Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Los Alamos Canyon Bridge Upgrades Project

Reinvestment in the Los Alamos Canyon Bridge (LACB) deck, superstructure, and substructure, ensures continued access between Los Alamos National Laboratory (LANL) and the Los Alamos County (LAC) town site; as well as maintains emergency response qualifications to/from the Los Alamos Medical Center (LAMC). The operability of the LACB is critical to the institution and with the evolving oversight from the Federal Highway Administration (FHWA), Department of Energy (DOE) Headquarters, and National Nuclear Security Administration (NNSA); it is imperative safety of the infrastructure is sustained. The Los Alamos Canyon Bridge is 60 plus years old (typical bridge design life of 50 years), a fracture critical structure (no girder redundancies), has an average daily traffic in excess of 13,000 vehicles/day (primary route for LAC commuters), is deteriorating (decreasing code ratings, per inspection), was last rehabilitated in 1992, and maintains access for fire evacuations (Cerro Grande, Las Conchas). Reinvestment in the bridge is expected to extend the service life of the LACB, reduce average maintenance costs by $0.5 M to $2.8M, per year, and provide compliance with current code requirements. Pros, cons, and proposed funding schedule are provided.

42 ENGINEERING↗

The Capability Portfolio Analysis Tool (CPAT): A Mixed Integer Linear Programming Formulation for Fleet Modernization Analysis (Version 2.0.2).

In order to effectively plan the management and modernization of their large and diverse fleets of vehicles, Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) commis- sioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thor- ough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation. This paper, which is an update to the original CPAT formulation document published in 2015 (SAND2015-3487), covers the formulation of important new CPAT features.

97 MATHEMATICS AND COMPUTING↗

Dispatch analysis of flexible power operation with multi-unit small modular reactors

The relevance of nuclear power plant flexible power operation (FPO) is rising due to increased penetration of variable renewables. Small Modular Reactors (SMRs) such as NuScale are envisaged to have multiple units on one site. This provides opportunities for coordinating FPO between units, but also introduces challenges as common services (e.g., refueling equipment) must be shared between units and fuel loadings may be standardized. It is therefore important to quantify whether FPO with SMRs is economically beneficial. Here, this paper quantifies the economics of FPO on different timescales to analyze refueling outages of such multi-unit SMRs. A 24-h price-taker profit maximization of SMR operation is first solved considering revenues from wholesale power and ancillary service (AS) markets. The results are then used to find the most profitable operation strategy over several years for multiple units at the site accounting for the physics and materials limits on NPP operation, including refueling outages. Results show a small but appreciable participation of nuclear into AS, contributing 4% of revenues. Due to the longer fuel cycle, over a decade of operation the units’ refueling outages drifted by 3 months, ultimately leading to refueling during summer.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Ride Pingo to Transit

In this project, we developed an on-demand microtransit first- and last-mile service. To integrate the service with fixed-route transit, we developed a feature called Transit Connect that prioritized riders’ on-time arrival at the transit station over other service requirements. We first prototyped service and related algorithms in a simulated environment, and then piloted the service in the city of Kent, Washington. Our algorithm incorporates request-specific hard drop-off deadlines to ensure timely arrivals for transit transfers. In the pilot, these constraints were obtained from GTFS Realtime data to accurately determine the schedule of the transit and the location of the stations. This approach introduced the ability to accept or decline new requests based on the timing of transit connections for these new requests and connection status of onboarding customers. The pilot (called “Ride Pingo to Transit”) deployed a fleet of three 14-person vans, ran from September 2021 to March 2023, and served a total of 21,329 trips. Transit Connect was offered for drop-offs at both Kent Station and the Kent Valley hub. In total, 2,844 such trips were completed. This dataset was collected from our pilot, which includes the following: - Requests: List of all trip requests, including those that were actually served and those not materialized. - Fleet: Daily vehicle service logs. - Service details: Daily vehicle stop logs (boarding and alighting). - Trip types: First mile, last mile, or point-to-point. ![pingo to transit](pingo-to-transit.jpg)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Error Detection and Error Classification: Failure Awareness in Data Transfer Scheduling

Data transfer in distributed environment is prone to frequent failures resulting from back-end system level problems, like connectivity failure which is technically untraceable by users. Error messages are not logged efficiently, and sometimes are not relevant/useful from users point-of-view. Our study explores the possibility of an efficient error detection and reporting system for such environments. Prior knowledge about the environment and awareness of the actual reason behind a failure would enable higher level planners to make better and accurate decisions. It is necessary to have well defined error detection and error reporting methods to increase the usability and serviceability of existing data transfer protocols and data management systems. We investigate the applicability of early error detection and error classification techniques and propose an error reporting framework and a failure-aware data transfer life cycle to improve arrangement of data transfer operations and to enhance decision making of data transfer schedulers.

97 MATHEMATICS AND COMPUTING↗

Recovery Act: Energy Efficiency of Data Networks through Rate Adaptation (EEDNRA) - Final Technical Report

This Concept Definition Study focused on developing a scientific understanding of methods to reduce energy consumption in data networks using rate adaptation. Rate adaptation is a collection of techniques that reduce energy consumption when traffic is light, and only require full energy when traffic is at full provisioned capacity. Rate adaptation is a very promising technique for saving energy: modern data networks are typically operated at average rates well below capacity, but network equipment has not yet been designed to incorporate rate adaptation. The Study concerns packet-switching equipment, routers and switches; such equipment forms the backbone of the modern Internet. The focus of the study is on algorithms and protocols that can be implemented in software or firmware to exploit hardware power-control mechanisms. Hardware power-control mechanisms are widely used in the computer industry, and are beginning to be available for networking equipment as well. Network equipment has different performance requirements than computer equipment because of the very fast rate of packet arrival; hence novel power-control algorithms are required for networking. This study resulted in five published papers, one internal report, and two patent applications, documented below. The specific technical accomplishments are the following: • A model for the power consumption of switching equipment used in service-provider telecommunication networks as a function of operating state, and measured power-consumption values for typical current equipment. • An algorithm for use in a router that adapts packet processing rate and hence power consumption to traffic load while maintaining performance guarantees on delay and throughput. • An algorithm that performs network-wide traffic routing with the objective of minimizing energy consumption, assuming that routers have less-than-ideal rate adaptivity. • An estimate of the potential energy savings in service-provider networks using feasibly-implementable rate adaptivity. • A buffer-management algorithm that is designed to reduce the size of router buffers, and hence energy consumed. • A packet-scheduling algorithm designed to minimize packet-processing energy requirements. Additional research is recommended in at least two areas: further exploration of rate-adaptation in network switching equipment, including incorporation of rate-adaptation in actual hardware, allowing experimentation in operational networks; and development of control protocols that allow parts of networks to be shut down while minimizing disruption to traffic flow in the network. The research is an integral part of a large effort within Bell Laboratories, Alcatel-Lucent, aimed at dramatic improvements in the energy efficiency of telecommunication networks. This Study did not explicitly consider any commercialization opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Feedback on the Electric Emergency Incident and Disturbance Report, OE-417

The US Department of Energy (DOE) Office of Electricity (OE) mandates requirements for reporting electric emergencies and disruptions in the United States. Specific electric power industry organizations (such as balancing authorities, reliability coordinators, some generating entities, and electric utilities) report this information through the OE-417 Electric Emergency Incident and Disturbance Report via Form OE-417. Entities are required to submit Form OE-417 when at least one of the qualifying 26 criteria is met pursuant to Section 13(b) of the Federal Energy Administration Act of 1974 (Public Law 93-275). Entities are required to report, within 6 hours of the incident, loss of electric service to 50,000 customers or more for 1 hour or longer. The deadline for submitting Form OE-417 depends on the nature of the incident. An updated Form OE-417 Schedule 1 and all of Schedule 2 are both due within 72 hours of the incident to provide complete disruption information. Additionally, a Final Report must be filed within 72 hours of the incident, unless an interim update has been provided. If the incident meets specific criteria, the form must be filed within one hour, six hours, or by the later of 24 hours after the recognition of the incident or by the end of the next business day.1 The ability of DOE to respond quickly to energy emergencies that could affect the nation’s infrastructure and help alleviate or prevent further disruptions depends on the industry’s prompt and complete submission of information. This report summarizes current issues with Form OE-417 and the reporting process and presents recommendations for improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

AC Power Flow Based DLMP Calculation and Decomposition Method to Smooth Power Fluctuation of Distributed Renewable Energy Sources

As the penetration of renewable energy sources increases, the growing renewable power variability brings ramping issues to power systems. Meanwhile, the development of distributed energy resources (DERs) makes the distribution systems to provide both energy and ancillary services. To incentivise individual resources and customers to alleviate ramping issues on the demand side, a two-stage distribution locational marginal price (DLMP) calculation and decomposition method is developed to formulate the marginal power ramping price for DERs. In the first stage of the proposed method, a distribution system operator market scheduling model based on AC optimal power flow is designed to estimate the optimal operating point of the distribution system. Subsequently, the voltage and power flow constraints are linearised in stage two to calculate DLMP. Finally, based on the Lagrange function and sensitivity factors, DLMP is decomposed to the marginal costs for active/reactive power, voltage management, power loss and power variability. Case studies demonstrate that the proposed model can effectively smooth the power fluctuation and reduce the ramping flexibility requirements of distribution systems.

AC optimal power flow↗

Optimization of Composite Cloud Service Processing with Virtual Machines

By leveraging virtual machine (VM) technology, we optimize cloud system performance based on refined resource allocation, in processing user requests with composite services. Our contribution is three-fold. (1) We devise a VM resource allocation scheme with a minimized processing overhead for task execution. (2) We comprehensively investigate the best-suited task scheduling policy with different design parameters. (3) We also explore the best-suited resource sharing scheme with adjusted divisible resource fractions on running tasks in terms of Proportional-share model (PSM), which can be split into absolute mode (called AAPSM) and relative mode (RAPSM). We implement a prototype system over a cluster environment deployed with 56 real VM instances, and summarized valuable experience from our evaluation. As the system runs in short supply, lightest workload first (LWF) is mostly recommended because it can minimize the overall response extension ratio (RER) for both sequential-mode tasks and parallel-mode tasks. In a competitive situation with over-commitment of resources, the best one is combining LWF with both AAPSM and RAPSM. It outperforms other solutions in the competitive situation, by 16 + % w.r.t. the worst-case response time and by 7.4 + % w.r.t. the fairness.

cloud resource allocation↗

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2010

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2010 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2010 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2009-00138, HLW Tank Farm Inspection Plan for 2010, were completed. Ultrasonic measurements (UT) performed in 2010 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 30, 31 and 32 and the findings are documented in SRNL-STI-2010-00533, Tank Inspection NDE Results for Fiscal Year 2010, Waste Tanks 30, 31 and 32. A total of 5824 photographs were made and 1087 visual and video inspections were performed during 2010. Ten new leaksites at Tank 5 were identified in 2010. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.5. Ten leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. None of these new leaksites resulted in a release to the environment. The leaksites were documented during wall cleaning activities and the waste nodules associated with the leaksites were washed away. Previously documented leaksites were reactivated at Tank 12 during waste removal activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenge and Promise of Remote Work: A Brief Study of Remote Work and Best Practices

Due to the shift in labor market from manufacturing and construction to service-based (Statistics 2016); the commoditization of high-bandwidth communication tools; advancements in management techniques; a dearth of trained knowledge workers within a geographic region; and a growing demand for flexible scheduling options, organizations are embracing and encouraging the growing distributed workforce. These workers are actual employees, not contractors; they may work independently or as part of a team; they have direct organizational supervision; and they work in a variety of virtual arrangements. This informal field study looks at several organizations that support the remote work model from the perspective of individual employees and presents several technologies, tools, and policies that can serve to maintain company culture and otherwise close the gap between onsite and remote workers.

99 GENERAL AND MISCELLANEOUS↗

Power quality of service optimization for microgrids

Various examples are provided for power quality of service optimization for microgrids. In one example, among others, a microgrid includes a smart meter configured to control supply of electric power to loads based at least in part upon energy consumption scheduling of the loads, which is based at least in part upon an effective electric generation capacity associated with the microgrid. The energy consumption scheduling can be based at least in part upon estimated power output of a sustainable energy resource of the microgrid and a load demand characterization of the loads. In another example, a system comprises a plurality of microgrids and an advanced metering infrastructure (AMI) configured to monitor operations of the microgrids and to control supply of electric power from sustainable energy resources and energy storage systems to loads of the microgrids via smart meters based at least in part upon energy consumption scheduling of the loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Behavioral modeling of on-demand mobility services: general framework and application to sustainable travel incentives

This paper presents a systematic way of understanding and modeling traveler behavior in response to on-demand mobility services. We explicitly consider the sequential and yet inter-connected decision-making stages specific to on-demand service usage. The framework includes a hybrid choice model for service subscription, and three logit mixture models with inter-consumer heterogeneity for the service access, menu product choice and opt-out choice. Different models are connected by feeding logsums. The proposed modeling framework is essential for accounting the impacts of real-time on-demand system's dynamics on traveler behaviors and capturing consumer heterogeneity, thus being greatly relevant for integrations in multi-modal dynamic simulators. The methodology is applied to a case study of an innovative personalized on-demand real-time system which incentivizes travelers to select more sustainable travel options. The data for model estimation is collected through a smartphone-based context-aware stated preference survey. Through model estimation, lower values of time are observed when the respondents opt to use the reward system. The perception of incentives and schedule delay by different population segments are quantified. These results are fundamental in setting the ground for different behavioral scenarios of such a new on-demand system. Here, the proposed methodology is flexible to be applied to model other on-demand mobility services such as ride-hailing services and the emerging mobility as a service.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Hybrid Demand Response Simulator Version 1.0

A hybrid demand response simulator is developed to test different control algorithms for centralized and distributed demand response (DR) programs in a small distribution power grid. The HDRS is designed to model a wide variety of DR services such as peak having, load shifting, arbitrage, spinning reserves, load following, regulation, emergency load shedding, etc. The HDRS does not model the dynamic behaviors of the loads, rather, it simulates the load scheduling and dispatch process. The load models include TCAs (water heaters, air conditioners, refrigerators, freezers, etc) and non-TCAs (lighting, washer, dishwasher, etc.) The ambient temperature changes, thermal resistance, capacitance, and the unit control logics can be modeled for TCA loads. The use patterns of the non-TCA can be modeled by probability of use and probabilistic durations. Some of the communication network characteristics, such as delays and errors, can also be modeled. Most importantly, because the simulator is modular and greatly simplified the thermal models for TCA loads, it is very easy and fast to be used to test and validate different control algorithms in a simulated environment.

Lu, Ning↗

Charging Hub Scenario Sheet Screenshot

The Excel-based CHECT tool estimates the LCOC ($/kWh) by charger type (Level 1, Level 2, and DC fast charging) for a given charging hub scenario. CHECT requires users to input certain charging hub scenario parameters, including the number of chargers, daily utilization, and charger replacement frequency by charger type. Additional inputs such as the charging schedule, local utility rates, capital/operational costs, and financial inputs can be customized by the user, or the tool can generate results using appropriate default values from literature for the charging hub scenario and service location(s). Using the above inputs, CHECT performs a robust techno-economic analysis to generate the LCOC by charger type, broken down by cost category (e.g., capital, operational, utility, taxes) for various combinations of charging hub types (multiunit dwelling or public) and ownership models (residential, utility, or private company). It also outputs the annual discounted cash flows and determines the most sensitive input variables. In addition, the tool allows users to easily compare the LCOC across various ownership models or across different states.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cygnus Dual Beam Radiographic Facility Refurbishment completed at U1A tunnel in Nevada NNSS meeting Level 2 milestone (P-23 Highlights 6/10/12)

A moratorium was placed on U.S. underground nuclear testing in 1992. In response, the Stockpile Stewardship Program was created to maintain readiness of the existing nuclear inventory through several efforts such as computer modeling, material analysis, and subcritical nuclear experiments (SCEs). As in the underground test era, the Nevada National Security Site (NNSS), formerly the Nevada Test Site, provides a safe and secure environment for SCEs by the nature of its isolated and secure facilities. A major tool for SCE diagnosis installed in the 05 drift laboratory is a high energy x-ray source used for time resolved imaging. This tool consists of two identical sources (Cygnus 1 and Cygnus 2) and is called the Cygnus Dual Beam Radiographic Facility (Figs. 2-6). Each Cygnus machine has 5 major elements: Marx Generator, Pulse Forming Line (PFL), Coaxial Transmission Line (CTL), 3-cell Inductive Voltage Adder (IVA), and Rod Pinch Diode. Each machine is independently triggered and may be fired in separate tests (staggered mode), or in a single test where there is submicrosecond separation between the pulses (dual mode). Cygnus must operate as a single shot machine since on each pulse the diode electrodes are destroyed. The diode is vented to atmosphere, cleaned, and new electrodes are inserted for each shot. There is normally two shots per day on each machine. Since its installation in 2003, Cygnus has participated in: 4 Subcritical Experiments (Armando, Bacchus, Barolo A, and Barolo B), a 12 shot plutonium physics series (Thermos), and 2 plutonium step wedge calibration series (2005, 2011), resulting in well over 1000 shots. Currently the Facility is in preparation for 2 SCEs scheduled for this calendar year - Castor and Pollux. Cygnus has performed well during 8 years of operations at NNSS. Many improvements in operations and performance have been implemented during this time. Throughout its service at U1a, major maintenance and replacement of many hardware items were delayed due to programmatic requirements. It is anticipated that Cygnus will be in service at U1a for another 5 years. With this assumption, it was realized that significant resources and effort should be allotted to bring the hardware back to its original condition, or even to improve elements when appropriate. The Cygnus Refurbishment and Enhancement Project started in April, 2011 with the intent to encompass a major overhaul of Cygnus.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Annual Radioactive Waste Tank Inspection Program - 2011

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2011 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2011 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2011-00026, HLW Tank Farm Inspection Plan for 2011, were completed. Ultrasonic measurements (UT) performed in 2011 met the requirements of C-ESR-G-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 25, 26 and 34 and the findings are documented in SRNL-STI-2011-00495, Tank Inspection NDE Results for Fiscal Year 2011, Waste Tanks 25, 26, 34 and 41. A total of 5813 photographs were made and 835 visual and video inspections were performed during 2011. A potential leaksite was discovered at Tank 4 during routine annual inspections performed in 2011. The new crack, which is above the allowable fill level, resulted in no release to the environment or tank annulus. The location of the crack is documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.6.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗