Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technical Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Support for Astronaut's View of Mexican/ Central American Fires and on-Line Earth Observations Training Manual

A small project to compile remote sensing and in-site data to review the processes leading to the May 1998 Mexican/Central American fires was undertaken. A web page based on this project was assembled. The second project initiated involved an interactive and on-line program that will replace the paper version of the Earth Observations Preflight Training Manual. Technical support was provided to Prof. Marvin Glasser as needed.

Kaminski, Charles F., Jr.↗

System Configuration Evaluation for Process Settling of Hanford Waste Solid Particles

Direct Feed High-Level Waste (DFHLW) is a potential flowsheet operations approach to initiating high-level waste (HLW) vitrification prior to completion of the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility. A settle/decant process has been proposed to concentrate solids prior to delivery to the WTP HLW Facility during DFHLW operations, wherein the solids in a settled layer would be remixed with the supernatant liquid remaining after decanting operations to provide the feed at required solids concentrations. Settling would be used in lieu of purpose-built filtration or other solids separation equipment. Pacific Northwest National Laboratory (PNNL) is providing baseline technical support to the Washington River Protection Solutions (WRPS) Flowsheet Integration group. To support planning for DFHLW, WRPS previously requested that PNNL evaluate the current data set available to predict the time needed for HLW solids to settle and the solids concentration and strength of that settled layer, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling times. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers. In addition to the data gaps, an overarching observation was made that there is significant variation in behavior of settling rate and settled layer data. The settling time required to concentrate solids via a settle/decant process was determined from the limited data to have a difference of potentially more than a factor of 5,000 in the estimated settling times, varying from 0.2 to 1,060 days for example depending on process vessel depth and final sediment solids concentration. In contrast, successful processes of liquid-forward output streams resulting from in-tank settling and decanting forward liquid have been reported for operations conducted at the Hanford Site. The purpose of this current report is to further support DFHLW planning by evaluating double-shell tank (DST) and alternate vessel equipment and operational configurations to enable optimization of the settle/decant process to concentrate solids. Hanford waste processing behavior specific to liquid feed availability following a slurry transfer in a DST is summarized, including process stream characteristics and process equipment configurations. The performance of DST process equipment configurations is evaluated for possible improvements using computational fluid dynamics (CFD) and simple analytical models. Potential new vessel design(s) specific to enabling effective settle/decant processes, and cursory summary of other separate and inline solids separations processes, are also provided. The CFD results indicated that improvement in outflow solids concentration was promoted by a reduction in the slurry flow rate, angling the distributor nozzles downward, and lifting the transfer pump. The solid-liquid analysis evaluating particle trajectory confirmed that the potential for particle ingestion (in the transfer pump) was decreased with increased radial separation between the inlet and outlet (transfer pump inlet), decreased inlet flow, and decreased liquid density and viscosity for a neutrally buoyant inlet flow. An assessment was also made of the potential for inflow configuration changes to result in the discrete mounding or piling of solids within the tank. Based on the characterization of the settled waste to date, HLW sediments will be unlikely to sustain a substantial angle of repose to facilitate significant variations in the elevation of the settled solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Tools to Provide Support for State Energy Programs [Slides]

This "Overview of Tools to Provide Support for State Energy Programs?" is a resource to support technical assistance programs, specifically motivated by the State Energy Program Direct TA program under SCEP at the Department of Energy. It provides a general description of seven unique tools - six by NREL, one by Argonne National Lab - which may be used to benefit state energy offices either through direct use (by state offices) or through contracted support (by national lab staff via TA programs).

97 MATHEMATICS AND COMPUTING↗

EXO-DAT: AN INFORMATION SYSTEM IN SUPPORT OF THE CoRoT/EXOPLANET SCIENCE

Exo-Dat is a database and an information system created primarily in support of the exoplanet program of the COnvection ROtation and planetary Transits (CoRoT) mission. In the directions of CoRoT pointings, it provides a united interface to several sets of data: stellar published catalogs, photometric and spectroscopic data obtained during the mission preparation, results from the mission and from follow-up observations, and several mission-specific technical parameters. The new photometric data constitute the subcatalog Exo-Cat, and give consistent 4-color photometry of 14.0 million stars with a completeness to 19th magnitude in the r-filter. It covers several zones in the galactic plane around CoRoT pointings, with a total area of 209 deg{sup 2}. This Exo-Dat information system provides essential technical support to the ongoing CoRoT light-curve analyses and ground-based follow-up by supplying additional complementary information such as the prior knowledge of the star's fundamental parameters or its contamination level inside the large CoRoT photometric mask. The database is fully interfaced with VO tools and thus benefits from existing visualization and analysis tools like TOPCAT or ALADIN. It is accessible to the CoRoT community through the Web, and will be gradually opened to the public. It is the ideal tool to prepare the foreseen statistical studies of the properties of the exoplanetary systems. As a VO-compliant system, such analyses could thus benefit from the most up-to-date classifier tools.

79 ASTRONOMY AND ASTROPHYSICS↗

Analysis of the Frequency of Extreme Precipitation Events at Los Alamos National Laboratory

The Environmental Protection and Compliance (EPC) Storm Water Permitting and Compliance Program is currently updating its stormwater compliance standards for the Los Alamos National Laboratory (LANL) Engineering Standards Manual (2015) and is addressing the required current meteorological data needed for storm water applications. Information on the frequency of extreme precipitation events at LANL is needed. In response to this request, LANL Meteorology & Air Quality (MAQ) was tasked to estimate the frequency of extreme precipitation events. An earlier study by Foley (2012) which estimated extreme precipitation rates at LANL for a set of duration periods and average recurrence intervals (return periods) was evaluated. However, it was determined that this study would not be helpful since its technical support documentation was unavailable and the meteorological data and the methodology employed were not well understood. This led to the need to develop a new peer-reviewed methodology. This report documents the development of the new methodology and the application of a temporally representative precipitation dataset from February 1990 through December 2018, monitored at the official LANL meteorological station, Technical Area (TA)-6, to develop the frequency of extreme precipitation events.

54 ENVIRONMENTAL SCIENCES↗

Packaging for Transport of the ILW-LL of EDF First Generation Power Plant Dismantling - 16517

EDF has a first generation decommissioning plan involving different types of reactors: Heavy Water Reactor, Natural Uranium and Gas Cooled Reactor, Fast Neutron Reactor and Chooz-A the first Pressurized Water Reactor (PWR) of the French decommissioning plan. The dismantling of these first generation reactors produces various types of radioactive waste, the most radioactive of them being the intermediate-level long-lived waste (ILW LL). After cutting and/or extraction from the reactors, these ILW LLs have to be transported to the EDF Conditioning and Storage Facility for Activated Waste ICEDA where they will be temporarily stored until a final depository solution is built. To transport these irradiated and contaminated metallic wastes, EDF decided to give ROBATEL Industries the responsibility of designing a new B- type package and obtaining the associated approval from the French Nuclear Safety Authority (ASN). A lot of issues had to be overcome to comply with the nuclear transport regulations and answer the ASN and its technical support IRSN's questions. Among them, was the difficulty to have a single type of package to transport unblocked waste coming from reactors of different technologies, sites in different stages of decommissioning and using different methods of waste production, conditioning and control. In the end, EDF had to apply for a specific approval for each dismantling site. These difficulties, some other technical issues encountered, and the decision to get first an approval for the transport of Chooz A's ILW LLs, are described here. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pathosphere.org: pathogen detection and characterization through a web-based, open source informatics platform

The detection of pathogens in complex sample backgrounds has been revolutionized by wide access to next-generation sequencing (NGS) platforms. However, analytical methods to support NGS platforms are not as uniformly available. Pathosphere (found at Pathosphere.org) is a cloud - based open - sourced community tool that allows for communication, collaboration and sharing of NGS analytical tools and data amongst scientists working in academia, industry and government. The architecture allows for users to upload data and run available bioinformatics pipelines without the need for onsite processing hardware or technical support. The pathogen detection capabilities hosted on Pathosphere were tested by analyzing pathogen-containing samples sequenced by NGS with both spiked human samples as well as human and zoonotic host backgrounds. Pathosphere analytical pipelines developed by Edgewood Chemical Biological Center (ECBC) identified spiked pathogens within a common sample analyzed by 454, Ion Torrent, and Illumina sequencing platforms. ECBC pipelines also correctly identified pathogens in human samples containing arenavirus in addition to animal samples containing flavivirus and coronavirus. These analytical methods were limited in the detection of sequences with limited homology to previous annotations within NCBI databases, such as parvovirus. Utilizing the pipeline-hosting adaptability of Pathosphere, the analytical suite was supplemented by analytical pipelines designed by the United States Army Medical Research Institute of Infectious Diseases and Walter Reed Army Institute of Research (USAMRIID-WRAIR). These pipelines were implemented and detected parvovirus sequence in the sample that the ECBC iterative analysis previously failed to identify. By accurately detecting pathogens in a variety of samples, this work demonstrates the utility of Pathosphere and provides a platform for utilizing, modifying and creating pipelines for a variety of NGS technologies developed to detect pathogens in complex sample backgrounds. These results serve as an exhibition for the existing pipelines and web-based interface of Pathosphere as well as the plug-in adaptability that allows for integration of newer NGS analytical software as it becomes available.

59 BASIC BIOLOGICAL SCIENCES↗

Issue Resolution During the Development of the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20125

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high-activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance (i.e., 100 m from the SDUs). In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. A number of issues were overcome during the development of these simulations. These issues were identified as part of internal technical reviews. Simulations are developed by people and people make mistakes, so the internal technical review process is a vital step in PA development. Specific examples of resolved issues include a unit-conversion error, an inappropriate definition for a model boundary condition, a model time-stepping issue, and an error in the calculation for the buildup of contaminants in soil. Actions taken to address these issues resulted in an improved product with a better supported technical basis and more defensible results. The identification and correction of these issues are discussed. By understanding these issues, model developers and technical reviewers working on PAs in the future may avoid repeating these types of mistakes. Transparency with respect to these mistakes builds trust between waste management sites, regulators, and stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Powering Progress: Increasing capacity for State Agency participation in the development of solar guidelines

This project supported State Fish and Wildlife Agencies (SFWAs) in their participation in an industry-led process to develop nationwide utility scale solar energy wildlife guidelines intended to mitigate the impacts of large-scale solar development on wildlife and natural habitats. Led by the Association of Fish and Wildlife Agencies (AFWA), the project focused on documenting and communicating SFWA priorities, providing logistical and technical support for state engagement, and disseminating early outcomes to promote adoption and use.

14 SOLAR ENERGY↗

The DOE Criticality safety support group - A retrospective perspective - 14580

The Department of Energy (DOE) Nuclear Criticality Safety Support Group (CSSG) came into being as a response to the DNFSB recommendation 1997-2 'Criticality Safety' which dealt with the continuation of criticality safety at defense nuclear facilities in the Department of Energy Enterprise. The DNFSB was concerned over the lack of capability management of practical experience pertinent to avoiding a criticality accident in non-reactor environments. One of the specific recommendations of 1997-2 was to 'Identify a core group of criticality experts experienced in the theoretical and experimental aspects of neutron chain reactions to advise on the above steps and assist in resolving future technical issues'. The CSSG, a group of 10 recognized experts in criticality safety, was chartered in late 1997 to address the recommendation. Members of the CSSG are drawn from DOE employees and contractor staff to provide advice and technical support to help meet the criticality safety needs of DOE missions, including stockpile stewardship, materials stabilization, transportation, storage, facilities life cycle (design through decommissioning), and waste disposal. The CSSG is an integral part of the DOE Nuclear Criticality Safety Program (NCSP) developed to maintain and enhance the operational and technical criticality safety expertise and capability within the Department of Energy Enterprise. This paper outlines the history, purpose and continuing contribution of the CSSG as well as providing an understanding of the interfaces between the DOE CSSG, the DOE Criticality Safety Coordinating Team (CSCT), the ANS Nuclear Criticality Safety Division and the EFCOG Criticality Safety Subgroup. (authors)

42 ENGINEERING↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

The Role of NASA Engineering & Safety Center (NESC) in Advancing NASA's Earth Science Missions (Past, Present, and Future)

The NASA Engineering & Safety Center (NESC) was established in 2003 to provide an independent technical resource for the resolution of challenging technical problems (through the use of studies, analysis, tests, etc.). Since its inception, NESC has completed nearly 1000 technical assessments for NASA’s Human Exploration and Operation Mission Directorate (HEOMD), Science Mission Directorate (SMD), Space Technology Mission Directorate (STMD), and Aeronautics Research Mission Directorate (ARMD). Of the SMD related assessments, several were for the resolution of technical problems, analysis, or studies related to NASA’s Earth science missions in various phases of the project from design to operation. Some of the recent examples of NESC technical support for NASA (or NOAA) Earth science missions have been for: Soil Moisture Active Passive (SMAP), Deep Space Climate Observatory (DSCOVR), Cyclone Global Navigation Satellite System (CYGNSS), Ice, Cloud, and Land Elevation Satellite (ICESat-II), Joint Polar Satellite System (JPSS), and the soon to be launched collaboration mission with India, NASA-ISRO Synthetic Aperture Radar (NISAR). In this paper, we outline some of the technical challenges faced by these Earth science missions and describe how NESC contributed to their resolution. The case studies cover a wide range of disciplines involving space lidars, radars, electronics, attitude control systems, as well as Micrometeoroid Orbital Debris (MMOD) risk assessment impact to NASA missions. The efforts include strategies for risk mitigation, technical resolution of challenging problems, and failure root cause investigations combined with lessons learned reports to advance discipline knowledge, enhance NASA capabilities, and avoid future problems.

NASA↗

MODIFICATION OF THE SPAR-H METHOD TO SUPPORT HRA FOR LEVEL 2 PSA

Currently, available Human Reliability Analysis (HRA) methods were generally developed to support Level 1 Probabilistic Safety Analysis (PSA) models. There has been an increased emphasis placed on Level 2 PSA in recent years; however, the currently used HRA methods are not ideal for this application, including the SPAR-H method. Challenges that will likely be present during a severe accident such as degraded or hazardous operating conditions, shift in control from the main control room to the technical support center, unavailability of instrumentation, and others are not routinely considered for Level 1 HRA analysis. These factors combine to create a much more uncertain condition to be accounted for in the HRA analysis. While the SPAR-H shaping factors were established to support Level 1 HRA, previous studies have shown it may be used for Level 2 HRA analysis as well. The Canadian Nuclear Safety Commission (CNSC) and Idaho National Laboratory (INL) in a joint project are investigating modifications to the SPAR-H method to create more consistency in applying the performance shaping factors used in the method for Level 2 analysis.

99 GENERAL AND MISCELLANEOUS↗

Future NTP Development Synergy Leveraged from Current J-2X Engine Development

This paper is a discussion of how the many long-lead development elements required for the realization of a future nuclear thermal propulsion (NTP) system can be effectively leveraged from the ongoing work being conducted on the J-2X engine program for the Constellation Program. Development studies conducted to date for NTP forward planning have identified a number of technical areas that will require advancement to acceptable technology readiness levels (TRLs) before they can be utilized in NTP system development. These include high-temperature, high-area ratio nozzle extension; long-life, low-NPSP. turbomachinery; and low-boiloff propellant management; and a qualified nuclear fuel element. The current J-2X program is working many of these areas that can be leveraged to support NTP development in a highly compatible and synergistic fashion. In addition to supporting technical development, there are other programmatic issues being worked in the J-2X program that can be leveraged by a future NTP development program. These include compliance with recently-evolved space system requirements such as human-rating, fault tolerance and fracture control. These and other similar mandatory system requirements have been adopted by NASA and can result in a significant technical impact beyond elevation of the root technologies required by NTP. Finally, the exploitation of experience, methodologies, and procedures developed by the J-2X program in the areas of verification, qualification, certification, altitude simulation testing, and facility definition will be especially applicable to a future NTP system. The similarities in system mission (in-space propulsion) and operational environment (vacuum, zero-gee) between J-2X and NTP make this highly synergistic. Thus, it can be $hown that the collective benefit of leveraging experience and technologies developed during the J-2X program can result in significant savings in development cost and schedule for NTP.

Ballard, Richard O.↗

Preliminary Analysis of ISS Maintenance History and Implications for Supportability of Future Missions

The International Space Station (ISS) enables the study of supportability issues associated with long-duration human spaceflight. The ISS is a large, complex spacecraft that must be maintained by its crew. In contrast to the Space Shuttle Orbiter vehicle, but similar to spacecraft that will be component elements of future missions beyond low-Earth orbit, ISS does not return to the ground for servicing and provisioning of spares is severely constrained by transportation limits. Although significant technical support is provided by ground personnel, all hands-on maintenance tasks are performed by the crew. It is expected that future missions to distant destinations will be further limited by lack of resupply opportunities and will, eventually, become largely independent of ground support. ISS provides an opportunity to begin learning lessons that will enable future missions to be successful. Data accumulated over the first several years of ISS operations have been analyzed to gain a better understanding of maintenance-related workload. This analysis addresses both preventive and corrective maintenance and includes all U.S segment core systems. Systems and tasks that are major contributors to workload are identified. As further experience accrues, lessons will be learned that will influence future system designs so that they require less maintenance and, when maintenance is required, it can be performed more efficiently. By heeding the lessons of ISS it will be possible to identify system designs that should be more robust and point towards advances in both technology and design that will offer the greatest return on investment.

Watson, Kevin J.↗

Advanced composite fuselage technology

Boeing's ATCAS program has completed its third year and continues to progress towards a goal to demonstrate composite fuselage technology with cost and weight advantages over aluminum. Work on this program is performed by an integrated team that includes several groups within The Boeing Company, industrial and university subcontractors, and technical support from NASA. During the course of the program, the ATCAS team has continued to perform a critical review of composite developments by recognizing advances in metal fuselage technology. Despite recent material, structural design, and manufacturing advancements for metals, polymeric matrix composite designs studied in ATCAS still project significant cost and weight advantages for future applications. A critical path to demonstrating technology readiness for composite transport fuselage structures was created to summarize ATCAS tasks for Phases A, B, and C. This includes a global schedule and list of technical issues which will be addressed throughout the course of studies. Work performed in ATCAS since the last ACT conference is also summarized. Most activities relate to crown quadrant manufacturing scaleup and performance verification. The former was highlighted by fabricating a curved, 7 ft. by 10 ft. panel, with cocured hat-stiffeners and cobonded J-frames. In building to this scale, process developments were achieved for tow-placed skins, drape formed stiffeners, braided/RTM frames, and panel cure tooling. Over 700 tests and supporting analyses have been performed for crown material and design evaluation, including structural tests that demonstrated limit load requirements for severed stiffener/skin failsafe damage conditions. Analysis of tests for tow-placed hybrid laminates with large damage indicates a tensile fracture toughness that is higher than that observed for advanced aluminum alloys. Additional recent ATCAS achievements include crown supporting technology, keel quadrant design evaluation, and sandwich process development.

Ilcewicz, Larry B.↗

Peak Dose Assessment for Proposed DOE-PPPO Authorized Limits

The Oak Ridge Institute for Science and Education (ORISE), a U.S. Department of Energy (DOE) prime contractor, was contracted by the DOE Portsmouth/Paducah Project Office (DOE-PPPO) to conduct a peak dose assessment in support of the Authorized Limits Request for Solid Waste Disposal at Landfill C-746-U at the Paducah Gaseous Diffusion Plant (DOE-PPPO 2011a). The peak doses were calculated based on the DOE-PPPO Proposed Single Radionuclides Soil Guidelines and the DOE-PPPO Proposed Authorized Limits (AL) Volumetric Concentrations available in DOE-PPPO 2011a. This work is provided as an appendix to the Dose Modeling Evaluations and Technical Support Document for the Authorized Limits Request for the C-746-U Landfill at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky (ORISE 2012). The receptors evaluated in ORISE 2012 were selected by the DOE-PPPO for the additional peak dose evaluations. These receptors included a Landfill Worker, Trespasser, Resident Farmer (onsite), Resident Gardener, Recreational User, Outdoor Worker and an Offsite Resident Farmer. The RESRAD (Version 6.5) and RESRAD-OFFSITE (Version 2.5) computer codes were used for the peak dose assessments. Deterministic peak dose assessments were performed for all the receptors and a probabilistic dose assessment was performed only for the Offsite Resident Farmer at the request of the DOE-PPPO. In a deterministic analysis, a single input value results in a single output value. In other words, a deterministic analysis uses single parameter values for every variable in the code. By contrast, a probabilistic approach assigns parameter ranges to certain variables, and the code randomly selects the values for each variable from the parameter range each time it calculates the dose (NRC 2006). The receptor scenarios, computer codes and parameter input files were previously used in ORISE 2012. A few modifications were made to the parameter input files as appropriate for this effort. Some of these changes included increasing the time horizon beyond 1,050 years (yr), and using the radionuclide concentrations provided by the DOE-PPPO as inputs into the codes. The deterministic peak doses were evaluated within time horizons of 70 yr (for the Landfill Worker and Trespasser), 1,050 yr, 10,000 yr and 100,000 yr (for the Resident Farmer [onsite], Resident Gardener, Recreational User, Outdoor Worker and Offsite Resident Farmer) at the request of the DOE-PPPO. The time horizons of 10,000 yr and 100,000 yr were used at the request of the DOE-PPPO for informational purposes only. The probabilistic peak of the mean dose assessment was performed for the Offsite Resident Farmer using Technetium-99 (Tc-99) and a time horizon of 1,050 yr. The results of the deterministic analyses indicate that among all receptors and time horizons evaluated, the highest projected dose, 2,700 mrem/yr, occurred for the Resident Farmer (onsite) at 12,773 yr. The exposure pathways contributing to the peak dose are ingestion of plants, external gamma, and ingestion of milk, meat and soil. However, this receptor is considered an implausible receptor. The only receptors considered plausible are the Landfill Worker, Recreational User, Outdoor Worker and the Offsite Resident Farmer. The maximum projected dose among the plausible receptors is 220 mrem/yr for the Outdoor Worker and it occurs at 19,045 yr. The exposure pathways contributing to the dose for this receptor are external gamma and soil ingestion. The results of the probabilistic peak of the mean dose analysis for the Offsite Resident Farmer indicate that the average (arithmetic mean) of the peak of the mean doses for this receptor is 0.98 mrem/yr and it occurs at 1,050 yr. This dose corresponds to Tc-99 within the time horizon of 1,050 yr.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗