Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Waste-to-Energy Pipeline through Consolidated Fermentation–Microbial Fuel Cell (MFC) System

The rise in population, urbanization, and industrial developments have led to a substantial increase in waste generation and energy demand, posing significant challenges for waste management as well as energy conservation and production. Bioenergy conversions have been merged as advanced, sustainable, and integrated solutions for these issues, encompassing energy generation and waste upcycling of different types of organic waste. Municipal solid waste (MSW) and agricultural residues (AR) are two main resources for bioenergy conversions. Bioenergy production involves feedstock deconstruction and the conversion of platform chemicals to energy products. This review provides a detailed overview of waste sources, biofuel, and bioelectricity production from fermentation and microbial fuel cell (MFC) technology, and their economic and environmental perspectives. Fermentation plays a critical role in liquid biofuel production, while MFCs demonstrate promising potential for simultaneous production of electricity and hydrogen. Fermentation and MFCs hold a significant potential to be integrated into a single pipeline, enabling the conversion of organic matter, including a variety of waste material and effluent, into diverse forms of bioenergy via microbial cultures under mild conditions. Furthermore, MFCs are deemed a promising technology for pollutant remediation, reducing COD levels while producing bioenergy. Importantly, the consolidated fermentation–MFC system is projected to produce approximately 7.17 trillion L of bioethanol and 6.12 × 10 4 MW/m 2 of bioelectricity from MSW and AR annually, contributing over USD 465 billion to the global energy market. Such an integrated system has the potential to initiate a circular economy, foster waste reduction, and improve waste management practices. This advancement could play a crucial role in promoting sustainability across the environmental and energy sectors.

09 BIOMASS FUELS↗

Versatile Remediation Module Final Operational Testing Results

Oak Ridge National Laboratory (ORNL) successfully demonstrated the Versatile Remediation Module (VRM), a prototype module designed and built by ORNL for performing the on-site remote repair of welded stainless-steel storage containers for spent nuclear fuel and high-level radioactive waste. This report describes the VRM prototype and its design features, components, qualification tests, operational procedures, and demonstration results to support continued long-term storage or off-site transportation of spent nuclear fuel and high-level radioactive waste currently stored in storage containers. A remote (i.e., 100 ft away from the simulated radiative environment) demonstration of the VRM was successfully performed on a full-scale mock-up welded stainless-steel canister. The VRM is designed with features to accommodate remediation techniques beyond those currently selected and described in this report. Therefore, many of the VRM’s features could benefit other remote nuclear or nonnuclear applications. The VRM is envisioned to serve as a development center to facilitate and enhance the further development of new remediation technologies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring Well Installation Completion Report for Ransom Road Landfill, Vertical Processing Facility, and Environmental Health Facility, Solid Waste Management Units: 003, 077, and 079

The intended purpose of the Monitoring Well Installation project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by installing new monitoring wells. The wells are installed in accordance with the Brevard County Health Department and St. Johns River Water Management Districts rules and guidelines.

Well Installation↗

Monitoring Well Abandonment Completion Report for KARS Park1, Mobil Service Station, and Hypergol Maintenance Material North Solid Waste Management Units: 084, 093, and 090

The intended purpose of the Monitoring Well Abandonment project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by abandoning monitoring wells throughout KSC that have been identified and prioritized as locations that no longer serve usefulness to program. The monitoring wells were abandoned in accordance with the Brevard County Health Departments and St. Johns River Water Management Districts rules and guidelines.

Timothy M Jellett↗

Western Sector In-Situ Chemical Oxidation Project: Additional Injection Pilot Testing Supplemental Results (U)

Trichloroethylene (TCE) and tetrachloroethylene (PCE) are persistent at elevated concentrations in the Western Sector of the M-Area Hazardous Waste Management Facility (HWMF) groundwater plume. Migration of these chlorinated ethenes as Dense Non-Aqueous Phase Liquids (DNAPLs) occurred from the M-Area Settling Basin along geologic strata resulting in a high concentration groundwater plume in Western Sector. Pump-and-treat has been active for over 30 years at the M-Area HWMF to hydraulically contain the primary sources of the plume in addition to other remediation strategies throughout the contaminated zone, like soil vapor extraction, dynamic underground stripping, groundwater recirculation wells, and bioremediation. In-situ chemical oxidation (ISCO) has been identified as a viable treatment method for removal of these volatile organic compounds (VOCs) due to the complex lithology and high concentrations in this part of the aquifer. In addition to ISCO, a new recovery well (i.e., RWM018) was also installed in Western Sector to contain the high concentration VOC plume. The ISCO projects have utilized the gradient induced by RWM018 to help plan the injection and monitoring locations. The combination of ISCO and the additional pump and treat in Western Sector with the installation of RWM018 will help to control the plume and maximize remediation efforts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustaining On-going Risk Communication at the Riverton, Wyoming, Processing Site - 20310

An environmental risk assessment report has been completed to provide an updated assessment regarding current site conditions for the Riverton, Wyoming, Processing site. Argonne National Laboratory conducted the assessment in collaboration with the U.S Department of Energy (DOE) Office of Legacy Management (LM) and the Northern Arapaho Natural Resources Office (NANRO). The data quality objectives process conducted confirmed that data from plants growing on the Riverton site would be useful and would address an outstanding concern. Data available from site soil, groundwater, and surface water were also used in the assessment in conjunction with the new plant data. A plant survey was then conducted in 2018 to identify the plants at the Riverton site with known traditional Native American cultural uses for sampling and analysis. Laboratory analysis was conducted on the plant samples for the contaminants of concern. Samples were collected from plants growing on the groundwater plume area of the site, and the same was done for eight other areas not affected by the groundwater plume but still within the institutional control boundary. These eight areas served as reference areas for this study. This human health and ecological assessment update provide the quantitative risk information that was qualitatively addressed in a 1995 Risk Assessment Report on plants, livestock, and surface water exposures at the Riverton site [1]. The conditions at the Riverton site are protective of human health and the environment given the results of the update, in combination with past completed remedial action and ongoing monitoring activities and IC implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Machine learning surrogates for surface complexation model of uranium sorption to oxides

Abstract The safety assessments of the geological storage of spent nuclear fuel require understanding the underground radionuclide mobility in case of a leakage from multi-barrier canisters. Uranium, the most common radionuclide in non-reprocessed spent nuclear fuels, is immobile in reduced form (U(IV) and highly mobile in an oxidized state (U(VI)). The latter form is considered one of the most dangerous environmental threats in the safety assessments of spent nuclear fuel repositories. The sorption of uranium to mineral surfaces surrounding the repository limits their mobility. We quantify uranium sorption using surface complexation models (SCMs). Unfortunately, numerical SCM solvers often encounter convergence problems due to the complex nature of convoluted equations and correlations between model parameters. This study explored two machine learning surrogates for the 2-pK Triple Layer Model of uranium retention by oxide surfaces if released as U(IV) in the oxidizing conditions: random forest regressor and deep neural networks. Our surrogate models, particularly DNN, accurately reproduce SCM model predictions at a fraction of the computational cost without any convergence issues. The safety assessment of spent fuel repositories, specifically the migration of leaked radioactive waste, will benefit from having ultrafast AI/ML surrogates for the computationally expensive sorption models that can be easily incorporated into larger-scale contaminant migration models. One such model is presented here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Expedited Results from Samples Supporting Tank Closure Cesium Removal (TCCR) Batch 3

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 3 for processing through the TCCR unit. SRNL received and characterized a set of dip samples collected from Tank 10H (one surface and one variable depth sample). No solids were observed in either sample and therefore the samples were combined, and a suite of analyses were performed on the composite sample. The density of the combined sample was 1.174 g/mL (0.18 %RSD), which was consistent with the measured sodium concentration of 3.54 M (0.08 %RSD). The 137Cs activity in the sample was 4.75E+07 dpm/mL (4.28 %RSD) and the total Cs concentration was calculated to be 1.54 mg/L (1.16E-05 M). The in-tank batch contact samples consist of 0.1 g of crystalline silicotitanate (CST) contained within a teabag device. Duplicate samples were submerged in Tank 10H supernate for a period of about 13 days, after which time they were retrieved and transferred to SRNL for analysis. At SRNL the CST was rinsed to remove excess salt solution and the CST was then air dried before being digested for analysis. Results of the analysis indicated a 137 Cs loading of 3.66E+10 ± 1.40E+09 dpm/g or 16.5 ± 0.63 Ci/kg CST . This value represents a bounding upper limit as it includes the addition of two sigma uncertainty from replicate analysis of the individual teabag samples as well as the addition of the small amount of 137 Cs activity measured in the rinse solutions. The above values are based on the air-dried mass of CST. Correcting to the true dry mass using a F-factor of 0.8191 results in a maximum loading of 20.2 ± 0.77 Ci/kg CST .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Analytical Results from Samples Supporting Tank Closure Cesium Removal (TCCR) Batch 3 and Modeling Results for Cs Loading on CST

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 3 for processing through the TCCR unit. Some results from analysis of those samples have been previously reported. This report documents the remaining analyses of the in-tank batch contact samples as well as the results of ZAM (Zheng, Anthony, Miller) isotherm modeling performed for comparison to the measured results. Results of the additional analyses include analysis of the loading of other radionuclides besides 137 Cs on the crystalline silicotitanate (CST) contained within the in-tank batch contact test samples. Results from those analyses revealed the next highest contributor to the activity on the CST was 90 Sr with an average loading of 2.76E+08 dpm/g CST compared to 3.56E+10 dpm/g CST for the 137Cs. Isotopes of plutonium were also detected on the samples. ZAM modeling was performed using the measured composition of the Tank 10H Batch 3 qualification samples. The modeling predicted a maximum Cs loading approximately 2.2x higher than the measured result. This is a slightly lower ratio (expected/measured) compared to what was observed for the prior TCCR in-tank batch contact testing performed for Batches 1A and 2 where the ZAM results were 2.7-2.8x higher than the measured values.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 11H Samples from Tank Closure Cesium Removal (TCCR) Batch 3 - Intermediate and Final Samples

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR unit processes dissolved salt from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST) and the effluent is then discharged to Tank 11H. Four interim samples pulled from Tank 11H during and just after the completion of processing of Batch 3 through the TCCR process have been analyzed for 137 Cs activity and density. The 137 Cs activity was found to decrease with each subsequent sample, which is consistent with the addition of decontaminated solution to Tank 11H. When compared to the expected composition from mixing the Tank 10H Batch 3 feed with the material already present in Tank 11H, the bulk chemical composition was as expected. A corrosion control sample collected from Tank 11H in June 2020 showed changes in the chemical composition and 137 Cs activity when compared to the composition measured at the end of Batch 2 processing. As there were no additions made to the tank during this period, these changes were attributed to leaching of the solids present in Tank 11H. Additional analyses of the 4 th interim sample are pending and will be documented in a revision to this report.

11H↗

Characterization of Tank 11H samples from tank closure cesium removal (TCCR) Batch 3 - intermediate and final samples

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR unit processes dissolved salt from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST) and the effluent is then discharged to Tank 11H. Four interim samples pulled from Tank 11H during and just after the completion of processing of Batch 3 through the TCCR process have been analyzed for 137 Cs activity and density. The 137 Cs activity was found to decrease with each subsequent sample, which is consistent with the addition of decontaminated solution to Tank 11H. When compared to the expected composition from mixing the Tank 10H Batch 3 feed with the material already present in Tank 11H, the bulk chemical composition was as expected. A corrosion control sample collected from Tank 11H in June 2020 showed changes in the chemical composition and 137 Cs activity when compared to the composition measured at the end of Batch 2 processing. As there were no additions made to the tank during this period, these changes were attributed to leaching of the solids present in Tank 11H. Revision 1 of this report contains additional analyses of the fourth interim sample including inductively coupled plasma – mass spectrometry (ICP-MS) results and activities of other radionuclides. These results are consistent with the previously reported results, showing leaching from the Tank 11H heel. Notably, the 90 Sr activity was about 2.7x higher than calculated from a mixture of the original Tank 11H supernate and the Tank 10H supernate as treated by TCCR, suggesting additional leaching of Sr from the Tank 11H heel solids. In addition, Revision 1 includes analysis results for the Batch 3 Post-Production surface and variable depth samples collected in October of 2020. The Post-Production surface sample was similar in composition to the fourth interim surface sample, except for the increased Cs-137 and oxalate concentrations that were presumably associated with leaching of the Tank 11H heel solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reactive transport modeling for supporting climate resilience at groundwater contamination sites

Abstract. Climate resilience is an emerging issue at contaminated sites and hazardous waste sites, since projected climate shifts (e.g., increased/decreased precipitation) and extreme events (e.g., flooding, drought) could affect ongoing remediation or closure strategies. In this study, we develop a reactive transport model (Amanzi) for radionuclides (uranium, tritium, and others) and evaluate how different scenarios under climate change will influence the contaminant plume conditions and groundwater well concentrations. We demonstrate our approach using a two-dimensional (2D) reactive transport model for the Savannah River Site F-Area, including mineral reaction and sorption processes. Different recharge scenarios are considered by perturbing the infiltration rate from the base case as well as considering cap-failure and climate projection scenarios. We also evaluate the uranium and nitrate concentration ratios between scenarios and the base case to isolate the sorption effects with changing recharge rates. The modeling results indicate that the competing effects of dilution and remobilization significantly influence pH, thus changing the sorption of uranium. At the maximum concentration on the breakthrough curve, higher aqueous uranium concentration implies that sorption is reduced with lower pH due to remobilization. To better evaluate the climate change impacts in the future, we develop the workflow to include the downscaled CMIP5 (Coupled Model Intercomparison Project) climate projection data in the reactive transport model and evaluate how residual contamination evolves through 2100 under four climate Representative Concentration Pathway (RCP) scenarios. The integration of climate modeling data and hydrogeochemistry models enables us to quantify the climate change impacts, assess which impacts need to be planned for, and therefore assist climate resiliency efforts and help guide site management.

54 ENVIRONMENTAL SCIENCES↗

Reducing Cost of Chlorinated Volatile Organic Compound Remediation by Transitioning from Active to Passive Soil Vapor Extraction - 20157

Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Converter/Compressor Building Solid Waste Management Unit (SWMU) #89 Monitoring Well 21 Area Interim Measure Work Plan

This Work Plan details the approach and design for the Interim Measure (IM) to remediate groundwater within the MW21 Area where VOC concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The IM includes in-situ bioremediation via injection of emulsified vegetable oil (EVO) and emulsified zero-valent iron (EZVI). The in-situ bioremediation technology consists of injecting an electron donor substrate into the subsurface to promote microbial breakdown of VOCs. The EVO injections for this IM are designed based on the use of Provectus ERD-CH4, which is a vegetable oil/carbon substrate mixture. The EZVI injections for this IM are designed based on the use of Provectus EZVI-CH4. The IM treatment layout consists of nine injection locations of EVO at approximately 10-foot radius of influence (ROI) and three injections locations of EZVI at approximately 6-foot ROI. The injection method will be direct push using a DPT rig. The overall injection depths range from 7 to 17 ft bls. The 7 ft bls top depth is designed to be 2 ft below the water table to prevent substrates from reaching the top of the water table. Injections are planned to be implemented using 2 ft intervals and will take place using a bottom-up approach to 2 ft below the water table. This work plan further describes the IM design, injection calculations, performance monitoring plan, and provides an injection layout. Revision 1 of this Work Plan includes quarterly performance sampling during Year 1 in accordance with F.A.C. 62-780. These changes are reflected in Section 7 and Table 2 of the Work Plan.

Mark J Jonnet↗

Biotic degradation of acetonitrile. Limitations, controls and conversion rates

This document has been prepared to support Washington River Protection Solutions (WRPS) in their evaluation of technologies to remediate organic compounds in the Liquid Effluent Retention Facility (LERF)/Effluent Treatment Facility (ETF) during direct feed low activity waste (DFLAW) operations at Hanford. This report summarizes the results of a review of the available literature describing aerobic and anaerobic biological treatment of acetonitrile and proposes a test matrix to evaluate microbial degradation rates of acetonitrile. Numerous studies describe acetonitrile degradation by pure culture strains of bacteria, fungi, and yeast; however, the purpose of this review was to provide estimations of degradation under conditions that more closely approximate the Liquid Effluent Retention Facility (LERF) basins at the Hanford Site. To this end, documented limitations, controls, and conversion rates are summarized for mixed and natural microbial communities being maintained or operated as a biological treatment for wastewater processing. Based on the literature evaluation, the inherent capacity and rates of microbial degradation of acetonitrile are sufficiently high that if applied in the LERF basins, acetonitrile removal would be achieved. To be clear, though, published studies have not been conducted under conditions that approximate or that could be directly related to the LERF basins. Thus, a focused test matrix the encompasses LERF relevant conditions to specifically measure microbial degradation of acetonitrile is proposed and the results would provide the strong technical justification for use of this low-cost efficient biological process at LERF during DFLAW operations and beyond.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an In-Situ Leaching Technology for Extracting Residual Uranium from Remediated Soil - 20099

Site-specific chemical solutions for extracting uranium were developed and evaluated for treating previously remediated soil at a former thorium mill tailings site, known as the Former Rare Earths Facility (REF), in West Chicago, Illinois. Prior remediation efforts had resulted in residual sand and gravel aggregate that met the soil cleanup standards. The target soil contains residual levels of uranium, which continues to leach into the site groundwater at levels exceeding groundwater protection standards (GWPS). A series of bench-scale tests were conducted to evaluate the efficacy and viability of in-situ leaching (ISL) technology to treat the target soil for the purposes of attaining uranium GWPS at the REF. Specific objectives of the bench-scale tests entailed identification and selection of optimal leaching, quantification of the extent and rate of uranium released as a function of chemical composition, chemical concentrations, chemical residence times, and obtaining critical data to estimate treatment costs. A combination of sodium bicarbonate and sodium carbonate reagent was the most effective leaching solution. In general, leaching solutions containing a higher concentration of sodium carbonate demonstrated superior uranium leaching capabilities. Removal of 50% of the uranium mass from the soil matrix was adequate for achieving compliance with the site-specific GWPS. After six to seven pore volume flushes (PVFs), the uranium leaching effectiveness of all leaching solutions was similar. The amount of initial uranium removed with each subsequent PVF was minimal, suggesting limited solubility of the remaining mass of uranium. The effects of leaching duration were significant and persisted through at least the first five consecutive PVFs. Leaching of uranium also resulted in leaching of several non-uranium constituents, many of which exceeded applicable National Pollutant Discharge Elimination System (NPDES) standards. Given historical operations and waste disposal practices at the site, leaching of non-uranium constituents was expected. Hydrochloric acid was used to stabilize treated soil. Savings of approximately $148 million in direct and indirect remediation costs are expected with an ISL alternative compared to the excavation and landfill disposal remediation option. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY24 Task 5: Leachate Disposition

Directly feeding sludge solids to the high-level waste (HLW) Waste Treatment Plant represents an alternative flowsheet seeking to initiate sludge processing as soon as possible. Key processing functions previously captured during baseline pretreatment operations include leaching and washing prior to solids concentration. These operations should be considered in the potential direct feed flowsheets to maximize waste feed loading, minimize HLW volume, and mitigate corrosion challenges associated with vitrification of high phosphate and fluoride concentrations. Additionally, single-shell tank (SST) retrievals and waste transfers to double-shell tanks (DSTs) in a direct feed flowsheet would likely also benefit from some level of leaching, washing, and solids concentration in order to reduce DST space and mission duration. These operations could occur in a new facility or potentially in available DSTs. If washing and leaching are utilized, an effective disposition pathway for the wash water and leachate solutions are needed. Three target species that benefit significantly from leaching and washing are phosphate, fluoride and aluminum. Phosphate (PO 4 3- ) and fluoride (F - ) can contribute substantially to the amount of carrier fluid needed for dissolution, and the resulting volume of liquid generated. Disposition of this retrieval solution should be evaluated in order to prevent crystallization of these anions throughout system processing. Since there is a high probability that any retrieval solutions will be at or near their PO 4 3- and F - solubility limits, evaporation or blending with a high Na supernate (>3.5 M) is not recommended for the wash water streams without a method to remove precipitants prior to solution disposal. Additionally, aluminum present in the southeast quadrant of the Hanford site represents roughly 60% of the waste solids in the initial processing tanks. These aluminum solids are in the form of gibbsite (Al(OH) 3 ) and can pose significant challenges for processing due to the fast-settling times and high solids loading associated with these materials. Easily remediated by caustic addition to the solids, these wash solutions could be processed through crystalline silicotitanate (CST) ion exchange columns to prepare the supernate solutions for disposition. The current target for feed conditions to the Low Activity Waste (LAW) melter are waste streams that contain nominally 5-6 M Na. Fractions within the tanks contain upwards of 0.2 M phosphate and fluoride in solution at 3.5 M Na. Concentrating these solutions above 5 M Na would result in an exceedance of the solubility limits, and potential for uncontrolled precipitation of the phosphate and fluoride crystal material. The resulting crystalline salt material is typically sodium fluoride phosphate, also referred to as natrophosphate (Na 7 FPO 4 ·19H 2 O). Salt phases are of importance in tank waste due to their chemical reactivity, which can result in precipitation, dissolution, or transformation, impacting any downstream processes (Bolling et al. 2020, Russell, Snow, and Peterson 2010). Salt generation and precipitation could pose challenges by causing system plugging and melter corrosion if left in the supernate stream, or limit sodium molarity of the supernate that would be accepted without incident in waste operations. To understand the impact of this salt generation, the crystallization of natrophosphate in multiple simulant feed matrices was studied to understand the implications of various tank waste supernate chemistries. Three matrices were examined: high PO 4 3- /low F - , low PO 4 3- /high F - , and an average matrix. Subsequent testing was performed with the average matrix with the inclusion of CsNO 3 , and a final run with the average matrix including CsNO 3 and a 137 Cs spike for tracer purposes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗