Search NASA⌕ Search

SEARCH · Search NASA

Results for “Solar Plus”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Installed Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage: Q1 2016

In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quarter of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.

14 SOLAR ENERGY↗

Spectroscopic planetary detection

One of the most promising methods for the detection of extra-solar planets is the spectroscopic method, where a small Doppler shift (approximately 10 meters/sec) in the spectrum of the parent star reveals the presence of planetary companions. However, solar-type stars may show spurious Doppler shifts due to surface activity. If these effects are periodic, as is the solar activity cycle, then they may masquerade as planetary companions. The goal of this investigation is to determine whether the solar cycle affects the Doppler stability of integrated sunlight. Observations of integrated sunlight are made in the near infrared (approximately 2 micrometer), using the Kitt Peak McMath Fourier transform spectrometer, with an N2O gas absorption cell for calibration. Researchers currently achieve an accuracy of approximately 5 meters/sec. Solar rotation velocities vary by plus or minus 2000 meters/sec across the solar disk, and imperfect optical integration of these velocities is the principal source of error. We have been monitoring the apparent velocity of integrated sunlight since 1983. They initially saw a decrease of approximately 30 meters/sec in the integrated light velocity from 1983 through 1985, but in 1987 to 1988 the integrated light velocity returned to its 1983 level. It is too early to say whether these changes are solar-cycle related. Although the FTS, unlike a slit spectrograph, has a large field of view, researchers are always looking for ways to improve the optical integration of the solar disk. They recently made an improvement in the method used to optically collimate the FTS, and this has reduced the error level, eliminating some systematic effects seen earlier.

Deming, Drake↗

Microlensing by the galactic bar

We compute the optical depth and duration distribution of microlensing events towrd Baade's window in a model composed of a Galactic disk and a bar. The bar model is a self-consistent dynamical model built out of individual orbits that has been populated to be consistent with the COBE maps of the Galaxy and kinematic observations of the Galactic bulge. We find that most of the lenses are in the bulge with a line-of-sight distance 6.25 kpc (adopting R(sub 0) = 8 kpc). The microlensing optical depth of a 2 x 10(exp 10) solar mass bar plus a truncated disk is (2.2 +/- 0.45) x 10(exp -6), consistent with the large optical depth (3.2 +/- 1.2) x 10(exp -6) found by Udalski et al. (1994). This model optical depth is enhanced over the predictions of axisymmetric models by Kiraga & Paczynski (1994) by slightly more than a factor of 2, since the bar is elongated along the line of sight. The large Einstein radius and small transverse velocity dispersion also predict a longer event duration in the self-consistent bar model than in the Kiraga-Paczynski model. The event rate and duration distribution also depend on the lower mass cutoff of the lens mass function. With a 0.1 solar mass cutoff, five to seven events (depending on the contribution of disk lenses) with a logarithmic mean duration of 20 days are expected for the Optical Gravitational Lensing Experiment (OGLE) according to our model, while Udalski et al. (1994) observed nine events with durations from 8 to 62 days. On the other hand, if most of the lenses are brown dwarfs, our model predicts too many short-duration events. A Kolmogorov-Smirnov test finds only 7% probability for the model with 0.01 solar mass cutoff to be consistent with current data.

Zhao, Hongsheng↗

Cross-scale observations of the 2015 St. Patrick's day storm: THEMIS, Van Allen Probes, and TWINS

In this paper, we present cross-scale magnetospheric observations of the 17 March 2015 (St. Patrick's Day) storm, by Time History of Events and Macroscale Interactions during Substorms (THEMIS), Van Allen Probes (Radiation Belt Storm Probes), and Two Wide-angle Imaging Neutral-atom Spectrometers (TWINS), plus upstream ACE/Wind solar wind data. THEMIS crossed the bow shock or magnetopause 22 times and observed the magnetospheric compression that initiated the storm. Empirical models reproduce these boundary locations within 0.7 R E . Van Allen Probes crossed the plasmapause 13 times; test particle simulations reproduce these encounters within 0.5 R E . Before the storm, Van Allen Probes measured quiet double-nose proton spectra in the region of corotating cold plasma. About 15 min after a 0605 UT dayside southward turning, Van Allen Probes captured the onset of inner magnetospheric convection, as a density decrease at the moving corotation-convection boundary (CCB) and a steep increase in ring current (RC) proton flux. During the first several hours of the storm, Van Allen Probes measured highly dynamic ion signatures (numerous injections and multiple spectral peaks). Sustained convection after ~1200 UT initiated a major buildup of the midnight-sector ring current (measured by RBSP A), with much weaker duskside fluxes (measured by RBSP B, THEMIS a and THEMIS d). A close conjunction of THEMIS d, RBSP A, and TWINS 1 at 1631 UT shows good three-way agreement in the shapes of two-peak spectra from the center of the partial RC. A midstorm injection, observed by Van Allen Probes and TWINS at 1740 UT, brought in fresh ions with lower average energies (leading to globally less energetic spectra in precipitating ions) but increased the total pressure. Finally, the cross-scale measurements of 17 March 2015 contain significant spatial, spectral, and temporal structure.

79 ASTRONOMY AND ASTROPHYSICS↗

AN ASTEROID BELT INTERPRETATION FOR THE TIMING VARIATIONS OF THE MILLISECOND PULSAR B1937+21

Pulsar timing observations have revealed companions to neutron stars that include other neutron stars, white dwarfs, main-sequence stars, and planets. We demonstrate that the correlated and apparently stochastic residual times of arrival from the millisecond pulsar B1937+21 are consistent with the signature of an asteroid belt having a total mass {approx}< 0.05 M{sub Circled-Plus }. Unlike the solar system's asteroid belt, the best fit pulsar asteroid belt extends over a wide range of radii, consistent with the absence of any shepherding companions. We suggest that any pulsar that has undergone accretion-driven spin-up and subsequently evaporated its companion may harbor orbiting asteroid mass objects. The resulting timing variations may fundamentally limit the timing precision of some of the other millisecond pulsars. Observational tests of the asteroid belt model include identifying periodicities from individual asteroids, which are difficult; testing for statistical stationarity, which becomes possible when observations are conducted over a longer observing span; and searching for reflected radio emission.

79 ASTRONOMY AND ASTROPHYSICS↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Models of the giant planets

Models of the giant planets were constructed based on the assumption that the hydrogen to helium ratio is solar in these planets. This assumption, together with arguments about the condensation sequence in the primitive solar nebula, yields models with a central core of rock and possibly ice surrounded by an envelope of hydrogen, helium, methane, ammonia, and water. These last three volatiles many be individually enhanced due to condensation at the period of core formation. Jupiter was found to have a core of about 40 earth masses and a water enhancement in the atmosphere of about 7.5 times the solar value. Saturn was found to have a core of 20 earth masses and a water enhancement in the atmosphere of about 25 times the solar value. Rock plus ice constitute 75-85% of the mass of Uranus and Neptune.

Podolak, M.↗

Conversion Of Classical Orbital Elements

OSMEAN is sophisticated program that converts between osculating and mean classical orbital elements. Enables engineer to exploit advantages of each approach for design and planning or orbital trajectories and maneuvers. Converts mean elements to osculating elements or vice-versa. Conversion based on mathematical modeling of all first-order aspherical terrestrial, lunar, and solar gravitational perturbations plus second-order aspherical term based on second-degree central-body zonal perturbation. Written in FORTRAN 77.

Guinn, Joseph R.↗

Key Technologies, Systems, and Infrastructure Enabling the Commercialization and Human Settlement of the Moon and Cislunar Space

Over 50 years have passed since 2001: A Space Odyssey debuted in April 1968. In the film, Dr. Heywood Floydflies to a large artificial gravity space station orbiting Earth aboard a commercial space plane. He then embarks on acommuter flight to the Moon arriving there 25 hours later. Today, in this the 50th anniversary year of the Apollo 11lunar landing, the images portrayed in 2001 still remain well beyond our capabilities. This paper examines keytechnologies and systems (e.g., in-situ resource utilization, fission power, advanced chemical and nuclearpropulsion), and supporting orbital infrastructure (providing a propellant and cargo transfer function), that could bedeveloped by NASA and industry over the next 30 years allowing the operational capabilities presented in 2001 to beachieved, albeit on a more spartan scale. Lunar-derived propellants (LDPs) will be essential to developing a reusablelunar transportation system that can allow initial outposts to evolve into settlements supporting a variety ofcommercial activities. Deposits of icy regolith discovered at the lunar poles can supply the feedstock material neededto produce liquid oxygen (LO2) and hydrogen (LH2) propellants. On the lunar nearside, near the equator, iron oxiderichvolcanic glass beads from vast pyroclastic deposits, together with mare regolith, can provide the feedstockmaterials to produce lunar-derived LO2 plus other important solar wind implanted (SWI) volatiles, including H2and helium-3. Megawatt-class fission power systems will be essential for providing continuous "24/7" power toprocessing plants, human settlements and commercial enterprises that develop on the Moon and in orbit. Reusablelunar landing vehicles will provide cargo and passenger "orbit-to-surface" access and will also transport LDP toSpace Transportation Nodes (STNs) located in lunar polar (LPO) and equatorial orbits (LLO). Reusable space-based,lunar transfer vehicles (LTVs), operating between STNs in low Earth orbit, LLO, and LPO, and able to refuel withLDPs, offer unique mission capabilities including short transit time crewed cargo transports. Even commuter flightssimilar to that portrayed in 2001 appear possible, allowing 1-way trip times to and from the Moon as short as 24hours. The performance of LTVs using both RL10B-2 chemical rockets, and a variant of the nuclear thermal rocket(NTR), the LO2-Augmented NTR (LANTR), are examined and compared. If only 1% of the LDP obtained from icyregolith, volcanic glass, and SWI volatile deposits were available for use in lunar orbit, such a supply could supportroutine commuter flights to the Moon for many thousands of years. This paper provides a look ahead at what mightbe possible in the not too distant future, quantifies the operational characteristics of key in-space and surfacetechnologies and systems, and provides conceptual designs for the various architectural elements discussed.

Borowski, Stanley K.↗

Key Technologies, Systems, and Infrastructure Enabling the Commercialization and Human Settlement of the Moon and Cislunar Space

Over 50 years have passed since 2001: A Space Odyssey debuted in April 1968. In the film, Dr. Heywood Floydflies to a large artificial gravity space station orbiting Earth aboard a commercial space plane. He then embarks on acommuter flight to the Moon arriving there 25 hours later. Today, in this the 50th anniversary year of the Apollo 11lunar landing, the images portrayed in 2001 still remain well beyond our capabilities. This paper examines keytechnologies and systems (e.g., in-situ resource utilization, fission power, advanced chemical and nuclearpropulsion), and supporting orbital infrastructure (providing a propellant and cargo transfer function), that could bedeveloped by NASA and industry over the next 30 years allowing the operational capabilities presented in 2001 to beachieved, albeit on a more spartan scale. Lunar-derived propellants (LDPs) will be essential to developing a reusablelunar transportation system that can allow initial outposts to evolve into settlements supporting a variety ofcommercial activities. Deposits of icy regolith discovered at the lunar poles can supply the feedstock material neededto produce liquid oxygen (LO2) and hydrogen (LH2) propellants. On the lunar nearside, near the equator, iron oxiderichvolcanic glass beads from vast pyroclastic deposits, together with mare regolith, can provide the feedstockmaterials to produce lunar-derived LO2 plus other important solar wind implanted (SWI) volatiles, including H2and helium-3. Megawatt-class fission power systems will be essential for providing continuous "24/7" power toprocessing plants, human settlements and commercial enterprises that develop on the Moon and in orbit. Reusablelunar landing vehicles will provide cargo and passenger "orbit-to-surface" access and will also transport LDP to Space Transportation Nodes (STNs) located in lunar polar (LPO) and equatorial orbits (LLO). Reusable space-based,lunar transfer vehicles (LTVs), operating between STNs in low Earth orbit, LLO, and LPO, and able to refuel with LDPs, offer unique mission capabilities including short transit time crewed cargo transports. Even commuter flights similar to that portrayed in 2001 appear possible, allowing 1-way trip times to and from the Moon as short as 24hours. The performance of LTVs using both RL10B-2 chemical rockets, and a variant of the nuclear thermal rocket(NTR), the LO2-Augmented NTR (LANTR), are examined and compared. If only 1% of the LDP obtained from icyregolith, volcanic glass, and SWI volatile deposits were available for use in lunar orbit, such a supply could support routine commuter flights to the Moon for many thousands of years. This paper provides a look ahead at what might be possible in the not too distant future, quantifies the operational characteristics of key in-space and surface technologies and systems, and provides conceptual designs for the various architectural elements discussed.

Borowski, Stanley K.↗

Commercial and Human Settlement of the Moon and Cislunar Space – A Look Ahead at the Possibilities over the Next 50 Years

Over 50 years have passed since the movie 2001: A Space Odyssey debuted in April 1968. In the film, Dr. Heywood Floyd flies to a large artificial gravity space station orbiting Earth aboard a commercial space plane. He then embarks on a commuter flight to the Moon arriving there 25 hours later. Today, on the 50th anniversary of the Apollo 11 lunar landing, the images portrayed in 2001 still remain well beyond our capabilities. This paper examines key technologies and systems (in-situ resource utilization, fission power, advanced chemical and nuclear propulsion), and orbiting infrastructure elements (providing a propellant depot and cargo transfer function), that could be developed by NASA and the private sector in future decades allowing the operational capabilities presented in 2001 to be achieved, albeit on a more spartan scale. Lunar-derived propellants (LDPs) will be essential to reducing the launch mass requirements from Earth and developing a reusable lunar transportation system (LTS) that can allow initial outposts to evolve into settlements supporting a variety of commercial activities like in-situ propellant production. Deposits of icy regolith found within permanently shadowed craters at the lunar poles can supply the feedstock material to produce liquid oxygen (LO2) and hydrogen (LH2) propellant needed by surface-based lunar landing vehicles (LLVs) using chemical rocket engines. Along the Moon’s nearside equatorial corridor, iron oxide-rich volcanic glass beads from vast pyroclastic deposits, together with mare regolith, can provide the materials to produce lunar-derived LO2 plus other important solar wind implanted (SWI) volatiles, including H2 and helium-3. Megawatt-class fission power systems will be essential for providing continuous “24/7” power to processing plants, evolving human settlements, and other commercial activities that develop on the Moon and in orbit. Reusable LLVs will provide cargo and passenger “orbit-to-surface” access and will also be used to transport LDP to Space Transportation Nodes (STNs) located in lunar polar (LPO) and equatorial orbits (LLO). Spaced-based, reusable lunar transfer vehicles (LTVs), operating between STNs in low Earth orbit (LEO), LLO, and LPO, and able to refuel with LDPs, can offer unique mission capabilities including short transit time crewed cargo transports. Even a commuter shuttle service similar to that portrayed in 2001 appears possible, allowing 1-way trip times to and from the Moon as short as 24 hours. The performance of LTVs using both RL10B-2 chemical rockets, and a variant of the nuclear thermal rocket (NTR), the LO2-Augmented NTR (LANTR), are examined and compared. The bipropellant LANTR engine utilizes its divergent nozzle section as an afterburner into which oxygen is injected and supersonically combusted with reactor-heated hydrogen emerging from the engine’s sonic throat. If only 1% of the LDP obtained from icy regolith, volcanic glass, and SWI volatile deposits were available for use in lunar orbit, such a supply could support routine commuter flights to the Moon for many thousands of years! This paper provides a look ahead at what might be possible in the not too distant future, quantifies the operational characteristics of key in-space and surface technologies and systems, and provides conceptual designs for the various architectural elements discussed.

Borowski, Stanley K.↗

A Super-Jupiter Orbiting A Late-Type Star: A Refined Analysis of Microlensing Event OGLE-2012-BLG-0406

We present a detailed analysis of survey and follow-up observations of microlensing event OGLE-2012-BLG-0406 based on data obtained from 10 different observatories. Intensive coverage of the light curve, especially the perturbation part, allowed us to accurately measure the parallax effect and lens orbital motion. Combining our measurement of the lens parallax with the angular Einstein radius determined from finite-source effects, we estimate the physical parameters of the lens system. We find that the event was caused by a 2.73 plus or minus 0.43 M (sub J) planet orbiting a 0.44 plus or minus 0.07 solar mass early M-type star. The distance to the lens is 4.97 plus or minus 0.29 kpc and the projected separation between the host star and its planet at the time of the event is 3.45 plus or minus 0.26 AU. We find that the additional coverage provided by follow-up observations, especially during the planetary perturbation, leads to a more accurate determination of the physical parameters of the lens.

microlensing↗

Considerations for Implementing PV Plus Storage Systems at Federal Buildings and Campuses

Federal agencies have a long history of using solar photovoltaics and battery storage (PV plus storage) systems at remote sites where the technologies can offset costly diesel fuel. However, recent declines in lithium-ion battery costs, along with changes in net metering policies and utility rate structures, are opening up opportunities for PV plus storage to be deployed cost-effectively at grid-connected sites.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Using Image Pro Plus Software to Develop Particle Mapping on Genesis Solar Wind Collector Surfaces

The continued success of the Genesis mission science team in analyzing solar wind collector array samples is partially based on close collaboration of the JSC curation team with science team members who develop cleaning techniques and those who assess elemental cleanliness at the levels of detection. The goal of this collaboration is to develop a reservoir of solar wind collectors of known cleanliness to be available to investigators. The heart and driving force behind this effort is Genesis mission PI Don Burnett. While JSC contributes characterization, safe clean storage, and benign collector cleaning with ultrapure water (UPW) and UV ozone, Burnett has coordinated more exotic and rigorous cleaning which is contributed by science team members. He also coordinates cleanliness assessment requiring expertise and instruments not available in curation, such as XPS, TRXRF [1,2] and synchrotron TRXRF. JSC participates by optically documenting the particle distributions as cleaning steps progress. Thus, optical document supplements SEM imaging and analysis, and elemental assessment by TRXRF.

Rodriquez, Melissa C.↗

NREL Benchmarks the Installed Cost of Residential Solar Photovoltaics with Energy Storage for the First Time

Fact sheet summarizing technical report TP-7A40-67474. New National Renewable Energy Laboratory research fills a gap in the existing knowledge about barriers to PV-plus-storage systems by providing detailed component- and system-level installed cost benchmarks for systems in the first quarter of 2016. The report is meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede PV-plus-storage deployment.

14 SOLAR ENERGY↗

Study of hybrid power system potential to power agricultural water pump in mountain area

As industry and Indonesian economy grow fast, there are a lot of agricultural land has changed into housing and industrial land. This causes the agricultural land moves to mountain area. In mountainous agricultural area, farmers use the water resources of small rivers in the groove of the mountain to irrigate the farmland. Farmers use their power to lift up water from the river to their land which causes inefectivity in the work of the farmers. Farmers who have capital utilize pump to raise water to their land. The only way to use pump in mountain area is by using fuel energy as there is no electricity, and the fuel price in mountain area is very expensive. Based on those reasons it is wise to consider the exploration of renewable energy available in the area such as solar energy, wind energy and hybrid energy. This study analyses the potential of the application of hybrid power plant, which is the combination of solar and wind energy, to power agricultural pump. In this research, the data of wind speed and solar radiation are collected from the measurement of BMKG SMPK Plus Sare. Related to the solar energy, the photovoltaic output power calculation is 193 W with duration of irradiation of 5 hours/day. While for the wind energy, the output power of the wind turbine is 459.84 W with blade diameter of 3 m and blow duration of 7 hours/day. The power of the pump is 558 W with 8 hours of usage, and the water capacity is 2.520 liters/hour for farmland with the area of 15 ha. Based on the analysis result, the designed system will generate electricity of 3.210 kW/year with initial investment of US$ 14,938.

17 WIND ENERGY↗