Search NASA⌕ Search

SEARCH · Search NASA

Results for “cis-Lunar”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

224 records · Page 13

OSIRIS-REx Conjunction Screenings: Earth Gravity Assist and Earth Return Analysis and Results

The NASA OSIRIS-REx asteroid sample return mission performed an Earth gravity assist on September 22, 2017, and returned to Earth to drop off the sample on September 24, 2023. In each case, the NASA Conjunction Assessment Risk Analysis (CARA) team screened the OSIRIS-REx trajectories against the satellite catalog in search of high-risk close approaches. This paper describes the preparation for collision avoidance and screening results, along with lessons learned, providing a baseline for support of future missions in this category, particularly as space traffic around the Earth and in cis-lunar space continues to rapidly expand.

Dolan E. Highsmith↗

OSIRIS-REx Conjunction Screenings: Earth Gravity Assist and Earth Return Analysis and Results

The NASA OSIRIS-REx asteroid sample return mission performed an Earth gravity assist on September 22, 2017, and returned to Earth to drop off the sample on September 24, 2023. In each case, the NASA Conjunction Assessment Risk Analysis (CARA) team screened the OSIRIS-REx trajectories against the satellite catalog in search of high-risk close approaches. This paper describes the preparation for collision avoidance and screening results, along with lessons learned, providing a baseline for support of future missions in this category, particularly as space traffic around the Earth and in cis-lunar space continues to rapidly expand.

Dolan Highsmith↗

Update on NASA’s ISRU Development and Mission Plans for the Artemis Program

In 2017, NASA initiated the Artemis program to send astronauts back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface. While much of NASA’s plans for the Artemis program currently focus on the Human Lunar Return and the ability for astronauts to explore the lunar surface for limited durations each year, the longer-term vision for the Artemis program is to enable sustained human exploration and commercial operations in cis-lunar space and the lunar surface. An important aspect of achieving this long-term vision, is to better understand and characterize the resources on the Moon and Mars and learn how to extract and use these resources. Known as In Situ Resource Utilization (ISRU), the identification, mapping, extraction, and processing of space resources has the potential to greatly reduce the cost and risk of human exploration. These are achieved by reducing what needs to be delivered from Earth and the dependency on these supplies, lowering costs through commercial operations, and expanding infrastructure for safer and more capable exploration and surface operations. To guide development of ISRU technologies and systems on the ground and demonstrate these capabilities on the Moon and Mars, the NASA Space Technology Mission Directorate (STMD) created and released the ISRU Envisioned Future Priorities (EFP) strategic plan in 2022 and updated it in 2023. While lunar ISRU technology development had already started, these publicly released strategic plans have been used to guide and prioritize technology development, and assess the progress in achieving the vision. Since the release of the ISRU EFP, there have been several significant activities/events that have occurred with respect to human lunar exploration, surface infrastructure, and ISRU. One was the release of the Artemis Architecture Definition Document Revision 1 that included ISRU as a sub-architecture. The second was the release of several STMD solicitations including the Announcement of Collaborative Opportunities (ACO) and Tipping Point (TP). The third was the release of a Request for Information for the Lunar Infrastructure Foundational Technology-1 (LIFT-1) mission with the primary objective of extracting oxygen from lunar regolith. The fourth was the release of STMD technology and capability Shortfalls, and the review, ranking by numerous stakeholders and individuals, and subsequent prioritization of the Shortfalls that will be utilized in future solicitation and development plans. This paper will provide an overview and status of on-going technology and system development activities, an update of ISRU into the Artemis campaign, an update on ISRU-related mission, and the impacts of the Shortfall prioritization.

NASA↗

Moon to Mars In Situ Resource Utilization (ISRU) Status Update

In 2017, NASA initiated the Artemis program to send astronauts back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface. While much of NASA’s plans for the Artemis program currently focus on the Human Lunar Return and the ability for astronauts to explore the lunar surface for limited durations each year, the longer-term vision for the Artemis program is to enable sustained human exploration and commercial operations in cis-lunar space and the lunar surface. An important aspect of achieving this long-term vision, is to better understand and characterize the resources on the Moon and Mars and learn how to extract and use these resources. Known as In Situ Resource Utilization (ISRU), the identification, mapping, extraction, and processing of space resources has the potential to greatly reduce the cost and risk of human exploration. These are achieved by reducing what needs to be delivered from Earth and the dependency on these supplies, lowering costs through commercial operations, and expanding infrastructure for safer and more capable exploration and surface operations. To guide development of ISRU technologies and systems on the ground and demonstrate these capabilities on the Moon and Mars, the NASA Space Technology Mission Directorate (STMD) created and released the ISRU Envisioned Future Priorities (EFP) strategic plan in 2022 and updated it in 2023. While lunar ISRU technology development had already started, these publicly released strategic plans have been used to guide and prioritize technology development, and assess the progress in achieving the vision. Since the release of the ISRU EFP, there have been several significant activities/events that have occurred with respect to human lunar exploration, surface infrastructure, and ISRU. This presentation will provide an overview and status of on-going technology and system development activities, an update of ISRU into the Artemis campaign, an update on ISRU-related activities.

NASA↗

The Lunar IceCube Mission Design: Construction of Feasible Transfer Trajectories with a Constrained Departure

Lunar IceCube, a 6U CubeSat, will prospect for water and other volatiles from a low-periapsis, highly inclined elliptical lunar orbit. Injected from Exploration Mission-1, a lunar gravity assisted multi-body transfer trajectory will capture into a lunar science orbit. The constrained departure asymptote and value of trans-lunar energy limit transfer trajectory types that re-encounter the Moon with the necessary energy and flight duration. Purdue University and Goddard Space Flight Center's Adaptive Trajectory Design tool and dynamical system research is applied to uncover cislunar spatial regions permitting viable transfer arcs. Numerically integrated transfer designs applying low-thrust and a design framework are described.

Cis-lunar↗

NASA Access 2 Space Workshop: Summary Report: Increased Science Return through Rideshare

This report summarizes the Access to Space (A2S) Workshop held on February 25-27, 2020 at the Johns Hopkins University Applied Physics Laboratory (APL) and hosted by NASA’s Science Mission Directorate (SMD). This workshop solicited community input on the creation and management of an ESPA-class1payload pipeline for NASA SMD launches. The workshop brought together roughly 180 participants including scientists, engineers, instrument developers, launch providers, and policy makers across NASA centers, government agencies, commercial industry, research institutes, and academia.

ESPA-Class Spacecraft↗