Search NASA⌕ Search

SEARCH · Search NASA

Results for “Verification of data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

The DES Bright Arcs Survey: Hundreds of Candidate Strongly Lensed Galaxy Systems from the Dark Energy Survey Science Verification and Year 1 Observations

We report the results of searches for strong gravitational lens systems in the Dark Energy Survey (DES) Science Verification and Year 1 observations. The Science Verification data span approximately 250 sq. deg. with a median i -band limiting magnitude for extended objects (10 σ ) of 23.0. The Year 1 data span approximately 2000 sq. deg. and have an i -band limiting magnitude for extended objects (10 σ ) of 22.9. As these data sets are both wide and deep, they are particularly useful for identifying strong gravitational lens candidates. Potential strong gravitational lens candidate systems were initially identified based on a color and magnitude selection in the DES object catalogs or because the system is at the location of a previously identified galaxy cluster. Cutout images of potential candidates were then visually scanned using an object viewer and numerically ranked according to whether or not we judged them to be likely strong gravitational lens systems. Having scanned nearly 400,000 cutouts, we present 374 candidate strong lens systems, of which 348 are identified for the first time. We provide the R.A. and decl., the magnitudes and photometric properties of the lens and source objects, and the distance (radius) of the source(s) from the lens center for each system.

79 ASTRONOMY AND ASTROPHYSICS↗

Passive Tomography for Spent Fuel Verification: Analysis Framework and Instrument Design Study

The potential for gamma emission tomography (GET) to detect partial defects within a spent nuclear fuel assembly is being assessed through a collaboration of Support Programs to the International Atomic Energy Agency (IAEA). In the first phase of this study, two safeguards verification objectives have been identified. The first is the independent determination of the number of active pins that are present in the assembly, in the absence of a priori information. The second objective is to provide quantitative measures of pin-by-pin properties, e.g. activity of key isotopes or pin attributes such as cooling time and relative burnup, for the detection of anomalies and/or verification of operator-declared data. The efficacy of GET to meet these two verification objectives will be evaluated across a range of fuel types, burnups, and cooling times, and with a target interrogation time of less than 60 minutes. The evaluation of GET viability for safeguards applications is founded on a modelling and analysis framework applied to existing and emerging GET instrument designs. Monte Carlo models of different fuel types are used to produce simulated tomographer responses to large populations of “virtual” fuel assemblies. Instrument response data are processed by a variety of tomographic-reconstruction and image-processing methods, and scoring metrics specific to each of the verification objectives are defined and used to evaluate the performance of the methods. This paper will provide a description of the analysis framework and evaluation metrics, example performance-prediction results, and describe the design of a “universal” GET instrument intended to support the full range of verification scenarios envisioned by the IAEA.

spent nuclear fuel assemblies, partial defect veri↗

Verification Testing of OLI Systems Mixed Solvent Electrolyte Model for the Na-K-Mg-Ca-H-Cl-SO 4 -OH-HCO 3 -CO 3 -CO 2 -H 2 ) System to High Ionic Strength at 25°C

This technical report summarizes model verification results and summary statistics for 41 evaporite mineral solubility cases evaluated by Savannah River National Laboratory using OLI Systems’ aqueous electrolyte thermodynamic modeling software. The 41 verification cases containing a total of 60 solubility curves comprise mineral solubility data from low to high ionic strength at 25°C for the eight-component system Na-K-Mg-Ca-H-Cl-SO 4 -OH-HCO 3 -CO 3 -CO 2 -H 2 O as reported by Harvie et al. (1984). Thermodynamic calculations were executed using OLI Systems’ Stream Analyzer computation module within the OLI Studio software platform (Ver. 11.0, Rev. 11.0.1.9). The Mixed Solvent Electrolyte (MSE) thermodynamic framework was chosen for this investigation because of its superiority in modeling high ionic-strength inorganic salt solutions and actinide redox chemistry and solubility, both of which are relevant to the geological repository conditions at the Waste Isolation Pilot Plant in Carlsbad, New Mexico. Mineral solubility data in various inorganic salt solutions were digitized and extracted from figures generated by Harvie et al. (1984). For each of the 60 solubility curves, a case-specific chemistry model and input file were generated in OLI Studio using OLI Stream Analyzer and the MSE (H 3 O + ion) public databank provided by OLI Systems. Model simulation results were exported to Microsoft Excel to calculate summary statistics and to generate graphs comparing the OLI model predictions to the solubility data. Summary statistics include residuals (model – data) and concordance (accuracy × precision, where precision is indicated by the Pearson correlation coefficient and accuracy accounts for bias and scale differential). Private databanks were not developed, and activity coefficient model regressions were not performed to improve OLI model fits to the data. Of the 41 model verification plots, 83% have a mean of the percent residuals less than or equal to 25%. Similarly, 75% display a concordance greater than or equal to 0.75. Only seven of the 41 verification plots fail to show good agreement between the model and data. Of these seven, three are relevant to the WIPP repository because they involve the Mg-OH-Cl-SO 4 -CO 3 aqueous system. The remaining four address salt solubilities at the pH extremes (strong acid and strong base). It should be noted that in two of the three Mg-OH-Cl-SO 4 -CO 3 system cases, the regressed Harvie et al. (1984) solubility curve also deviated from the data. Lack of agreement between the OLI model-predicted solubility curves and the data is attributable to one or more of the following: specific solid species are not included in the OLI MSE databank; there is significant variation among the different solubility datasets chosen by Harvie et al. (1984); the OLI MSE model’s thermodynamic parameters were determined using different solubility datasets; and the activity coefficient parameters for certain relevant ion-ion and ion-molecule pairs have not been optimized via data regression. Two recommendations for future work are to (1) evaluate solubility data for the Mg-OH-Cl-SO 4 -CO 3 system at high ionic strength and, if necessary, develop a private OLI MSE database that includes missing species and, where necessary, regressed standard state properties and interaction parameters; (2) perform similar verification testing of the OLI model for actinide solubility data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for using Privacy Preserving Machine Learning Techniques for Safeguards

In international nuclear safeguards, the International Atomic Energy Agency (IAEA) is tasked with inspecting and verifying nuclear facilities and their activities. Data analytics and machine learning to support inspections require large amounts of data that nuclear facility operators may consider proprietary or sensitive, so the IAEA may not have full access. Allowing computation over private data without compromising its security therefore has value for safeguards inspections and analysis. Privacy-preserving machine learning (PPML) consists of security-focused techniques that allow data analytics and machine learning algorithms to run on sensitive data without revealing it. This includes ideas like homomorphic encryption (HE), secure multiparty computation (SMPC), and secure enclaves. HE allows algorithms and mathematical operations to be conducted directly on the encrypted data instead of first decrypting it. With SMPC, multiple entities collaboratively compute over distributed data such that no party is able to directly view any others’ original data. Secure enclaves allow computation to take place in a separate and heavily blocked-off section of a CPU. Techniques like these allow for several potential use cases in which the security of data is essential. With SMPC, machine learning models can be trained over the input data from multiple entities, resulting in a model that all users can benefit from without leaking the input data from any particular entity. With SMPC or a zero-knowledge proof (ZKP), an algorithm returning some single answer or truth value can be run on someone else’s data without ever needing to see that data, potentially allowing for verification or proof of some underlying question. HE can allow for outsourcing computation on data to a hostile or untrusted environment. Although most of the research in this field resides within the health and financial domains, tools from PPML may have similar applications in nuclear safeguards. Allowing the IAEA to compute over proprietary information, such as process models and raw sensor data using PPML techniques, provides the baseline for running complex analytics without needing direct unencrypted access to the underlying data, maintaining its privacy. Important limitations to consider for these techniques include the efficiency and level of security required. The security of HE and SMPC come at the cost of speed—the significant amount of overhead means that algorithms implemented in these protocols and encryption schemes are slower than when run on plaintext. Additionally, several important parameters determine what techniques or protocols are used based on the security requirements. SMPC protocols may need to be selected for resistance against a party that attempts to deviate from the protocol to distort the result or gain access to additional information, and a protocol secure against these attacks may further increase the overhead of the algorithm.

97 MATHEMATICS AND COMPUTING↗

Expressing precision and bias in calorimetry

The calibration and calibration verification of a nuclear calorimeter represents a substantial investment of time in part because a single calorimeter measurement takes of the order of 2 to 24h to complete. The time to complete a measurement generally increases with the size of the calorimeter measurement well. It is therefore important to plan the sequence of measurements rather carefully so as to cover the dynamic range and achieve the required accuracy within a reasonable time frame. This work will discuss how calibrations and their verification has been done in the past and what we consider to be good general practice in this regard. A proposed approach to calibration and calibration verification is presented which, in the final analysis, makes use of all the available data - both calibration and verification collectively - in order to obtain the best (in a best fit sense) possible calibration. The combination of sample variance and percent recovery are traditionally taken as sufficient to capture the random (precision) and systematic (bias) contributions to the uncertainty in a calorimetric assay. These terms have been defined as well as formulated for a basic calibration. It has been tradition to assume that sensitivity is a linear function of power. However, the availability of computer power and statistical packages should be utilized to fit the response function as accurately as possible using whatever functions are deemed most suitable. Allowing for more flexibility in the response function fit will enable the calibration to be updated according to the results from regular validation measurements through the year. In a companion paper to be published elsewhere we plan to discuss alternative fitting functions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MCNP6 Status and plans for criticality safety applications - 14368

The first production version of MCNP6 was released in 2013, with an update in 2014. MCNP6 provides all of the standard methodology for criticality calculations available in previous versions and new capabilities for adjoint-based sensitivity profiles and perturbations. This paper reviews the current status of MCNP6, including new features, performance improvements, verification testing, and nuclear data libraries. For criticality safety support, a new statistical package called Whisper was developed and first applied in 2014 for validation and determining USLs. Whisper includes input files and sensitivity profiles for over 1000 ICSBEP benchmarks and will be distributed with MCNP6. For the long term, an initiative called MCNP 2020 is underway to improve performance, strengthen the code foundation, and prepare for future computer systems. (authors)

42 ENGINEERING↗

Type A Verification Report for the High Flux Beam Reactor Stack and Grounds Brookhaven National Laboratory Upton, New York

The U.S. Department of Energy (DOE) Order 458.1 requires independent verification (IV) of DOE cleanup projects (DOE 2011). The Oak Ridge Institute for Science and Education (ORISE) has been designated as the responsible organization for IV of the High Flux Beam Reactor (HFBR) Stack and Grounds area at Brookhaven National Laboratory (BNL) in Upton, New York. The IV evaluation may consist of an in-process inspection with document and data reviews (Type A Verification) or a confirmatory survey of the site (Type B Verification). DOE and ORISE determined that a Type A verification of the documents and data for the HFBR Stack and Grounds: Survey Units (SU) 6, 7, and 8 was appropriate based on the initial survey unit classification, the walkover surveys, and the final analytical results provided by the Brookhaven Science Associates (BSA).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methodology, verification, and performance of the continuous-energy nuclear data sensitivity capability in MCNP6

A continuous-energy sensitivity coefficient capability has been introduced into MCNP6. The methods for generating energy-resolved and energy-integrated sensitivity profiles are discussed. Results from the verification exercises that were performed are given, and these show that MCNP6 compares favorably with analytic solutions, direct density perturbations, and comparisons to TSUNAMI-3D and MONK. Run-time and memory requirements are assessed for typical applications, and these are shown to be reasonable with modern computing resources. (authors)

97 MATHEMATICS AND COMPUTING↗

Type A Verification Report for the High Flux Beam Reactor Stack and Grounds, Brookhaven National Laboratory, Upton, New York

The U.S. Department of Energy (DOE) Order 458.1 requires independent verification (IV) of DOE cleanup projects (DOE 2011). The Oak Ridge Institute for Science and Education (ORISE) has been designated as the responsible organization for IV of the High Flux Beam Reactor (HFBR) Stack and Grounds area at Brookhaven National Laboratory (BNL) in Upton, New York. The IV evaluation may consist of an in-process inspection with document and data reviews (Type A Verification) or a confirmatory survey of the site (Type B Verification). DOE and ORISE determined that a Type A verification of the documents and data for the HFBR Stack and Grounds: Survey Units (SU) 6, 7, and 8 was appropriate based on the initial survey unit classification, the walkover surveys, and the final analytical results provided by the Brookhaven Science Associates (BSA). The HFBR Stack and Grounds surveys began in June 2011 and were completed in September 2011. Survey activities by BSA included gamma walkover scans and sampling of the as-left soils in accordance with the BSA Work Procedure (BNL 2010a). The Field Sampling Plan - Stack and Remaining HFBR Outside Areas (FSP) stated that gamma walk-over surveys would be conducted with a bare sodium iodide (NaI) detector, and a collimated detector would be used to check areas with elevated count rates to locate the source of the high readings (BNL 2010b). BSA used the Mult- Agency Radiation Survey and Site Investigation Manual (MARSSIM) principles for determining the classifications of each survey unit. Therefore, SUs 6 and 7 were identified as Class 1 and SU 8 was deemed Class 2 (BNL 2010b). Gamma walkover surveys of SUs 6, 7, and 8 were completed using a 2X2 NaI detector coupled to a data-logger with a global positioning system (GPS). The 100% scan surveys conducted prior to the final status survey (FSS) sampling identified two general soil areas and two isolated soil locations with elevated radioactivity. The general areas of elevated activity identified were investigated further with a collimated NaI detector. The uncollimated average gamma count rate was less than 15,000 counts per minute (cpm) for the SU 6, 7, and 8 composite area (BNL 2011a). Elevated count rates were observed in portions of each survey unit. The general areas of elevated counts near the Building 801 ventilation and operations and the entry to the Stack were determined to be directly related to the radioactive processes in those structures. To compensate for this radioactive shine, a collimated or shielded detector was used to lower the background count rate (BNL 2011b and c). This allowed the surveyor(s) to distinguish between background and actual radioactive contamination. Collimated gamma survey count rates in these shine affected areas were below 9,000 cpm (BNL 2011a). The average background count rate of 7,500 cpm was reported by BSA for uncollimated NaI detectors (BNL 2011d). The average collimated background ranged from 4,500-6,500 cpm in the westernmost part of SU 8 and from 2,000-3,500 cpm in all other areas (BNL 2011e). Based on these data, no further investigations were necessary for these general areas. SU 8 was the only survey unit that exhibited verified elevated radioactivity levels. The first of two isolated locations of elevated radioactivity had an uncollimated direct measurement of 50,000 cpm with an area background of 7,500 cpm (BNL 2011f). The second small area exhibiting elevated radiation levels was identified at a depth of 6 inches from the surface. The maximum reported count rate of 28,000 cpm was observed during scanning (BNL 2011g). The affected areas were remediated, and the contaminated soils were placed in an intermodal container for disposal. BSA's post-remediation walkover surveys were expanded to include a 10-foot radius around the excavated locations, and it was determined that further investigation was not required for these areas (BNL 2011 f and g). The post-remediation soil samples were collected and analyzed with onsite gamma spectroscopy equipment. These samples were also included with the FSS samples that were analyzed at an offsite facility for the primary radionuclides of concern (ROCs) (i.e., cesium-137, strontium-90, and radium-226). Analysis included full spectrum gamma spectroscopy for all samples. Sr-90 analysis was completed on all samples from SUs 6 and 7. However Sr-90 was only completed on the cores, composites, field blank and duplicate samples in SU 8. Alpha spectroscopy as well as liquid scintillation performed for tritium, carbon-14, and nickel-63 concentrations were completed on the composite samples from SUs 6 and 7. Various cores, composites, and samples from the remediated areas of SU 8 received alpha spectroscopy as well as liquid scintillation analyses for tritium, carbon-14, and nickel-63 to determine respective ROC concentrations (BNL 2011 h, i, and j). BSA submitted the FSS data and analytical results to demonstrate that remediation efforts complied with the specified cleanup goal of less than or equal to 15 millirem per year (mrem/yr) above background to a resident in 50 years (BNL 2011a through j). ORISE has reviewed the project documentation and FSS data for the HFBR Stack and Grounds: SUs 6, 7, and 8. The highest concentrations of the primary ROCs reported were 5.92 picocuries per gram (pCi/g) for Cs-137 and 2.03 pCi/g for Sr-90, with both ROCs having the qualifier for the sample result as less than the minimum detectable activity (MDA). For Ra-226, the highest detected concentration from the FSS data provided was 0.682 pCi/g. Other potential secondary contaminants were below their respective MDAs. Therefore, ORISE is of the opinion that BSA has provided sufficient evidence to demonstrate compliance with the 15 mrem/yr cleanup objectives for the final status survey data provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Verification of Reactor Activation Modelling with Physical Characterization Data and the Impact on Long Term Assessments - 20303

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on Whiteshell Reactor 1 (WR-1), an organically cooled, heavy water moderated nuclear reactor. WR-1 was safely shut down in 1985, defueled and drained, and has been in a safe Storage with Surveillance (Deferred Decommissioning) state until present day. In support of an Environmental Assessment for proposed in-situ disposal of WR-1, detailed characterization information regarding the reactor core components (calandria, calandria tubes, and pressure tubes) was necessary to provide confidence that the long-term impacts of the facility can be assessed adequately. A simplified estimate of the total activation of core components was completed in 1992 using conservative assumptions, expected reactor configuration and computer models built with WIMS-CRNL, ONEDANT and ORIGEN-S. Due to the simplification, and age of the work, there was considerable doubt that the modelled inventory estimate of the core components was sufficient to support long-term performance modeling of the planned in-situ decommissioning. Additional data would be required to provide this confidence. Several options were considered for characterizing the WR-1 core components, but it was decided to collect only a limited number of samples in an effort to validate the 1992 simplified estimate as bounding. The limited number of samples reduced risks to workers, both radiological and non-radiological, and significantly reduced the costs required to confidently define and bound the radiological inventory of activation products in the core. The results of the sampling were compared to the simplified activation estimation. There was good agreement between the modelled and sampled results, with all major contributors to total activity showing similar relative quantities. The samples were generally lower than predicted by the models, with few exceptions. Notable exceptions included Nb-94, which were higher in the sample results than the model. This was determined to be caused by the use of Niobium containing steel alloys in the stainless steel pressure tube that were not accounted for in the models. The comparison of results provided confidence that the original inventory estimates produced through the simplified model are conservative and bounding, and therefore suitable for use in the long-term assessment of in situ disposal of the WR-1 reactor. This paper provides details of the simplified computer model results, their comparison to results of the sampling, and the changes adopted in the assessment of the in-situ decommissioning of WR-1 as a result. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification of Upcoming MCNP Features For Estimating Nuclear Data Sensitivities in Fixed Source Simulations [Abstract]

Predictive simulation codes, like the Monte Carlo N-Particle (MCNP) transport code, are used throughout the nuclear community. These simulations are based on nuclear data. Maximizing the accuracy and precision of nuclear data maximizes the accuracy and precision of the overall simulation. This is imperative to applications that rely on simulations. For example, improving nuclear data for special nuclear material improves simulation accuracy in stockpile stewardship applications, which results in larger safety margins and decreased operational costs. The improvement and validation of nuclear data is completed through integral benchmark experiments. Past benchmarks have primarily been limited to focus on the effective multiplication factor ($\kappa$ eff ); broadening the purview of benchmarks beyond $\kappa$ eff -dependent nuclear data addresses nuclear data deficiencies. Different response types depend on different areas of nuclear data. This dependence is quantified as nuclear data sensitivity: the change in response due to perturbation of a contributing parameter. The larger the nuclear data sensitivity of a response, the more the experiment is influenced by the uncertainties of the nuclear data. The optimization of nuclear data sensitivities in future benchmarks would result in more detailed validation of lesser studied areas of nuclear data. Currently, direct sensitivity capabilities are not easily found for all experiment types and parameters. An MCNP tool to directly estimate the cross section sensitivities of tallied values is under development. Additionally, updates have been made to the perturbation feature of MCNP, which can be used in a less direct approach to estimating sensitivities. This work verifies these features to estimate nuclear data sensitivities in fixed source simulations of a 4.5-kg sphere of alpha- phase weapons-grade plutonium surrounded by differing amounts of copper and polyethylene. Integrated estimates made using MCNP’s tools were found to statistically agree with integrated estimates made from manual perturbation of nuclear data proving the validity of the MCNP tools.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Verification, Validation, and Calibration Through a Causal Lens

While typical validation and verification approaches focus on identifying the associations between data elements using statistical and machine learning methods, the novel methods in this paper focus instead on identifying causal relationships between data elements. Statistical and machine-learning-based approaches are strictly data-driven, meaning that they provide quantitative comparison measures between data sets without explicitly considering the hypotheses behind them. This can lead to the erroneous conclusion that, if two data sets are close enough, the models that generated them are similar. In addition, when experimental and simulated data differ to an extent that fails to meet the acceptance criteria, calibration techniques are used to tweak simulation model parameters to reduce the gap between the two types of data. This produces the false expectation that a simulation model will match reality. The methods presented in this paper move away from these strictly data-driven methods for validation and calibration toward more robust, model-driven methods based on causal inference. Causal inference aims to identify the possible mechanisms that might have generated data. Thus, this analysis targets the prediction of the effects when one (or more) of the identified mechanisms are altered. There are many approaches to identify, quantify, and illustrate causal relationships. For the scope of this paper, directed graphs are employed as causal models. If the directed graph lacks cycles, it is known as a directed acyclic graph. A node in such a graph represents an observed data element while a directed edge connecting two nodes represents a causal relationship between two variables. The developed causal methods are designed to extract causal models from simulation models and experimental data. Causal models capture the causal relationships between data elements (e.g., simulated and experimental data). In this context, validation and verification are performed by comparing causal models. The proposed approach does not only inform system analysts on how a simulation model matches real-world data, but also identifies elements of the simulation model that should be revised when discrepancies between simulation and experimental data are observed. Through these causal methods, analysts can identify the portion of the model equation(s) that are behind an edge connecting two variables. Hence, once the structural differences between causal models have been determined, model calibration can occur by changing only those model parameters that impact the identified causal relationships.

97 MATHEMATICS AND COMPUTING↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-T-188: Commission of World 1st Commercial Compact PBS Proton System

Purpose: ProteusONE is the 1st commercial compact PBS proton system with an upstream scanning gantry and C230 cyclotron. We commissioned XiO and Raystation TPS simultaneously. This is a summary of beam data collection, modeling, and verification and comparison without range shiter for this unique system with both TPS. Methods: Both Raystation and XiO requires the same measurements data: (i) integral depth dose(IDDs) of single central spot measured in water tank; (ii) absolute dose calibration measured at 2cm depth of water with mono-energetic 10×10 cm2 field with spot spacing 4mm, 1MU per spot; and (iii) beam spot characteristics in air at 0cm and ± 20cm away from ISO. To verify the beam model for both TPS, same 15 cube plans were created to simulate different treatment sites, target volumes and positions. PDDs of each plan were measured using a Multi-layer Ionization Chamber(MLIC), absolute point dose verification were measured using PPC05 in water tank and patient-specific QA were measured using MatriXX PT, a 2D ion chamber array. Results: All the point dose measurements at midSOBP were within 2% for both XiO and Raystation. However, up to 5% deviations were observed in XiO’s plans at shallow depth while within 2% in Raystation plans. 100% of the ranges measured were within 1 mm with maximum deviation of 0.5 mm. 20 patient specific plan were generated and measured in 3 planes (distal, proximal and midSOBP) in Raystation. The average of gamma index is 98.7%±3% with minimum 94% Conclusions: Both TPS were successfully commissioned and can be safely deployed for clinical use for ProteusONE. Based on our clinical experience in PBS planning, user interface, function and workflow, we preferably use Raystation as our main clinical TPS. Gamma Index >95% at 3%/3 mm criteria is our institution action level for patient specific plan QAs.

60 APPLIED LIFE SCIENCES↗

Verification of a VRF Heat Pump Computer Model in EnergyPlus

This paper provides verification results of the EnergyPlus variable refrigerant flow (VRF) heat pump computer model using manufacturer's performance data. The paper provides an overview of the VRF model, presents the verification methodology, and discusses the results. The verification provides quantitative comparison of full and part-load performance to manufacturer's data in cooling-only and heating-only modes of operation. The VRF heat pump computer model uses dual range bi-quadratic performance curves to represent capacity and Energy Input Ratio (EIR) as a function of indoor and outdoor air temperatures, and dual range quadratic performance curves as a function of part-load-ratio for modeling part-load performance. These performance curves are generated directly from manufacturer's published performance data. The verification compared the simulation output directly to manufacturer's performance data, and found that the dual range equation fit VRF heat pump computer model predicts the manufacturer's performance data very well over a wide range of indoor and outdoor temperatures and part-load conditions. The predicted capacity and electric power deviations are comparbale to equation-fit HVAC computer models commonly used for packaged and split unitary HVAC equipment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Vexcel Imaging's Suitability for Automatic Verification

Accurate, independently verified geospatial data is essential for automated calibration, validation, and operational decision-making. This study evaluated the positional accuracy of Vexcel Imaging™’s UltraCam® Osprey imagery (7.5 cm GSD) using globally distributed Continuously Operating Reference Stations (CORS) as independent control. Despite manufacturer claims of 15 cm horizontal accuracy, residual errors were consistently one to two orders of magnitude larger, with no subset of imagery meeting precision thresholds. These discrepancies cannot be explained by normal photogrammetric or environmental factors and raise concerns about the reliability of the imagery for high-precision tasks. The results demonstrate that Vexcel imagery, in its current form, is unsuitable for workflows requiring rigorous spatial accuracy or automated verification. At the same time, the reproducible validation framework developed in this study establishes a scalable method for assessing commercial imagery, ensuring that future products can be independently and objectively verified before operational adoption.

47 OTHER INSTRUMENTATION↗

Process Monitoring for Nuclear Safeguards

Process Monitoring has long been used to evaluate industrial processes and operating conditions in nuclear and non-nuclear facilities. In nuclear applications there is a recognized need to demonstrate the safeguards benefits from using advanced process monitoring on spent fuel reprocessing technologies and associated facilities, as a complement to nuclear materials accounting. This can be accomplished by: defining credible diversion pathway scenarios as a sample problem; using advanced sensor and data analysis techniques to illustrate detection capabilities; and formulating 'event detection' methodologies as a means to quantify performance of the safeguards system. Over the past 30 years there have been rapid advances and improvement in the technology associated with monitoring and control of industrial processes. In the context of bulk handling facilities that process nuclear materials, modern technology can provide more timely information on the location and movement of nuclear material to help develop more effective safeguards. For international safeguards, inspection means verification of material balance data as reported by the operator through the State to the international inspectorate agency. This verification recognizes that the State may be in collusion with the operator to hide clandestine activities, potentially during abnormal process conditions with falsification of data to mask the removal. Records provided may show material is accounted for even though a removal occurred. Process monitoring can offer additional fidelity during a wide variety of operating conditions to help verify the declaration or identify possible diversions. The challenge is how to use modern technology for process monitoring and control in a proprietary operating environment subject to safeguards inspectorate or other regulatory oversight. Under the U.S. National Nuclear Security Administration's Next Generation Safeguards Initiative, a range of potential safeguards applications for process monitoring are under conceptual development and evaluation. This paper reports on a study of process monitoring for a sample problem involving spent fuel reprocessing with aqueous reprocessing technologies. This includes modeling the processes in the context of a nuclear material diversion scenario and measuring the associated process chemistry. A systems-centric model is applied using actual and simulated plant data, advanced sensors, anomaly detection methods, statistical analysis and data authentication methods, to help illustrate the benefits of process monitoring applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The DES Science Verification weak lensing shear catalogues

Here, we present weak lensing shear catalogues for 139 square degrees of data taken during the Science Verification (SV) time for the new Dark Energy Camera (DECam) being used for the Dark Energy Survey (DES). We also describe our object selection, point spread function estimation and shear measurement procedures using two independent shear pipelines, IM3SHAPE and NGMIX, which produce catalogues of 2.12 million and 3.44 million galaxies, respectively. Furthermore, we detail a set of null tests for the shear measurements and find that they pass the requirements for systematic errors at the level necessary for weak lensing science applications using the SV data. Finally, we discuss some of the planned algorithmic improvements that will be necessary to produce sufficiently accurate shear catalogues for the full 5-yr DES, which is expected to cover 5000 square degrees.

79 ASTRONOMY AND ASTROPHYSICS↗