At least 235 records · Page 13

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed– A Robotic Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, a 3-axis robotic positioning system, and a regolith bin. For the REACT project, a pellet extruder and feed hopper have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

Moon↗

Creating the Thermal Environment for Safely Testing the James Webb Space Telescope at the Johnson Space Center's Chamber A

Chamber A is the largest thermal vacuum chamber at the Johnson Space Center and is one of the largest space environment chambers in the world. The chamber is 19.8 m (65 ft) in diameter and 36.6 m (120 ft) tall and is equipped with cryogenic liquid nitrogen panels (shrouds) and gaseous helium shrouds to create a simulated space environment. The chamber was originally built to support testing of the Apollo Service and Command Module for lunar missions, but underwent major modifications to be able to test the James Webb Space Telescope in a simulated deep space environment. To date seven tests have been performed in preparation of testing the flight optics for the James Webb Space Telescope (JWST). Each test has had a uniquie thermal profile and set of thermal requirements for cooling down and warming up, controlling contamination, and releasing condensed air. These range from temperatures from 335K to 15K, with tight uniformity and controllability for maintining thermal stability and pressure control. One unique requirement for two test was structurally proof loading hardware by creating thermal gradients at specific temperatures. This paper will discuss the thermal requirements and goals of the tests, the original requirements of the chamber thermal systems for planned operation, and how the new requirements were met by the team using the hardware, system flexiblilty, and engineering creativity. It will also discuss the mistakes and successes to meet the unique goals, especially when meeting the thermal proof load.

Homan, Jonathan L.↗

Using NASA's Molecular Adsorber Coating Technology During Thermal Vacuum Testing to Protect Critical Laser Flight Optics on the ATLAS Instrument

The Molecular Adsorber Coating (MAC) is a sprayable coatings technology that was developed at NASA Goddard Space Flight Center (GSFC). The coating was designed to address molecular contamination concerns on or near sensitive surfaces and instruments within the spacecraft for flight or ground-based applications in vacuum conditions. This paper will discuss the use of NASA's MAC technology to isolate and protect the critical laser flight optics of the Advanced Topographic Laser Altimeter System (ATLAS) instrument on the Ice, Cloud, and land Elevation Satellite-2 (ICESat-2). MAC was strategically used during thermal vacuum (TVAC) testing efforts to reduce the risk of contaminating the laser optical components from non-baked items and other unknown outgassing sources from the chamber environment. This paper summarizes the design and implementation efforts, and the chemical analysis of the MAC samples that were used during two recent TVAC tests for the ICESat-2/ATLAS mission.

thermal vacuum↗

xEMU Spacesuit Boot Lunar South Pole Thermal Vacuum Testing

The Exploration Extravehicular Mobility Unit (xEMU) spacesuit lunar boot was evaluated in the Jet Propulsion Lab (JPL) CITADEL thermal vacuum chamber at lunar South Pole conditions. The JPL CITADEL chamber provides a radiation environment and contact plate temperature of 48K, simulating the temperature of a lunar Permanently Shadowed Region (PSR) at the South Pole of the Moon. The main objectives of the test series are: to evaluate the risk lunar PSRs pose to advanced spacesuit boots, validate the xEMU lunar boot thermal model, and to develop a test methodology to evaluate lunar spacesuit boots. To simulate the thermal effects of a crewmember’s foot inside the boot, a thermal manikin foot was developed to inject heat into the spacesuit boot. Thermal data was collected through a variety of sensors including thermocouples, thermistors, heat flux sensors, and infrared cameras. A test matrix was developed to investigate the variables of foot contact force, simulated skin temperature, external contact plate temperature, and ventilation flowrate. The JPL CITADEL chamber includes a loadlock (airlock) that afforded the ability to simulate the transition of the boot from a thermally neutral IVA condition to a cold EVA condition within seconds. This paper will document the test design, test objectives, success criteria, test support equipment, spacesuit boot to chamber interfaces, and configuration of the test article. Additionally, this paper will document the high-level results of the testing. More detailed test results will be presented in a different paper.

Ben Swartout↗

MMS Observatory Thermal Vacuum Results Contamination Summary

The MMS mission is a constellation of 4 observatories designed to investigate the fundamental plasma physics of reconnection in the Earths magnetosphere. Each spacecraft has undergone extensive environmental testing to prepare it for its minimum 2 year mission. The various instrument suites measure electric and magnetic fields, energetic particles, and plasma composition. Thermal vacuum testing was conducted at the Naval Research Laboratory (NRL) in their Big Blue vacuum chamber. The individual spacecraft were tested and enclosed in a cryopanel enclosure called a Hamster cage. Specific contamination control validations were actively monitored by several QCMs, a facility RGA, and at times, with 16 Ion Gauges. Each spacecraft underwent a bakeout phase, followed by 4 thermal cycles. Unique aspects of the TV environment included slow pump downs with represses, thruster firings, Helium identification, and monitoring pressure spikes with Ion gauges. Various data from these TV tests will be shown along with lessons learned.

TV↗

CRYogenic Orbital TEstbed Ground Test Article Thermal Analysis

The purpose of this study was to anchor thermal and fluid system models to CRYOTE ground test data. The CRYOTE ground test artide was jointly developed by Innovative Engineering Solutions, United Launch Alliance and NASA KSC. The test article was constructed out of a titanium alloy tank, Sapphire 77 composite skin (similar to G10), an external secondary payload adapter ring, thermal vent system, multi layer insulation and various data acquisition instrumentation. In efforts to understand heat loads throughout this system, the GTA (filled with liquid nitrogen for safety purposes) was subjected to a series of tests in a vacuum chamber at Marshall Space Flight Center. By anchoring analytical models against test data, higher fidelity thermal environment predictions can be made for future flight articles which would eventually demonstrate critical cryogenic fluid management technologies such as system chilldown, transfer, pressure control and long term storage. Significant factors that influenced heat loads included radiative environments, multi-layer insulation performance, tank fill levels and pressures and even contact conductance coefficients. This report demonstrates how analytical thermal/fluid networks were established and includes supporting rationale for specific thermal responses.

Piryk, David↗

Leak rate measurements for satellite subsystems and residual gas analysis during space environment tests

The measuring and evaluation procedure for the determination of leak rates of satellite subsystems with a quadrupole mass spectrometer, and the results of the residual gas analysis are described. The method selected for leak rate determination was placing the system into a vacuum chamber and furnishing the chamber with a mass spectrometer and calibrated leaks. The residual gas of a thermal vacuum test facility, in which the thermal balance test radiation input was simulated by a heated canister, was analyzed with the mass spectrometer in the atomic mass unit range up to 300 amu. In addition to the measurements during the space environment tests, mass spectrometric studies were performed with samples of spacecraft materials. The studies were carried out during tests for the projects HELIOS, AEROS B and SYMPHONIE.

Nuss, H. E.↗

Transient Heater Analysis for Orion Thermal Vacuum Testing

The Space Environments Complex (SEC) at NASA's Plum Brook Station is currently being prepared to perform thermal vacuum testing of the Orion spacecraft. This thermal vacuum, or T-VAC test will be run for a period of 60 days, which will be the longest such test ever conducted at SEC. The Orion Crew Module (CM) and Service Module (SM) will undergo T-VAC testing in SEC's Space Simulation Vacuum Chamber to ensure the functionality of these systems in a high vacuum environment at extremely cold temperatures. The T-VAC test setup in SEC was modeled and simulated in Thermal Desktop. The initial results from thermal analysis showed areas on the chamber floor to reach very low temperatures, which were below the minimum operating range of certain hardware located on or near the chamber floor. These hardware including elastomeric seals on the GN2 piping, bearing pads and O-rings are essential to both test and the operation of the SEC facility, and must be kept well above -20°F throughout the duration of the T-VAC test. Thus, further analysis was conducted to include the placement of patch heaters on the chamber floor in an effort to increase the temperature near colder areas on the floor. The results and findings from this analysis showed that using these heaters will result in a favorable temperature distribution on the chamber floor. This paper will discuss the methods used in the analysis, and the results obtained to determine the optimal configuration of these heaters on the chamber floor.

Wilhite, Jarred↗

Transient Heater Analysis for Orion Thermal Vacuum Testing

The Space Environments Complex (SEC) at NASA’s Plum Brook Station is currently being prepared to perform thermal vacuum testing of the Orion spacecraft. This thermal vacuum, or T-VAC test will be run for a period of 60 days, which will be the longest such test ever conducted at SEC. The Orion Crew Module (CM) and Service Module (SM) will undergo T-VAC testing in SEC’s Space Simulation Vacuum Chamber to ensure the functionality of these systems in a high vacuum environment at extremely cold temperatures. The T-VAC test setup in SEC was modeled and simulated in Thermal Desktop. The initial results from thermal analysis showed areas on the chamber floor to reach very low temperatures, which were below the minimum operating range of certain hardware located on or near the chamber floor. These hardware including elastomeric seals on the GN2 piping, bearing pads and O-rings are essential to both test and the operation of the SEC facility, and must be kept well above -20°F throughout the duration of the T-VAC test. Thus, further analysis was conducted to include the placement of patch heaters on the chamber floor in an effort to increase the temperature near colder areas on the floor. The results and findings from this analysis showed that using these heaters will result in a favorable temperature distribution on the chamber floor. This paper will discuss the methods used in the analysis, and the results obtained to determine the optimal configuration of these heaters on the chamber floor.

Wilhite, Jarred↗

Using NASA's Molecular Adsorber Coating Technology During Thermal Vacuum Testing to Protect Critical Laser Flight Optics on the ATLAS Instrument

The Molecular Adsorber Coating (MAC) is a sprayable coatings technology that was developed at NASA Goddard Space Flight Center (GSFC). The coating was designed to address molecular contamination concerns on or near sensitive surfaces and instruments within the spacecraft for flight or ground-based applications in vacuum conditions. This paper will discuss the use of NASA's MAC technology to isolate and protect the critical laser flight optics of the Advanced Topographic Laser Altimeter System (ATLAS) instrument on the Ice, Cloud, and land Elevation Satellite-2 (ICESat-2). MAC was strategically used during thermal vacuum (TVAC) testing efforts to reduce the risk of contaminating the laser optical components from non-baked items and other unknown outgassing sources from the chamber environment. This paper summarizes the design and implementation efforts, and the chemical analysis of the MAC samples that were used during two recent TVAC tests for the ICESat-2/ATLAS mission.

molecular adsorber coating↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed: A Robotic Excavation and Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior to surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, 3-axis robotic positioning system, and regolith bin. For the REACT project, a pellet extruder, feed hopper, and heated 600mm x 600mm (23.6x23.6in) build plate have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

regolith↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed – A Robotic Excavation and Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior to surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, 3-axis robotic positioning system, and regolith bin. For the REACT project, a pellet extruder, feed hopper, and heated 600mm x 600mm (23.6x23.6in) build plate have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

regolith↗

Solar Simulation for the CREST Preflight Thermal-Vacuum Test at B-2

In June 2011, the multi-university sponsored Cosmic Ray Electron Synchrotron Telescope (CREST) has undergone thermal-vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the B-2 Space Propulsion Facility vacuum chamber. The CREST was later flown over the Antarctic region as the payload of a stratospheric balloon. Solar simulation was provided by a system of planar infrared lamp arrays specifically designed for CREST. The lamp arrays, in conjunction with a liquid-nitrogen-cooled cold wall, achieved the required thermal conditions for the qualification tests. The following slides accompanied the presentation of the report entitled Solar Simulation for the CREST Preflight Thermal-Vacuum Test at B-2, at the 27th Aerospace Testing Seminar, October 2012. The presentation described the test article, the test facility capability, the solar simulation requirements, the highlights of the engineering approach, and the results achieved. The presentation was intended to generate interest in the report and in the B-2 test facility.

Ziemke, Robert A.↗

Thermal vacuum performance testing of the Space Shuttle Orbiter radiator system

A space shuttle orbiter system thermal vacuum performance test was conducted at NASA-Johnson Space Center in Chamber A of the space environment simulation laboratory. The test of objective was to verify the radiator system heat rejection performance capability utilizing two development and two flight radiator panels comprising one of the two Orbiter Freon-21 coolant loops. Radiator performance over the range of expected flight conditions was as predicted, and there was no degradation of performance after extended vacuum exposure.

Behrend, A. F., Jr.↗

Lunar Environment Simulation for a High Performance Motor

NASA and the Canadian Space Agency (CSA) through a CSA contractor, Argo Space/Robotics Division, partnered to perform environmental performance tests on a high torque producing motor. CSA provided the motor and NASA provided a thermal vacuum chamber capable of achieving high vacuum (P < 1 E-5 torr) and temperatures between 25 and 400 K. NASA also provided a dynamometer system capable of measuring and or applying break torque between 0 and 28 Nm. The two primary goals of the test were to simulate sun exposed and shadow condition expected on the lunar surface in order to determine survivability of the motor at extreme temperature conditions and to operate the motor under a constant break load of 6.8 Nm in the temperature range of 30K to 415K. A secondary objective of the test was to operate the motor for 15 km under 6.8 Nm of load. The primary goals of the test were fully achieved. The secondary goal was partially achieved.

O'Connell, Joe↗

Volatiles Loss from Water Bearing Regolith Simulant at Lunar Environments

Permanently shadowed craters at the lunar poles contain water, ~5 wt% according to LCROSS. Interest in water for ISRU applications. Desire to 'ground truth' water using surface prospecting; e.g. Resource Prospector (RP) & RESOLVE. How to access subsurface water resources and accurately measure quantity; Excavation operations and exposure to lunar environment may affect the results A series a ground based dirty thermal vacuum tests are being conducted to better understand the subsurface sampling operations: Sample removal and transfer, Volatiles loss during sampling operations, Concept of operations, Instrumentation. This presentation covers: The capabilities of the VF-13 Thermal Vacuum Chamber (Tvac). The Resource Prospector TVAC hardware. The summary and results of 5 years of RP volatiles tests; 43 viable samples

In-situ Resource Utilization↗