FY24 Report on Water NSTF Testing: Lower Tank Inlet Piping Configuration

The following report serves as a summary of the accomplishments and testing results by the Natural convection Shutdown heat removal Test Facility (NSTF) experimental program over the past 12-month period. A major activity included reconfiguration of the chimney piping geometry which altered the discharge position into the tank from the original 50% tank height to a new lower position at a 10.9% tank height. This modification increases the volume of available coolant thus extending long-term operating capacity, however also results in a decreased liquid driving head which has the potential to reduce the natural circulation efficiency and decrease overall performance. Examination of the tradeoffs for these two configurations is an area of interest for RCCS designers and drove planned test activities this year. Ten matrix tests were performed in FY24, totaling 195 hours of heated operations and 12.9 MWh of electrical heating throughout the year, with eight classified as Accepted per NQA-1 and two classified as Trending. Testing prior to the facility reconfiguration examined the facility response to throttling at the tank inlet, demonstrating increased sensitivity of flow instabilities to throttling within the two-phase region when compared to throttling at the lower sensitivity single-phase inlet region. Testing after the chimney reconfiguration began with a baseline test at conditions of 80% inventory fill and prototypic thermal power input of 2.1 MW t . In addition to establishing a reference for nominal system behavior and performance, repeat testing with multiple subsequent runs demonstrated strong repeatability between tests performed at the same conditions in this new configuration. These tests also examined if influences would occur to system behavior with installation of new higher-resolution instrumentation within the upper chimney. In this critical region where boiling and flashing phenomena dominate, the test results provided confidence that the new instrumentation does not uncharacteristically influence the observed behaviors. An inventory parametric series was then initiated to examine system behavior with the new chimney configuration at six varying initial inventory levels, ranging from high 80% to low 20% fill. Two-phase oscillations with similar peak and mean flow rates were observed when comparing to the previous mid tank configuration. Generally, similar system response trends with inventory were also observed, such as two phase oscillations suppressing as inventories were lowered. However, in one absolute inventory comparison at the highest fill of 80%, flow oscillations saw a gradual growth over the 4 hours of two-phase operation in the new lower tank inlet configuration, opposite of the gradual dampening observed in the mid tank inlet configuration. This can be attributed to, in part, a greater hydrostatic head pressure above the two-phase discharge region where the boiling front is developed. Furthermore, the change resulted in greater sensitivity to liquid degassing phenomena during single-phase heating, causing loop instabilities to form which trigged moderate flow degradation during the period approaching saturation and boiling conditions. This behavior had been observed previously under some conditions but was a common occurrence in recent testing with the newer lower tank inlet configuration. Initial observations from these first data sets suggest an overall larger window of stability for the mid tank inlet configuration compared to the lower tank inlet. Lastly, the lowest inventory fill test was repeated over an extended testing window to examine depletion behavior. Natural circulation flow and effective heat removal performance were observed during most of the testing period; only after the tank became fully drained (0% fill) did flow stagnate and violent geysering events occur. This early observation confirms one relative advantage over the mid tank inlet configuration, which stagnated under comparable conditions at ~20% inventory remaining in the tank.

42 ENGINEERING↗

Countering Weapons of Mass Destruction (CWMD) Device Cybersecurity Characterization Process and Profile

Countering Weapons of Mass Destruction (CWMD) recognizes that threats in the cyberspace domain continue to grow, which requires CWMD devices and supporting systems to be both cybersecure (ability to protect or defend from cyber-attacks) and resilient (ability to maintain required capability in the face of adversity) to cyber threats. The CWMD cybersecurity characterization approach in this document supports existing cyber resilience activities within the Acquisition Lifecycle Framework. Similarly, this process supports existing Department of Homeland Security Cyber Resilience Test and Evaluation activities, which consist of iterative processes, starting at the initiation of system acquisition and continuing throughout the entire device and system life cycle. Cyber resilience is the ability of an information system to continue to operate while under attack, even if in a degraded or debilitated state,1 and to rapidly recover operational capabilities for essential functions after a successful attack.2 The goal of the security characterization task for CWMD is to support the development of a CBRN device-dependent profile that aligns with device network capabilities and maps to recommended security controls to create a characterization security profile impact levels. The impact levels for CWMD devices should be characterized as Low (L), Moderate (M), High (H) to align with the low, moderate, high control baselines. To estimate the impact levels, the device’s security-related attributes are translated into the security objectives: Confidentiality (C), Integrity (I), and Availability (A), known as the CIA triad. The potential impact for each device can be L, M, H, for devices that connect and transmit different types of data and may have different impact levels. National Institute of Standards and Technology Federal Information Processing Standards Publication 199 states, “the potential impact values assigned to the respective security objectives shall be the highest value from among those security categories that have been determined for each type of information resident on the information system.”3 As CWMD is determining the cybersecurity impact levels of CBRN devices based on network connections and data transfers, the impact levels are aligned with the associated attributes of network connections and communications. For example, if the device system is connected to a wireless network and transmits different data types based on the confidentiality of the data, the highest impact value for each security objective should represent the device’s CIA impact level. This document is intended to be used by test managers, test team, and program managers.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Development and Experimental Optimization of High-Temperature Modeling Tools and Methods for Concentrated Solar Power Particle - Systems

A novel, open-source radiative modeling toolset was developed to extend the functionality of particle-based modeling software (e.g. discrete element method (DEM)) to environmental conditions relevant to concentrated solar power applications. This toolset was optimized for deployment on desktop workstations instead of high-performance computing systems, to render such tools more accessible to the research community. Both particle-based modeling and radiative exchange modeling are computationally expensive and often require specialized programming expertise, making these methods cumbersome to use. Recent developments in DEM software by DCS Computing have greatly reduced these challenges, providing a graphical-user-interface based platform and modeling optimization for desktop workstations, HPCs, and cloud computing. The University of Dayton leveraged the experience of DCS Computing in developing a user-friendly, open-source radiative heat transfer expansion for DEM modeling. The University of Dayton DEM+ radiative modeling toolset was developed using a combination of fundamental experimental measurements, modeling, and simplified flow experiments over a range of temperatures and flow conditions. The toolset provides researchers with access to multiple radiative models including an accelerated Monte-Carlo Ray Tracing (application agnostic, highly computationally expensive), an expanded database of distance-based approximations (application limited, computationally light), and a weighted blending of the two methods capable of achieving over 90% reduction in computation time with equivalent accuracy compared to Monte-Carlo Ray Tracing. Through a graphical user interface, users can customize the radiative models to match their desired accuracy and available computational resources, improving access to particle based modeling for the research community. Ceramic sintered bauxite proppants were used in modeling and experimentally as a baseline. Both the radiative heat transfer and flow properties for particulate systems were investigated at elevated temperatures up to 800 °C. The major accomplishments for this work include a verified, open-source radiative modeling toolset to be distributed amongst the research community and the fabrication of three small-scale test facilities to investigate particle behavior and tune DEM flow properties for operation up to 800 °C. The findings have been shared with the research community via conference modeling workshops, deployment of the tools in DCS Computing Aspherix®, and open-source access to the developed radiative modeling tool. The development of next-generation CSP facilities and thermal energy storage systems based on ceramic particles requires providing access to computationally efficient and accurate modeling tools. Particles will experience a wide range of environments (20-800 °C) and handling conditions (dilute curtains or dense packing), requiring specially designed and optimized equipment. Optimizing solid particle physics models and establishing best-practices for particle modeling in CSP environments will assist researchers with designing optimized equipment, accelerating the deployment of more economically-competitive CSP facilities.

14 SOLAR ENERGY↗

High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2024 Incubator Final Report: Active Hybrid Mooring

This Incubator project has defined and developed a representation of an active hybrid mooring (AHM) system in Simulink to assess whether the speed and accuracy of AHM is sufficient to warrant further investigation in a larger project. We first built a representative mooring system for the VolturnUS-S 15MW floating offshore wind turbine (FOWT) in 1,000-meter water depth to provide baseline loads and displacements needed in the AHM system, with the results showing off-the-shelf actuators would be practical. We then defined model configurations for the numerical and physical substructures, using standalone MoorDyn v2 with a novel input strategy and chained hydraulic actuators represented in Simulink Simscape, respectively. The remainder of the project has focused on verifying the existing models for speed and accuracy against OpenFAST simulations, increasing their complexity to enable six degree of freedom (6DOF) operation, and connecting the numerical and physical substructures into a single holistic model. The verification phase of the project has shown promising results, though further refinement is needed to resolve accuracy discrepancies and for robust performance across a wider range of metocean conditions. The numerical model we developed is computationally stable and operates faster than real time using a time step of 0.01 seconds or shorter, indicating the model is likely fast enough for our AHM design to operate successfully. Additionally, the Simscape model of a hydraulic actuator operates with less than 0.3% relative error when actuating mooring loads from an OpenFAST simulation of the VolturnUS-S 1,000-meter mooring system. The aforementined refinements will be performed in the next year as a Continuing Incubator, with key remaining tasks include programming the predictor-corrector loop to minimize movement error, testing against more complex nonlinear wave cases, and expanding to enable loads from connected shared mooring lines.

17 WIND ENERGY↗

TEX-Chlorine: Highly Enriched Uranium with Chloride Absorbers to Provide Validation Benchmarks for Y-12 Electrorefining Facility

This report documents the final benchmark of the TEX-Chlorine (IER-499) Thermal Epithermal eXperiments (TEX) with highly enriched uranium with chlorine absorbers and high-density polyethylene reflectors and moderators. TEX-Chlorine is a variation of the TEX-HEU baseline assembly with the addition of sodium chloride absorber plates. This evaluation contains three experimental configurations that were performed on Comet at NCERC between July and August 2024. The three configurations, which were acceptable as benchmark cases, spanned from thermal (first two configurations) to fast (third configuration). All three cases were reviewed and accepted by the ICSBEP TRG in April 2025 and was submitted to the ICSBEP in August 2025 after receiving subgroup approval.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Evaluating the potential of short-term instrument deployment to improve distributed wind resource assessment

Distributed wind projects, which are connected at the distribution level of an electricity system or in off-grid applications to serve specific or local energy needs, often rely solely on wind resource models to establish wind speed and energy generation expectations. Historically, anemometer loan programs have provided an affordable avenue for more accurate onsite wind resource assessment, and the lowering cost of lidar systems has shown similar advantages for more recent assessments. While a full 12 months of onsite wind measurement is the standard for correcting model-based long-term wind speed estimates for utility-scale wind farms, the time and capital investment involved in gathering onsite measurements must be reconciled with the energy needs and funding opportunities that drive expedient deployment of distributed wind projects. Much literature exists to quantify the performance of correcting long-term wind speed estimates with 1 or more years of observational data, but few studies explore the impacts of correcting with months-long observational periods. This study aims to answer the question of how short you can go in terms of the observational time period needed to make impactful improvements to model-based long-term wind speed estimates. Three algorithms, multivariable linear regression, adaptive regression splines, and regression trees, are evaluated for their skill at correcting long-term wind resource estimates from the European Centre for Medium-Range Weather Forecasts Reanalysis version 5 (ERA5) using months-long periods of observational data from 66 locations across the US. On average, correction with even 1 month of observations provides significant improvement over the baseline ERA5 wind speed estimates and produces median bias magnitudes and relative errors within 0.22 m s −1 and 4 percentage points of the median bias magnitudes and relative errors achieved using the standard 12 months of data for correction. However, in cases when the shortest observational periods (1 to 2 months) used for correction are not well correlated with the overlapping ERA5 reference, the resultant long-term wind speed errors are worse than those produced using ERA5 without correction. Summer months, which are characterized by weaker relative wind speeds and standard deviations for most of the evaluation sites, tend to produce the worst results for long-term correction using months-long observations. The three tested algorithms perform similarly for long-term wind speed bias; however, regression trees perform notably worse than multivariable linear regression and adaptive regression splines in terms of correlation when using 6 months or less of observational data for correction. Translating the analysis to wind energy, median relative errors in the capacity factor are on average within 10 % using 1 month of training. If the observation period used for correction is not well correlated with the reference data, however, misrepresentation of the observed capacity factor can be substantial. The risk associated with poor correlation between the observed and reference datasets decreases with increasing training period length. In the worst-correlation scenarios, the median capacity factor relative errors from using 1, 3, and 6 months are within 47 %, 26 %, and 16 %, respectively.

17 WIND ENERGY↗

Improving Efficiency of Off-Road Vehicles by Novel Integration of Electric Machines and Advanced Combustion Engines

Modern off-road equipment will increasingly rely on electrified implements that will deliver precision control with a smaller footprint than hydraulics. The primary energy converter, however, will be an onboard reciprocating internal combustion engine because of the power density of hydrocarbon fuels in comparison to electrical energy storage and the remote locations where much of this equipment is deployed. Adding energy storage and electric machines creates opportunities to improve efficiency while reducing emissions. This program investigated approaches to take advantage of the extra flexibility that an enhanced electrical system to enable high-efficiency, low-emissions combustion technologies. The current program evaluated hybridization of both the torque application and air-handling systems to maximize efficiency while minimizing cost. This program designed, analyzed and tested a hybrid off-road vehicle consisting of a series electric powertrain with energy storage, an electrified air system, and a 33% downsized diesel engine. Detailed comparisons were made between the base powertrain and the developed powertrain using powertrain simulations, engine testing, and vehicle testing. The key results of the study are: • The resulting vehicle reduces fuel consumption by 5% to 15% at equal productivity. The primary improvements were due to recovery of regenerative braking losses for cycles where large transients are encountered. • The electrified air system was an enabler to allow engine downsizing. This was most important for duty-cycles where the engine primarily operated at moderate loads and had few low speed high torque conditions. • Engine level improvements showed re-optimization of the powertrain is possible when electrified air handing is available. Increased exhaust gas recirculation and advanced injection timing allowed up to a 15% reduction in brake specific fuel consumption at equal NOx and transient response. Compared to the larger engine, the downsized engine achieves up to an 18% reduction in brake specific fuel consumption over the non-road transient cycle. • The life cycle analysis and total cost of ownership study showed that the hybrid powertrain has the potential to reduce 5-year CO2 and total cost of ownership by ~6% over the baseline vehicle. The results also indicated that a pure battery electric vehicle is not feasible in this application and is likely to increase the CO2 emissions due to the CO2 from battery production. A hybrid powertrain with low carbon fuels shows the potential to substantially reduce CO2 and total cost of ownership.

02 PETROLEUM↗

Leveraging FPGA Advantages for Quicker Data Processing for LBNF

The Long Baseline Neutrino Facility (LBNF) will deliver a 2.4 MW muon neutrino beam from Fermilab to the Deep Underground Neutrino Experiment (DUNE), requiring unprecedented precision in beamline alignment to achieve DUNE's neutrino oscillation measurement goals. Vertical misalignments of beamline components as small as 0.5 mm can contribute 6-7\% uncertainty in predicted neutrino flux, necessitating sub-0.1 mm alignment monitoring capabilities. The Horn Location Sensor (HLS) system employs frequency sweep interferometry (FSI) in a distributed hydrostatic leveling network to achieve the required precision under harsh radiation conditions up to 5000 kRad/year. Traditional FSI implementations suffer from laser sweep nonlinearities that degrade resolution and require computationally intensive post-processing corrections using gas reference cells. This work presents a real-time FPGA-based implementation of the HLS data acquisition and processing system using a sweep tracker interferometer for dynamic sweep linearization. The system utilizes a PYNQ-Z2 FPGA with programmable logic implementing parallel 16k-point FFT processing across four channels, synchronized by the sweep tracker signal to eliminate post-processing requirements. Spectral performance testing demonstrates significant improvements in peak sharpness compared to traditional fixed-frequency digitization. The FPGA implementation enables real-time displacement monitoring with processing speeds orders of magnitude faster than software-based approaches, essential for the operational requirements of LBNF's eventual distributed sensor network. This advancement in real-time FSI processing directly supports DUNE's precision neutrino physics program by providing the rapid feedback necessary for maintaining stringent beamline alignment tolerances during high-power beam operations.

Rossel, Jacob↗

Real-Time FPGA Implementation For Frequency Sweep Interferometry In The LBNF Complex

The Long Baseline Neutrino Facility (LBNF) will deliver a 2.4 MW muon neutrino beam from Fermilab to the Deep Underground Neutrino Experiment (DUNE), requiring unprecedented precision in beamline alignment to achieve DUNE's neutrino oscillation measurement goals. Vertical misalignments of beamline components as small as 0.5 mm can contribute 6-7\% uncertainty in predicted neutrino flux, necessitating sub-0.1 mm alignment monitoring capabilities. The Horn Location Sensor (HLS) system employs frequency sweep interferometry (FSI) in a distributed hydrostatic leveling network to achieve the required precision under harsh radiation conditions up to 5000 kRad/year. Traditional FSI implementations suffer from laser sweep nonlinearities that degrade resolution and require computationally intensive post-processing corrections using gas reference cells. This work presents a real-time FPGA-based implementation of the HLS data acquisition and processing system using a sweep tracker interferometer for dynamic sweep linearization. The system utilizes a PYNQ-Z2 FPGA with programmable logic implementing parallel 16k-point FFT processing across four channels, synchronized by the sweep tracker signal to eliminate post-processing requirements. Spectral performance testing demonstrates significant improvements in peak sharpness compared to traditional fixed-frequency digitization. The FPGA implementation enables real-time displacement monitoring with processing speeds orders of magnitude faster than software-based approaches, essential for the operational requirements of LBNF's eventual distributed sensor network. This advancement in real-time FSI processing directly supports DUNE's precision neutrino physics program by providing the rapid feedback necessary for maintaining stringent beamline alignment tolerances during high-power beam operations.

Rossel, A. Jacob [Fermilab; Unlisted]↗

Beam-beam backgrounds for the Cool Copper Collider

In this paper, we present a comprehensive characterization of beam-beam backgrounds for the Cool Copper Collider (C 3 ), a proposed linear e + e - collider designed for precision Higgs studies at center-of-mass energies of 250 and 550 GeV. Using a simulation pipeline based on the Key4hep framework, we evaluate incoherent pair production and hadron photoproduction backgrounds through the SiD detector for baseline, power-efficiency, and high-luminosity C 3 operating scenarios. The occupancy induced by the beam-beam background is evaluated for each scenario, validating the compatibility of the existing SiD detector design with operations at C 3 without substantial modifications. Furthermore, at the same time, the modular simulation framework and analysis methodology presented in this paper offer a versatile toolkit for background studies in future collider proposals, contributing to a common platform for different machine designs.

Analysis and statistical methods↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Analyzing the Impact of Future Weather Data on Energy Consumption in Weatherization Assistant

This study supports the mission of the U.S. Department of Energy’s Weatherization Assistance Program (WAP), which aims to increase the energy efficiency of dwellings and reduce their total residential expenditures. Specifically, we examine how projected future climate conditions may affect residential building energy performance by integrating future weather data into the National Energy Audit Tool (NEAT). Since WAP evaluates the cost-effectiveness of retrofit measures over lifespans of up to 30 years, accounting for evolving climate conditions is increasingly important. To reflect future household energy demands, this study replaces historically based Typical Meteorological Year (TMY3) weather inputs with Future Typical Meteorological Year (fTMY) datasets derived from global climate model (GCM) projections. A simulation-based framework was established to enable NEAT analysis under future weather conditions. This workflow involves converting EPW-format weather files into JSON inputs compatible with NEAT and generating degree-hour metrics needed for load calculations. The fTMY dataset used in this study was developed by Oak Ridge National Laboratory through downscaling of six GCMs under different emission scenarios and covers the period from 2020 to 2100. In contrast, the TMY3 dataset is based on historical weather data from 1961 to 1990. Simulations were conducted for benchmark single-family prototype buildings across ASHRAE climate zones 1–7, which cover all regions of the U.S. except the subarctic Zone 8 in northern Alaska, evaluating both heating and cooling loads under TMY3 and fTMY conditions. Four foundation types were tested, while heating systems were standardized, as NEAT does not differentiate thermal energy load by HVAC system type in its load calculations. Results show that fTMY weather input consistently yield lower heating loads and higher cooling loads across most locations, aligning with expected climate warming trends. Notably, colder regions such as zones 6A, 6B, and 7 experience marked reductions in heating load, while warmer and transitional zones, such as 2A (Lufkin, TX) and 3C (San Francisco, CA), have substantial increases in cooling loads. Although this study does not directly assess the performance of retrofit measures under future climate conditions, it provides a critical foundation for doing so. By quantifying shifts in baseline (i.e., pre-retrofit case) energy loads between historical and future weather files, the study highlights the importance of integrating climate-responsive data into audit tools. These findings will inform future efforts to evaluate the long-term effectiveness and cost-effectiveness of weatherization measures under changing climate conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High-Resolution Model Intercomparison Project phase 2 (HighResMIP2) towards CMIP7

Abstract. Robust projections and predictions of climate variability and change, particularly at regional scales, rely on the driving processes being represented with fidelity in model simulations. Consequently, the role of enhanced horizontal resolution in improved process representation in all components of the climate system continues to be of great interest. Recent simulations suggest the possibility of significant changes in both large-scale aspects of the ocean and atmospheric circulations and in the regional responses to climate change, as well as improvements in representations of small-scale processes and extremes, when resolution is enhanced. The first phase of the High-Resolution Model Intercomparison Project (HighResMIP1) was successful at producing a baseline multi-model assessment of global simulations with model grid spacings of 25–50 km in the atmosphere and 10–25 km in the ocean, a significant increase when compared to models with standard resolutions on the order of 1° that are typically used as part of the Coupled Model Intercomparison Project (CMIP) experiments. In addition to over 250 peer-reviewed manuscripts using the published HighResMIP1 datasets, the results were widely cited in the Intergovernmental Panel on Climate Change report and were the basis of a variety of derived datasets, including tracked cyclones (both tropical and extratropical), river discharge, storm surge, and impact studies. There were also suggestions from the few ocean eddy-rich coupled simulations that aspects of climate variability and change might be significantly influenced by improved process representation in such models. The compromises that HighResMIP1 made should now be revisited, given the recent major advances in modelling and computing resources. Aspects that will be reconsidered include experimental design and simulation length, complexity, and resolution. In addition, larger ensemble sizes and a wider range of future scenarios would enhance the applicability of HighResMIP. Therefore, we propose the High-Resolution Model Intercomparison Project phase 2 (HighResMIP2) to improve and extend the previous work, to address new science questions, and to further advance our understanding of the role of horizontal resolution (and hence process representation) in state-of-the-art climate simulations. With further increases in high-performance computing resources and modelling advances, along with the ability to take full advantage of these computational resources, an enhanced investigation of the drivers and consequences of variability and change in both large- and synoptic-scale weather and climate is now possible. With the arrival of global cloud-resolving models (currently run for relatively short timescales), there is also an opportunity to improve links between such models and more traditional CMIP models, with HighResMIP providing a bridge to link understanding between these domains. HighResMIP also aims to link to other CMIP projects and international efforts such as the World Climate Research Program lighthouse activities and various digital twin initiatives. It also has the potential to be used as training and validation data for the fast-evolving machine learning climate models.

54 ENVIRONMENTAL SCIENCES↗

A Clean Energy Deployment Baseline for the Energy Community and Low-Income Tax Credit Bonuses [Slides]

The Inflation Reduction Act of 2022 introduced, for the first time, place-based federal tax incentives for projects sited in “Energy Communities,” potentially changing the economic calculus of where projects are best sited. Storage projects can qualify for a 10-percentage-point bonus to the Investment Tax Credit (e.g., from 30% to 40%), while wind and solar projects may qualify for either the ITC bonus or a 10% bonus to the Production Tax Credit (e.g., from $\$27.5$ to $\$30.25$/MWh). Energy Communities are areas with historical ties to fossil fuel industries and above average unemployment levels (FFEU), with closed coal mines or power plants, or contaminated properties. They seek to identify locations across the US that could especially benefit from economic revitalization. This report explores how the new federal tax credit incentives are impacting clean energy deployment patterns and establishes historical baselines against which future changes can be compared. We include a few case studies of clean energy projects going specifically to areas that were recently impacted by coal power plant closures to provide concrete examples of investments in Energy Communities. However, this publication does not assess how much of the incentive benefits pass from clean energy developers to hosting communities, nor does it offer a comprehensive view of the economic effects of clean energy deployment on Energy Communities. Key highlights include: - As clean energy projects take multiple years to conceptualize and develop, it is likely too early to see shifts towards Energy Community locations either among newly built projects or those that entered interconnection queues in 2023. - Approximately 35% of onshore wind, 50% of solar, and 60% of storage capacity built in 2023 and the first half of 2024 are located in Energy Communities, making them likely eligible for bonus incentives. While these bonus incentives were not available to projects coming online before 2023, we used 2023 Energy Community definitions to classify whether past projects were built in what is now considered an Energy Community. The deployment levels for 2023-2024 are similar to recent years (2020-2022) for solar and storage but slightly lower for wind. - Clean energy capacity has surged in the interconnection queues over the last few years, with about 45-50% of both recently proposed and total queued capacity being located in Energy Communities. While the amount of capacity in Energy Communities has also grown, its relative share is either stable (solar and storage) or slightly lower (wind) among projects that entered the queue in 2023. - Clean energy projects can be built at lower costs in Energy Communities. The levelized cost of energy after incentives was on average $\$9$/MWh (24%) lower for solar projects and $\$2$/MWh (6%) lower for wind projects built in 2023, relative to projects not located in Energy Communities. Wholesale electricity values at Energy Community locations relative to the rest of the market vary by region. The average value was often higher for wind projects (-$\$3$ to $\$11$/MWh) but lower for solar projects (-$\$6$ to 0/MWh). - Distributed solar that is owned by commercial entities is eligible for the Energy Community bonus and also, potentially, a Low-Income Community bonus. Residential solar installations in qualifying Energy Communities that are third-party owned represent about 10% of the total residential market. Larger commercial and industrial solar installations in Energy Communities make up 17% of the total market in 2023. Nearly 2 GW of distributed solar was built in areas qualifying as Low-Income Communities in 2023, exceeding the available annual program cap of 700 MW. Continued tracking of these trends will be important for system planners, investors, and local communities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probing jet base emission of M87* with the 2021 Event Horizon Telescope observations

We investigate the presence and spatial characteristics of the jet base emission in M87* at 230 GHz, enabled by the significantly enhanced (u,v) coverage in the 2021 Event Horizon Telescope (EHT) observations. The integration of the 12−m Kitt Peak Telescope (USA) and NOEMA (France) stations into the array introduces two critical intermediate-length baselines to SMT (USA) and IRAM 30−m (Spain), providing sensitivity to emission structures at spatial scales of ∼250 μas and ∼2500 μas (∼ 0.02 pc and ∼ 0.02 pc). Without these new baselines, previous EHT observations of the source in 2017 and 2018 lacked the capability to constrain emission on large scales, where a “missing flux” of order ∼1 Jy is expected to reside. To probe these scales, we analyzed closure phases–robust against station-based gain calibration errors–and model the jet base emission using a simple Gaussian component offset from the compact ring emission at spatial separations > 100 μas. Our analysis revealed a Gaussian feature centered at (ΔRA ≈ 320 μ as, ΔDec. ≈ 60 μ as), projected separation of ≈ 5500 AU, with an estimated flux density of only ∼60 mJy, implying that most of the missing flux identified in previous EHT studies had to originate from different, larger scales. Brighter emission at the relevant spatial scales is firmly ruled out, and the data do not favor more complex models. This component aligns with the inferred position of the large-scale jet and is therefore physically consistent with the emission of the jet base. While our findings point to detectable jet base emission at 230 GHz, the limited coverage provided by only two intermediate baselines limits our ability to robustly reconstruct its morphology. Consequently, we treated the recovered Gaussian as an upper limit on the jet base flux density. Future EHT observations with expanded intermediate baseline coverage will be essential to constrain the structure and nature of this component with higher precision.

accretion, accretion disks↗

Locating the missing large-scale emission in the jet of M87* with short EHT baselines

In very-long baseline interferometric arrays, nearly co-located stations probe the largest scales and typically cannot resolve the observed source. In the absence of a large-scale structure, closure phases constructed with these stations are zero and, since they are independent of station-based errors, they can be used to probe data issues. Here, we show how these trivial closure phases become nonzero with a brightness distribution on smaller scales than their short baseline would suggest. When applied to sources that are made up of a bright compact and large-scale diffuse component, the trivial closure phases directly measure the centroid relative to the compact source and higher-order image moments. We present a technique to measure these image moments with minimal model assumptions and validate it on synthetic Event Horizon Telescope (EHT) data. We then apply this technique to 2017 and 2018 EHT observations of M87* and find a weak preference for extended emission in the direction of the large-scale jet. We also apply it to 2021 EHT data and measure the source centroid about 1 mas northwest of the compact ring, which is consistent with the jet observed at lower frequencies.

79 ASTRONOMY AND ASTROPHYSICS↗