Development and Test Plans for the MSR EEV

The goal of the proposed Mars Sample Return mission is to bring samples from the surface of Mars back to Earth for thorough examination and analysis. The Earth Entry Vehicle is the passive entry body designed to protect the sample container from entry heating and deceleration loads during descent through the Earth s atmosphere to a recoverable location on the surface. This paper summarizes the entry vehicle design and outlines the subsystem development and testing currently planned in preparation for an entry vehicle flight test in 2010 and mission launch in 2013. Planned efforts are discussed for the areas of the thermal protection system, vehicle trajectory, aerodynamics and aerothermodynamics, impact energy absorption, structure and mechanisms, and the entry vehicle flight test.

Dillman, Robert↗

Propulsion Ground Testing: Planning for the Future

Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre-exiting test facilities. The key words in the previous sentence are 'substantial investment.' In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based on both life cycle cost decisions in an environment in which the more immediate challenge of front-end capital investment oftentimes is the linchpin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.

Bruce, Robert↗

Propulsion Ground Testing: Planning for the Future

Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre- existing test capabilities. The key words in the previous sentence are "substantial investment". In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based upon both life cycle cost decisions in an environment in which the more immediate challenge of "front-end" capital investment? Often times is the linch-pin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.

Aerospace Systems↗

Accelerated test plan for nickel cadmium spacecraft batteries

An accelerated test matrix is outlined that includes acceptance, baseline and post-cycling tests, chemical and physical analyses, and the data analysis procedures to be used in determining the feasibility of an accelerated test for sealed, nickel cadmium cells.

Hennigan, T. J.↗

Space Shuttle stability and control test plan

The development of a completely automatic flight test program to test different aspects of the Shuttle flight capability during reentries is described. Data from each flight to date has been employed to devise a sequence of maneuvers which will be keyboard-punched into the Orbiter control system by the astronauts during entry phases of flight. Details of the interaction and cooperation of the Orbiter elevons and bodyflap to provide the vehicle with latitudinal and longitudinal directional control and trim are outlined. Uncertainties predicted for the control of the Orbiter during wind tunnel testing prior to actual flights have been adjusted to actual flight data, leading to the identification of actual flight regimes which need further investigation. Maneuvers scheduled for flights 5-9 are reviewed.

Cooke, D. R.↗

ART/Ada design project, phase 1. Task 3 report: Test plan

The plan is described for the integrated testing and benchmark of Phase Ada based ESBT Design Research Project. The integration testing is divided into two phases: (1) the modules that do not rely on the Ada code generated by the Ada Generator are tested before the Ada Generator is implemented; and (2) all modules are integrated and tested with the Ada code generated by the Ada Generator. Its performance and size as well as its functionality is verified in this phase. The target platform is a DEC Ada compiler on VAX mini-computers and VAX stations running the VMS operating system.

Allen, Bradley P.↗

Test plan for the irradiation of nonmetallic materials.

A comprehensive test program to evaluate nonmetallic materials use in the Hanford tank farms is described in detail. This test program determines the effects of simultaneous multiple stressors at reasonable conditions on in-service configuration components by engineering performance testing.

Brush, Laurence H.↗

Test plan for the irradiation of nonmetallic materials.

A comprehensive test program to evaluate nonmetallic materials use in the Hanford Tank Farms is described in detail. This test program determines the effects of simultaneous multiple stressors at reasonable conditions on in-service configuration components by engineering performance testing.

Brush, Laurence H.↗

The development of an automated flight test management system for flight test planning and monitoring

The development of an automated flight test management system (ATMS) as a component of a rapid-prototyping flight research facility for AI-based flight systems concepts is described. The rapid-prototyping facility includes real-time high-fidelity simulators, numeric and symbolic processors, and high-performance research aircraft modified to accept commands for a ground-based remotely augmented vehicle facility. The flight system configuration of the ATMS includes three computers: the TI explorer LX and two GOULD SEL 32/27s.

Hewett, Marle D.↗

Overview of environmental test plans for Space Station Freedom work package 4

The generation and distribution of electric power for Space Station Freedom (SSF) is critical to the station's success. Work Package 4 (WP-04) has the responsibility for the design, development, test, and delivery of the Electric Power System (EPS) for the SSF. During launch, assembly, and operation, the EPS will be subjected to various environments. A test and verification approach has been developed to assure that the EPS will function in these environments. An overview of that test program is presented with emphasis on environmental testing of hardware. Two key areas of the test program are highlighted in the overview. One area is the verification of the Solar Power Module (SPM) and associated cargo element hardware. This area includes detailing the plans for development and qualification testing of the SPM hardware. One series of tests, including modal and acoustic, has been completed on a development cargo element. Another area highlighted is the acceptance testing of high-power Orbital Replacement Units (ORU). The environmental test equipment plans are presented and reviewed in light of an aggressive production rate, which delivers ORU's to the WP-04 and other Space Station Work Packages. Through implementing the test program as outlined, the EPS hardware will be certified for flight and operation on the Space Station Freedom.

Peterson, Tom J.↗

Long-Term Evaluation of Remedial Technology Performance in the Laboratory: Multi-year Experimental Test Plan

An understanding of the long-term effectiveness of remediation technologies is central to sustainable environmental cleanup. Long-term experiments are valuable for reducing uncertainty and predicting remediation outcomes at scales required for regulatory compliance. However, these types of tests can be costly and challenging to interpret. Therefore, contaminated sites often rely on short-term laboratory experiments that may not account for the potentially significant effects of gradual, time- dependent processes governing contaminant retention, release, and species transformation. For example, short-term lab experiments (from months to a year) conducted with sediments from the unsaturated and saturated zones at the Hanford Site play an important role in initial evaluations of remediation technologies but cannot capture the full extent of time-dependent reactions, leaving uncertainties in field-scale deployment. Here, long-term testing will be conducted on select technologies based on their performance in short-term testing. The overall objective is to directly address the challenges described above by generating and analyzing data on long-term (2–10 years) efficacy of selected remediation technologies, integrating this understanding into models, and providing critical input for remediation planning, monitoring, and 5-year review cycles for field-implemented remedies. Specific objectives include: 1. Evaluating long-term efficiency of promising remedies under site-specific conditions. 2. Generating robust parameters for modeling, reducing uncertainty in predictive simulations. 3. Advancing integrated monitoring by combining geochemical and geophysical observations. 4. Informing field-scale implementation by incrementally advancing technologies, identifying failure mechanisms early, and prioritizing robust, cost-effective remedies. Through systematic evaluation of technologies in laboratory-scale column experiments, integrated monitoring, and modeling support, this project is designed to bolster confidence in the long-term robustness of selected technologies. The ultimate outcome is the identification and deployment of more reliable, cost-effective remedies that safeguard human health and the environment while reducing the uncertainties that have historically hindered cleanup progress at Hanford Site. An experimental approach was developed and initiated for long-term testing potentially up to 10 years. The table below summarizes the experimental approach developed for testing select technologies and presented in this multi-year experimental test plan.

54 ENVIRONMENTAL SCIENCES↗

Test Plan - Solids Accumulation Scouting Studies

This plan documents the highlights of the Solids Accumulations Scouting Studies test; a project, from Washington River Protection Solutions (WRPS), that began on February 1, 2012. During the last 12 weeks considerable progress has been made to design and plan methods that will be used to estimate the concentration and distribution of heavy fissile solids in accumulated solids in the Hanford double-shell tank (DST) 241-AW-105 (AW-105), which is the primary goal of this task. This DST will be one of the several waste feed delivery staging tanks designated to feed the Pretreatment Facility (PTF) of the Waste Treatment and Immobilization Plant (WTP). Note that over the length of the waste feed delivery mission AW-105 is currently identified as having the most fill empty cycles of any DST feed tanks, which is the reason for modeling this particular tank. At SRNL an existing test facility, the Mixing Demonstration Tank, which will be modified for the present work, will use stainless steel particles in a simulant that represents Hanford waste to perform mock staging tanks transfers that will allow solids to accumulate in the tank heel. The concentration and location of the mock fissile particles will be measured in these scoping studies to produce information that will be used to better plan larger scaled tests. Included in these studies is a secondary goal of developing measurement methods to accomplish the primary goal. These methods will be evaluated for use in the larger scale experiments. Included in this plan are the several pretest activities that will validate the measurement techniques that are currently in various phases of construction. Aspects of each technique, e.g., particle separations, volume determinations, topographical mapping, and core sampling, have been tested in bench-top trials, as discussed herein, but the actual equipment to be employed during the full test will need evaluation after fabrication and integration into the test facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NRT Design Verification Test Plan

The National Rotor Testbed (NRT) design verification experiment is the first test of the new NRT blades retrofitted to the existing Vestas V27 hub and nacelle operated at the Sandia Scaled Wind Farm Technology (SWiFT) facility. This document lays out a plan for pre-assembly, ground assembly, installation, commissioning, and flight testing the NRT rotor. Its performance will be quantified. Adjustments to torque constant and collective blade pitch will be made to ensure that the tip-speed-ratio and span-wise loading are as close to the NRT design as possible. This will ensure that the NRT creates a scaled wake of the GE 1.5sle turbine. Upon completion of this test, the NRT will be in an operational state, ready for future experiments.

17 WIND ENERGY↗