Search NASA⌕ Search

SEARCH · Search NASA

Results for “asteroid mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Precious Dust Two Mission Converge on Asteroid Sample Returns

Far-flung spacecraft deliver incredible views of distant worlds. But there's nothing like bringing samples back to Earth. Instruments carried by spacecraft have limitations-of power, complexity, size, and number. Their investigations leave many fundamental questions unanswered, questions that we might be able to answer if only we had samples. This summer marks the beginning of an exciting new era in sample-return missions: NASA's OSIRIS-REx spacecraft arrives at asteroid Bennu, and the Japanese Hayabusa2 spacecraft arrives at asteroid Ryugu. Both are primitive asteroids-dark remnants of Solar System formation that carry carbon and water-a type of asteroid that's never been visited before. After thoroughly mapping their respective asteroids for geology and mineralogy, each probe will collect surface samples and return them to Earth. I can't wait to study them in my laboratory. Cosmic-dust pioneer Kazu Tomeoka introduced me to the dream of sample-return missions 20 years ago. In those days, the only returned extraterrestrial samples were from the Moon. He said to his students, "In the near future, we will be able to collect samples from asteroids and comets. There will be no need to wait for meteorites or cosmic dust to come and fall from the sky. And some of you might be the first to look at those samples." This inspired my life's work: laboratory analysis of returned astromaterials.

Nakamura-Messenger, Keiko↗

Sampling Strategy and Curation Plan of "Hayabusa" Asteroid Sample Return Mission

On the 9th May 2003 JST, Japanese spacecraft MUSES-C was successfully launched from Uchinoura. The spacecraft was directly inserted to interplanetary trajectory and renamed as Hayabusa , or "Falcon" to be the world s first sample return spacecraft to a near Earth asteroid (NEA). The NEA (25143)Itokawa (formerly known as "1998SF36") is its mission target. Its orbital and physical characteristics were well observed; the size is (490 +/- 100)x (250 +/- 55)x(180 +/- 50) m with about 12-hour rotation period. It has a red-sloped S(IV)-type spectrum with strong 1- and 2-micron absorption bands, analogous to ordinary LL chondrites with space weathering effect. Assuming its bulk density, the surface gravity level of Itokawa is in the order of 10 micro-G with its escape velocity = approx. 20 cm/s.

Yano, H.↗

Automation and Process Improvement Enables a Small Team to Operate a Low Thrust Mission in Orbit Around the Asteroid Vesta

NASA's Dawn mission to the asteroid Vesta and dwarf planet Ceres launched September 27, 2007 and arrived at Vesta in July of 2011. This mission uses ion propulsion to achieve the necessary delta-V to reach and maneuver at Vesta and Ceres. This paper will show how the evolution of ground system automation and process improvement allowed a relatively small engineering team to transition from cruise operations to asteroid operations while maintaining robust processes. The cruise to Vesta phase lasted almost 4 years and consisted of activities that were built with software tools, but each tool was open loop and required engineers to review the output to ensure consistency. Additionally, this same time period was characterized by the evolution from manually retrieved and reviewed data products to automatically generated data products and data value checking. Furthermore, the team originally took about three to four weeks to design and build about four weeks of spacecraft activities, with spacecraft contacts only once a week. Operations around the asteroid Vesta increased the tempo dramatically by transitioning from one contact a week to three or four contacts a week, to fourteen contacts a week (every 12 hours). This was accompanied by a similar increase in activity complexity as well as very fast turn around activity design and build cycles. The design process became more automated and the tools became closed loop, allowing the team to build more activities without sacrificing rigor. Additionally, these activities were dependent on the results of flight system performance, so more automation was added to analyze the flight data and provide results in a timely fashion to feed the design cycle. All of this automation and process improvement enabled up the engineers to focus on other aspects of spacecraft operations, including spacecraft health monitoring and anomaly resolution.

ground system automation↗

Spacecraft exploration of asteroids - The 1988 perspective

Planned and proposed missions to study asteroids are examined. The history of asteroid studies in the 1980s is reviewed, including the proposed Mainbelt Asteroid Orbiter/Flyby mission. Main-belt asteroid flyby missions are discussed, including the Galileo, Cassini, and Comet Rendezvous Asteroid Flyby mission. Also, consideration is given to proposed missions to near-earth asteroids, the Vesta mission to perform in situ studies on two large asteroids, the Piazzi mission to flyby an Apollo-Amor-Aten asteroid using a Giotto-derived spacecraft, and the possibility of a Japanese asteroid flyby mission.

Veverka, J.↗

Round trip landing missions to the asteroid Eros, 1981 opportunity

A comprehensive, Del V (magnitude of impulsive velocity-change vector) study of short staytime (0 to 30 days), short total trip time (10 to 160 days) round trip landing missions (fast missions) is presented. The characteristics of the following selected round trip landing missions are described: mission A (fast mission) with 120-day total trip time, 0-day stay-time, and 73,000-fps total mission Del V; mission B (opposition class) with 380-day total trip time, 0-day staytime, and 52,000-fps total mission Del V; and mission C (conjuction class) with 540-day total trip time, 175-day staytime, and 39,000-fps total mission Del V. A study of large-tank Agena, chemical propulsion stage (CPS), and nuclear stage was conducted. A payload of 5000 pounds was assumed. The propulsion requirements for mission A were found to be two large-tank Agenas and ten CPSs (or alternatively, two large-tank Agenas and five nuclear stages) while mission B required two large-tank Agenas and two CPSs. Mission C can be performed with one large-tank Agena and one CPS.

Zambo, G. A.↗

PHAROS: Shedding Light on the Near-Earth Asteroid Apophis

The Pharos mission to asteroid Apophis provides the first major opportunity to enhance orbital state and scientific knowledge of the most threatening Earth-crossing asteroid that has ever been tracked. Pharos aims to accomplish concrete and feasible orbit determination and scientific objectives while achieving balance among mission cost, nsk,and schedule. Similar to its ancient Egyptian namesake, Pharos acts as a beacon shedding light not only on the physical characteristics of Apophis, but also on its state as it travels through the solar system.

Sharma, Jonathan↗

Stepping Beyond LEO

This slide presentation reviews several mission scenarios designed to take human spaceflight to points beyond low Earth Orbit (LEO). The presentation reviews future lunar missions, missions to near-earth asteroids, and missions to Mars. The use of solar electric propulsion (SEP) is involved in the mission to the asteroids and the martian mission scenarios. The technologies that are critical to these missions are reviewed.

Connolly, John F.↗

Implications of current SEP mission performance data on planning exploration of comets and asteroids.

The most comprehensive performance data base currently available for SEP comet and asteroid rendezvous missions has been synthesized and reduced into forms allowing evaluation of primary mission planning parameters. These data are based on utilization of the Shuttle with a Centaur injection stage and a SEP system having a 3000-sec specific impulse. The analysis indicates that a SEP vehicle system designed at a power level of around 20 kW with a system operating life of three years, offers the capability for achieving rendezvous missions to almost all comet and asteroid targets expected to be of interest in the 1980s. This degree of mission selection flexibility is desirable for a comprehensive program of small body exploration.

Allen, L. C.↗

The Mission Accessibility of Near-Earth Asteroids

Astrodynamical Earth departure dates; mission v; mission duration; stay time; etc. Physical I NEO size(?); rotation rate; dust satellites environment; chemistry; etc. Architectural Launch vehicle(s); crew vehicle(s); habitat module(s); budget; etc. Operational Operations experience; abort options profiles; etc. Astrodynamical Accessibility is the starting point for understanding the options and opportunities available to us. Here we shall focus on. Astrodynamical Accessibility.2 Earth departure date between 2015-01-01 and 2040-12-31 Earth departure C3 60 km2s2. Total mission v 12 kms. The total v includes (1) the Earth departure maneuver from a 400 km altitude circular parking orbit, (2) the maneuver to match the NEAs velocity at arrival, (3) the maneuver to depart the NEA and, (4) if necessary, a maneuver to control the atmospheric re-entry speed during Earth return. Total round trip mission duration 450 days. Stay time at the NEA 8 days Earth atmospheric entry speed 12 kms at an altitude of 125 km. A near-Earth asteroid (NEA) that offers at least one trajectory solution meeting those criteria is classified as NHATS-compliant.

Trajectory Optimization↗

Project VESTA, exploratory mission to the asteroids: Scientific objectives and technical specifications

The VESTA project, a Franco-Soviet collaboration, is described. The VESTA probe will be launched and will pass through the asteroid belts before encountering comets. The probe will be an autonomous vehicle. The scientific objectives are to obtaining information on asteroids, comets, solar system formation, meteorites and other sources of extraterrestrial material. The surface morphology, mineral composition and internal structure of asteroids will be studied.

Source record↗

JPL Power Systems for Current Planned Missions

The viewgraph presentation includes fact sheets, instrument lists, and mission parameters for 13 future missions. Those missions include Moon Mineralogy Mapping (MMM), Space Interferometry Mission (SIM), New Millennium--Space Technology-8 (ST-8), Ocean Salinity Mapping Orbiter (Aquarius), Ocean Surface Topology Mission (OSTM), Asteroid Rendezvous Mission-SEP (Dawn), Mars Scout Lander Mission (Phoenix), Solar Powered Jupiter Orbiter (Juno), Earth orbiting carbon observatory (OCO), planet finder observatory (Kepler), far infrared/sub-millimeter telescope (Hershel), Wide-field Infrared Survey Explorer (WISE), and Mars Science Laboratory-Rover (MSL). The presentation also contains a table of current missions and instruments.

Phoenix↗

Probability of Causation for Space Radiation Carcinogenesis Following International Space Station, Near Earth Asteroid, and Mars Missions

Cancer risk is an important concern for International Space Station (ISS) missions and future exploration missions. An important question concerns the likelihood of a causal association between a crew members radiation exposure and the occurrence of cancer. The probability of causation (PC), also denoted as attributable risk, is used to make such an estimate. This report summarizes the NASA model of space radiation cancer risks and uncertainties, including improvements to represent uncertainties in tissue-specific cancer incidence models for never-smokers and the U.S. average population. We report on tissue-specific cancer incidence estimates and PC for different post-mission times for ISS and exploration missions. An important conclusion from our analysis is that the NASA policy to limit the risk of exposure-induced death to 3% at the 95% confidence level largely ensures that estimates of the PC for most cancer types would not reach a level of significance. Reducing uncertainties through radiobiological research remains the most efficient method to extend mission length and establish effective mitigators for cancer risks. Efforts to establish biomarkers of space radiation-induced tumors and to estimate PC for rarer tumor types are briefly discussed.

Cucinotta, Francis A.↗

In-Space Transportation for NASA's Evolvable Mars Campaign

As the nation embarks on a new and bold journey to Mars, significant work is being done to determine what that mission and those architectural elements will look like. The Evolvable Mars Campaign, or EMC, is being evaluated as a potential approach to getting humans to Mars. Built on the premise of leveraging current technology investments and maximizing element commonality to reduce cost and development schedule, the EMC transportation architecture is focused on developing the elements required to move crew and equipment to Mars as efficiently and effectively as possible both from a performance and a programmatic standpoint. Over the last 18 months the team has been evaluating potential options for those transportation elements. One of the key aspects of the EMC is leveraging investments being made today in missions like the Asteroid Redirect Mission (ARM) mission using derived versions of the Solar Electric Propulsion (SEP) propulsion systems and coupling them with other chemical propulsion elements that maximize commonality across the architecture between both transportation and Mars operations elements. This paper outlines the broad trade space being evaluated including the different technologies being assessed for transportation elements and how those elements are assembled into an architecture. Impacts to potential operational scenarios at Mars are also investigated. Trades are being made on the size and power level of the SEP vehicle for delivering cargo as well as the size of the chemical propulsion systems and various mission aspects including Inspace assembly and sequencing. Maximizing payload delivery to Mars with the SEP vehicle will better support the operational scenarios at Mars by enabling the delivery of landers and habitation elements that are appropriately sized for the mission. The purpose of this investigation is not to find the solution but rather a suite of solutions with potential application to the challenge of sending cargo and crew to Mars. The goal is that, by building an architecture intelligently with all aspects considered, the sustainable Mars program wisely invests limited resources enabling a long-term human Mars exploration program.

Percy, Thomas K.↗