Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Service Management Database for DSN Equipment

This data- and event-driven persistent storage system leverages the use of commercial software provided by Oracle for portability, ease of maintenance, scalability, and ease of integration with embedded, client-server, and multi-tiered applications. In this role, the Service Management Database (SMDB) is a key component of the overall end-to-end process involved in the scheduling, preparation, and configuration of the Deep Space Network (DSN) equipment needed to perform the various telecommunication services the DSN provides to its customers worldwide. SMDB makes efficient use of triggers, stored procedures, queuing functions, e-mail capabilities, data management, and Java integration features provided by the Oracle relational database management system. SMDB uses a third normal form schema design that allows for simple data maintenance procedures and thin layers of integration with client applications. The software provides an integrated event logging system with ability to publish events to a JMS messaging system for synchronous and asynchronous delivery to subscribed applications. It provides a structured classification of events and application-level messages stored in database tables that are accessible by monitoring applications for real-time monitoring or for troubleshooting and analysis over historical archives.

Zendejas, Silvino↗

Impact of Glen Canyon Generation Loss

Colorado River Basin hydropower generation has faced challenges due to droughts and ecological and social water requirements. Specifically, Glen Canyon hydropower generation fluctuates substantially with recent extreme weather trends. Further, the western grid evolves with higher wind and solar share, and Glen Canyon hydropower's contribution to grid flexibility services is essential. The Western Area Power Administration (WAPA) markets and schedules electricity production at GCD, and the loss of this power could have significant financial consequences for the WAPA Colorado River Storage Project's (CRSP) Office because it may need to purchase relatively large amounts of energy to serve its firm electrical obligations. In addition, GCD provides grid reliability services for the WAPA Colorado-Missouri (WACM) balancing authority (BA). Both WAPA and DOE's Water & Power Technology Office (WPTO) are interested in researching how these drier hydrological conditions will impact federal electrical energy production, the Western Electricity Coordinating Council (WECC) power grid, and the value of hydropower in the face of lower production. We study multiple hydrologic and power grid scenarios to understand the grid impacts of the loss of Glen Canyon generation. The study uses a production cost model, water resources planning models, water-centric grid models, and various data analytic techniques. The study progress presentation discusses the selection of probable CRSP' hydropower scenarios and power grid scenarios to understand the impacts of Glen Canyon generation, which includes technologies that compensate the Glen Canyon energy and ancillary services contributions, transmission availability, and energy local marginal prices at interested grid locations of WAPA operation.

droughts↗

Investigation of Stochastic Unit Commitment to Enable Advanced Flexibility Measures for High Shares of Solar PV

As the share of solar photovoltaics (PV) in the power system increases, there is a growing need for flexibility from multiple, possibly interdependent sources to adjust to PV's variability, uncertainty, and diurnal dependence. This paper investigates how stochastic unit commitment leveraging probabilistic solar forecasts can support other flexibility measures under high solar shares. We consider two flexibility measures relevant to day-ahead scheduling: battery energy time-shifting and solar ancillary service provision. Unit commitment and economic dispatch simulations are conducted on a realistic test system based on Texas using day-ahead solar trajectories. The benefits of the two flexibility measures are pronounced when the instantaneous solar share is high, offering cost savings of 10%-20% in the spring. For a Texas-sized system, this translates to hundreds of millions of dollars in cost savings once the installed PV capacity enables instantaneous solar shares regularly exceeding 40%. Using probabilistic forecasts also greatly increases the reliability of upward reserve provision from solar PV, reducing unserved reserves by 50%-100%. Both day-ahead forecast resolution and errors can impact system reliability at high solar shares, but the stochastic formulation has significant value, mitigating reliability impacts on over-forecast days.

ancillary services↗

DYnamic and Asynchronous Data Streamliner

DYAD aims to help sharing data files between producer and consumer job elements, especially between co-scheduled jobs or within an ensemble. DYAD provides the service by two components: a FLUX module and a I/O wraper set. DYAD transparently synchronizes file I/O between producer and consumer, and transfers data from the producer location to the consumer location managed by the service. Users only need to use the file path that is under the directory managed by the service.

Ahn, DongH↗

DSIF station schedules

System manages Deep Space Instrumentation Facilities /DSIF/ equipment construction and modification planning. Versatile program applies to such tasks as employee time and task schedules, pay schedules, operations schedules, and plant and equipment procurement, construction, modification or service.

Flarity, L. D.↗

Advanced systems engineering and network planning support

The objective of this task was to take a fresh look at the NASA Space Network Control (SNC) element for the Advanced Tracking and Data Relay Satellite System (ATDRSS) such that it can be made more efficient and responsive to the user by introducing new concepts and technologies appropriate for the 1997 timeframe. In particular, it was desired to investigate the technologies and concepts employed in similar systems that may be applicable to the SNC. The recommendations resulting from this study include resource partitioning, on-line access to subsets of the SN schedule, fluid scheduling, increased use of demand access on the MA service, automating Inter-System Control functions using monitor by exception, increase automation for distributed data management and distributed work management, viewing SN operational control in terms of the OSI Management framework, and the introduction of automated interface management.

Walters, David H.↗

Goddard Ground System Environment

This slide presentation reviews the Goddard Mission Services Evolution Center's work in providing the Ground System Infrastructure to allow for standard interfaces, and allow for a mix of heritage and new components. This software has been used by NASA and other Government users. Telemetry and command services are also provided as are mission planning and scheduling systems. Other areas that the presentation covers are work on trending systems, and data management system.

Liu, Ben↗

Investigation of Nonflammable Electrolytes for Behind-the-Meter Storage Batteries

Behind-the-Meter Storage (BTMS) is a battery-based, stationary energy storage system that is connected to the residential or industrial customer's side of the electrical grid utility service meter. BTMS systems enable consumers to (A) economically schedule charging and usage of stored energy, (B) store and use energy from on-site generation, especially from inconstant, renewable sources like solar and wind, and (C) avoid overloading the grid during peak hours via supplementation with stored energy. BTMS battery performance requirements and general priorities differentiate from other applications, like EVs, which has prompted the development of batteries with tailored electrode and electrolyte materials. These materials prioritize low cost, avoiding critical materials; longevity, achieving 8000 cycle and 20-year shelf lives; and importantly, high safety. Nonflammable electrolytes show promise to improve safety by mitigating thermal runaway, yet often come with sacrifices to battery performance. In this presentation (1) primary categories of nonflammable electrolytes will be discussed; (2) a rational design of experiment will be presented for efficient performance evaluation of several nonflammables electrolyte in BTMS-relevant battery chemistry, Li4Ti5O12- and LiNi0.90Mn0.10O2; and (3) preliminary results will be presented.

battery↗

Development of the European Service Module Propulsion Subsystem for the Multi-Purpose Crew Vehicle

Hardware Heritage Schedule limitations and budget constraints drove the need for extensive use of heritage hardware designs. In some cases (OMS and TVC) flight hardware reuse (from Shuttle) was required,and will be delta-qualified for use on Orion Primary sources of heritage: ATV Shuttle Orion CM PSS Ariane 5 EPS Targeted Development Testing Component development testing was performed to address the highest risk areas of heritage design compliance with Orion requirements Assembly level development testing was performed to understand complex assemblies and component interactions Heritage Direct re-use of assets from Shuttle Orbiters, all assets have varying flight history. Orion Use Used by Orion to gimbal the main engine during major translational maneuvers Development Testing Random vibration on controller box (lead to card retention design mod) Design Changes (only as required) Circuit board retention in controller box (single instance from Shuttle flight history) New, longer harnesses Basic Specs(8) fixed position engines Thrust: 105 lbf Nozzle area ratio: 164:1 Orion Use Nominally used for separation maneuvers and mid-course correction maneuvers In contingency scenario (failed main engine), used for major translational maneuvers Drives the need for long continuous duration firing Drives the need for off-pulsing (to steer) Control authority requires 50 duty cycle Development Testing Random Vibration (added vibration isolation bracket) Hot fire, duty cycle (changed MR)

pressure fed↗

STS-109 Crew Interview: Grunsfeld

STS-109 Payload Commander John Grunsfeld is seen during a prelaunch interview answering questions about his inspiration to become an astronaut and his career path. He gives details on the mission's goal (which is to service the Hubble Space Telescope (HST)), his role during the mission, the five scheduled spacewalks, the Columbia Orbiter's recent upgrades, and what he sees as the challenges of the mission. Grunsfeld describes how his experience on the STS-103 mission, a previous HST servicing mission, has helped prepare him for the STS-109 mission. The interview ends with Grunsfeld explaining why the servicing of the Reaction Wheel Assembly, a task added late in his training, is so important.

Source record↗

Commercialization and Standardization Progress Towards an Optical Communications Earth Relay

NASA is planning to launch the next generation of a space based Earth relay in 2025 to join the current Space Network, consisting of Tracking and Data Relay Satellites in space and the corresponding infrastructure on Earth. While the requirements and architecture for that relay satellite are unknown at this time, NASA is investing in communications technologies that could be deployed to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in 2018 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the next generation space based relay. This paper will describe NASA efforts in the on-going commercialization of optical communications and the development of inter-operability standards. Both are seen as critical to making optical communications a reality on future NASA science and exploration missions. Commercialization is important because NASA would like to eventually be able to simply purchase an entire optical communications terminal from a commercial provider. Inter-operability standards are needed to ensure that optical communications terminals developed by one vendor are compatible with the terminals of another. International standards in optical communications would also allow the space missions of one nation to use the infrastructure of another.

lasers↗

A Geosynchronous Orbit Optical Communications Relay Architecture

NASA is planning to fly a Next Generation Tracking and Data Relay Satellite (TDRS) next decade. While the requirements and architecture for that satellite are unknown at this time, NASA is investing in communications technologies that could be deployed on the satellite to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in December 2017 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the Next Generation TDRS. While it is obvious that a small to medium sized optical communications terminal could be flown on a GEO satellite to provide support to Near Earth missions, it is also possible to deploy a large terminal on the satellite to support Deep Space missions. Onboard data processing and Delay Tolerant Networking (DTN) are two additional technologies that could be used to optimize optical communications link services and enable additional mission and network operations. This paper provides a possible architecture for the optical communications augmentation of a Next Generation TDRS and touches on the critical technology work currently being done at NASA. It will also describe the impact of clouds on such an architecture and possible mitigation techniques.

optics↗

Scheduling Software

Advanced Scheduling Environment is a software product designed and marketed by AVYX, Inc. to provide scheduling solutions for complex manufacturing environments. It can be adapted to specific scheduling and manufacturing processes and has led to substantial cost savings. The system was originally developed for NASA use in scheduling Space Shuttle flights and satellite activities. AVYX, Inc. is an offshoot of a company formed to provide computer-related services to NASA. TREES-plus, the company's initial product became the programming language for the advanced scheduling environment system.

Source record↗

Surface Systems Capability Gaps for Enabling NASA’s Sustainable Lunar Operations

This paper discusses the NASA Ground, Test, and Surface Systems Taxonomy (TX-13) related capability gaps, including details of architecture, technology, engineering, and policy gaps for enabling sustainable lunar surface operations and subsequent Mars missions. Architecture gaps include standardized architectures and interfaces, multi-element systems engineering and integration, design for supportability, and nuclear payload processing and launch approach. Technology gaps, primarily focused on uncrewed surface operations, include automated/autonomous cryogenic loading, transfer, servicing, and storage of commodities; health determination and fault management; automated/autonomous planning and scheduling; automated/autonomous inspection, maintenance and repair; logistics management and reliability; launch and landing site preparation; commodity management; and advanced umbilicals and dust tolerant interfaces. Engineering gaps include high-purity propellant production for ground and surface applications and large-scale xenon servicing capabilities. The policy gap includes nuclear propulsion acceptance testing and qualification approach. Strategically identifying human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle is essential for achieving the mission objectives for a sustainable human lunar presence, improving performance and mission effectiveness, reducing operations costs and reliance on humans to perform tasks, and accommodating ground communication delays.

Surface Systems↗

Collaborative Scheduling Using JMS in a Mixed Java and .NET Environment

A collaborative framework/environment was proto-typed to prove the feasibility of scheduling space flight missions on NASA's Deep Space Network (DSN) in a distributed fashion. In this environment, effective collaboration relies on efficient communications among all flight mission and DSN scheduling users. There-fore, messaging becomes critical to timely event notification and data synchronization. In the prototype, a rapid messaging system using Java Message Service (JMS) in a mixed Java and .NET environment is established. This scheme allows both Java and .NET applications to communicate with each other for data synchronization and schedule negotiation. The JMS approach we used is based on a centralized messaging scheme. With proper use of a high speed messaging system, all users in this collaborative framework can communicate with each other to generate a schedule collaboratively to meet DSN and projects tracking needs.

scheduling↗

Enabling discovery data science through cross-facility workflows

Experimental and observational instruments for scientific research (such as light sources, genome sequencers, accelerators, telescopes and electron microscopes) increasingly require High Performance Computing (HPC) scale capabilities for data analysis and workflow processing. Next-generation instruments are being deployed with higher resolutions and faster data capture rates, creating a big data crunch that cannot be handled by modest institutional computing resources. Often these big data analysis pipelines also require near real-time computing and have higher resilience requirements than the simulation and modeling workloads more traditionally seen at HPC centers. While some facilities have enabled workflows to run at a single HPC facility, there is a growing need to integrate capabilities across HPC facilities to enable cross-facility workflows, either to provide resilience to an experiment, increase analysis throughput capabilities, or to better match a workflow to a particular architecture. In this paper we describe the barriers to executing complex data analysis workflows across HPC facilities and propose an architectural design pattern for enabling scientific discovery using cross-facility workflows that includes orchestration services, application programming interfaces (APIs), data access and co-scheduling.

Antypas, Katerina B.↗

Orbit transfer operations for the Space Shuttle era

Orbit transfer operations are reviewed relative to the objectives, operational factors, and crew model concepts of future mission requirements. The review is based on studies presently underway and on projected needs and goals of the Space Shuttle era. Numerous tradeoff studies and further analyses are needed before the best form of the manned geostationary vehicle becomes fixed. However, the Shuttle can provide the necessary low-orbit logistics service for dispatching manned geostationary missions on as frequent a schedule as will be needed to serve the advanced geostationary satellites of the near future.

Davis, H. P.↗