Search NASA⌕ Search

SEARCH · Search NASA

Results for “advanced distribution management system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Enabling Advanced Automation in Spacecraft Operations with the Spacecraft Emergency Response System

True autonomy is the Holy Grail of spacecraft mission operations. The goal of launching a satellite and letting it manage itself throughout its useful life is a worthy one. With true autonomy, the cost of mission operations would be reduced to a negligible amount. Under full autonomy, any problems (no matter the severity or type) that may arise with the spacecraft would be handled without any human intervention via some combination of smart sensors, on-board intelligence, and/or smart automated ground system. Until the day that complete autonomy is practical and affordable to deploy, incremental steps of deploying ever-increasing levels of automation (computerization of once manual tasks) on the ground and on the spacecraft are gradually decreasing the cost of mission operations. For example, NASA's Goddard Space Flight Center (NASA-GSFC) has been flying spacecraft with low cost operations for several years. NASA-GSFC's SMEX (Small Explorer) and MIDEX (Middle Explorer) missions have effectively deployed significant amounts of automation to enable the missions to fly predominately in 'light-out' mode. Under light-out operations the ground system is run without human intervention. Various tools perform many of the tasks previously performed by the human operators. One of the major issues in reducing human staff in favor of automation is the perceived increased in risk of losing data, or even losing a spacecraft, because of anomalous conditions that may occur when there is no one in the control center. When things go wrong, missions deploying advanced automation need to be sure that anomalous conditions are detected and that key personal are notified in a timely manner so that on-call team members can react to those conditions. To ensure the health and safety of its lights-out missions, NASA-GSFC's Advanced Automation and Autonomy branch (Code 588) developed the Spacecraft Emergency Response System (SERS). The SERS is a Web-based collaborative environment that enables secure distributed fault and resource management. The SERS incorporates the use of intelligent agents, threaded discussions, workflow, database connectivity, and links to a variety of communications devices (e.g., two-way paging, PDA's, and Internet phones) via commercial gateways. When the SERS detects a problem, it notifies on-call team members, who then can remotely take any necessary actions to resolve the anomalies.The SERS goes well beyond a simple '911' system that sends out an error code to everyone with a pager. Instead, SERS' software agents send detailed data (i.e., notifications) to the most appropriate team members based on the type and severity of the anomaly and the skills of the on-call team members. The SERS also allows the team members to respond to the notifications from their wireless devices. This unique capability ensures rapid response since the team members no longer have to go to a PC or the control center for every anomalous event. Most importantly, the SERS enables safe experimentation with various techniques for increasing levels of automation, leading to robust autonomy. For the MIDEX missions at NASA GSFC, the SERS is used to provide 'human-in-the-loop' automation. During lights-out operations, as greater control is given to the MIDEX automated systems, the SERS can be configured to page remote personnel and keep them informed regarding actions taking place in the control center. Remote off-duty operators can even be given the option of enabling or inhibiting a specific automated response in near real time via their two-way pagers. The SERS facilitates insertion of new technology to increase automation, while maintaining the safety and security of mission resources. This paper will focus on SERS' overall functionality and how SERS has been designed to handle the monitoring and emergency response for missions with varying levels of automation. The paper will also convey some of the key lessons learned from SERS' deployment across of variety of missions, highlighting this incremental approach to achieving 'robust autonomy'.

Breed, Julie↗

Verification of technical elements of the advanced spacecraft based upon the CCSDS recommendation

We are going to meet the era when advanced spacecraft such as space stations are developed and operated. The current system of the satellite operations control will need to undergo many changes. We consider that the future system will require the following functions: the function for interchanging data between international agencies, processing the various kinds of space data, and distributing data as many unspecified users require. However, we have to solve the following problems in order to satisfy these requirements: the problem of standardization of space data communication protocol, establishment of multimedia data management method, and standardization of the user interface. This paper describes three techniques to solve the above mentioned problems. That is, standardization of the data communication protocol between space and ground by AOS (Advanced Orbiting System) protocol of CCSDS (Consultative Committee for Space Data Systems) Recommendation, management of multimedia data by catalog reference, standardization of user interface by SFDU(Standard Formatted Data Unit) of CCSDS Recommendation.

Hara, Hideo↗

Planning and Resource Management in an Intelligent Automated Power Management System

Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

Morris, Robert A.↗

Electric Vehicles at Scale (EVs@Scale) Laboratory Consortium

The U.S. Department of Energy (DOE) Electric Vehicles at Scale Lab Consortium (EVs@Scale Lab Consortium) is accelerating research to support the establishment of a secure and scalable national network of charging infrastructure. This network will be critical to support tens of millions of light-, medium-, and heavy-duty EVs on American roads by 2030. The EVs@Scale Lab Consortium brings together national laboratories and key stakeholders to conduct infrastructure research and development (R&D) that advances innovations in, and sets unified standards for, high-power and wireless charging. The effort will also develop technologies to integrate vehicle charging with the power grid, and develop cybersecurity measures to protect drivers, vehicles, equipment, and the grid.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Experiments in structural dynamics and control using a grid

Future spacecraft are being conceived that are highly flexible and of extreme size. The two features of flexibility and size pose new problems in control system design. Since large scale structures are not testable in ground based facilities, the decision on component placement must be made prior to full-scale tests on the spacecraft. Control law research is directed at solving problems of inadequate modelling knowledge prior to operation required to achieve peak performance. Another crucial problem addressed is accommodating failures in systems with smart components that are physically distributed on highly flexible structures. Parameter adaptive control is a method of promise that provides on-orbit tuning of the control system to improve performance by upgrading the mathematical model of the spacecraft during operation. Two specific questions are answered in this work. They are: What limits does on-line parameter identification with realistic sensors and actuators place on the ultimate achievable performance of a system in the highly flexible environment? Also, how well must the mathematical model used in on-board analytic redundancy be known and what are the reasonable expectations for advanced redundancy management schemes in the highly flexible and distributed component environment?

Montgomery, R. C.↗

A NASA Strategy for Leveraging Emerging Launch Vehicles for Routine, Small Payload Missions

Orbital flight opportunities for small payloads have always been few and far between, and then on February 1, 2002, the situation got worse. In the wake of the loss of the Columbia during STS- 107, changing NASA missions and priorities led to the termination of the Shuttle Small Payloads Projects, including Get-Away Special, Hitcbker, and Space Experiment Module. In spite of the limited opportunities, long queue, and restrictions associated with flying experiments on a man-rated transportation system; the carriers provided a sustained, high quality experiment services for education, science, and technology payloads, and was one of the few games in town. Attempts to establish routine opportunities aboard existing ELVs have been unsuccessful, as the cost-per-pound on small ELVs and conflicts with primary spacecraft on larger vehicles have proven prohibitive. Ths has led to a backlog of existing NASA-sponsored payloads and no prospects or plans for fbture opportunities within the NASA community. The prospects for breaking out of this paradigm appear promising as a result of NASA s partnership with DARPA in pursuit of low-cost, responsive small ELVs under the Falcon Program. Through this partnership several new small ELVs, providing 1000 lbs. to LEO will be demonstrated in less than two years that promise costs that are reasonable enough that NASA, DoD, and other sponsors can once again invest in small payload opportunities. Within NASA, planning has already begun. NASA will be populating one or more of the Falcon demonstration flights with small payloads that are already under development. To accommodate these experiments, Goddard s Wallops Flight Facility has been tasked to develop a multi-payload ejector (MPE) to accommodate the needs of these payloads. The MPE capabilities and design is described in detail in a separately submitted abstract. Beyond use of the demonstration flights however, Goddard has already begun developing strategies to leverage these new ELVs as elements of a larger system designed to provide routine, low-cost end-to-end services for small science, Exploration, and education payloads. The plan leverages the management approaches of the successful Sounding Rocket Program and Shuttle Small Payloads Projects. The strategy consists of using a systems implementation approach of elements, including 1) Falcon ELVs, 2) advanced launch site technologies and processes, 3) suite of experiment carriers accommodating different mission requirements, 4) streamlined integration and test operations, 5 ) experiment brokering and management, and 6) standardized, distributed payload operations. The envisioned suite of carriers includes the MPE, a standard interface experiment carrier, and potentially a reentry fieeflyer experiment carrier. Key to the success of this strategy is standard experiment interfaces within the carriers to limit mission- unique tasks, establishmg and managing a program of scheduled reoccurring flights rather than discrete missions, and streamlined, centralized implementation of the elements. These individual elements are each under development and Goddard will demonstrate the overall system strategy low-cost small payload missions on the initial Falcon demonstration launches from Wallops. goal is to show that this model should be converted to a sustained NASA program supporting science, technology, and education, with annual flight opportunities. The paper will define in detail the various elements of the overall program, as well as provide status, philosophy, and strategy for the program that will hopefully once-and-for-all provide low-cost, routine access to space for the small payloads community.

Underwood, Bruce E.↗

Intelligent Systems Technologies and Utilization of Earth Observation Data

The addition of raw data and derived geophysical parameters from several Earth observing satellites over the last decade to the data held by NASA data centers has created a data rich environment for the Earth science research and applications communities. The data products are being distributed to a large and diverse community of users. Due to advances in computational hardware, networks and communications, information management and software technologies, significant progress has been made in the last decade in archiving and providing data to users. However, to realize the full potential of the growing data archives, further progress is necessary in the transformation of data into information, and information into knowledge that can be used in particular applications. Sponsored by NASA s Intelligent Systems Project within the Computing, Information and Communication Technology (CICT) Program, a conceptual architecture study has been conducted to examine ideas to improve data utilization through the addition of intelligence into the archives in the context of an overall knowledge building system (KBS). Potential Intelligent Archive concepts include: 1) Mining archived data holdings to improve metadata to facilitate data access and usability; 2) Building intelligence about transformations on data, information, knowledge, and accompanying services; 3) Recognizing the value of results, indexing and formatting them for easy access; 4) Interacting as a cooperative node in a web of distributed systems to perform knowledge building; and 5) Being aware of other nodes in the KBS, participating in open systems interfaces and protocols for virtualization, and achieving collaborative interoperability.

Ramapriyan, H. K.↗

Monitoring Disasters by Use of Instrumented Robotic Aircraft

Efforts are under way to develop data-acquisition, data-processing, and data-communication systems for monitoring disasters over large geographic areas by use of uninhabited aerial systems (UAS) robotic aircraft that are typically piloted by remote control. As integral parts of advanced, comprehensive disaster- management programs, these systems would provide (1) real-time data that would be used to coordinate responses to current disasters and (2) recorded data that would be used to model disasters for the purpose of mitigating the effects of future disasters and planning responses to them. The basic idea is to equip UAS with sensors (e.g., conventional video cameras and/or multispectral imaging instruments) and to fly them over disaster areas, where they could transmit data by radio to command centers. Transmission could occur along direct line-of-sight paths and/or along over-the-horizon paths by relay via spacecraft in orbit around the Earth. The initial focus is on demonstrating systems for monitoring wildfires; other disasters to which these developments are expected to be applicable include floods, hurricanes, tornadoes, earthquakes, volcanic eruptions, leaks of toxic chemicals, and military attacks. The figure depicts a typical system for monitoring a wildfire. In this case, instruments aboard a UAS would generate calibrated thermal-infrared digital image data of terrain affected by a wildfire. The data would be sent by radio via satellite to a data-archive server and image-processing computers. In the image-processing computers, the data would be rapidly geo-rectified for processing by one or more of a large variety of geographic-information- system (GIS) and/or image-analysis software packages. After processing by this software, the data would be both stored in the archive and distributed through standard Internet connections to a disaster-mitigation center, an investigator, and/or command center at the scene of the fire. Ground assets (in this case, firefighters and/or firefighting equipment) would also be monitored in real time by use of Global Positioning System (GPS) units and radio communication links between the assets and the UAS. In this scenario, the UAS would serve as a data-relay station in the sky, sending packets of information concerning the locations of assets to the image-processing computer, wherein this information would be incorporated into the geo-rectified images and maps. Hence, the images and maps would enable command-center personnel to monitor locations of assets in real time and in relation to locations affected by the disaster. Optionally, in case of a disaster that disrupted communications, the UAS could be used as an airborne communication relay station to partly restore communications to the affected area. A prototype of a system of this type was demonstrated in a project denoted the First Response Experiment (Project FiRE). In this project, a controlled outdoor fire was observed by use of a thermal multispectral scanning imager on a UAS that delivered image data to a ground station via a satellite uplink/ downlink telemetry system. At the ground station, the image data were geo-rectified in nearly real time for distribution via the Internet to firefighting managers. Project FiRE was deemed a success in demonstrating several advances essential to the eventual success of the continuing development effort.

Wegener, Steven S.↗

Medical Imaging System

The MD Image System, a true-color image processing system that serves as a diagnostic aid and tool for storage and distribution of images, was developed by Medical Image Management Systems, Huntsville, AL, as a "spinoff from a spinoff." The original spinoff, Geostar 8800, developed by Crystal Image Technologies, Huntsville, incorporates advanced UNIX versions of ELAS (developed by NASA's Earth Resources Laboratory for analysis of Landsat images) for general purpose image processing. The MD Image System is an application of this technology to a medical system that aids in the diagnosis of cancer, and can accept, store and analyze images from other sources such as Magnetic Resonance Imaging.

Source record↗

Range Information Systems Management (RISM) Phase 1 Report

RISM investigated alternative approaches, technologies, and communication network architectures to facilitate building the Spaceports and Ranges of the future. RISM started by document most existing US ranges and their capabilities. In parallel, RISM obtained inputs from the following: 1) NASA and NASA-contractor engineers and managers, and; 2) Aerospace leaders from Government, Academia, and Industry, participating through the Space Based Range Distributed System Working Group (SBRDSWG), many of whom are also; 3) Members of the Advanced Range Technology Working Group (ARTWG) subgroups, and; 4) Members of the Advanced Spaceport Technology Working Group (ASTWG). These diverse inputs helped to envision advanced technologies for implementing future Ranges and Range systems that builds on today s cabled and wireless legacy infrastructures while seamlessly integrating both today s emerging and tomorrow s building-block communication techniques. The fundamental key is to envision a transition to a Space Based Range Distributed Subsystem. The enabling concept is to identify the specific needs of Range users that can be solved through applying emerging communication tech

Bastin, Gary L.↗

EV Forecasting-Based Model Predictive Control for Distribution System Congestion Mitigation

The uncoordinated charging of electric vehicles (EVs) in time and space brings congestion issues to the distribution network. This paper proposes an EV charging demand forecasting-based model predictive control (MPC) method for distribution system congestion management. To effectively forecast the time-series EV station charging demand, a hybrid forecasting model that integrates the long short-term memory network (LSTM) and Transformer is proposed. The Transformer-LSTM model is trained using a one-year real historical charging dataset of EV stations to forecast future charging demand in 15-minute intervals. This informs the MPC for distribution network congestion management and minimization of PV curtailment. Numerical results carried out on the modified IEEE 123-bus distribution system demonstrate that the proposed method can effectively resolve line congestion issues through EV smart charging and PV curtailment while outperforming other benchmarks.

ADVANCED PROPULSION SYSTEMS,SOLAR ENERGY↗

Electric Vehicles at Scale (EVs@Scale) Laboratory Consortium Deep-Dive Technical Meetings: High Power Charging (HPC) Summary Report

Electric vehicle (EV) adoption will change the composition of EV charging load to higher-power charging as more medium- (MD) and heavy-duty (HD) applications are electrified, and as all vocations, including light-duty (LD) vehicles, are capable of faster charging. These shifts provide the opportunity for high-power charging (HPC) and facility equipment to evolve and improve efficiency, cost, and space. High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP) project designs and develops a high-power, interoperable charging experimental platform to research, develop, and demonstrate the integration approaches and technology solutions. The project addresses (1) interconnection and management of a grid-tied inverter; (2) development of a DC distribution system that is responsible for system energy management, interoperability, and DC protection; (3) modular DC/DC conversion for vehicle charging; (4) EV charging interface and DC/DC integration; and (5) smart charge control and vehicle-to-edge (vehicle-to-building [V2B], vehicle-to-everything [V2X]) capability. This summary presentation is the first technical progress output of the project. It provides insight for the first deep-dive technical meeting outputs in terms of research presentations and also includes summary of the discussions occurred in the follow-up breakout sessions. The summary presentation covers three technical areas: (1) HPC: State of the art power architectures and the design of the power electronics, (2) Modeling, energy management, and power control in the HPC station, and (3) Codes and standards work that are in line with the previous two topic areas.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Transportation Electrification Impact Study (TEIS)

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Integrated Boiler Management through Advanced Condition Monitoring and Component Assessment

The objective of this project, supported by the U.S. Department of Energy (USDOE) under DEFE0031683, is to develop, demonstrate, and support technology transfer of an integrated boiler management system inclusive of distributed sensing and near real-time damage assessment tools to provide for the first highly accurate condition monitoring system for boiler components.

01 COAL, LIGNITE, AND PEAT↗

A Testbed Demonstration of an Intelligent Archive in a Knowledge Building System

The last decade's influx of raw data and derived geophysical parameters from several Earth observing satellites to NASA data centers has created a data-rich environment for Earth science research and applications. While advances in hardware and information management have made it possible to archive petabytes of data and distribute terabytes of data daily to a broad community of users, further progress is necessary in the transformation of data into information, and information into knowledge that can be used in particular applications in order to realize the full potential of these valuable datasets. In examining what is needed to enable this progress in the data provider environment that exists today and is expected to evolve in the next several years, we arrived at the concept of an Intelligent Archive in context of a Knowledge Building System (IA/KBS). Our prior work and associated papers investigated usage scenarios, required capabilities, system architecture, data volume issues, and supporting technologies. We identified six key capabilities of an IA/KBS: Virtual Product Generation, Significant Event Detection, Automated Data Quality Assessment, Large-Scale Data Mining, Dynamic Feedback Loop, and Data Discovery and Efficient Requesting. Among these capabilities, large-scale data mining is perceived by many in the community to be an area of technical risk. One of the main reasons for this is that standard data mining research and algorithms operate on datasets that are several orders of magnitude smaller than the actual sizes of datasets maintained by realistic earth science data archives. Therefore, we defined a test-bed activity to implement a large-scale data mining algorithm in a pseudo-operational scale environment and to examine any issues involved. The application chosen for applying the data mining algorithm is wildfire prediction over the continental U.S. This paper reports a number of observations based on our experience with this test-bed. While proof-of-concept for data mining scalability and utility has been a major goal for the research reported here, it was not the only one. The other five capabilities of an WKBS named above have been considered as well, and an assessment of the implications of our experience for these other areas will also be presented. The lessons learned through the testbed effort and presented in this paper will benefit technologists, scientists, and system operators as they consider introducing IA/KBS capabilities into production systems.

Ramapriyan, Hampapuram↗

Autonomous power expert system

The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling and dynamic replanning.

Ringer, Mark J.↗

Autonomous power expert system

The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling an dynamic replanning.

Ringer, Mark J.↗