Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada

This report presents results of data collected during the annual post-closure site inspections conducted at the Central Nevada Test Area surface Corrective Action Unit (CAU) 417 in May 2011 and July 2012. The annual post-closure site inspections included inspections of the UC-1, UC-3, and UC-4 sites in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report (NNSA/NV 2001). The annual inspections conducted at the UC-1 Central Mud Pit (CMP) indicated that the site and soil cover were in good condition. No new fractures or extension of existing fractures were observed and no issues with the fence or gate were identified. The vegetation on the cover continues to look healthy, but the biennial vegetation survey conducted during the 2012 inspection indicated that the total foliar cover was slightly higher in 2009 than in 2012. This may be indicative of a decrease in precipitation observed during the 2-year monitoring period. The precipitation totaled 9.9 inches from July 1, 2010, through June 30, 2011, and 5 inches from July 1, 2011, through June 30, 2012. This decrease in precipitation is also evident in the soil moisture data obtained from the time domain reflectometry sensors. Soil moisture content data show that the UC-1 cover is performing as designed, and evapotranspiration is effectively removing water from the cover.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada

This report presents results of data collected during the annual post-closure site inspection conducted at the Central Nevada Test Area, surface Corrective Action Unit (CAU) 417 in June 2009. The annual post-closure site inspection included inspections of the UC-1, UC-3, and UC-4 sites in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report (NNSA/NV 2001). The annual inspection conducted at the UC-1 Central Mud Pit (CMP) indicated that the site and soil cover were in good condition. Three new fractures were identified in the soil cover and were filled with bentonite chips during the inspection. The vegetation on the soil cover was adequate but showed signs of the area's ongoing drought. No issues were identified with the CMP fence, gate, or subsidence monuments. No issues were identified with the warning signs and monuments at the other two UC-1 locations

54 ENVIRONMENTAL SCIENCES↗

Test Report for DPP-1 Regulatory Compliance Testing. Volume 1 - Main Report

Consolidated Nuclear Security, LLC (CNS), the management and operating contractor for the Y-12 National Security Complex (Y-12) for the National Nuclear Security Administration (NNSA), is currently responsible for the regulatory testing of a new Type B fissile material shipping package called the Defense Programs Package (DPP)-1. The DPP-1 is a drum packaging with an inner liner and a removable lid. Both the drum body and the lid are filled with an impact-limiting, thermal-insulating material that protects the inner containment vessel (CV) during normal conditions of transport (NCT) and hypothetical accident conditions (HAC) as defined by 10 US code of Federal Regulations (CFR) 71. In fiscal year 2021, the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP), located at the National Transportation Research Center (NTRC), conducted Type B performance tests as prescribed in Title 10 Code of Federal Regulations Part 71 (10 CFR 71) on seven DPP-1 prototype units. This test report documents test unit (TU) preparation, pretest condition, conditioning of each TU, NCT and HAC testing, and posttest measurements and observations made of the damage resulting from these tests.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives included No Further Action and Clean Closure.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SuperCam Body Unit Flight Model Vibration Test Report (Rev.A)

This report describes the vibration tests that were applied to the SuperCam Body Unit (SCBU) Flight Model (FM) at Protoflight levels. These tests were performed November 28 and 29, 2018, at the Los Alamos National Laboratory ISR-5 Shock and Vibration Environmental Test Facility, at TA-3, Building 502 Room E102. The test environments shown below were obtained from the SuperCam FM test plan, which is the overarching document for all testing. The vibration results from all testing are shown below. An anomaly was identified during the FM functional testing at the conclusion of the X-Axis. It was decided to re-test at -6 dB to determine if the anomaly progressed or remained the same. Functional testing did not show any changes after the -6 dB random vibration. It was then decided to re-test at -3 dB. Once again functional testing after the -3 dB vibration did not show any changes. Low-level random vibration signature surveys were performed before and after the -6 dB and -3 dB retests. This test series met the vibration requirements to qualify the SuperCam Body Unit FM for flight without any significant anomalies.

42 ENGINEERING↗

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada

This report presents data collected during the annual post-closure site inspection conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Central Nevada Test Area (CNTA) surface Corrective Action Unit (CAU) 417. This report has been prepared in accordance with the Post-Closure Monitoring Plan contained in the CAU 417 Closure Report (NNSA/NV 2001) and Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996). Responsibility for environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada-March 2012

This report presents data collected during the annual post-closure site inspection conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Central Nevada Test Area (CNTA) surface Corrective Action Unit (CAU) 417. This report has been prepared in accordance with the Post-Closure Monitoring Plan contained in the CAU 417 Closure Report (NNSA/NV 2001) and Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996). Responsibility for environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2012 Groundwater Monitoring Report Central Nevada Test Area, Subsurface Corrective Action Unit 443

The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was monitoring with institutional controls. Annual sampling and hydraulic head monitoring are conducted as part of the subsurface corrective action strategy. The site is currently in the fourth year of the 5-year proof-of-concept period that is intended to validate the compliance boundary. Analytical results from the 2012 monitoring are consistent with those of previous years. Tritium remains at levels below the laboratory minimum detectable concentration in all wells in the monitoring network. Samples collected from reentry well UC-1-P-2SR, which is not in the monitoring network but was sampled as part of supplemental activities conducted during the 2012 monitoring, indicate concentrations of tritium that are consistent with previous sampling results. This well was drilled into the chimney shortly after the detonation, and water levels continue to rise, demonstrating the very low permeability of the volcanic rocks. Water level data from new wells MV-4 and MV-5 and recompleted well HTH-1RC indicate that hydraulic heads are still recovering from installation and testing. Data from wells MV-4 and MV-5 also indicate that head levels have not yet recovered from the 2011 sampling event during which several thousand gallons of water were purged. It has been recommended that a low-flow sampling method be adopted for these wells to allow head levels to recover to steady-state conditions. Despite the lack of steady-state groundwater conditions, hydraulic head data collected from alluvial wells installed in 2009 continue to support the conceptual model that the southeast-bounding graben fault acts as a barrier to groundwater flow at the site.

54 ENVIRONMENTAL SCIENCES↗

2011 Groundwater Monitoring Report, Central Nevada Test Are, Subsurface Corrective Action Unit 443

The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was proof-of-concept and monitoring with institutional controls. Annual sampling and hydraulic head monitoring are conducted as part of the subsurface corrective action strategy. The site is currently in the third year of the 5-year proof-of-concept period that is intended to validate the compliance boundary. Analytical results from the 2011 monitoring are consistent with those of previous years. Tritium remains at levels below detection in all wells. Water levels continue to rise in the reentry well UC-1-P-2SR that was drilled into the chimney shortly after the detonation, demonstrating the very low permeability of the volcanic rocks. Water level data from the new wells MV-4 and MV-5 and recompleted well HTH-1RC indicate that hydraulic heads are still recovering from installation and testing. Data from wells MV-4 and MV-5 also indicate that head levels do not recover after yearly sampling events during which several thousand gallons of water are purged. It is recommended that low-flow sampling methods be adopted for these wells to allow head levels to recover to steady-state conditions. Despite the lack of steady-state groundwater conditions, hydraulic head data collected from alluvial wells installed in 2009 continue to support the conceptual model that the southeast-bounding graben fault acts as a barrier to flow at the site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2013 Groundwater Monitoring Report, Central Nevada Test Area Subsurface Corrective Action Unit 443

The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was monitoring with institutional controls. Annual sampling and hydraulic head monitoring of the well network are conducted as part of the subsurface corrective action strategy for the site. The monitoring well network was enhanced in 2013 with the installation of a new well MV-6. The site is currently in the fifth year of the 5-year proof-of-concept monitoring period. Analytical results from the 2013 monitoring are consistent with those of previous years indicating no tritium or 14 C concentrations above the required detection limits. Water level data from new wells MV-4 and MV-5 and recompleted well HTH-1RC indicate that hydraulic heads are still recovering from installation and testing. Data from wells MV-4 and MV-5 also indicate that head levels have not yet recovered from the 2011 sampling event during which several thousand gallons of water were purged. Low-flow bladder pumps were installed during the November 2013 sampling event to reduce the well purge volumes and the impact purging has on the water levels during sampling. The new bladder pumps allow the collection of groundwater samples using the low-flow sampling method and will allow head levels to recover to steadystate conditions. Despite the lack of steady-state groundwater conditions, hydraulic head data collected from site continue to support the conceptual model that the southeast-bounding graben fault acts as a barrier to groundwater flow at the site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2014 Groundwater Monitoring Report Central Nevada Test Area Subsurface Corrective Action Unit 443

The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was monitoring with institutional controls. Annual sampling and hydraulic head monitoring of the well network are conducted as part of the subsurface corrective action strategy for the site. The monitoring well network consists of 12 locations (wells and piezometers) in the alluvium, seven locations (wells and piezometers) in the volcanic section, and one well in the collapse chimney that resulted from the underground nuclear test. The site is currently in the conceptual model evaluation phase of the corrective action strategy.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility.

54 ENVIRONMENTAL SCIENCES↗

Draft Summary Report on Irradiated Fuel Handling and Management for LOTUS

The National Reactor Innovation Center (NRIC) has conceptualized the design of the Laboratory for Operation and Testing in the United States (LOTUS) test bed to provide the United States Department of Energy (DOE) with the infrastructure necessary to make advanced reactor designs available for commercial developers. LOTUS will provide a test bed to developers with the capabilities of supporting a wide range of experiment design possibilities. Upon completion of the developers’ operations and experiments within the test bed, the irradiated fuel, reactor components, and other experiment materials must be removed. Idaho National Laboratory (INL) possesses significant capabilities for radioactive material handling such as casks, carts, and forklifts. However, given the unique environment presented by the NRIC-LOTUS test bed, located inside the Zero Power Physics Reactor (ZPPR) Perimeter Intrusion Detection and Assessment System (PIDAS) area at the Materials and Fuels Complex (MFC) and the complexity of novel removal activities of recently operated reactor experiments through the new proposed access tunnel. The efficacy was not apparent for existing equipment to provide all the needed capability. To bridge the potential gaps in cask designs, storage, and transportation, NRIC requested the development of trade studies for the transfer, handling, and storage requirements of irradiated fuel salts and other radioactive materials. NRIC directed Boston Government Services, LLC (BGS) to perform the trade studies and develop a report analyzing alternatives. In addition to the BGS reports, the Idaho National Lab’s (INL), provided by the first potential user’s Advanced Reactor Development (ARD) team, prepared a feasibility study for the storage of specific irradiated fuel within the existing ZPPR vault.This summary report is intended to present the trade studies, options, and alternatives that were investigated. The maturity level of LOTUS, the reactor, fuel salt containers, gloveboxes, and reactor testing campaign and concept of operations were not at a level sufficient to base critical decisions on. This report is not intended to present a final recommendation. The final recommendations for fuel storage location, transport, handling equipment, and operations will be made in FY 2024 and will be based on known materials, test campaign requirements, funding, and final analysis of the fuel and equipment to be used.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

54 ENVIRONMENTAL SCIENCES↗

Identification and Characterization of Hydrogeologic Units at the Nevada Test Site Using Geophysical Logs: Examples from the Underground Test Area Project

The diverse and complex geology of the Nevada Test Site region makes for a challenging environment for identifying and characterizing hydrogeologic units penetrated by wells drilled for the U.S. Department of Energy, National Nuclear Security Administration, Underground Test Area (UGTA) Environmental Restoration Sub-Project. Fortunately, UGTA geoscientists have access to large and robust sets of subsurface geologic data, as well as a large historical knowledge base of subsurface geological analyses acquired mainly during the underground nuclear weapons testing program. Of particular importance to the accurate identification and characterization of hydrogeologic units in UGTA boreholes are the data and interpretation principles associated with geophysical well logs. Although most UGTA participants and stakeholders are probably familiar with drill hole data such as drill core and cuttings, they may be less familiar with the use of geophysical logs; this document is meant to serve as a primer on the use of geophysical logs in the UGTA project. Standard geophysical logging tools used in the UGTA project to identify and characterize hydrogeologic units are described, and basic interpretation principles and techniques are explained. Numerous examples of geophysical log data from a variety of hydrogeologic units encountered in UGTA wells are presented to highlight the use and value of geophysical logs in the accurate hydrogeologic characterization of UGTA wells.

58 GEOSCIENCES↗

National Weather Service Radiosonde Evaluation Field Campaign Report

The purpose of the campaign was to perform a full evaluation of participating vendor’s radiosondes to qualify for potential use in the National Weather Service (NWS) upper air field operations. The NWS has specific requirements that vendors systems were evaluated against to determine if the vendor’s radiosonde performs within specifications. For this evaluation, the NWS was pursuing commercial off-the-shelf (COTS) ground/tracking systems in the 403 MHz frequency band over the previously used Telemetry Receiving System (TRS) and house-built software using the 1680 MHz frequency. The U.S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility’s Southern Great Plains (SGP) observatory served as the warm and dry test region. The radiosondes were assessed for precision of the radiosonde (unit under test versus itself) and accuracy of the radiosonde’s humidity measurements (unit under test versus a cryogenic frostpoint hygrometer [CFH]).

54 ENVIRONMENTAL SCIENCES↗

ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2009

This Annual Report presents the data and evaluates the progress of the three-component remedy implemented for remediation of groundwater contamination at Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory Site. Overall, each component is achieving progress toward the goal of total plume remediation. In situ bioremediation operations in the hot spot continue to operate as planned. Progress toward the remedy objectives is being made, as evidenced by continued reduction in the amount of accessible residual source and decreases in downgradient contaminant flux, with the exception of TAN-28. The injection strategy is maintaining effective anaerobic reductive dechlorination conditions, as evidenced by complete degradation of trichloroethene and ethene production in the biologically active wells. In the medial zone, the New Pump and Treat Facility operated in standby mode. Trichloroethene concentrations in the medial zone wells are significantly lower than the historically defined concentration range of 1,000 to 20,000 μg/L. The trichloroethene concentrations in TAN-33, TAN-36, and TAN-44 continue to be below 200 μg/L. Monitoring in the distal zone wells outside and downgradient of the plume boundary demonstrate that some plume expansion has occurred, but less than the amount allowed in the Record of Decision Amendment. Additional data need to be collected for wells in the monitored natural attenuation part of the plume to confirm that the monitored natural attenuation part of the remedy is proceeding as predicted in the modeling.

54 ENVIRONMENTAL SCIENCES↗