. Both operational scenarios require complete knowledge of the expected GPM prediction errors as a function of time. In this study, we present a method for generating realistic predicted covariance that uses linear propagation of the covariance with the addition of process noise. Further analyses are presented for the process noise ''tuning'' that generates an inflation factor based on the observed error statistics of the predictive satellite trajectories when compared to the definitive ones. Different tuning strategies are considered and compared via a Goodness-of-Fit testing for the Gaussian properties of the scaled covariance. SpaceNav's realistic covariance generation approach takes into account the contribution of predicted maneuver errors in the increased propagation uncertainty. Corresponding maneuver uncertainty is injected into the state uncertainty, and is used within the collision avoidance process to determine the collision risk for close approach events that follow a maneuver. This is a critical step in the maneuver planning process that provides the satellite operator with an accurate quantification of the collision probability for planned maneuvers. Using this information, an informed decision can be made to proceed with a maneuver if the collision risk is acceptable. This approach is validated by Monte-Carlo simulations and results are presented.

spacecraft uncertainty propagation↗

Developments and activities in solar sail propulsion

NASA's drive to reduce mission costs and accept the risk of incorporating innovative, high payoff technologies into its missions while simultaneously undertaking ever more difficult missions has sparked a greatly renewed interest in solar sails. This paper summarizes these on-going developments in solar sails.

solar↗

Having a Come-Apart: Lessons Learned from Additively Manufactured Hardware Failures

NASA has been engaged with additively manufactured (AM) process and component development since the 2000’s. AM offers various technical advantages, such as enhanced hardware design complexity, part consolidation, and processing of novel alloys in addition to programmatic advantages for reduction in processing time and cost. The focus of much of the AM development at NASA has been to mature the various processes, characterize material properties, develop standards, produce demonstrator parts, and integrate AM hardware in liquid rocket engines. These aspects have been demonstrated through process and design iterations using a methodical characterization, test-fail-fix cycles, as well as application and dissemination of lessons learned. In addition to these fundamental demonstrations of the AM process and hardware development, alloys that provide performance advantages in the high temperature and high-pressure environments have been matured for use in rocket engines. These environments are challenging for any alloy and any design, and the AM process is required to fully meet the intended design requirements. The importance of proper AM process was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality resulted from an AM process issue. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. In part, such concerns motivate the AM certification approach that NASA has recently adopted in NASA-STD-6030 “Additive Manufacturing Requirements for Spaceflight Systems”. This presentation provides an overview of the previously mentioned failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. The objective of this presentation is to provide awareness to the community working critical and non-critical AM components and the lessons learned on proper implementation of AM.

Additive Manufacturing↗

Metal Additive Manufacturing for Rocket Engines: Successes and Failures

NASA has been developing additive manufacturing (AM) for various technical and programmatic advantages for complex rocket engine and aerospace components. This maturation has focused on various AM processes, new alloys, characterizing material properties, developing standards, producing demonstrator parts, and integrating AM hardware in liquid rocket engines through test-fail-fix cycles, as well as application and dissemination of lessons learned of the AM lifecycle. The importance of proper AM processing was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. This presentation provides an overview of the development failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. This presentation with provide critical awareness to the community lessons learned on proper implementation of AM.

L-PBF↗

Successes and Failures of Metal Additive Manufacturing for Rocket Engines

NASA has been developing additive manufacturing (AM) for various technical and programmatic advantages for complex rocket engine and aerospace components. This maturation has focused on various AM processes, new alloys, characterizing material properties, developing standards, producing demonstrator parts, and integrating AM hardware in liquid rocket engines through test-fail-fix cycles, as well as application and dissemination of lessons learned of the AM lifecycle. The importance of proper AM processing was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. This presentation provides an overview of the development failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. This presentation with provide critical awareness to the community lessons learned on proper implementation of AM.

Additive Manufacturing↗

How NASA Accounts for Weather Throughout Artemis Mission

Development and operations of NASA spacecraft and launch vehicles are influenced by the natural environment (i.e. weather) across all applicable mission phases. Defining the natural environments provides engineers the applicable factors, along with exposure ranges, that must be accounted for in the hardware design. Effects from exposure to these environments must be addressed through structural design of the hardware, mitigated through operational controls, or accepted as risk by the governing program. Managing and mitigating these environmental factors was crucial to ensure the safe and successful launch of the Space Launch System (SLS) rocket, the transit of the Multi-Purpose Crew Vehicle (MPCV) around the moon and the recovery of MPCV after landing off the California coast in November 2022. A summary of how the Artemis I mission accounts for both the terrestrial and space environments, as well as the impacts, will be provided.

Ryan K Decker↗

TBIRD, a rapid prototyping approach for design, assembly, and test of a LEO-to-ground lasercom CubeSat

The TeraByte InfraRed Delivery (TBIRD) system is a 3U payload on a 6U CubeSat launched in May 2022 which has now demonstrated space to ground links of >1 Terabyte (TB) per pass at a max data rate of 200Gbps. As a CubeSat mission, the development of the TBIRD payload was focused on low SWaP and a “rapid prototyping” approach which accepted higher risks to accelerate the schedule and reduce costs. The optomechanical design process followed standard in-house processes to develop a system that would be robust to LEO environmental loads, with a focus on the stability of the transmit (Tx) and receive (Rx) channel performance metrics. The driving requirement of maintaining 20μrad pointing error between the TX and Rx channels forced specific attention to thermal and mechanical load changes over operational conditions, which drove major design decisions. This paper describes some of engineering challenges overcome and approaches used to make TBIRD a successful program, as well as some of the tradeoffs of rapid prototyping precision optical payloads. TBIRD successfully met and exceeded the total downlink requirements listed above, with a bandwidth of 200Gbps and a total downlink of 4.8TB of information in a single pass.

TBIRD↗

New initiatives in materials security

NRC Mission: To license and regulate the Nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. Scope of Responsibility: NRC's regulatory mission covers three main areas: - Reactors: commercial reactors for generating electric power and non-power reactors used for research, testing, and training; - Materials: uses of nuclear materials in medical, industrial, and academic settings and facilities that produce nuclear fuel; - Waste: transportation, storage, and disposal of nuclear materials and waste, and decommissioning of nuclear facilities from service. A Changing Environment: - National security is dominant concern; - Obtain appropriate balance between safety and Security initiatives and Operational activities; - Multiple layers of systems, infrastructures for various licensees. Effective Communication: Not easy; Sound bites galore; Nuclear 'phobia'; Acceptability of risk; Balance of cost and benefits; Responsibility of the regulator, licensees and radiation protection professionals. Prioritized Licensee Groups: - High priority: Panoramic irradiators; manufacturers/distributors; - Medium priority: medical and research facilities, radiography, well-logging, broad-scope licenses, self-shielded irradiators, open-field irradiators, and other licensees; - Low priority: Portable gauges. Increased Security Measures: Security Zone; Control Access; Monitor, Detect, Assess, and Respond; Transportation Security; Additional control to secure portable and mobile devices; Liaison with Local Law Enforcement Agencies; Background Investigations and Fingerprinting; License Verification; Document Retention; Information Protection; Orders/Legally binding requirements to more than 3000 licensees. Orders Issued: Large Panoramic Irradiators Security Measures (60 Orders issued 6/03, Inspections done); Manufacturing and Distribution Licensees Security Measures (61 Orders issued 1/04, Inspections done); Transportation of Radioactive Material Quantities of Concern (167 Orders Issued 07/05, Inspections done); Orders for Increased Control Measures for other types of sources by categories of licenses (1,098 NRC Orders and 1782 binding State requirements issued by 12/05, Implemented 06/06, Inspections done by NRC and States). Security Inspection Results: All first year Increased Control inspections completed; NRC Information Notice (IN) 2007-16 issued May 2007; Since IN 2007-16 was issued, {approx}50% of the NRC inspections performed resulted in violations; Licensees misinterpreted or incompletely implemented requirements; Common theme: failure to properly document actions or programs when implementing the Increased Controls. Energy Policy Act of 2005: Established Radiation Source Protection and Security Task Force: cooperative effort with 14 Federal agencies, 2 State organizations; Comprehensive analysis of the security of radiation sources in the U.S.; Directed NRC to contract with National Academy of Sciences to conduct a study on radiation source use and replacement; Report to the President and Congress issued 8/06 and every 4 years thereafter. Radiation Source Protection and Security Task Force: Need higher priority on international transport security; Evaluate feasibility of using new and existing technologies to detect and discourage theft during transport; Conduct a feasibility study on the possible phase out of CsCl in highly dispersible forms; Further evaluate potential alternative technologies; Expedite completion of fingerprint requirements in Act. National Source Tracking System: Joint NRC/DOE 2003 report on Radiological Dispersal Devices recommended development of a national source tracking system; IAEA Code of Conduct recommended establishment of a national registry; U.S. Energy Policy Act of 2005 placed requirements for NRC to issue regulations establishing a mandatory tracking system. New Fingerprinting Requirements: Orders were issued to NRC Increased Control licensees on Dec 5, 2007; Licensees have 60 days to notify the NRC if they are unable to comply or if compliance is unnecessary; Licensees have 90 days to fingerprint and approve a Trustworthiness and Reliability Official; Licensees will have 180 days to implement program; 34 Agreement Stated Increased Control Licensees will receive similar requirements within 180 days. 2007 GAO Investigation: Formed Bogus Company and Obtained NRC License; Altered NRC License; Two Suppliers Agreed to Sell Material; Parallel Attempt to Obtain Agreement State; License Aborted When Notified of Site Visit. Short-Term Actions Taken: Terminated the NRC License; Stopped issuance of new NRC licenses until Interim Guidance was issued; Mandatory pre-Licensing visits or meetings for new applicants; Performed consequence assessment; Coordinated with Federal and State Partners; Retrospective exam ensure licensees are legitimate. Action Plan: Independent, 120-day external review Issued 2/11/08 for comment; National Source Tracking System - Jan 2009; Web-Based Licensing; General Licenses and Outreach; Pre-Licensing and Materials Working Groups; Agreement State Partnership; Comprehensive Internal Assessment. Regulatory Issue Summary (RIS 2008-02): Issued February 1, 2008; Latest developments in materials security; Highlights Energy Policy Act 2005, GAO report and National Academy pending Feb 2008 report; New efforts with DHS, DOE/NNSA and manufacturers on additional security enhancements for Cs-137 irradiators; Low-cost, easily implemented physical security improvements. Enhanced State, Federal and International Partnerships: Federal, State and local interface; DHS' Domestic Nuclear Detection Office 'Securing the Cities' Initiative; DHS Protective Action Guides for RDDs and INDs; DOE/NNSA's Securing the Sources Initiative; International nuclear security outreach activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strategic considerations for developing future underground research facilities - 15114

The suite of existing underground research facilities (URFs) and their various operational histories and contexts provides useful insights to consider when deciding a particular URF location and approach (generic or site-specific) for new disposal facility research programmes. Even the smallest URF represents a large capital investment and a significant ongoing operational mortgage when recognizing the typically decades-long site characterization and data collection thought necessary to support a defensible safety case or safety assessment. Thus making such investments should be approached with an understanding of the short- and long-term implications for such factors as cost, location, data quality, public acceptance, operational risk, opportunity for design optimization, etc. and with an understanding of the potential risk management issues to help ensure the URF programme achieves the intended objectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗