Search NASA⌕ Search

SEARCH · Search NASA

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Brown Dwarfs: Discovery and Detailed Studies

We obtained the optical and IR spectra of Gliese 229B and identified Cs, I, and CO features - as expected in theoretical models. Our optical IR spectrum showed that most of the refractory metals have condensed out of the atmosphere and the presence of Cs, I and CO shows evidence for disequilibrium chemistry. We reported orbital evidence for Gliese 229B. The HST measured optical magnitudes provide additional evidence for the absence of dust in the atmosphere of this cool object. The luminosity of brown dwarfs depend on their masses and ages and in order to interpret the results of the survey we have carried out an extensive Monte Carlo analysis. Our conclusion is that warm brown dwarfs are rare, as companions in the orbital period range beyond approximately 30 - 50 AU. The Palomer survey poses no constraint for brown dwarfs in planetary orbits similar to those of the outer planets. We have just started a program of imaging nearby stars with the newly commissioned AO system at Palomar and Keck and have already found a brown dwarf candidate.

Kulkarni, Shrinivas R.↗

Cleaning up Silicon

A development program that started in 1975 between Union Carbide and JPL, led to Advanced Silicon Materials LLC's, formerly ASiMI, commercial process for producing silane in viable quantities. The process was expanded to include the production of high-purity polysilicon for electronic devices. The technology came out of JPL's Low Cost Silicon Array Project.

Source record↗

Orbital Space Plane Cost Credibility

NASA's largest new start development program is the Orbital Space Plane (OSP) Program. The program is currently in the formulation stage. One of the critical issues to be resolved, prior to initiating full-scale development, is establishing cost credibility of NASA s budget estimates for development, production, and operations of the OSP. This paper will discuss the processes, tools, and methodologies that NASA, along with its industry partners, are implementing to assure cost credibility for the OSP program. Results of benchmarking of current tools and the development of new cost estimating capabilities and approaches will be discussed.

Creech, Steve↗

The Development of a Plan for the Assessment, Improvement and Deployment of a Radar Acoustic Sounding System (RASS) for Wake Vortex Detection

This report describes the activities completed under a grant from the NASA Langley Research Center to develop a plan for the assessment, improvement, and deployment of a Radar Acoustic Sounding System (RASS) for the detection of wake vortices. A brief review is provided of existing alternative instruments for wake vortex detection. This is followed by a review of previous implementations and assessment of a RASS. As a result of this review, it is concluded that the basic features of a RASS have several advantages over other commonly used wake vortex detection and measurement systems. Most important of these features are the good fidelity of the measurements and the potential for all weather operation. To realize the full potential of this remote sensing instrument, a plan for the development of a RASS designed specifically for wake vortex detection and measurement has been prepared. To keep costs to a minimum, this program would start with the development an inexpensive laboratory-scale version of a RASS system. The new instrument would be developed in several stages, each allowing for a critical assessment of the instrument s potential and limitations. The instrument, in its initial stages of development, would be tested in a controlled laboratory environment. A jet vortex simulator, a prototype version of which has already been fabricated, would be interrogated by the RASS system. The details of the laboratory vortex would be measured using a Particle Image Velocimetry (PIV) system. In the early development stages, the scattered radar signal would be digitized and the signal post-processed to determine how extensively and accurately the RASS could measure properties of the wake vortex. If the initial tests prove to be successful, a real-time, digital signal processing system would be developed as a component of the RASS system. At each stage of the instrument development and testing, the implications of the scaling required for a full-scale instrument would be considered. It is concluded that a RASS system, developed for the specific application of wake vortex detection, could become part of a robust Aircraft Vortex Spacing System (AVOSS). This system, in turn, could contribute to Reduced Spacing Operations (RSO) in US airports and improvements in Terminal Area productivity (TAP).

Morris, Philip J.↗

Batteries and Fuel Cells in Space

The year 2000 will mark the 44th anniversary of the space program that started with the launch of the first Sputnik on October 4, 1956.

batteries fuel cells space↗

Measurement Challenges for Carbon Nanotube Material

The advances in large scale applications of carbon nanotubes demand a reliable supply of raw and processed materials. It is imperative to have a consistent quality control of these nanomaterials to distinguish material inconsistency from the modifications induced by processing of nanotubes for any application. NASA Johnson Space Center realized this need five years back and started a program to standardize the characterization methods. The JSC team conducted two workshops (2003 and 2005) in collaboration with NIST focusing on purity and dispersion measurement issues of carbon nanotubes [1]. In 2004, the NASA-JSC protocol was developed by combining analytical techniques of SEM, TEM, UV-VIS-NIR absorption, Raman, and TGA [2]. This protocol is routinely used by several researchers across the world as a first step in characterizing raw and purified carbon nanotubes. A suggested practice guide consisting of detailed chapters on TGA, Raman, electron microscopy and NIR absorption is in the final stages and is undergoing revisions with input from the nanotube community [3]. The possible addition of other techniques such as XPS, and ICP to the existing protocol will be presented. Recent activities at ANSI and ISO towards implementing these protocols as nanotube characterization standards will be discussed.

Sosa, Edward↗

Remote Versus Local Forcing of Chlorophyll Variability in the South Atlantic Bight

This TM documents results of analyses addressing the local versus remote forcing of chlorophyll variability on the shelf and slope regions of the South Atlantic Bight (SAB) based on satellite-derived products and a limited amount of in situ data. This study is part of a larger multi-disciplinary, multi-institutional effort to study the Eastern U.S. Continental Shelf carbon budget (U.S. Eastern Continental Shelf Carbon Budget: Modeling, Data Assimilation, and Analysis, U.S. ECoS), a project funded by the NASA Earth System Enterprise Interdisciplinary Science Program that started in the summer of 2004.

Signorini, Sergio R.↗

Atomic Data and Spectral Line Intensities for Be-like Ions

Atomic data and collision rates are needed to model the spectrum of optically thin astrophysical sources. Recent observations from solar instrumentation such as SOH0 and Hinode have revealed the presence of hosts of lines emitted by high-energy configurations from ions belonging to the Be-like to the 0-like isoelectronic sequences. Data for such configurations are often unavailable in the literature. We have started a program to calculate the atomic parameters and rates for the high-energy configurations of Be-like ions of the type ls2.21.nl' where n=3,4,5. We report on the results of this project and on the diagnostic application of the predicted spectral lines.

Bhatia, Anand↗

Overview of the Altair Lunar Lander Thermal Control System Design

NASA's Constellation Program has been developed to successfully return humans to the Lunar surface prior to 2020. The Constellation Program includes several different project offices including Altair, which is the next generation Lunar Lander. The planned Altair missions are very different than the Lunar missions accomplished during the Apollo era. These differences have resulted in a significantly different thermal control system architecture. The Altair project has employed a rather unique development approach as compared with previous manned spacecraft programs. Altair started the design process by developing a single-string (no fault tolerance), minimum functionality design. This first design and analysis cycle resulted in the baseline design for the entire process. From this point of departure, Altair continued the development process by adding vehicle functionality for the purposes of minimizing the risk of Loss Of Crew (LOC) and Loss Of Mission (LOM). Through the subsequent design and analysis cycles, the project office compared the added mass associated with the reduction of LOC/LOM and selected the most mass efficient design solutions. The current paper will summarize the Altair mission profile, the operational phases, and the LOC/LOM decisions that were made during the various design cycles. The evolution of the thermal control system design through Lunar Design and Analysis Cycle 3 (LDAC-3) will also be described in this paper.

Stephan, Ryan A.↗

Landsat-8 Thermal Infrared Sensor (TIRS) Vicarious Radiometric Calibration

Launched in February 2013, the Landsat-8 carries on-board the Thermal Infrared Sensor (TIRS), a two-band thermal pushbroom imager, to maintain the thermal imaging capability of the Landsat program. The TIRS bands are centered at roughly 10.9 and 12 micrometers (Bands 10 and 11 respectively). They have 100 m spatial resolution and image coincidently with the Operational Land Imager (OLI), also on-board Landsat-8. The TIRS instrument has an internal calibration system consisting of a variable temperature blackbody and a special viewport with which it can see deep space; a two point calibration can be performed twice an orbit. Immediately after launch, a rigorous vicarious calibration program was started to validate the absolute calibration of the system. The two vicarious calibration teams, NASA/Jet Propulsion Laboratory (JPL) and the Rochester Institute of Technology (RIT), both make use of buoys deployed on large water bodies as the primary monitoring technique. RIT took advantage of cross-calibration opportunity soon after launch when Landsat-8 and Landsat-7 were imaging the same targets within a few minutes of each other to perform a validation of the absolute calibration. Terra MODIS is also being used for regular monitoring of the TIRS absolute calibration. The buoy initial results showed a large error in both bands, 0.29 and 0.51 W/sq m·sr·micrometers or -2.1 K and -4.4 K at 300 K in Band 10 and 11 respectively, where TIRS data was too hot. A calibration update was recommended for both bands to correct for a bias error and was implemented on 3 February 2014 in the USGS/EROS processing system, but the residual variability is still larger than desired for both bands (0.12 and 0.2 W/sq m·sr·micrometers or 0.87 and 1.67 K at 300 K). Additional work has uncovered the source of the calibration error: out-of-field stray light. While analysis continues to characterize the stray light contribution, the vicarious calibration work proceeds. The additional data have not changed the statistical assessment but indicate that the correction (particularly in band 11) is probably only valid for a subset of data. While the stray light effect is small enough in Band 10 to make the data useful across a wide array of applications, the effect in Band 11 is larger and the vicarious results suggest that Band 11 data should not be used where absolute calibration is required.

TIIRS↗

Fundamentals for Team Based Rehearsals and the Differences Between Low Earth and Deep Space Missions

Presentation to be presented at the 2015 IEEE Aerospace Conference, Big Sky, Montana, March 7-14-2015.Rehearsals are mission level readiness tests that exercise personnel, operational process, and flight products, in a near flight like environment. The program is started 6-9 months prior to launch and is used to ensure the final as built system will meet mission goals (i.e. validation). On Deep Space missions you rehearse cruise activities post launch!Focus on critical activities to the mission, (i.e. propulsive maneuvers, instrument commissioning and any first time events or coordinating activities that involve major stakeholders).

Deep Space Missions↗

Adaptable, Deployable Entry and Placement Technology (ADEPT) Overview of FY15 Accomplishments

ADEPT is an atmospheric entry architecture for missions to most planetary bodies with atmospheres: Current Technology development project funded under STMD Game Changing Development Program (FY12 start); stowed inside the launch vehicle shroud and deployed in space prior to entry; low ballistic coefficient (less than 50 kilograms per square meter) provides a benign deceleration and thermal environment to the payload; High-temperature ribs support three dimensional woven carbon fabric to generate drag and withstand high heating.

technology↗

APM for a Constellation Intersatellite Link - EM Qualification and Lessons Learned

For an Intersatellite Link (ISL) of a future constellation program, a study phase was initiated by ESA to design a mechanism for Radio Frequency communication. Airbus DS Friedrichshafen (ADSF) proposed a design based on the Antenna Pointing Mechanism (APM) family with modifications that met the stated needs of the constellation. A qualification program was started beginning in September 2015 to verify the launch and thermal loads and the equipment performance (Radio Frequency, Pointing, Microvibration and Magnetic Moment). Technical challenges identified with the Engineering Model will be discussed within this paper.

Hartel, Frank↗

AztechSat-1, a First Collaborative CubeSat Between NASA and Mexico

An international collaboration program for capacity building in space technology is being established between NASA and the Mexican Space Agency (AEM). Its objective is to develop a series of CubeSats collaboratively in a way that benefits both agencies. For AEM, this experience will support the development of human capital required for its space program. This project provides an opportunity for NASA future missions to benefit from commercially available technologies demonstrated in space. AEM was recently created by the Mexican Government to use and develop space technology in Mexico. Current AEM plans call for having the capability of developing its own communication satellites by 2030, so the need for having a Mexican cadre of space experts is mandatory. The program will start with the development and launching of AztechSat-1, the first AEM CubeSat project to be deployed from the International Space Station (ISS). Several public Mexican universities will participate in this project to demonstrate GlobalStar, a satellite communications provider using a constellation of LEO satellites, as an option for small satellite missions. AztechSat-1 mission objectives are:(1) Develop a flight ready CubeSat for deployment from the ISS; (2) Demonstrate GlobalStar´s Network as a method to advance communications in CubeSat missions. AztechSat-1 is envisioned as a 1U CubeSat and will be designed and constructed by Mexican graduate students from two major universities in Mexico: UNAM and IPN. The students will be mentored and supervised by researchers from NASA Ames Research Center (NARC). Flight acceptance tests are going to be done both at Mexican university labs as well as at NARC. Funding for the project will be provided concurrently by AEM, the Mexican participating universities, and other Mexican entities. The development of AztechSat-1 will emphasize the transfer of knowledge in space mission analysis and design, flight acceptance testing and other areas of space technology which are not well developed in Mexico yet. Mexican students will benefit from their mentoring from NASA researchers and will provide a multiplier effect in the development of the next generation of Mexican aerospace engineers. AztechSat-1 will be developed in a period of twelve months and will be launched by late 2015. AztechSat´s success will define the future of collaboration between NASA and AEM in capacity building. A plan for developing a series of AztechSat’s in a one per year basis, with increasing capabilities and complexity is currently being negotiated between NASA an AEM.

Martinez, Andres↗

Information and Best Practices Related to NASA Nuclear Flight Safety for Space Flights Involving Space Nuclear Systems

The purpose of this handbook is to facilitate a repeatable and robust process that promotes clear and effective interfaces between activities and stakeholders focused on meeting nuclear flight safety requirements for missions utilizing space nuclear systems (SNS), within the context of NASA’s broader nuclear-related activities and interfaces. NPR 8715.26, Nuclear Flight Safety, requires that the NASA project manager “incorporate nuclear flight safety considerations starting with program or project formulation through the point at which the SNS or other radioactive material no longer has the potential to affect Earth’s biosphere.” NASA’s use of SNS inherently involves partnering with other stakeholders to conduct a range of related activities that interface with nuclear flight safety. From a categorical perspective these include: (i) meeting the authorities and licensing requirements for possession and use of nuclear material, as governed by other Federal authorities; (ii) conducting National Environmental Policy Act (NEPA) activities for nuclear-enabled missions; (iii) meeting Federal nuclear launch authorization requirements; (iv) conducting radiological contingency planning activities, including those associated with international commitments; (v) performing risk communication and public outreach activities; and (vi) ensuring decommissioning and disposal strategies reflect National policies and interests. It is the intent of this handbook to promote an effective interface between nuclear flight safety and these interrelated categorical activities. In addition to activities undertaken with partnering agencies, there are individual nuclear-related activities and programs that have a nexus to nuclear flight safety, and these include: (i) applicable NASA Standing Review Boards; (ii) the US Department of Energy nuclear safety activities conducted in partnership with NASA under Memoranda of Understanding; (iii) the Department of Defense’s Range Safety activities; (iv) NASA’s general involvement in interagency and international dialogues regarding nuclear safety; (v) the NASA-administered Interagency Nuclear Safety Review Board; (vi) NASA’s program and project governance activities and nuclear-specific Technical Discipline Team activities under the Office of the Chief Engineer; and others. It is the intent of this handbook to promote effective leveraging of these additional interrelated organizational activities, as appropriate.

Donald Helton↗

Exploring the Moon: Training Astronauts for Artemis Missions

For the first time in over 50 years, NASA scientists are training astronauts assigned to lunar missions. The successful Artemis 1 test flight in 2022 set the stage for future human missions to the Moon. The Artemis II mission will send astronauts to fly by the Moon, providing the first opportunity since Apollo for humans to directly observe and document the lunar surface from a few thousand kilometers, including the lunar far side. Artemis III will be the first human mission to land and explore the Moon’s surface near the lunar South Pole. To prepare for Artemis exploration, geology training for the Artemis II crew and detailed training plans for Artemis III and beyond are in full swing. NASA scientists have been working for several years with the Flight Operations Directorate (FOD) at the Johnson Space Center on a progressive geology training program that starts with incoming astronaut classes, offers opportunities to maintain the geology proficiency between flight assignments, and trains the broader engineering-operations-management community in geology and field operations. In the spring of 2023, our team developed an introductory week-long class called Lunar Fundamentals and delivered this content to the Artemis II crew, as well as key NASA Flight Control Team members. The Lunar Fundamentals curriculum combines basic geographic and geologic information about the Moon; includes detailed content on major geologic processes, the lunar environment, lunar volatiles, and sample science; provides historical context of our growing knowledge about the Moon; and introduces new lunar data sets and tools for exploring the lunar surface. With the Lunar Fundamentals foundation, we continue development of the advanced planetary science classroom content for the Artemis III crew, together with field training science objectives and plans. Partnering with our FOD colleagues, we are building an integrated training plan for lunar science, exploration field methods, and operational skills to ensure that the Artemis astronauts exploring the Moon will have the necessary foundation in geology and lunar science to achieve mission success.

Astronauts training↗

Planetary Science Training for Artemis Missions

Planetary geology training for Artemis crews and mission support teams is well underway. We recently reported on the development of our geology/planetary science training flow, and the cross-agency coordination efforts necessary for implementing the training [1, 2]. We discussed our progressive geology training program that starts with incoming astronaut classes, offers opportunities to maintain the geology proficiency between flight assignments, and trains the broader Artemis engineering-operations management community in geology and basic field methods [3, 4]. In this abstract, we outline and discuss our 2023 accomplishments and near-term plans for continued development of lunar science classroom content, field training objectives, and the delivery of geology training to astronauts and the Artemis mission engineers.

Artemis↗