Search NASA⌕ Search

SEARCH · Search NASA

Results for “Trajectory Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

A New Window into the Baryon Cycle at Cosmic Noon with Line Intensity Mapping: Forecasts for auto- and cross-correlations in [CII]-158$μ$m, HI 21 cm, CO$_{J+1\rightarrow J}$, and H$α$ galaxies

Across the peak of cosmic star formation at $z\sim1-2$, inflow, processing, and feedback drive rapid changes in the spatial distribution and chemical composition of baryons in galaxies and surrounding reservoirs; this baryon cycle can be tomographically mapped by line intensity mapping (LIM) of atomic hydrogen, ionized carbon, and carbon monoxide. We present a simulation-based forecasting framework for detecting auto- and cross-power spectra between spectroscopic surveys of four such tracers at $z\sim0.5-1.7$ mapping the same deep field - TIM, EoRSpec/FYST, MeerKAT, & Euclid. We forward-model 3-D distributions for these tracers from magnetohydrodynamic simulations, directly capturing the two-halo, one-halo, and shot statistics without relying on analytical decompositions. We further detail a signal-to-noise formalism, tailored to LIM surveys with highly anisotropic geometries and Fourier-space coverage. We demonstrate that galaxy cross-correlations will be the dominant discovery channel for current-generation surveys. These instruments will detect the auto-spectra for CO and HI 21 cm and the CO $\times$ 21 cm cross-spectrum at modest S/N $\sim 1-10$, while placing upper limits on the [CII]-158$μ$m signals. [CII], CO, and HI LIM will be $\sim3-30\times$ ($0.5-1.5$ dex) more sensitive to cross-correlation with the Euclid survey, however, than their respective auto-correlations, constraining all three models of line emission at high significance (S/N $\sim 10-40$) within this decade. Finally, we formulate a staged instrumental trajectory with planned or reasonable improvements, including the as-proposed SKA-Mid. We forecast advancing the per-$k$-mode sensitivities of each auto-, galaxy-line, and line-line spectrum by several orders of magnitude, enabling new percent- and sub-percent level constraints on cosmology and the redshift evolution of star formation and the baryon cycle.

Agrawal, Shubh [Pennsylvania U., Dept. Math.]↗

BioSentinel: To the Moon or Beyond?

BioSentinel, an Artemis-1 secondary spacecraft, will carry a biology experiment into deep space for the first time in 50 years. A 6U CubeSat form factor was utilized for the spacecraft and included technologies newly developed or adapted for operations beyond Earth orbit. This is the maiden deep-space voyage for the radio, propulsion system, electrical power system, and BioSensor payload. The spacecraft carries onboard budding yeast, Saccharomyces cerevisiae, as an analog to human cells to test the biological response to deep space radiation. Flying a secondary payload beyond LEO comes with unique challenges with respect to trajectory uncertainty and mission operations planning. BioSentinel does not carry propulsion for trajectory maneuvers, so plans for Comms and Power need to be developed for all trajectories. The nominal plan is a lunar flyby followed by an insertion into Heliocentric orbit. However, some possible scenarios include lunar eclipses that could severely impact the power budget during that phase of the mission, while others could result in a “Retrograde” hyperbola at swingby resulting in the spacecraft traveling inward toward Earth or even towards a collision with the lunar surface. BioSentinel’s final trajectory will not be known until after launch and deployment so possible scenarios need to be planned for ahead of time. This paper discusses the operational scenarios that were planned for as well as the actual execution of the mission operations including: command pass scheduling with the Deep Space Network, selecting bandwidth limits, medium gain antenna versus low gain antenna usage, and conserving power prior to a lunar eclipse. Note: Artemis-1 is planned to launch in the Spring of 2022

BioSentinel↗

Flight Dynamics Operations: Methods and Lessons Learned from Space Shuttle Orbit Operations

The Flight Dynamics Officer is responsible for trajectory maintenance of the Space Shuttle. This paper will cover high level operational considerations, methodology, procedures, and lessons learned involved in performing the functions of orbit and rendezvous Flight Dynamics Officer and leading the team of flight dynamics specialists during different phases of flight. The primary functions that will be address are: onboard state vector maintenance, ground ephemeris maintenance, calculation of ground and spacecraft acquisitions, collision avoidance, burn targeting for the primary mission, rendezvous, deorbit and contingencies, separation sequences, emergency deorbit preparation, mass properties coordination, payload deployment planning, coordination with the International Space Station, and coordination with worldwide trajectory customers. Each of these tasks require the Flight Dynamics Officer to have cognizance of the current trajectory state as well as the impact of future events on the trajectory plan in order to properly analyze and react to real-time changes. Additionally, considerations are made to prepare flexible alternative trajectory plans in the case timeline changes or a systems failure impact the primary plan. The evolution of the methodology, procedures, and techniques used by the Flight Dynamics Officer to perform these tasks will be discussed. Particular attention will be given to how specific Space Shuttle mission and training simulation experiences, particularly off-nominal or unexpected events such as shortened mission durations, tank failures, contingency deorbit, navigation errors, conjunctions, and unexpected payload deployments, have influenced the operational procedures and training for performing Space Shuttle flight dynamics operations over the history of the program. These lessons learned can then be extended to future vehicle trajectory operations.

Cutri-Kohart, Rebecca M.↗

Maneuver design overview of the 2018 InSight Mars lander mission

Launched on May 5, 2018, the Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) spacecraft landed safely on Mars on November 26, 2018. To deliver the lander accurately to the landing site, six trajectory correction maneuvers (TCMs) were planned along the reference trajectory from Earth launch to Mars entry. For the last two TCMs, there were two corresponding contingency TCMs planned that could be executed in the event that the corresponding nominal one failed. There were also twenty pre-designed menu TCMs available for execution at the time of the last contingency TCM, about 8 hours before the Mars entry, descent, and landing. This navigation paper overviews the maneuver design of each TCM, as well as how each one actually performed during operations.

Wallace, Mark↗

Evolution of Trajectory Design Requirement of NASA's Planned Europa Clipper Mission

Europa is one of the most scientifically intriguing targets in planetary science due to its potential suitability for extant life. As such, NASA has funded the California Institute of Technology Jet Propulsion Laboratory and the Johns Hopkins University Applied Physics Laboratory to jointly develop the planned Europa Clipper mission—a multiple Europa flyby mission architecture aimed to thoroughly investigate the habitability of Europa and provide reconnaissance data to determine a landing site that maximizes the probability of both a safe landing and high scientific value for a potential future Europa lander. The trajectory design—a major enabling component for this Europa Clipper mission concept—was developed to maximize science from a set of eight model payload instruments determined by a NASA-appointed Europa Science Definition Team (SDT) between 2011-2015. On May 26, 2015, NASA officially selected 10 instruments from 6 different U.S. research facilities and universities. With the selection of instruments have come the development of new science measurement requirements, as well as a rich set of requirements stemming from project policies, planetary protection, and the evolved capability and characteristics of the flight system and mission operations system. This paper will focus on the evolution of requirements levied on the trajectory design, discuss strategies and solutions to the multidimensional optimization problem of designing high fidelity end-to-end trajectories that maximize Europa science while mitigating mission risk, complexity and cost, and last, verification of candidate trajectories to meet the requirements on the trajectory design.

Buffington, Brent↗

Low-Earth Orbit Trajectory Optimization in the Presence of Atmospheric Uncertainty

The previous 20 to 25 years have seen a tremendous increase in space exploration, and with that an increase in the level of logistics planning needed to ensure mission success. For spacecraft that are designed to be periodically re-supplied, a key logistics consumable is propellant, as it constitutes the greatest up-mass on re-supply vehicles. A trajectory design strategy is therefore desired that minimizes propellant usage in order to ease the demand for propellant re-supply missions. This thesis develops such a strategy in three stages, and uses the International Space Station (ISS) as its testbed, as no other LEO spacecraft is more challenging from a space logistics standpoint. First, the ISS trajectory planning problem is formulated as a constrained burn optimization problem assuming a deterministic atmosphere. The cost function is total ∆v, with constraints imposed on longitude of ascending viii node (LAN) and semi-major axis (SMA) altitude. Analytic derivatives are constructed for both the cost and constraints, which are necessary given the 6-week to 2-year time frames being considered. A gradient-based optimizer is then utilized to find locally-optimal solutions to real-world ISS trajectory planning problems. Second, atmospheric uncertainty is addressed by constructing a probabilistic model of space weather data using Gaussian Processes (GPs). Bayesian inference is performed using the GP model to generate mean and covariance estimates for space weather predictions, whose pedigree is assessed against test data. The predictions are then mapped into atmospheric density via the analytic Jacchia-Roberts density model, and the effect of space weather uncertainty on orbital lifetime is examined. Third, an ISS burn execution uncertainty model is developed. This model, along with the space weather uncertainty model, are deployed in a linear covariance analysis to ascertain their combined effect on LAN and SMA altitude dispersions. The deterministic constraints from the original problem are re-formulated as stochastic constraints, where now the constraint uncertainty interval is required to fall within specified bounds. An updated optimization framework is constructed using the original ∆v cost function along with the stochastic constraints to solve the trajectory optimization problem under atmospheric uncertainty. Finally, the complete architecture is summarized for deployment in an operational setting.

Trajectory Optimization↗

The OPALS Plan for Operations: Use of ISS Trajectory and Attitude Models in the OPALS Pointing Strategy

This paper will discuss the OPALS pointing strategy, focusing on incorporation of ISS trajectory and attitude models to build pointing predictions. Methods to extrapolate an ISS prediction based on past data will be discussed and will be compared to periodically published ISS predictions and Two-Line Element (TLE) predictions. The prediction performance will also be measured against GPS states available in telemetry. The performance of the pointing products will be compared to the allocated values in the OPALS pointing budget to assess compliance with requirements.

Optical PAyload for Lasercomm Science (OPALS)↗

Mission Planner Algorithm for Urban Air Mobility – Initial Performance Characterization

In this paper, an initial characterization was performed of the Mission Planner algorithm developed by NASA for Urban Air Mobility (UAM) operations research. The algorithm plans conflict-free trajectories for flights to support a given set of UAM passenger trips. The UAM trips are planned in an on-demand, first-come, first-served manner, such that any given trip is subject to the constraints imposed by previously planned trips. For this analysis, the mission planning algorithm considered only the trajectory constraints from previously-planned trips in one test condition and added vertiport constraints for the second test condition. The conflict and constraint resolution strategies used by the Mission Planner were characterized by their percentage contribution to planning iterations, their percentage effectiveness in those iterations, and their contributions to the departure delay applied to each UAM trip’s flight. With the exception of the climb and descent vertical speed strategies, most strategies showed reasonable or good performance in all test scenarios. In the test condition with vertipad constraints enabled, both the total number of iterations executed, and the number of flights that required planning iterations, was reduced for all scenarios. This was the result of the natural conditioning of the traffic achieved with scheduling and the additional information available to the Mission Planner from the vertiport scheduler. The next steps for this work will include improvements to the mission planning strategies and analyses with additional constraints and under other demand scenarios.

Guerreiro, Nelson M.↗

Comparison of Acoustic Models and Trajectory Generation Methods for an Acoustically-Aware Aircraft

This paper presents a comparison of trajectory generation methodologies using acoustic source noise models of different fidelity for motion planning for an acoustically-aware aircraft subject to constraints on the vehicle dynamic performance, mission, and acoustic footprint of the vehicle at a set of (three-dimensional) observer locations. The performance of a pre-mission Bézier curve-based planner and a (near) real-time stochastic model predictive control planner are compared. Additionally, a comparison is made between the motion planning performance using a lower-fidelity acoustic model based on propeller tip Mach number and omni-directional sound power radiation, and a hemisphere-based higher-fidelity acoustic model. It is demonstrated that the asymmetry in hemisphere-based acoustic model can be exploited for improved flight path planning and trajectory-tracking performance in the presence of acoustic constraints.

Kasey A Ackerman↗

Hayabusa Re-Entry: Trajectory Analysis and Observation Mission Design

On June 13th, 2010, the Hayabusa sample return capsule successfully re-entered Earth s atmosphere over the Woomera Prohibited Area in southern Australia in its quest to return fragments from the asteroid 1998 SF36 Itokawa . The sample return capsule entered at a super-orbital velocity of 12.04 km/sec (inertial), making it the second fastest human-made object to traverse the atmosphere. The NASA DC-8 airborne observatory was utilized as an instrument platform to record the luminous portion of the sample return capsule re-entry (~60 sec) with a variety of on-board spectroscopic imaging instruments. The predicted sample return capsule s entry state information at ~200 km altitude was propagated through the atmosphere to generate aerothermodynamic and trajectory data used for initial observation flight path design and planning. The DC- 8 flight path was designed by considering safety, optimal sample return capsule viewing geometry and aircraft capabilities in concert with key aerothermodynamic events along the predicted trajectory. Subsequent entry state vector updates provided by the Deep Space Network team at NASA s Jet Propulsion Laboratory were analyzed after the planned trajectory correction maneuvers to further refine the DC-8 observation flight path. Primary and alternate observation flight paths were generated during the mission planning phase which required coordination with Australian authorities for pre-mission approval. The final observation flight path was chosen based upon trade-offs between optimal viewing requirements, ground based observer locations (to facilitate post-flight trajectory reconstruction), predicted weather in the Woomera Prohibited Area and constraints imposed by flight path filing deadlines. To facilitate sample return capsule tracking by the instrument operators, a series of two racetrack flight path patterns were performed prior to the observation leg so the instruments could be pointed towards the region in the star background where the sample return capsule was expected to become visible. An overview of the design methodologies and trade-offs used in the Hayabusa re-entry observation campaign are presented.

Cassell, Alan M.↗

Improved Conflict Detection for Reducing Operational Errors in Air Traffic Control

An operational error is an incident in which an air traffic controller allows the separation between two aircraft to fall below the minimum separation standard. The rates of such errors in the US have increased significantly over the past few years. This paper proposes new detection methods that can help correct this trend by improving on the performance of Conflict Alert, the existing software in the Host Computer System that is intended to detect and warn controllers of imminent conflicts. In addition to the usual trajectory based on the flight plan, a "dead-reckoning" trajectory (current velocity projection) is also generated for each aircraft and checked for conflicts. Filters for reducing common types of false alerts were implemented. The new detection methods were tested in three different ways. First, a simple flightpath command language was developed t o generate precisely controlled encounters for the purpose of testing the detection software. Second, written reports and tracking data were obtained for actual operational errors that occurred in the field, and these were "replayed" to test the new detection algorithms. Finally, the detection methods were used to shadow live traffic, and performance was analysed, particularly with regard to the false-alert rate. The results indicate that the new detection methods can provide timely warnings of imminent conflicts more consistently than Conflict Alert.

Paielli, Russell A.↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Reconstruction of the Apollo 11 Moon Landing Final Descent Trajectory

Relatively limited data on the Apollo 11 pre-planned and as-flown trajectories are available in the open literature and in the NASA archives. Furthermore, a single report appears to be the only source containing plots comparing the pre-planned and as-flown final approach and landing trajectories. The plots in that report, however, are small and difficult to read, and contain data that are insufficient for directly reconstructing the final landing trajectory. In this report, several published graphics are digitized, and then a variety of least-squares and Kalman filter estimators are applied using kinematic equations and simplified dynamic equations to reconstruct the final descent trajectory. The reconstructed trajectory is important in the crew training effort for program Artemis, which intends to send humans back to the moon, as well as other studies focusing on landing on extraterrestrial worlds.

Apollo 11↗

Reactive Collision Avoidance Algorithm

The reactive collision avoidance (RCA) algorithm allows a spacecraft to find a fuel-optimal trajectory for avoiding an arbitrary number of colliding spacecraft in real time while accounting for acceleration limits. In addition to spacecraft, the technology can be used for vehicles that can accelerate in any direction, such as helicopters and submersibles. In contrast to existing, passive algorithms that simultaneously design trajectories for a cluster of vehicles working to achieve a common goal, RCA is implemented onboard spacecraft only when an imminent collision is detected, and then plans a collision avoidance maneuver for only that host vehicle, thus preventing a collision in an off-nominal situation for which passive algorithms cannot. An example scenario for such a situation might be when a spacecraft in the cluster is approaching another one, but enters safe mode and begins to drift. Functionally, the RCA detects colliding spacecraft, plans an evasion trajectory by solving the Evasion Trajectory Problem (ETP), and then recovers after the collision is avoided. A direct optimization approach was used to develop the algorithm so it can run in real time. In this innovation, a parameterized class of avoidance trajectories is specified, and then the optimal trajectory is found by searching over the parameters. The class of trajectories is selected as bang-off-bang as motivated by optimal control theory. That is, an avoiding spacecraft first applies full acceleration in a constant direction, then coasts, and finally applies full acceleration to stop. The parameter optimization problem can be solved offline and stored as a look-up table of values. Using a look-up table allows the algorithm to run in real time. Given a colliding spacecraft, the properties of the collision geometry serve as indices of the look-up table that gives the optimal trajectory. For multiple colliding spacecraft, the set of trajectories that avoid all spacecraft is rapidly searched on-line. The optimal avoidance trajectory is implemented as a receding-horizon model predictive control law. Therefore, at each time step, the optimal avoidance trajectory is found and the first time step of its acceleration is applied. At the next time step of the control computer, the problem is re-solved and the new first time step is again applied. This continual updating allows the RCA algorithm to adapt to a colliding spacecraft that is making erratic course changes.

Scharf, Daniel↗

Attitude Design for the LADEE Mission

The Lunar Atmosphere and Dust Environment Explorer (LADEE) satellite successfully completed its 148-day science investigation in a low-altitude, near-equatorial lunar orbit on April 18, 2014. The LADEE spacecraft was built, managed and operated by NASA's Ames Research Center (ARC). The Mission Operations Center (MOC) was located at Ames and was responsible for activity planning, command sequencing, trajectory and attitude design, orbit determination, and spacecraft operations. The Science Operations Center (SOC) was located at Goddard Space Flight Center and was responsible for science planning, data archiving and distribution. This paper details attitude design and operations support for the LADEE mission. LADEE's attitude design was shaped by a wide range of instrument pointing requirements that necessitated regular excursions from the baseline one revolution per orbit "Ram" attitude. Such attitude excursions were constrained by a number of flight rules levied to protect instruments from the Sun, avoid geometries that would result in simultaneous occlusion of LADEE's two star tracker heads, and maintain the spacecraft within its thermal and power operating limits. To satisfy LADEE's many attitude requirements and constraints, a set of rules and conventions was adopted to manage the complexity of this design challenge and facilitate the automation of ground software that generated pointing commands spanning multiple days of operations at a time. The resulting LADEE Flight Dynamics System (FDS) that was developed used Visual Basic scripts that generated instructions to AGI's Satellite Tool Kit (STK) in order to derive quaternion commands at regular intervals that satisfied LADEE's pointing requirements. These scripts relied heavily on the powerful "align and constrain" capability of STK's attitude module to construct LADEE's attitude profiles and the slews to get there. A description of the scripts and the attitude modeling they embodied is provided. One particular challenge analysts faced was in the design of LADEE maneuver attitudes. A flight rule requiring pre-maneuver verification of in-flight maneuver conditions by ground operators prior to burn execution resulted in the need to accommodate long periods in the maneuver attitude. This in turn complicated efforts to satisfy star tracker interference and communication constraints in lunar orbit. In response to this challenge, a graphical method was developed and used to survey candidate rotation angles about the thrust vector. This survey method is described and an example of its use on a particular LADEE maneuver is discussed. Finally, the software and methodology used to satisfy LADEE's attitude requirements are also discussed in the context of LADEE's overall activity planning effort. In particular, the way in which strategic schedules of instrument and engineering activities were translated into actual attitude profiles at the tactical level, then converted into precise quaternion commands to achieve those pointing goals is explained. In order to reduce the risk of time-consuming re-planning efforts, this process included the generation of long-term projections of constraint violation predictions for individual attitude profiles that could be used to establish keep-out time-frames for particular attitude profiles. The challenges experienced and overall efficacy of both the overall LADEE ground system and the attitude components of the Flight Dynamics System in meeting LADEE's varied pointing requirements are discussed.

LADEE↗