Search NASASearch

SEARCH · Search NASA

Results for “Stack testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Durability of Membrane Electrode Assemblies (MEAs) in PEM Fuel Cells Operated on Pure Hydrogen and Oxygen

Proton exchange membrane (PEM) fuel cells are energy sources that have the potential to replace alkaline fuel cells for space programs. Broad power ranges, high peak-to-nominal power capabilities, low maintenance costs, and the promise of increased life are the major advantages of PEM technology in comparison to alkaline technology. The probability of PEM fuel cells replacing alkaline fuel cells for space applications will increase if the promise of increased life is verified by achieving a minimum of 10,000 hours of operating life. Durability plays an important role in the process of evaluation and selection of MEAs for Teledyne s Phase I contract with the NASA Glenn Research Center entitled Proton Exchange Membrane Fuel cell (PEMFC) Power Plant Technology Development for 2nd Generation Reusable Launch Vehicles (RLVs). For this contract, MEAs that are typically used for H2/air operation were selected as potential candidates for H2/O2 PEM fuel cells because their catalysts have properties suitable for O2 operation. They were purchased from several well-established MEA manufacturers who are world leaders in the manufacturing of diverse products and have committed extensive resources in an attempt to develop and fully commercialize MEA technology. A total of twelve MEAs used in H2/air operation were initially identified from these manufacturers. Based on the manufacturers specifications, nine of these were selected for evaluation. Since 10,000 hours is almost equivalent to 14 months, it was not possible to perform continuous testing with each MEA selected during Phase I of the contract. Because of the lack of time, a screening test on each MEA was performed for 400 hours under accelerated test conditions. The major criterion for an MEA pass or fail of the screening test was the gas crossover rate. If the gas crossover rate was higher than the membrane intrinsic permeability after 400 hours of testing, it was considered that the MEA had failed the test. Three types of MEAs out of the nine total membranes failed the test. The evaluation results showed that fuel cell operating conditions (current, pressure, stoichiometric flow rates) were the parameters that influenced the durability of MEAs. In addition, the durability test results indicated that the type of membrane was also an important parameter for MEA durability. At accelerated test conditions, the MEAs with casted membranes failed during the 400 hour test. However, the MEAs prepared from the casted membrane with support as well as extruded membranes, both passed the 400h durability test at accelerated operating test conditions. As a result of the MEA accelerated durability tests, four MEAs were selected for further endurance testing. These tests are being carried out with four-cell stacks under nominal fuel cell operating conditions.

Stanic, Vesna

(abstract) Student Involvement in the Pluto Mission

The Pluto Fast Flyby mission development baseline consists of 2 identical spacecraft (120 - 165 kg) to be launched to Pluto/ Charon in the late 1990s. These spacecraft are intended to fly by Pluto and Charon in order to perform various remote-sensing scientific investigations and have a mission development cost less than $400M (FY92$) through launch plus 30 days. The Pluto team is committed to involving students in all areas of mission development and operations. In November 1992, the Pluto team sent a request for information to industry and universities looking for ways to lower the mass and cost of the mission. A number of universities responded with creative and promising technological developments. In addition to contracts with industry and other federal labs, contracts were signed with schools which allowed students to apply their research, enabling the Pluto team to use valuable resources on a variety of advanced technology endeavors. Perhaps the most exciting aspect of these investigations was that the deliverables that the students produced were not just final reports, but actual prototype hardware complete with write-ups on lessons learned in machining, programming, and design. Another exciting development was a prototype adapter competition in which 7 universities competed to design, build, and test their idea of a lightweight spacecraft-propulsion stack adapter. Georgia Tech won with an innovative dodecahedron composite lattice cone. Other students from other universities were involved as well. All in all, over 40 students from 20 different colleges made significant contributions to the Pluto Fast Flyby mission development through their efforts. This paper will give an overview of Pluto student involvement, the technologies which they examined, and useful results for the mission.

Pluto student involvement design universities tech

Objectives and Progress on Integrated Vehicle Ground Vibration Testing for the Ares Launch Vehicles

As NASA begins design and development of the Ares launch vehicles to replace the Space Shuttle and explore beyond low Earth orbit, Integrated Vehicle Ground Vibration Testing (IVGVT) will be a vital component of ensuring that those vehicles can perform the missions assigned to them. A ground vibration test (GVT) is intended to measure by test the fundamental dynamic characteristics of launch vehicles during various phases of flight. During the series of tests, properties such as natural frequencies, mode shapes, and transfer functions are measured directly. This data is then used to calibrate loads and control systems analysis models for verifying analyses of the launch vehicle. The Ares Flight & Integrated Test Office (FITO) will be conducting IVGVT for the Ares I crew launch vehicle at Marshall Space Flight Center (MSFC) from 2011 to 2012 using the venerable Test Stand (TS) 4550, which supported similar tests for the Saturn V and Space Shuttle vehicle stacks.

Tuma, Margaret L.

NASA Space Launch System Completes Key Hot Fire Test and Begins Vehicle Integration

NASA and its commercial and international partners are on the way back to the Moon. Significant progress towards that goal was made in 2021, including on the agency’s Space Launch System (SLS) rocket – a key part of the Artemis initiative. The SLS core stage for the Artemis I mission – the first launch of SLS and an uncrewed Orion capsule – completed its Green Run test series in early 2021 and was successfully mated with the SLS twin solid rocket boosters on the mobile launcher at Kennedy Space Center (KSC). The launch vehicle stage adapter, interim cryogenic propulsion stage, and the Orion stage adapter structural test article and Orion spacecraft mass simulator were also stacked. The flight Orion spacecraft and Orion stage adapter are being prepared for stacking and launch, targeted for late 2021 following a wet dress rehearsal at Launch Complex 39B. SLS hardware for Artemis II, which will be the first flight of crew on Orion and SLS, is also in work. Work progressed on core stage components, booster segments, and other hardware for Artemis III and future missions. This paper will detail the progress made.

John Honeycutt

Significance of Landsat-7 Spacecraft Level Thermal Balance and Thermal Test for ETM+Instrument

The thermal design and the instrument thermal vacuum (T/V) test of the Landsat-7 Enhanced Thematic Mapper Plus (ETM+) instrument were based on the Landsat-4, 5 and 6 heritage. The ETM+ scanner thermal model was also inherited from Landsat-4, 5 and 6. The temperature predictions of many scanner components in the original thermal model had poor agreement with the spacecraft and instrument integrated sun-pointing safehold (SPSH) thermal balance (T/B) test results. The spacecraft and instrument integrated T/B test led to a change of the Full Aperture Calibrator (FAC) motor stack "solar shield" coating from MIL-C-5541 to multi-layer insulation (MLI) thermal blanket. The temperature predictions of the Auxiliary Electronics Module (AEM) in the thermal model also had poor agreement with the T/B test results. Modifications to the scanner and AEM thermal models were performed to give good agreement between the temperature predictions and the test results. The correlated ETM+ thermal model was used to obtain flight temperature predictions. The flight temperature predictions in the nominal 15-orbit mission profile, plus margins, were used as the yellow limits for most of the ETM+ components. The spacecraft and instrument integrated T/B and TN test also revealed that the standby heater capacity on the Scan Mirror Assembly (SMA) was insufficient when the Earth Background Simulator (EBS) was 1 50C or colder, and the baffle heater possibly caused the coherent noise in the narrow band data when it was on. Also, the cooler cool-down was significantly faster than that in the instrument T/V test, and the coldest Cold Focal Plane Array (CFPA) temperature achieved was colder.

Choi, Michael K.

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech

Low Cost Propulsion Technology Testing at the Stennis Space Center: Propulsion Test Article and the Horizontal Test Facility

The need for low cost access to space has initiated the development of low cost liquid rocket engine and propulsion system hardware at the Marshall Space Flight Center. This hardware will be tested at the Stennis Space Center's B-2 test stand. This stand has been reactivated for the testing of the Marshall designed Fastrac engine and the Propulsion Test Article. The RP-1 and LOX engine is a turbopump fed gas generator rocket with an ablative nozzle which has a thrust of 60,000 lbf. The Propulsion Test Article (PTA) is a test bed for low cost propulsion system hardware including a composite RP-I tank, flight feedlines and pressurization system, stacked in a booster configuration. The PTA is located near the center line of the B-2 test stand, firing vertically into the water cooled flame deflector. A new second position on the B-2 test stand has been designed and built for the horizontal testing of the Fastrac engine in direct support of the X-34 launch vehicle. The design and integration of these test facilities as well as the coordination which was required between the two Centers is described and lessons learned are provided. The construction of the horizontal test position is discussed in detail. The activation of these facilities is examined and the major test milestones are described.

Fisher, Mark F.

Mechanisms of fatigue damage in boron/aluminum composites

Tensile fatigue tests were conducted on several laminates of boron/aluminum (6061-0). In laminates with 0 deg fibers on the outside, an analysis that identifies "shakedown" conditions predicted the stress amplitude below which no fatigue damage accumulated. A fatigue damage accumulation model which relates matrix fatigue cracking and the overall laminate properties is described. A model for the saturation damage stage development is presented, that identical laminates, tested in directions 90 deg apart (such that one layup has 90 deg outer plies and the other 0 deg), have different fatigue behaviors due to the stacking sequence. The 90 deg plies on the surface develop cracks earlier than predicted by shakedown. An attempt was made to explain this stacking sequence effect. Variable load history effects on the fatigue damage response were investigated. Tests reveal that for a given stress ratio the specimen seeks the saturation damage state for the largest stress range to which it is subjected. It was also found that little damage is generated by shifting a given stress range down, whereas significant damage may be created by shifting it upward. The laminate stresses were always tensile.

Johnson, W. S.

Validation of an SEU simulation technique for a complex processor: PowerPC7400

Published data on the processors sensitivites with respect to SEU is generally obtained from radiation ground testing during which the program is executed by the DUT consists in the sequential inspection of each of the processor memory cells accessible to the user, through the execution of a suitable instruction sequence. In such programs, so-called static tests, typically considered memory cells are general-purpose registers, special registers (program counter, stack pointer...) and internal memory. Nevertheless, the register use and duty cycle of the final application will be very different, including using instructions no in the static tests and disturbing other potential SEU targets. The ideal would be the use of the final application program for the radiation ground testing, but generally this program is either unknown or unavailable when the qualification testing is performed on candidate circuits to space projects.

Radiation

Integrated Modal Test of the Artmis I Launch Vehicle

The dynamic testing campaign for the Artemis I launch vehicle culminated in the Integrated Modal Test (IMT). The IMT consisted of the Space Launch System with a mass simulator of Orion (MSO) on top of the SLS stack, which rested on the deck of the mobile launcher (ML) and mount mechanisms. The modal testing met the goal to capture a set of target modes under 7Hz, in two test configurations, using 298 accelerometer locations and 472 accelerometer channels. Overall the model of the test matched very well with the data without tuning the model with the exception of the first torsion mode, which was measured at a much lower frequency than predicted at when excited at higher levels.

Dan Lazor

A comparison of several methods of calculating fracture toughness from composite laminate test data

Critical fracture toughness was determined by two different techniques for graphite/epoxy laminates of three stacking sequences and several thicknesses. Critical fracture toughness was determined by a finite element stress analysis of a center-cracked tension specimen which yielded the stress intensity factor as a function of specimen thickness and applied load. As an alternative approach the critical strain energy release rate was determined from the compliance calibration technique. Test results from both procedures are compared and discussed.

Harris, C. E.

A Comparison of Quasi-Static Indentation and Drop-Weight Impact Testing on Carbon/Epoxy Laminates

This project was initiated to investigate the damage tolerance of polymer matrix composites (PMC). After a low velocity impact-such as the ones that can occur during manufacturing or service there is usually very little visual damage. There are two possible methods to simulate foreign object impact on PMC: static indentation and drop weight impact. A static method for modeling low velocity foreign object impact events for composites can prove to be very beneficial to researchers since much more data can be obtained from a static test than from an impact test. In order to examine if this is feasible, a series of static indentation and low velocity impact tests were performed and compared. Square specimens of different sizes and thicknesses were tested to cover a wide array of low velocity impact events. Laminates with a 45 degree stacking sequence were used since this is a common type of engineering laminate. Three distinct flexural rigidities under two different boundary conditions were tested in order to obtain damage due to large deflections. Comparisons between static indentation and low velocity impact tests were based on the maximum applied transverse load. The dependent parameters examined were dent depth, back surface crack length, delamination area, and load-deflection behavior. Results showed that no distinct differences could be seen between the static indentation tests and the low velocity impact tests, indicating that static indentation tests can be used to simulate low velocity impact events.

Prabhakaran, R.

High-temperature combustor liner tests in structural component response test facility

Jet engine combustor liners were tested in the structural component response facility at NASA Lewis. In this facility combustor liners were thermally cycled to simulate a flight envelope of takeoff, cruise, and return to idle. Temperatures were measured with both thermocouples and an infrared thermal imaging system. A conventional stacked-ring louvered combustor liner developed a crack at 1603 cycles. This test was discontinued after 1728 cycles because of distortion of the liner. A segmented or float wall combustor liner tested at the same heat flux showed no significant change after 1600 cycles. Changes are being made in the facility to allow higher temperatures.

Moorhead, Paul E.

Experimental Determination of Exhaust Gas Thrust, Special Report

This investigation presents the results of tests made on a radial engine to determine the thrust that can be obtained from the exhaust gas when discharged from separate stacks and when discharged from the collector ring with various discharge nozzles. The engine was provided with a propeller to absorb the power and was mounted on a test stand equipped with scales for measuring the thrust and engine torque. The results indicate that at full open throttle at sea level, for the engine tested, a gain in thrust horsepower of 18 percent using separate stacks, and 9.5 percent using a collector ring and discharge nozzle, can be expected at an air speed of 550 miles per hour.

Pinkel, Benjamin

Ares I-X Overview

The Ares I-X flight test is the first development flight of the Ares I crew launch vehicle. This mission, first conceived in 2006, will be launching later in 2009. Its primary mission objectives will be to demonstrate flight and roll control of a dynamically similar vehicle, perform a separation event and measure its shock effects, stack and recover a first stage booster, and demonstrate ground operations. All of the primary flight test vehicle s hardware is at Kennedy Space Center, and is being stacked in the Vehicle Assembly Building for a liftoff at Launch Complex 39B. Mission hardware specific to Ares I-X also is being installed at Launch Complex 39, which has been supporting Space Shuttle operations. This presentation will provide a status and preview of the upcoming mission.

Davis, Stephan R.

Multistack nickel-hydrogen units

A typical 625 Inconel pressure vessel, equipped with four thermocouples, has voltage taps not only for the cell, but for each of the several packs inside the container. In a two-stack design, a weld ring is used to separate the packs which, joined together, form one solid group. In the four-stack design, stacks are separated mechanically with about half inch Plexiglas and are connected through the center. Electrolytes are forced out by vacuum. The two stack design is intended for 500 psi and was pressure tested up to 1,000. The problem of electrolyte shorts is discussed and possible solutions for its correction are given.

Smith, J.

Radiation experiments on Cosmos 2044: K-7-41, parts A, B, C, D, E

The Cosmos 2044 biosatellite mission offered the opportunity for radiation measurements under conditions which are seldom available (an inclination of 82.3 deg and attitude of 294 x 216 km). Measurements were made on the outside of the spacecraft under near-zero shielding conditions. Also, this mission was the first in which active temperature recorders (the ATR-4) were flown to record the temperature profiles of detector stacks. Measurements made on this mission provide a comparison and test for modeling of depth doses and LET spectra for orbital parameters previously unavailable. Tissue absorbed doses from 3480 rad (252 rad/d) down to 0.115 rad (8.33 mrad/d) were measured at different depths (0.0146 and 3.20 g/sq cm, respectively) with averaged TLD readings. The LET spectra yielded maximum and minimum values of integral flux of 27.3 x 10(exp -4) and 3.05 x 10(exp -4)/sq cm/s/sr, of dose rate of 7.01 and 1.20 mrad/d, and of dose equivalent rate of 53.8 and 11.6 mrem/d, for LET(sub infinity)-H2O is greater than or equal to 4 keV/micron. Neutron measurements yielded 0.018 mrem/d in the thermal region, 0.25 mrem/d in the resonance region and 3.3 mrem/d in the high energy region. The TLD depth dose and LET spectra were compared with calculations from the modeling codes. The agreement is good but some further refinements are in order. In comparing measurements on Cosmos 2044 with those from previous Cosmos missions (orbital inclinations of 62.8 deg) there is a greater spread (maximum to minimum) in depth doses and an increased contribution from GCRs, and higher LET particles, in the heavy particle fluxes.

Frank, A. L.