Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Artemis I Space Launch System Base Heat Shield Thermal Protection System Performance

The Space Launch System (SLS) Core Stage base heat shield experienced the highest external heating environments on the entire launch vehicle during Artemis I ascent flight. This result was consistent with design predictions. The base heat shield experiences P50 cork combustion dynamics at low altitudes, plume-induced recirculation at moderate altitudes and then in-space base flow physics out to Main Engine Cut-Off (MECO). The base heat shield thermal protection system (TPS) is composed of a P50 cork ablator which is bonded to a substrate. The heat shield protects the gimbal actuation system, RS-25 turbomachinery systems and other aft section sensitive components during ascent. This paper estimates the base heat shield TPS performance from Artemis I using flight data from the NASA Langley Research Center’s Scientifically Calibrated In-Flight Imagery (SCIFLI) Airborne Multispectral Imager (SAMI), development flight instrumentation (DFI) and other TPS recession flight measurements. Predictions from computational and ground test-derived engineering ablation models and observations are also applied. Since no base heat shield substrate thermocouple data were obtained for Artemis I, an estimate of the TPS performance data is derived here. This data assesses thermal margin of the SLS Core Stage base heat shield and best informs the Artemis II Crewed mission to the moon.

aerothermodynamics↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASAs Space Launch System

The engineering development of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS) requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The nominal and off-nominal characteristics of SLS's elements and subsystems must be understood and matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large and complex systems engineering challenge, which is being addressed in part by focusing on the specific subsystems involved in the handling of off-nominal mission and fault tolerance with response management. Using traditional model-based system and software engineering design principles from the Unified Modeling Language (UML) and Systems Modeling Language (SysML), the Mission and Fault Management (M&FM) algorithms for the vehicle are crafted and vetted in Integrated Development Teams (IDTs) composed of multiple development disciplines such as Systems Engineering (SE), Flight Software (FSW), Safety and Mission Assurance (S&MA) and the major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GNC), Thrust Vector Control (TVC), and liquid engines. These model-based algorithms and their development lifecycle from inception through FSW certification are an important focus of SLS's development effort to further ensure reliable detection and response to off-nominal vehicle states during all phases of vehicle operation from pre-launch through end of flight. To test and validate these M&FM algorithms a dedicated test-bed was developed for full Vehicle Management End-to-End Testing (VMET). For addressing fault management (FM) early in the development lifecycle for the SLS program, NASA formed the M&FM team as part of the Integrated Systems Health Management and Automation Branch under the Spacecraft Vehicle Systems Department at the Marshall Space Flight Center (MSFC). To support the development of the FM algorithms, the VMET developed by the M&FM team provides the ability to integrate the algorithms, perform test cases, and integrate vendor-supplied physics-based launch vehicle (LV) subsystem models. Additionally, the team has developed processes for implementing and validating the M&FM algorithms for concept validation and risk reduction. The flexibility of the VMET capabilities enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the developed algorithms utilizing actual subsystem models such as MPS, GNC, and others. One of the principal functions of VMET is to validate the M&FM algorithms and substantiate them with performance baselines for each of the target vehicle subsystems in an independent platform exterior to the flight software test and validation processes. In any software development process there is inherent risk in the interpretation and implementation of concepts from requirements and test cases into flight software compounded with potential human errors throughout the development and regression testing lifecycle. Risk reduction is addressed by the M&FM group but in particular by the Analysis Team working with other organizations such as S&MA, Structures and Environments, GNC, Orion, Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission (LOM) and Loss of Crew (LOC) probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and associated detection and responses to be tested in VMET to ensure reliable failure detection, and confirm responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - the ARINC 6535-partitioned Operating System, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM such as telemetry packing and processing. The baseline plan for use of VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by FSW. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure their effectiveness and performance in the exterior FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA’s Space Launch System (SLS) (Fig. 1) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering for launch the first flight hardware of the world’s most capable launch vehicle. The program is now in a stage of hardware assembly, integration and testing in preparation for the first integrated flight of SLS and the Orion crew vehicle. SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the Moon in preparation for missions deeper into space. This paper will elaborate on SLS accomplishments in 2017 and plans for progress in 2018.

Askins, Bruce R.↗

Using NASA's Space Launch System to Enable Game Changing Science Mission Designs

NASA's Marshall Space Flight Center is directing efforts to build the Space Launch System (SLS), a heavy-lift rocket that will help restore U.S. leadership in space by carrying the Orion Multi-Purpose Crew Vehicle and other important payloads far beyond Earth orbit. Its evolvable architecture will allow NASA to begin with Moon fly-bys and then go on to transport humans or robots to distant places such as asteroids, Mars, and the outer solar system. Designed to simplify spacecraft complexity, the SLS rocket will provide improved mass margins and radiation mitigation, and reduced mission durations. These capabilities offer attractive advantages for ambitious missions such as a Mars sample return, by reducing infrastructure requirements, cost, and schedule. For example, if an evolved expendable launch vehicle (EELV) were used for a proposed mission to investigate the Saturn system, a complicated trajectory would be required with several gravity-assist planetary fly-bys to achieve the necessary outbound velocity. The SLS rocket, using significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, reducing trip times and cost. As this paper will report, the SLS rocket will launch payloads of unprecedented mass and volume, such as monolithic telescopes and in-space infrastructure. Thanks to its ability to co-manifest large payloads, it also can accomplish complex missions in fewer launches. Future analyses will include reviews of alternate mission concepts and detailed evaluations of SLS figures of merit, helping the new rocket revolutionize science mission planning and design for years to come.

Creech, Stephen D.↗

Space Launch Initiative: New Capabilities - New Horizons

This paper presents NASA's Space Launch Initiative (SLI) with new capabilities and new horizons. The topics include: 1) Integrated Space Transportation Plan; 2) SLI: The Work of a Nation; 3) SLI Goals and Status; 4) Composites and Materials; and 5) SLI and DOD/USAF Collaboration. This paper is in viewgraph form.

Dumbacher, Daniel↗

Space Launch Initiative: New Capabilities ... New Horizons

This paper presents NASA's Space Launch Initiative (SLI) with new capabilities and new horizons. The topics include: 1) Integrated Space Transportation Plan; 2) SLI: The Work of an Nation; 3) SLI Goals and Status; 4) Composites and Materials; and 5) SLI & DoD/USAF Collaboration. This paper is presented in viewgraph form.

Dumbacher, Daniel L.↗

The NASA Space Launch System Program Systems Engineering Approach for Affordability

The National Aeronautics and Space Administration is currently developing the Space Launch System to provide the United States with a capability to launch large Payloads into Low Earth orbit and deep space. One of the development tenets of the SLS Program is affordability. One initiative to enhance affordability is the SLS approach to requirements definition, verification and system certification. The key aspects of this initiative include: 1) Minimizing the number of requirements, 2) Elimination of explicit verification requirements, 3) Use of certified models of subsystem capability in lieu of requirements when appropriate and 4) Certification of capability beyond minimum required capability. Implementation of each aspect is described and compared to a "typical" systems engineering implementation, including a discussion of relative risk. Examples of each implementation within the SLS Program are provided.

Hutt, John J.↗

NASA’s Space Launch System: Powering Artemis and Enabling Discovery

The debut launch of NASA’s super-heavy lift SLS (Space Launch System) rocket in November 2022 opened a new era of deep space exploration. Called the Artemis I mission, the launch sent an uncrewed Orion spacecraft more than 268,000 miles from Earth into a distant retrograde orbit (DRO) about the Moon, before splashing down in the Pacific Ocean 25 days later. While the mission was critical for multiple reasons to NASA’s Artemis campaign, the data collected during the first launch of SLS was vital to understanding how the launch vehicle performs in the flight environment. The test flight provided real-world data to ground and improve models, on-ground testing, and vehicle performance. Data returned show a nominal launch, with many parameters accurate to pre-flight predictions to within tenths of a percent. Equipped with the data, the SLS team is readying the Artemis II vehicle. Beginning with the fourth flight, SLS variants will have multiple upgrades, which increase the capability of the rocket to enable the nation’s most ambitious missions of returning astronauts to the Moon and lunar vicinity. Current hardware progress, as well as Artemis I flight data, will be provided. Additionally, the test programs that enabled the successful first flight will be discussed.

John Honeycutt↗

A Comparison of Boundary Layer Wind Profilers for Use with Space Launch Vehicles

The United States Air Force (USAF) operates two space launch ranges, the Eastern Range (ER) and the Western Range (WR). The ER is primarily located at the Cape Canaveral Air Force Station (CCAFS) and the WR is located at the Vandenberg Air Force Base (VAFB). Multiple systems are used to measure the atmosphere at both ranges, including a suite of 915-Mhz (megahertz) Doppler Radar Wind Profilers (DRWP). The 915-MHz DRWPs are used to measure winds in the lowest few kilometers of the atmosphere, primarily in the boundary layer. Boundary layer winds are important during launch, and observations of such can be used as input to toxic dispersion and low-level abort trajectory models. However, these 915-MHz systems are nearing the end of their service life and need to be replaced by systems with similar, or greater, capabilities. The USAF funded evaluations of two systems: a 449-MHz DRWP and a Lidar. Both systems were stationed at each range for separate periods of approximately three months from November 2017 through May 2018. The USAF also funded NASA’s Marshall Space Flight Center (MSFC) Natural Environments Branch (NE) to evaluate wind output from the two systems. MSFC NE conducted analysis to demonstrate the system’s wind accuracy relative to measurements from the Automated Meteorological Profiling System (AMPS) (Divers et al., 2000), data availability, and Effective Vertical Resolution (EVR).

Orcutt, John M.↗

Overview of the High Reynolds Number Ascent Wind Tunnel Test of the Space Launch System at the National Transonic Facility

Transonic, high Reynolds number wind tunnel testing for the Space Launch System (SLS) ascent flight environment was conducted in the National Transonic Facility (NTF) at the NASA Langley Research Center from December 2019 to April 2021. The test was sponsored by the SLS Program and the NASA Engineering & Safety Center with the ob- jective of assessing and characterizing Reynolds number effects on the ascent aerodynamics of the SLS launch vehicle. The cryogenic test article was a 1.75%-scale representation of the SLS Block 1 Cargo configuration that was fabricated mostly out of stainless steel, but with several additive-manufactured components including the Solid Rocket Booster (SRB) attach brackets and the SRB nozzles. This was the first use of additive manufacturing on structural components of a cryogenic model in the NTF, therefore post-fabrication material testing and inspections were performed to satisfy safety requirements. Force & moment and surface pressure data were acquired for Mach numbers between 0.50 and 0.95 over a range of Reynolds numbers based on core stage diameter between 2x10^6 and a maximum of 40x10^6 corresponding to 45% of flight Reynolds number. Additionally, flow visualization data using Pressure Sensitive Paint were acquired with a focus on the SRB forward attach area, which is susceptible to Reynolds number sensitivity at transonic speeds. This paper provides an overview of the test campaign including details on the unique test article and the experimental setup and test execution. General test findings and observations are also presented, but the majority of the test results and data analyses are provided in a companion paper.

Space Launch System↗

Overview of the High Reynolds Number Ascent Wind Tunnel Test of the Space Launch System at the National Transonic Facility

Transonic, high Reynolds number wind tunnel testing for the Space Launch System (SLS) ascent flight environment was conducted in the National Transonic Facility (NTF) at the NASA Langley Research Center from December 2019 to April 2021. The test was sponsored by the SLS Program and the NASA Engineering & Safety Center with the ob- jective of assessing and characterizing Reynolds number effects on the ascent aerodynamics of the SLS launch vehicle. The cryogenic test article was a 1.75%-scale representation of the SLS Block 1 Cargo configuration that was fabricated mostly out of stainless steel, but with several additive-manufactured components including the Solid Rocket Booster (SRB) attach brackets and the SRB nozzles. This was the first use of additive manufacturing on structural components of a cryogenic model in the NTF, therefore post-fabrication material testing and inspections were performed to satisfy safety requirements. Force & moment and surface pressure data were acquired for Mach numbers between 0.50 and 0.95 over a range of Reynolds numbers based on core stage diameter between 2x10^6 and a maximum of 40x10^6 corresponding to 45% of flight Reynolds number. Additionally, flow visualization data using Pressure Sensitive Paint were acquired with a focus on the SRB forward attach area, which is susceptible to Reynolds number sensitivity at transonic speeds. This pa- per provides an overview of the test campaign including details on the unique test article and the experimental setup and test execution. General test findings and observations are also presented, but the majority of the test results and data analyses are provided in a companion paper.

Space Launch System↗

Development of a Display Tool to Quality Control Weather Balloon Data for Space Launch Vehicles

Continuous atmospheric data analysis is an important factor for space launch vehicle design and operations. The balloon quality control tool was developed by NASA’s Marshall Space Flight Center (MSFC) Natural Environments Branch (NEB) for monitoring quality control processes and verifying the automated flags created on the balloon data sets analyzed. The data sets currently analyzed are comprised of high-resolution and low-resolution balloon data from NASA Kennedy Space Center (KSC), co-located on the United States Air Force’s Eastern range (ER) at the Cape Canaveral Air Force Station. The NEB was tasked to perform a quality assessment of these data sets and needed a tool to confirm the quality control (QC) flags produced from an automated process and add additional QC flags if necessary. This Graphical User Interface (GUI) was developed to visualize all of the data from these balloon sets, display any flags from the automated QC process, and add additional flags to variables if necessary. The GUI was developed in Python 3.6 utilizing different packages available such as pandas for data analysis and manipulation, NumPy for high-performance multidimensional array and tools to compute with and manipulate arrays, Matplotlib for plotting data and Tkinter to build the GUI.

Jessica K Headley↗

Space Launch System Base Heating Test: Experimental Operations & Results

NASA's Space Launch System (SLS) uses four clustered liquid rocket engines along with two solid rocket boosters. The interaction between all six rocket exhaust plumes will produce a complex and severe thermal environment in the base of the vehicle. This work focuses on a recent 2% scale, hot-fire SLS base heating test. These base heating tests are short-duration tests executed with chamber pressures near the full-scale values with gaseous hydrogen/oxygen engines and RSRMV analogous solid propellant motors. The LENS II shock tunnel/Ludwieg tube tunnel was used at or near flight duplicated conditions up to Mach 5. Model development was based on the Space Shuttle base heating tests with several improvements including doubling of the maximum chamber pressures and duplication of freestream conditions. Test methodology and conditions are presented, and base heating results from 76 runs are reported in non-dimensional form. Regions of high heating are identified and comparisons of various configuration and conditions are highlighted. Base pressure and radiometer results are also reported.

Dufrene, Aaron↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Crew Vehicle s (MPCV s) first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd A.↗

NASA's Space Launch System: Positioning Assets for Tele-Robotic Operations

The National Aeronautics and Space Administration (NASA) is designing and developing America's most capable launch vehicle to support high-priority human and scientific exploration beyond Earth's orbit. The Space Launch System (SLS) will initially lift 70 metric tons (t) on its first flights, slated to begin in 2017, and will be evolved after 2021 to a full 130-t capability-larger than the Saturn V Moon rocket. This superior lift and associated volume capacity will support game-changing exploration in regions that were previously unattainable, being too costly and risky to reach. On the International Space Station, astronauts are training for long-duration missions to asteroids and cis-martian regions, but have not had transportation out of Earth's orbit - until now. Simultaneously, productive rovers are sending scientists - and space fans - unprecedented information about the composition and history of Mars, the planet thought to be most like Earth. This combination of experience and information is laying the foundation for future missions, such as those outlined in NASA's "Mars Next Decade" report, that will rely on te1e-robotic operations to take exploration to the next level. Within this paradigm, NASA's Space Launch System stands ready to manifest the unique payloads that will be required for mission success. Ultimately, the ability to position assets - ranging from orbiters, to landers, to communication satellites and surface systems - is a critical step in broadening the reach of technological innovation that will benefit all Earth's people as the Space Age unfolds. This briefing will provide an overview of how the Space Launch System will support delivery of elements for tele-robotic operations at destinations such as the Moon and Mars, which will synchronize the human-machine interface to deliver hybrid on-orbit capabilities. Ultimately, telerobotic operations will open entirely new vistas and the doors of discovery. NASA's Space Launch System will be a safe, affordable, and sustainable platform for these purposes and more.

May, Todd A.↗

Selection of Lockheed Martin's Preferred TSTO Configurations for the Space Launch Initiative

Lockheed Martin is developing concepts for safe, affordable Two Stage to Orbit (TSTO) reusable launch vehicles as part of NASA s Space Launch Initiaiive. This paper discusses the options considered for the design of the TSTO, the impact of each of these options on the vehicle configuration, the criteria used for selection of preferred configurations, and the results of the selection process. More than twenty configurations were developed in detail in order to compare optioiis such as propellant choice, serial vs. parallel burn sequence, use of propellant crossfeed between stages, bimese or optimized stage designs, and high or low staging velocities. Each configuration was analyzed not only for performance and sizing, but also for cost and reliability. The study concluded that kerosene was the superior fuel for first stages, and that bimese vehicles were not attractive.

Hopkins, Joshua B.↗

Characterization of the Ignition Over-Pressure/Sound Suppression Water in the Space Launch System Mobile Launcher Using Volume of Fluid Modeling

The Space Launch System (SLS) Vehicle consists of a Core Stage with four RS-25 engines and two Solid Rocket Boosters (SRBs). This vehicle is launched from the Launchpad using a Mobile Launcher (ML) which supports the SLS vehicle until its liftoff from the ML under its own power. The combination of the four RS-25 engines and two SRBs generate a significant Ignition Over-Pressure (IOP) and Acoustic Sound environment. One of the mitigations of these environments is the Ignition Over-Pressure/Sound Suppression (IOP/SS) subsystem installed on the ML. This system consists of six water nozzles located parallel to and 24 inches downstream of each SRB nozzle exit plane as well as 16 water nozzles located parallel to and 53 inches downstream of the RS-25 nozzle exit plane. During launch of the SLS vehicle, water is ejected through each water nozzle to reduce the intensity of the transient pressure environment imposed upon the SLS vehicle. While required for the mitigation of the transient pressure environment on the SLS vehicle, the IOP/SS subsystem interacts (possibly adversely) with other systems located on the Launch Pad. One of the other systems that the IOP/SS water is anticipated to interact with is the Hydrogen Burn-Off Igniter System (HBOI). The HBOI system's purpose is to ignite the unburned hydrogen/air mixture that develops in and around the nozzle of the RS-25 engines during engine start. Due to the close proximity of the water system to the HBOI system, the presence of the IOP/SS may degrade the effectiveness of the HBOI system. Another system that the IOP/SS water may interact with adversely is the RS-25 engine nozzles and the SRB nozzles. The adverse interaction anticipated is the wetting, to a significant degree, of the RS-25 nozzles resulting in substantial weight of ice forming and water present to a significant degree upstream of the SRB nozzle exit plane inside the nozzle itself, posing significant additional blockage of the effluent that exits the nozzle upon motor start leading to detrimental effects. The purpose of the CFD simulations were to i) characterize the location of the IOP/SS water after it is ejected from the IOP/SS nozzles, ii) characterize the interaction of the IOP/SS system with the HBOI system and iii) characterize the interaction of the IOP/SS water with the RS-25 nozzles and the SRB nozzles.

West, Jeff↗