Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and spacing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

STS-103 Crew Interviews: Steven Smith

Live footage of a preflight interview with Mission Specialist Steven L. Smith is seen. The interview addresses many different questions including why Brown became an astronaut, the events that led to his interest, any role models that he had, and his inspiration. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, replacement of the gyroscopes, transistors, and computers. Also discussed is Smith's responsibility during any of the planned space walks scheduled for this mission.

Source record↗

STS-101 Crew Interview / Scott Horowitz

Live footage of a preflight interview with Pilot Scott J. Horowitz is seen. The interview addresses many different questions including why Horowitz became an astronaut, the events that led to his interest, any role models that he had, and his inspiration. Other interesting information that this one-on-one interview discusses is the reaction and reasons for the splitting-up of the objectives for STS-101 with STS-106. Horowitz also mentions the scheduled space-walk, docking with the International Space Station (ISS), the new glass cockpit of Atlantis, the repairs of equipment and change of the batteries. Horowitz also discusses his responsibilities during the space-walk, and docking of the spacecraft. He stresses that he will have an added challenge during the space-walk, his inability to see where he needs to place the Extravehicular Activities (EVA) crew.

Source record↗

STS-101 Crew Interview / Mary Ellen Weber

Live footage of a preflight interview with Mission Specialist Mary Ellen Weber is seen. The interview addresses many different questions including why Weber became an astronaut, the events that led to her interest in chemistry and sky diving. Other interesting information that this one-on-one interview discusses is the reaction and reasons for the change of the mission objectives. Weber also mentions the scheduled space-walk, docking with the International Space Station (ISS), the repairs of equipment and change of the batteries, and the installation of handrails. Weber also discusses her responsibilities during the space-walk, and docking of the spacecraft.

Source record↗

STS-101: Crew Interview / Jeffrey N. Williams

Live footage of a preflight interview with Mission Specialist Jeffrey N. Williams is seen. The interview addresses many different questions including why Williams became an astronaut, and the events that led to his interest. Other interesting information that this one-on-one interview discusses is his reaction to and the reasons for the change of the mission objectives. Williams also mentions the scheduled space-walk that he will perform, docking with the International Space Station (ISS), the repairs of equipment, and the change of the batteries.

Source record↗

STS-101: Crew Interview / James S. Voss

Live footage of a preflight interview with Mission Specialist James S. Voss is seen. The interview addresses many different questions including why Voss became an astronaut, the individuals who influenced him, and the events that led to his interest. Other interesting information that this one-on-one interview discusses is his reaction to and the reasons for the change of the mission objectives. Voss also mentions the scheduled space-walk that he will perform with Jeffrey N. Williams, docking with the International Space Station (ISS), the repairs of equipment, and the change of the batteries. Voss explains why himself, Susan J. Helms, and Yuri Vladimirovich Usachev are the perfect choice for this mission because of their certification from Russia to work on the Zarya Control Module.

Source record↗

STS-101: Crew Interview / Yuri Vladimirovich Usachev

Live footage of a preflight interview with Mission Specialist Yuri Vladimirovich Usachev is seen. The interview addresses many different questions including why Usachev became a cosmonaut, the individuals who influenced him, and the events that led to his interest. Other interesting information that this one-on-one interview discusses is his reaction and integration into the STS-101 crew. Usachev also mentions the scheduled space-walk of James S. Voss and Jeffrey N. Williams, his feeling once he steps into the International Space Station (ISS), the repairs of equipment, his handling of the hand held laser, and the change of the batteries.

Source record↗

The GLAST Burst Monitor

The GLAST Burst Monitor The Gamma Ray Large Area Space Telescope, scheduled for launch in 2006, comprises a Large Area Telescope (LAT) and a GLAST Burst Monitor (GBM). The LAT is a pair telescope with unprecedented sensitivity in the 20 Mev to 300 GeV energy range. The GLAST Burst Monitor (GBM) consists of an array of NaI and BGO scintillation detectors operating in the 10 kev to 30 MeV range and covering a wide field of view. The GBM will enhance LAT observations of GRBs by extending the spectral coverage into the range of current GRB databases, and will provide a trigger for re-orienting the spacecraft to observe delayed emission from bursts outside the LAT field of view.

Meegan, C. A.↗

The Many Dimensions of Program Management

For the purposes of this paper, program refers to a collection of activities or projects which must be performed according to a plan or schedule. The Space Exploration Initiative within the National Aeronautics and Space Administration (NASA) is an example. Dimensionality refers to both the various perspectives of a program and to the components within that perspective. It is, thus, appropriate to think of dimensions of dimensionality. For example, one dimension or perspective of a program is the projects which perform the program. Within the project dimension, the individual projects are the components of that dimensionality. The number of projects defines the spatial dimensionality of the project dimension. Thus, each perspective or dimension has a dimensionality of its own. The structure and associated values of all the various perspectives of a program define the program. A project refers to the collection of activities required to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a given system. A project thus effects the life cycle of given system. A project is, thus, the system to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a system. A program, thus, effects the life cycle of the collection of projects required to effect the collection of systems required to implement the program.

Dean, Edwin B.↗

Integrated Modeling Activities for the James Webb Space Telescope: Structural-Thermal-Optical Analysis

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. This is a continuation of a series of papers on modeling activities for JWST. The structural-thermal-optical, often referred to as STOP, analysis process is used to predict the effect of thermal distortion on optical performance. The benchmark STOP analysis for JWST assesses the effect of an observatory slew on wavefront error. Temperatures predicted using geometric and thermal math models are mapped to a structural finite element model in order to predict thermally induced deformations. Motions and deformations at optical surfaces are then input to optical models, and optical performance is predicted using either an optical ray trace or a linear optical analysis tool. In addition to baseline performance predictions, a process for performing sensitivity studies to assess modeling uncertainties is described.

Johnston, John D.↗

The Role of Integrated Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. System-level verification of critical optical performance requirements will rely on integrated modeling to a considerable degree. In turn, requirements for accuracy of the models are significant. The size of the lightweight observatory structure, coupled with the need to test at cryogenic temperatures, effectively precludes validation of the models and verification of optical performance with a single test in 1-g. Rather, a complex series of steps are planned by which the components of the end-to-end models are validated at various levels of subassembly, and the ultimate verification of optical performance is by analysis using the assembled models. This paper describes the critical optical performance requirements driving the integrated modeling activity, shows how the error budget is used to allocate and track contributions to total performance, and presents examples of integrated modeling methods and results that support the preliminary observatory design. Finally, the concepts for model validation and the role of integrated modeling in the ultimate verification of observatory are described.

Mosier, Gary E.↗

STOP Modeling for the JWST: Techniques, Results, and Sensitivities

The James Web Space Telescope (JWST) is a large, infrared-optimized, space telescope scheduled for launch to L2 in 2011. It must meet rigorous thermal stability requirements, almost all of which will be verified through analysis. Terrestrial testing will be performed but even that will require significant analytical interpretation of results. Preliminary analysis indicates that traditional second-order effects could cause the telescope to exceed established performance requirements. This leads to very large detailed models, primarily since composite tubes are being modeled using solid elements. To minimize differences between the current baseline and the model the project is using a number of rapid analysis cycles. The large size of the telescope models and the short cycle time creates a demanding multidisciplinary analysis environment.

John D. Johnston↗

Development Tests of a Cryogenic Filter Wheel Assembly for the NIRCam Instrument

The James Webb Space Telescope is an infrared-optimized space telescope scheduled for launch in 201 3. Its 6.5-m diameter primary mirror will collect light from some of the first galaxies formed after the big bang. The Near Infrared camera (NIRCam) will detect the first light from these galaxies, provide the necessary tools for studying the formation of stars, aid in discovering planets around other stars, and adjust the wave front error on the primary mirror (Fig. 1). The instrument and its complement of mechanisms and optics will operate at a cryogenic temperature of 35 K. This paper describes tests and test results of the NIRCam Filter Wheel assembly prototype.

McCully, Sean↗

New Frontiers for Massive Star Winds: Imaging and Spectroscopy with the James Webb Space Telescope

The James Webb Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2013. JWST will find the first stars and galaxies that formed in the early universe, connecting the Big Bang to our own Milky Way galaxy. JWST will peer through dusty clouds to see stars forming planetary systems, connecting the Milky Way to our own Solar System. JWST's instruments are designed to work primarily in the infrared range of 1 - 28 microns, with some capability in the visible range. JWST will have a large mirror, 6.5 meters in diameter, and will be diffraction-limited at 2 microns (0.1 arcsec resolution). JWST will be placed in an L2 orbit about 1.5 million km from the Earth. The instruments will provide imaging, coronography, and multi-object and integral-field spectroscopy across the full 1 - 28 micron wavelength range. The breakthrough capabilities of JWST will enable new studies of massive star winds from the Milky Way to the early universe.

Sonneborn, George↗

Imaging and Spectroscopy with the James Webb Space Telescope

The James Webb Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2013. JWST will find the first stars and galaxies that formed in the early universe, connecting the Big Bang to our own Milky Way galaxy. JWST will peer through dusty clouds to see stars forming planetary systems, connecting the Milky Way to our own Solar System. JWST's instruments are designed to work primarily in the infrared range of 1 - 28 microns, with some capability in the visible range. JWST will have a large mirror, 6.5 meters in diameter, and will be diffraction-limited at 2 microns (0.1 arcsec resolution). JWST will be placed in an L2 orbit about 1.5 million km from the Earth. The instruments will provide imaging, coronography, and multi-object and integral-field spectroscopy across the full 1 - 28 micron wavelength range. The breakthrough capabilities of JWST will enable new studies of star formation and evolution in the Milky Way, nearby galaxies, and the early universe.

Sonneborn, George↗

FPGA Control System for the Automated Test of Microshutters

The James Webb Space Telescope, scheduled to replace the Hubble in 2013, must simultaneously observe hundreds of faint galaxies. This requirement has led to the development of a programmable transmission mask which can be adapted to admit light with arbitrary pattern of galaxies into its spectrograph. This programmable mask will contain a large array of micro-electromechanical (MEMs) devices called MicroShutters. These microscopic shutters physically open and close like the shutter on a camera, except each shutter is microscopic in size and an array 365 by 171 is used to select the objects under spectroscopic observation at a given time, and to block the unwanted background light from other areas. NASA developed and is currently refining the exceptionally difficult process of manufacturing these shutters. This paper describes how the authors used LabVIEW FPGA and a reconfigurable I/O board to control the shutters in a test chamber and how the flexibility of the system allows us to continue to modify the control algorithms as NASA optimizes the performance of the MicroShutter arrays.

Lyness, Eric↗

FPGA Control System for the Automated Test of MicroShutters

The James Webb Space Telescope, scheduled to replace the Hubble in 2013, must simultaneously observe hundreds of faint galaxies. This requirement has led to the development of a programmable transmission mask which can be adapted to admit light from an arbitrary pattern of galaxies into its spectrograph. This programmable mask will contain a large array of micro-electromechanical (MEMs) devices called MicroShutters. These microscopic shutters physically open and close like the shutter on a camera, except each shutter is microscopic in size and an array 365 by 171 is used to select the objects under spectroscopic observation at a given time, and to block the unwanted background light from other areas. NASA developed and is currently refining the exceptionally difficult process of manufacturing these shutters. This paper describes how the authors used LabVIEW FPGA and a reconfigurable I/O board to control the shutters in a test chamber and how the flexibility of the system allows us to continue to modify the control algorithms as NASA optimizes the performance of the MicroShutter arrays.

Lyness, Eric↗

An Update on the Role of Systems Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2014. System-level verification of critical performance requirements will rely on integrated observatory models that predict the wavefront error accurately enough to verify that allocated top-level wavefront error of 150 nm root-mean-squared (rms) through to the wave-front sensor focal plane is met. The assembled models themselves are complex and require the insight of technical experts to assess their ability to meet their objectives. This paper describes the systems engineering and modeling approach used on the JWST through the detailed design phase.

Muheim, Danniella↗

Systems Engineering on the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2014. System-level verification of critical performance requirements will rely on integrated observatory models that predict the wavefront error accurately enough to verify that allocated top-level wavefront error of 150 nm root-mean-squared (rms) through to the wave-front sensor focal plane is met. This paper describes the systems engineering approach used on the JWST through the detailed design phase.

Menzel, Michael T.↗