Search NASA⌕ Search

SEARCH · Search NASA

Results for “code requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Field and Laboratory Testing of Approaches to Smart Whole-House Mechanical Ventilation Control

Whole-house mechanical ventilation is a critical component to a comprehensive strategy for good indoor air quality (IAQ). However, due to lack of integration with standard heating and cooling systems, and perceptions from a portion of the homebuilding industry about risks related to increased energy use, increased cost, and decreased comfort, voluntary and code-required adoption varies among regions. Smart ventilation controls (SVC) balance energy consumption, comfort, and IAQ by optimizing mechanical ventilation operation to reduce the heating and/or cooling loads, improve management of indoor moisture, and maintain IAQ equivalence according to ASHRAE 62.2.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrogen Quantitative Risk Assessment

DOE has identified consistent safety, codes, and standards as a critical need for the deployment of hydrogen technologies, with key barriers related to the availability and implementation of technical information in the development of regulations, codes, and standards. Advances in codes and standards have been enabled by risk-informed approaches to create and implement revisions to codes, such as National Fire Protection Association (NFPA) 2, NFPA 55, and International Organization for Standardization (ISO) Technical Specification (TS)-19880-1. This project provides the technical basis for these revisions, enabling the assessment of the safety of hydrogen fuel cell systems and infrastructure using QRA and physics-based models of hydrogen behavior. The risk and behavior tools that are developed in this project are motivated by, shared directly with, and used by the committees revising relevant codes and standards, thus forming the scientific basis to ensure that code requirements are consistent, logical, and defensible.

08 HYDROGEN↗

Prefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures

This project aimed to reduce the field construction times and fabrication costs of reinforced concrete (RC) nuclear structures through the use of: 1) high-strength steel deformed reinforcing bar (rebar); 2) prefabricated high-strength rebar (HSR) assemblies with headed anchorages; and 3) high-strength concrete (HSC). The focus of the project was not to develop new innovations on materials, but rather to fill a major knowledge gap on the effectiveness, code conformity, and viability (i.e., practicality, commercial availability) of existing high-strength materials in nuclear structures, especially in shear walls, their connections/joints, and around penetrations. These advances promote the Nuclear Energy Enabling Technologies Advanced Methods for Manufacturing (NEET-1) goals of accelerating deployment schedules by at least 6 months and reducing component fabrication costs by 20% or more. Toward this vision, the following objectives were identified and completed: Develop limit-benefit and cost-benefit analysis frameworks: The structural and economic limits and benefits of HSR and HSC in nuclear walls were evaluated. Importantly, it was found that modest increases in concrete strength up to 10.0 ksi and rebar yield strength up to 100 ksi result in the most economic designs and improved structural performance (Barbachyn et al., 2017a and Barbachyn et al., 2017b). Also, an industry survey was distributed to determine the cost benefits associated with prefabrication. Importantly, on-site worker-hours are significantly reduced, allowing for significantly accelerated construction schedules (Devine et al. 2018b). Develop an optimization methodology for structural design: An optimization study was deemed not necessary since the trivial solution with maximized use of high-strength materials and prefabrication always resulted in the largest cost and time savings. Instead, the benefits (and limits) of high-strength materials and prefabrication on construction costs and on-site construction time were investigated through a parametric study. Cost-reductions through the use of HSR and HSC were found to be greater than 40%. Also, on-site construction time of nuclear shear walls can be reduced by up to 83% through the use of prefabricated rebar assemblies. Conduct experimental evaluations of nuclear shear walls and wall-foundation joints: A large scale experimental program was completed on shear-critical RC cantilever deep beams. From these experiments, it was demonstrated that increasing rebar yield strength had a greater effect on increasing lateral strength than increasing the concrete compressive strength. Further, using HSR together with HSC resulted in the highest lateral strength and displacement ductility (Devine et al. 2018a). Additionally, large-scale reversed-cyclic lateral load tests were conducted on RC shear walls. It was demonstrated that through the utilization of HSR and HSC, a wall with 55% reduced vertical and horizontal rebar area was able to achieve 91% of the peak lateral strength of a conventional wall using state-of-practice materials with the same geometry. Further, trim reinforcement with headed anchorages around the penetrations proved to be effective. Develop validated numerical simulation models: Numerical modeling was completed in two phases during this project using 3 different finite element software packages. The first phase used existing measured data from previous experimental studies on stocky RC walls to validate simplified predictive models. Models using two different programs were validated based on a database of 38 stocky walls (Barbachyn et al., 2017a). The second phase occurred after experimental testing using a third and more detailed finite element package. Prediction improvements for the initial stiffness, lateral deformations, damage propagation, and failure mechanisms were targeted. The resulting detailed models more accurately predicted the peak lateral strength, initial and secant stiffnesses, lateral deformations, and cracking patterns of the wall test specimens subjected to reversed-cyclic lateral loading as compared to the simplified pretest models. Develop validated design procedures, tools, and criteria: This project evaluated the accuracy of existing closed-form design equations from U.S. building design standards and previous research (Barbachyn et al. 2017a and Devine et al. 2018a). It was shown that the current predictive equations for shear strength capacity need to be revisited as they provide significant scatter and gross overestimates, indicating the potential for unconservative designs. Further, for both the deep beam and shear wall specimens, the numerical models and flexural capacity predictions provided the most accurate strength predictions. Develop cost-effective field construction procedures: To promote the use of prefabricated rebar assemblies, the following construction conditions where prefabrication would be used instead of in-place rebar tying were identified from an industry survey: 1) to save on construction schedule; 2) to improve safety and/or quality control; 3) for areas with heavy rebar congestion; and 4) for structures with significant repetition in rebar layout. All of these conditions directly apply and benefit nuclear construction where construction costs and schedules are extensive, safety and quality are of utmost importance, the reinforcement is extremely dense, and the reinforcement layout is repetitive in many regions of the shear walls. Additionally, an experimental study was conducted to investigate the changes in bar spacing (with respect to code-required rebar spacing and placement tolerances) when a horizontally assembled prefabricated two-dimensional (2D) rebar mat or three-dimensional (3D) rebar cage is lifted (or tripped) to a vertical position. It was found that the bars involved in both the lateral translation of the rebar assemblies (i.e., movement of the assembly in its horizontal position) and the tripping process were most susceptible to large spacing changes, and thus, their positions within the assembly would need to be checked after the placement of the assembly in place within the formwork. Importantly, the spacings of all of the other bars in the assembly were not affected significantly by the lateral translation and tripping process, thereby eliminating the need to recheck their positions within the assembly (Devine et al. 2018b).

36 MATERIALS SCIENCE↗

Hydrogen Quantitative Risk Assessment (Annual Progress Report)

DOE has identified consistent safety, codes, and standards as a critical need for the deployment of hydrogen technologies, with key barriers related to the availability and implementation of technical information in the development of regulations, codes, and standards. Advances in codes and standards have been enabled by risk-informed approaches to create and implement revisions to codes, such as National Fire Protection Association (NFPA) 2, NFPA 55, and International Organization for Standardization (ISO) Technical Specification (TS)-19880-1. This project provides the technical basis for these revisions, enabling the assessment of the safety of hydrogen fuel cell systems and infrastructure using QRA and physics-based models of hydrogen behavior. The risk and behavior tools that are developed in this project are motivated by, shared directly with, and used by the committees revising relevant codes and standards, thus forming the scientific basis to ensure that code requirements are consistent, logical, and defensible.

08 HYDROGEN↗

Integrating Health and Energy Efficiency in Healthcare Facilities

This report presents a review of literature and current best practices along the intersection of energy efficiency and occupant health at U.S. healthcare facilities, including federally owned buildings. It also includes a review of minimum code requirements for healthcare indoor environmental quality (IEQ) and research on building measures that optimize occupant health and energy efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IMS Rapid Response FY21 Summary Report for: Integrating Patterned Probes with Four-Dimensional Scanning Transmission Electron Microscopy for Unrivaled Crystallographic Structure Determination in Nanomaterials

The initial goal of our 4-dimensional scanning transmission electron microscopy (4D-STEM)-based project was to develop strain resolution two orders of magnitude better than what is now currently possible with electron-based scattering techniques, all while collecting scattering information from 7 different tilt axes at one time [multi-beam electron diffraction (MBED)1 ] through the development of a new electron probe-forming aperture with non-circular features (patterned probes 2 ). We set out to accomplish this through a collaboration with Drs. Colin Ophus and Ben Savitsky at Lawrence Berkeley Laboratory (they are the world-leading experts in developing the complex computational codes required to perform orientation analysis and quantitative strain mapping on our 4D-STEM data sets. We are motivated to invest in this area as it will be the only technique sensitive enough to perform three- dimensional automated crystallographic orientation mapping (ACOM) and strain mapping for materials exposed to external stimulus (a focus of our larger efforts).

36 MATERIALS SCIENCE↗

Development of a Standard Test Method for Reducing the Uncertainties in Measuring the Capture Efficiency of Range Hoods

Cooking activities are a major source of indoor air pollutants. To control pollutants generated from cooking activities, a range hood is commonly used in residential kitchens. Several building codes require that a range hood be installed in new homes to control pollutants from cooking, and the required airflow rates for range hoods are specified by indoor air quality (IAQ) standards. However, air flow alone does not tell us how much of the cooking pollutants are exhausted by the range hood. A better metric to evaluate range hood IAQ performance is capture efficiency (CE)—the fraction of contaminants emitted during cooking that are exhausted directly to the outside via the range hood. This paper summarizes the development of a range hood CE test method for use in laboratory testing and equipment rating.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fulcrum House – Towards a Sustainable Composite Architecture

In the last decades, the accessibility to digital fabrication technologies positioned composites as an affordable, structurally efficient and low-maintenance alternative to traditional mineral-based and high-energy materials. Of special interest are carbon nanotubes (CNT) and carbon foam (CFoam) from methane and coal pyrolysis respectively, as an environmentally friendly substitute to glass and carbon fiber. This paper presents the design of a principled single-family house, as a first case study to identify the constraints of such a material system, including technology gap, techno-economic and life cycle assessment, as well as building code requirements. In turn, the investigation proposes a suitable design-to-fabrication workflow, which potentially could bring CNT and CFoam materials to the construction of buildings.

01 COAL, LIGNITE, AND PEAT↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reducing the Cost of Fatigue Crack Growth Testing for Storage Vessel Steels in Hydrogen Gas

Hydrogen storage pressure vessels are designed against fatigue crack growth, and the ASME Boiler and Pressure Vessel Code requires the fatigue crack growth rate (da/dN) vs. stress-intensity factor range (ΔK) relationship of the construction steel to be measured directly in hydrogen gas. These measurements are notoriously slow and expensive: the cyclic loading frequencies prescribed by standards (often 0.1 Hz) are two or more orders of magnitude below those for conventional fatigue testing, individual tests run for days to weeks, and the high-pressure test-chamber set-up imposes a significant per-specimen labor cost. Due to these time and cost constraints, near-threshold data—the regime most valuable for extending design fatigue life—are rarely generated for ferritic storage vessel steels in hydrogen gas.

08 HYDROGEN↗

HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT SUMMARY OF COMBINED THERMAL AND OPERATING LOADS WITH SEISMIC ANALYSIS

This report summarizes the results of the Double-Shell Tank Thermal and Operating Loads Analysis (TaLA) combined with the Seismic Analysis. This combined analysis provides a thorough, defensible, and documented analysis that will become a part of the overall analysis of record for the Hanford double-shell tanks (DSTs). The bases of the analytical work presented herein are two ANSYS{reg_sign} finite element models that were developed to represent a bounding-case tank. The TaLA model includes the effects of temperature on material properties, creep, concrete cracking, and various waste and annulus pressure-loading conditions. The seismic model considers the interaction of the tanks with the surrounding soil including a range of soil properties, and the effects of the waste contents during a seismic event. The structural evaluations completed with the representative tank models do not reveal any structural deficiencies with the integrity of the DSTs. The analyses represent 60 years of use, which extends well beyond the current date. In addition, the temperature loads imposed on the model are significantly more severe than any service to date or proposed for the future. Bounding material properties were also selected to provide the most severe combinations. While the focus of the analyses was a bounding-case tank, it was necessary during various evaluations to conduct tank-specific analyses. The primary tank buckling evaluation was carried out on a tank-specific basis because of the sensitivity to waste height, specific gravity, tank wall thickness, and primary tank vapor space vacuum limit. For this analysis, the occurrence of maximum tank vacuum was classified as a service level C, emergency load condition. The only area of potential concern in the analysis was with the buckling evaluation of the AP tank, which showed the current limit on demand of l2-inch water gauge vacuum to exceed the allowable of 10.4 inches. This determination was based on analysis at the design waste temperature of 350 F and the full 60-year corrosion allowance on the tank wall of 0.060 inch. However, analysis at a more realistic temperature of 250 F or corrosion allowance of 0.025 inch results in an acceptable demand/capacity ratio according to the ASME code criteria. Thus, buckling of the primary tank is judged to be unlikely for the current lack of corrosion in the tanks, and the expectation that the maximum waste temperature will not exceed 210 F. The reinforced concrete structure was evaluated as specified by the American Concrete Institute (ACI) code requirements for nuclear safety-related structures (ACI-349). The demand was demonstrated to be lower than the capacity at all locations. Revision 1 is being issued to document changes to the anchor bolt evaluation. RPP-RPT-32237 Rev. 1, Hanford Double-Shell Tank Thermal and Seismic Project-Increased Liquid Level Analysis for 241AP Tank Farms, described changes to the anchor bolt modeling and evaluation which were implemented in response to the independent reviewer's comments. Similar changes have been made in the bounding tank analysis and are documented in RPP-RPT-28968 Rev. 1. The conclusions of the previous releases of this report remain unchanged.

36 MATERIALS SCIENCE↗

PNNL Hoisting and Rigging Manual

This manual describes the safe and cost effective operation, inspection, maintenance, and repair requirements for cranes, hoists, fork trucks, slings, rigging hardware, and hoisting equipment. It is intended to be a user's guide to requirements, codes, laws, regulations, standards, and practices that apply to Pacific Northwest National Laboratory (PNNL) and its subcontractors.

42 ENGINEERING↗

The Development of a Parameterized Scatter Removal Algorithm for Nuclear Materials Identification System Imaging

This dissertation presents a novel method for removing scattering effects from Nuclear Materials Identification System (NMIS) imaging. The NMIS uses fast neutron radiography to generate images of the internal structure of objects non-intrusively. If the correct attenuation through the object is measured, the positions and macroscopic cross-sections of features inside the object can be determined. The cross sections can then be used to identify the materials and a 3D map of the interior of the object can be reconstructed. Unfortunately, the measured attenuation values are always too low because scattered neutrons contribute to the unattenuated neutron signal. Previous efforts to remove the scatter from NMIS imaging have focused on minimizing the fraction of scattered neutrons which are misidentified as directly transmitted by electronically collimating and time tagging the source neutrons. The parameterized scatter removal algorithm (PSRA) approaches the problem from an entirely new direction by using Monte Carlo simulations to estimate the point scatter functions (PScFs) produced by neutrons scattering in the object. PScFs have been used to remove scattering successfully in other applications, but only with simple 2D detector models. This work represents the first time PScFs have ever been applied to an imaging detector geometry as complicated as the NMIS. By fitting the PScFs using a Gaussian function, they can be parameterized and the proper scatter for a given problem can be removed without the need for rerunning the simulations each time. In order to model the PScFs, an entirely new method for simulating NMIS measurements was developed for this work. The development of the new models and the codes required to simulate them are presented in detail. The PSRA was used on several simulated and experimental measurements and chi-squared goodness of fit tests were used to compare the corrected values to the ideal values that would be expected with no scattering. Using the PSRA resulted in an improvement of the chi-squared test by a factor of 60 or more when applied to simple homogeneous objects.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

THE DEVELOPMENT OF A PARAMETERIZED SCATTER REMOVAL ALGORITHM FOR NUCLEAR MATERIALS IDENTIFICATION SYSTEM IMAGING

This report presents a novel method for removing scattering effects from Nuclear Materials Identification System (NMIS) imaging. The NMIS uses fast neutron radiography to generate images of the internal structure of objects nonintrusively. If the correct attenuation through the object is measured, the positions and macroscopic cross sections of features inside the object can be determined. The cross sections can then be used to identify the materials, and a 3D map of the interior of the object can be reconstructed. Unfortunately, the measured attenuation values are always too low because scattered neutrons contribute to the unattenuated neutron signal. Previous efforts to remove the scatter from NMIS imaging have focused on minimizing the fraction of scattered neutrons that are misidentified as directly transmitted by electronically collimating and time tagging the source neutrons. The parameterized scatter removal algorithm (PSRA) approaches the problem from an entirely new direction by using Monte Carlo simulations to estimate the point scatter functions (PScFs) produced by neutrons scattering in the object. PScFs have been used to remove scattering successfully in other applications, but only with simple 2D detector models. This work represents the first time PScFs have ever been applied to an imaging detector geometry as complicated as the NMIS. By fitting the PScFs using a Gaussian function, they can be parameterized, and the proper scatter for a given problem can be removed without the need for rerunning the simulations each time. In order to model the PScFs, an entirely new method for simulating NMIS measurements was developed for this work. The development of the new models and the codes required to simulate them are presented in detail. The PSRA was used on several simulated and experimental measurements, and chi-squared goodness of fit tests were used to compare the corrected values to the ideal values that would be expected with no scattering. Using the PSRA resulted in an improvement of the chi-squared test by a factor of 60 or more when applied to simple homogeneous objects.

Grogan, Brandon R↗

CO2 MONITORING FOR DEMAND CONTROLLED VENTILATION IN COMMERCIAL BUILDINGS

Carbon dioxide (CO{sub 2}) sensors are often deployed in commercial buildings to obtain CO{sub 2} data that are used, in a process called demand-controlled ventilation, to automatically modulate rates of outdoor air ventilation. The objective is to keep ventilation rates at or above design specifications and code requirements and also to save energy by avoiding excessive ventilation rates. Demand controlled ventilation is most often used in spaces with highly variable and sometime dense occupancy. Reasonably accurate CO{sub 2} measurements are needed for successful demand controlled ventilation; however, prior research has suggested substantial measurement errors. Accordingly, this study evaluated: (a) the accuracy of 208 CO{sub 2} single-location sensors located in 34 commercial buildings, (b) the accuracy of four multi-location CO{sub 2} measurement systems that utilize tubing, valves, and pumps to measure at multiple locations with single CO{sub 2} sensors, and (c) the spatial variability of CO{sub 2} concentrations within meeting rooms. The field studies of the accuracy of single-location CO{sub 2} sensors included multi-concentration calibration checks of 90 sensors in which sensor accuracy was checked at multiple CO{sub 2} concentrations using primary standard calibration gases. From these evaluations, average errors were small, -26 ppm and -9 ppm at 760 and 1010 ppm, respectively; however, the averages of the absolute values of error were 118 ppm (16%) and 138 ppm (14%), at concentrations of 760 and 1010 ppm, respectively. The calibration data are generally well fit by a straight line as indicated by high values of R{sup 2}. The Title 24 standard specifies that sensor error must be certified as no greater than 75 ppm for a period of five years after sensor installation. At 1010 ppm, 40% of sensors had errors greater than {+-}75 ppm and 31% of sensors has errors greater than {+-}100 ppm. At 760 ppm, 47% of sensors had errors greater than {+-}75 ppm and 37% of sensors had errors greater than {+-}100 ppm. A significant fraction of sensors had errors substantially larger than 100 ppm. For example, at 1010 ppm, 19% of sensors had an error greater than 200 ppm and 13% of sensors had errors greater than 300 ppm. The field studies also included single-concentration calibration checks of 118 sensors at the concentrations encountered in the buildings, which were normally less than 500 ppm during the testing. For analyses, these data were combined with data from the calibration challenges at 510 ppm obtained during the multi-concentration calibration checks. For the resulting data set, the average error was 60 ppm and the average of the absolute value of error was 154 ppm. Statistical analyses indicated that there were statistically significant differences between the average accuracies of sensors from different manufacturers. Sensors with a 'single lamp single wavelength' design tended to have a statistically significantly smaller average error than sensors with other designs except for 'single lamp dual wavelength' sensors, which did not have a statistically significantly lower accuracy. Sensor age was not consistently a statistically significant predictor of error.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗