Search NASA⌕ Search

SEARCH · Search NASA

Results for “contingency control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Mathematical models for space shuttle ground systems

Math models are a series of algorithms, comprised of algebraic equations and Boolean Logic. At Kennedy Space Center, math models for the Space Shuttle Systems are performed utilizing the Honeywell 66/80 digital computers, Modcomp II/45 Minicomputers and special purpose hardware simulators (MicroComputers). The Shuttle Ground Operations Simulator operating system provides the language formats, subroutines, queueing schemes, execution modes and support software to write, maintain and execute the models. The ground systems presented consist primarily of the Liquid Oxygen and Liquid Hydrogen Cryogenic Propellant Systems, as well as liquid oxygen External Tank Gaseous Oxygen Vent Hood/Arm and the Vehicle Assembly Building (VAB) High Bay Cells. The purpose of math modeling is to simulate the ground hardware systems and to provide an environment for testing in a benign mode. This capability allows the engineers to check out application software for loading and launching the vehicle, and to verify the Checkout, Control, & Monitor Subsystem within the Launch Processing System. It is also used to train operators and to predict system response and status in various configurations (normal operations, emergency and contingent operations), including untried configurations or those too dangerous to try under real conditions, i.e., failure modes.

Tory, E. G.↗

Tell Me about Your Lemonade Stand

At STARSYS, we execute many Firm Fixed Price (FFP) programs for the development of mechanical systems for spacecraft. Contracting this way pre-suppose that we have the ability to establish and hold scope for a system that has yet to be defined. To do FFP, it is critical that we have program managers who are masters at cost control. Fortunately, we have some "masters" in our company. They just seem to have a knack for driving to a financial target. Doesn't matter if the program has contingency or not. Doesn't seem to matter if they use MS Project, Excel spread-sheets, or the back of an envelope. Doesn't even seem to matter whether the program is set up as a financial challenge or a winner.

Tibbitts, Scott↗

Streamlining Tactical Operator Handoffs During Multi-Vehicle Operations

Increased automation has shifted the operator control paradigm from a single operator controlling a single vehicle, to multiple operators collaborating to control multiple vehicles; this paradigm is known as m:N. Many questions remain unanswered in this new operational paradigm about the division of assets as workload for individual operators varies over time. This paper explores the management of workload by enabling operators to temporarily handoff vehicles among each other. A study was conducted to explore both a manual and assisted method for performing handoffs during manipulated contingency scenarios. The assisted handoff method allowed subjects to easily choose and group nominal and/or contingency vehicles. The number of contingencies was also manipulated to determine the effect workload had on how pilots utilized the ability to handoff vehicles. Results show subjects performed handoffs more often when there were more contingencies and when the assisted handoff tool was available. In addition, the assisted tool made subjects feel more comfortable, enabling them to feel like they could take longer to resolve contingency situations. Lastly, even during contingencies, subjects were able to successfully complete secondary tasks.

m:N operations↗

NASA CEV On-Orbit GN&C Analysis

The Orion spacecraft orbit GN&C system will be required to perform both ISS servicing missions and Lunar sortie and outpost crew transportation. While certain aspects of these two missions are complementary, the two missions are also distinct in many ways. Common between the missions is a Low Earth Orbit (LEO) rendezvous, one with the ISS And the other with the LSAM/EDS stack prior to trans-lunar insertion. The lunar missions will additionally require Orion to perform orbit maintenance in LLO, perform contingency lunar orbit operations including RPOD with the LSAM, perform the TEI maneuver sequence, and execute the trans-Earth cruise. The NASA-led team developed a reference configuration orbit GN&C system capable of executing all of these activities with the same navigation sensor suite and control effectors while fully meeting the requirements being developed for System Requirements Review in advance of prime contractor selection. This paper will present an overview of the analyses performed to support system trade studies, demonstrate the feasibility of the NASA reference configuration, and validate the Orion system requirements. These analyses include linear covariance techniques, 3-DOF Monte Carlo simulations, 6-DOF Monte Carlo simulations, and analytical evaluations of GN&C systems performed by the NASA-led Orion team to characterize the sensitivities of Orion s various missions and assess the unique challenges of each. The first part of this paper will describe the trade studies that were performed in order to characterize the RPOD system performance for both the ISS and the lunar missions including development of an RPOD operations concept, RPOD trajectories, contingency scenarios, docking mechanism and associated contact conditions, post-contact thrust issues, relative navigation sensors, relative navigation sensor target infrastructure. The paper will also discuss concepts for both manually-piloted and automatically executed scenarios, as well as the remotely-piloted contingency scenario in LLO. The second part of the paper will discuss the analyses performed for lunar and cislunar GN&C performance including the accuracy of the post-insertion lunar orbit, the ability of Orion to hit a particular Earth return entry corridor, attitude control solutions for long-duration surface operations, and autonomous navigation in support of TEI without ground tracking.

DSouza, Chris↗

Demonstration of Two Extended Visual Line of Sight Methods for Urban UAV Operations

This report describes two extended visual line of sight (EVLOS) methods developed and utilized during two flight campaigns over the campus of NASA Langley Research Center (LaRC): a chase vehicle method and a radio controlled (RC) pilot handoff method. These campaigns were performed to (a) evaluate small unmanned aerial system (sUAS) flight beyond the visual line of sight (BVLOS) of the ground control station operator and (b) test technologies under development to enable a transition from EVLOS to BVLOS operations. While an autonomous waypoint-based operational approach enabled minimal pilot intervention in both methods, range containment was enforced (a) manually via continual pilot visual monitoring and (b) autonomously via on-board contingency landing autonomy triggerable at the boundary of stay-in geofences. In the thirty-nine flights which utilized the chase vehicle, the pilot followed the sUAS flying a 1.2 km path at 40m altitude over urban streets. In the fifteen flights which utilized pilot handoff, a pilot at one end of a 1.5 km path initiated the flight at 120m altitude over buildings and trees, and at the midway point of the path transferred radio control to a pilot at the other end. In comparison, the chase vehicle method requires less ground crew and simpler avionics, while the pilot handoff method avoids schedule risk arising from street traffic congestion but better replicates actual direct routing for BVLOS flights. Collision risk with another aircraft was introduced in both campaigns and mitigated with the same manual and autonomous methods. Results from these campaigns serve as a basis for planned BVLOS operations at NASA LaRC.

Nicholas Rymer↗

CFD Simulations in Support of Shuttle Orbiter Contingency Abort Aerodynamic Database Enhancement

Modern Computational Fluid Dynamics (CFD) techniques were used to compute aerodynamic forces and moments of the Space Shuttle Orbiter in specific portions of contingency abort trajectory space. The trajectory space covers a Mach number range of 3.5-15, an angle-of-attack range of 20deg-60deg, an altitude range of 100-190 kft, and several different settings of the control surfaces (elevons, body flap, and speed brake). Presented here are details of the methodology and comparisons of computed aerodynamic coefficients against the values in the current Orbiter Operational Aerodynamic Data Book (OADB). While approximately 40 cases have been computed, only a sampling of the results is provided here. The computed results, in general, are in good agreement with the OADB data (i.e., within the uncertainty bands) for almost all the cases. However, in a limited number of high angle-of-attack cases (at Mach 15), there are significant differences between the computed results, especially the vehicle pitching moment, and the OADB data. A preliminary analysis of the data from the CFD simulations at Mach 15 shows that these differences can be attributed to real-gas/Mach number effects. The aerodynamic coefficients and detailed surface pressure distributions of the present simulations are being used by the Shuttle Program in the evaluation of the capabilities of the Orbiter in contingency abort scenarios.

Papadopoulos, Periklis E.↗

A Co-Simulation Framework for Steady-State Analyses of Multiple Droop-based MTdc Grids in Continental-Scale Systems

The growing scale and complexity of planning continental hybrid ac and multi-terminal dc (MTdc) systems require scalable steady-state modeling and analysis approaches not currently available in commercial tools. This paper presents a comprehensive multi-fidelity model-conversion framework that enables the efficient transition of MTdc grid models from production cost modeling (PCM) and approximated ac power flow to detailed ac–MTdc power flow for large-scale planning studies. The core of this framework is a scalable co-simulation approach that, for the first time, enables power flow analysis in continental-scale ac–MTdc systems. It seamlessly couples commercial ac solvers with a detailed MTdc grid model that incorporates droop-based control and current-limiting strategies of multiple meshed MTdc grids. Leveraging this capability, an evaluation framework to systematically assess and compare different MTdc power redispatch strategies under ac and dc contingencies is introduced. The proposed framework and algorithm are evaluated using a combined Western and Eastern Interconnection system with 11 MTdc grids of various sizes, showing a coherent transition from PCM to detailed ac–MTdc power flow and improved system performance in voltage regulation and line overload mitigation following typical contingencies.

Nguyen, Quan H.↗

Demonstration of automated proximity and docking technologies

An autodock was demonstrated using straightforward techniques and real sensor hardware. A simulation testbed was established and validated. The sensor design was refined with improved optical performance and image processing noise mitigation techniques, and the sensor is ready for production from off-the-shelf components. The autonomous spacecraft architecture is defined. The areas of sensors, docking hardware, propulsion, and avionics are included in the design. The Guidance Navigation and Control architecture and requirements are developed. Modular structures suitable for automated control are used. The spacecraft system manager functions including configuration, resource, and redundancy management are defined. The requirements for autonomous spacecraft executive are defined. High level decisionmaking, mission planning, and mission contingency recovery are a part of this. The next step is to do flight demonstrations. After the presentation the following question was asked. How do you define validation? There are two components to validation definition: software simulation with formal and vigorous validation, and hardware and facility performance validated with respect to software already validated against analytical profile.

Anderson, Robert L.↗

Mid-L/D Lifting Body Entry Demise Analysis

The mid-lift-to-drag ratio (mid-L/D) lifting body is a fully autonomous spacecraft under design at NASA for enabling a rapid return of scientific payloads from the International Space Station (ISS). For contingency planning and risk assessment for the Earth-return trajectory, an entry demise analysis was performed to examine three potential failure scenarios: (1) nominal entry interface conditions with loss of control, (2) controlled entry at maximum flight path angle, and (3) controlled entry at minimum flight path angle. The objectives of the analysis were to predict the spacecraft breakup sequence and timeline, determine debris survival, and calculate the debris dispersion footprint. Sensitivity analysis was also performed to determine the effect of the initial pitch rate on the spacecraft stability and breakup during the entry. This report describes the mid-L/D lifting body and presents the results of the entry demise and sensitivity analyses.

Ling, Lisa↗

Streamlining Tactical Operator Handoffs During Multi-Vehicle Applications

Increased automation has shifted the operator control paradigm from a single operator controlling a single vehicle, to multiple operators collaborating to control multiple vehicles; this paradigm is known as m:N. Many questions remain unanswered in this new operational paradigm about the division of assets as workload for individual operators varies overtime. This paper explores the management of workload by enabling operators to temporarily handoff vehicles among each other. A study was conducted to explore both a manual and assisted method for performing handoffs during manipulated contingency scenarios. The assisted handoff method allowed subjects to easily choose and group nominal and/or contingency vehicles. The number of contingencies was also manipulated to determine the effect workload had on how pilots utilized the ability to handoff vehicles. Results show subjects performed handoffs more often when there were more contingencies and when the assisted handoff tool was available. In addition, the assisted tool make subjects feel more comfortable, enabling them to feel like they could take longer to resolve contingency situations. Lastly, even during contingencies, subjects were able to successfully complete secondary tasks.

M:N operations↗

Geometric reasoning

Cognitive robot systems are ones in which sensing and representation occur, from which task plans and tactics are determined. Such a robot system accomplishes a task after being told what to do, but determines for itself how to do it. Cognition is required when the work environment is uncontrolled, when contingencies are prevalent, or when task complexity is large; it is useful in any robotic mission. A number of distinguishing features can be associated with cognitive robotics, and one emphasized here is the role of artificial intelligence in knowledge representation and in planning. While space telerobotics may elude some of the problems driving cognitive robotics, it shares many of the same demands, and it can be assumed that capabilities developed for cognitive robotics can be employed advantageously for telerobotics in general. The top level problem is task planning, and it is appropriate to introduce a hierarchical view of control. Presented with certain mission objectives, the system must generate plans (typically) at the strategic, tactical, and reflexive levels. The structure by which knowledge is used to construct and update these plans endows the system with its cognitive attributes, and with the ability to deal with contingencies, changes, unknowns, and so on. Issues of representation and reasoning which are absolutely fundamental to robot manipulation, decisions based upon geometry, are discussed here, not AI task planning per se.

Woodbury, R. F.↗

FLIGHT OPERATIONS FACILITIES

Early in the Mercury design stages, it became evident that this project would require an extensive tracking and data-acquisition network. The presence of man in a satellite demanded that considerably different requirements be placed on the tracking network than had hitherto been necessary for unmanned vehicles. The most significant of these requirements was that it was now imperative that the system respond rapidly to contingency situations to insure adequate safety of the astronaut.

Manned space flight↗

Transactive energy systems for distributed blackstart and service recovery

Abstract Current transactive controls use marginal benefits and marginal costs to achieve an economic market efficiency during normal grid operations. However, the transactive mechanisms designed for normal economic operations cannot be applied directly for the contingencies because the grid operations during contingencies are often dictated by technical needs rather than purely economic criteria. For instance, one of the key technical requirements for the blackstart is to have at least one blackstart capable resource cleared which cannot be ensured by the transactive mechanism designed for normal economic operations because they work primarily based on the marginal benefit and marginal cost of the participants. This article presents one of the first attempts to develop a transactive mechanism to be used during grid contingencies. A distributed blackstart and service recovery is used as an example contingency to evaluate the performance of the proposed transactive mechanism. The performance of the proposed transactive mechanism is demonstrated for various use cases using a modified IEEE‐123 node test system. The simulation results demonstrated the proof of concept of applying a transactive mechanism to enable distributed blackstart and service recovery by engaging the mix of blackstart capable and non‐capable distributed energy resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Deep Space Network information system in the year 2000

The Deep Space Network (DSN), the largest, most sensitive scientific communications and radio navigation network in the world, is considered. Focus is made on the telemetry processing, monitor and control, and ground data transport architectures of the DSN ground information system envisioned for the year 2000. The telemetry architecture will be unified from the front-end area to the end user. It will provide highly automated monitor and control of the DSN, automated configuration of support activities, and a vastly improved human interface. Automated decision support systems will be in place for DSN resource management, performance analysis, fault diagnosis, and contingency management.

Markley, R. W.↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of tether cutting on onboard navigation during the Tethered Satellite Mission-1

The first Tethered Satellite System mission (TSS-1) is manifested for Shuttle Flight STS-44 in January of 1991. The TSS mission presents a new challenge to engineers, requiring advanced guidance, navigation and control concepts. Current NASA flight rules require that the navigational state of the Orbiter at deorbit burn be known to an accuracy of 20 nautical miles. Response of the Shuttle crew to this contingency may involve cutting the tether prior to a complete retrieval. The degradation of the navigational state accuracy as modelled by Shuttle navigation system is examined. Responses to the loss of communication scenario are proposed for two cases. The first case examines navigational performance during a nominal attitude profile. The second case is identical to the first, with the inclusion of modelled tether electrodynamical forces. Comparisons of trajectories propagated from the onboard navigational state vector and a reference ephemeris state vector were performed, with the tether cut simulated at various points during the mission. Additionally, updates to the onboard navigational state via ground uplinks were provided prior to the assumed loss of communication. Through these comparisons, the onboard navigation state error was determined. Alternative responses result from efforts to minimize this error during the various phases of TSS-1 deployment. These results demonstrated existing NASA flight rules could be violated by cutting the tether, and suggests reponses to a loss of communications contingency to maintain a more accurate navigational state.

Pirker, Dana M.↗

Data recovery via covert cognizance for unattended operational resilience

One of the important premises of unattended operation, a highly promoted characteristic of fission batteries and advanced microreactors, is the ability to automate the analysis of sensors data used in support of operational monitoring and control. Here, to meet this vision, this work proposes a new monitoring and data recovery paradigm to ensure resilience against data corruption which may be the result of malicious intrusion into the reactor operational network. This is paramount to ensure 100% availability under contingency scenarios such as cyberattacks. In support of this vision, earlier work has presented the concept of covert cognizance and demonstrated its mathematical ability to identify and embed cognizance parameters under the noise-dominated null space of the sensors data. This work extends this concept and applies it in real-time to demonstrate three key characteristics: zero-impact, zero-observability, and data recovery, where the first characteristic is to ensure no impact on operation, the second is immunity to discovery by pattern recognition techniques, and the third is to allow recovery of corrupt or falsified data. Recognizing that fission batteries are designed to operate under steady state most of the time, we elect to employ a small modular reactor model under transient operational conditions to demonstrate the operational resilience enabled by the covert cognizance paradigm. Specifically, the PI controller is augmented with the covert cognizance modules to develop self-awareness and enable automatic data recovery. The developed modules are expected to be equally applicable to a wide range of advanced reactor technologies relying on full or partial unattended control.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

The SAX Italian scientific satellite. The on-board implemented automation as a support to the ground control capability

This paper presents the capabilities implemented in the SAX system for an efficient operations management during its in-flight mission. SAX is an Italian scientific satellite for x-ray astronomy whose major mission objectives impose quite tight constraints on the implementation of both the space and ground segment. The most relevant mission characteristics require an operative lifetime of two years, performing scientific observations both in contact and in noncontact periods, with a low equatorial orbit supported by one ground station, so that only a few minutes of communications are available each orbit. This operational scenario determines the need to have a satellite capable of performing the scheduled mission automatically and reacting autonomously to contingency situations. The implementation approach of the on-board operations management, through which the necessary automation and autonomy are achieved, follows a hierarchical structure. This has been achieved adopting a distributed avionic architecture. Nine different on-board computers, in fact, constitute the on-board data management system. Each of them performs the local control and monitors its own functions while the system level control is performed at a higher level by the data handling applications software. The SAX on-board architecture provides the ground operators with different options of intervention by three classes of telecommands. The management of the scientific operations will be scheduled by the operation control center via dedicated operating plans. The SAX satellite flight mode is presently being integrated at Alenia Spazio premises in Turin for a launch scheduled for the end of 1995. Once in orbit, the SAX satellite will be subject to intensive check-out activities in order to verify the required mission performances. An overview of the envisaged procedure and of the necessary on-ground activities is therefore depicted as well.

Martelli, Andrea↗