Search NASA⌕ Search

SEARCH · Search NASA

Results for “controller test bed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Pool-Based Tow System for Testing Tethered Hydrokinetic Devices Being Developed to Harvest Energy From Ocean Currents

Abstract The immense potential for ocean current energy harvesting is being actively explored as the push for renewable energy becomes more urgent. This paper demonstrates a tow testing platform built to examine and validate mathematical models related to the performance of tethered, underwater, hydrokinetic devices in development to harvest energy from ocean currents, and presents experimental results illustrating how such a system can be used. The platform has been modularly designed to allow for the testing of various tethered, underwater energy-generation systems, including kite-based systems, coaxial turbines, and duct sails. Previous research on tethered energy-generating systems has primarily been focused on airborne systems. Additionally, the limited experimental research on tethered, underwater energy-generation systems has relied on a rigid rod for mechanical and electrical connections between the test articles and instrumentation. The tow testing platform presented in this paper accomplishes the mechanical and electrical connection through a dual-function tether, featuring internal conductors and an external sheath to support towing loads. The goal of this platform was to enable the emulation of ocean currents, which are largely unidirectional, and to retrofit a regular pool into a cost-effective, adaptable, small-scale tow tank test bed. The capabilities of the system include two-way communication with tethered devices, multiple towing profiles in order to emulate different flow regimes, real-time control, and differential velocities via dual winch operation.

Engineering↗

INL WTB Overview Capabilities Future v14_040419

INL Wireless Test Bed Mission Provide highly-regarded cellular, wireless and communications technical expertise, systems and environment to enable: Test & Demonstrate full scale wireless systems and equipment With and without controlled interference Terrestrial, Subterranean and Airborne Demonstrate new & emerging wireless technologies Develop and Train to Tactics, Techniques and Procedures (TTPs) for wireless systems In a real world environment and configurations at real frequencies and real power levels to make informed decision State-of-the-Art INL WTB Assets and Capabilities Instrumentation: RF waveform analyzers, generators Protocol analyzers Noise generators for controlled interference Established Services & Processes: Spectrum approval & monitoring Safety, Medical, Fire, Security (physical) Resource management - personnel, networks, configuration control Secure, IP protected multi-user facility Broadband data access – entire INL Range Hardware prototyping, scientific labs Visitor – US citizen & foreign national

2G↗

Emissions mitigation technology for advanced water-lean solvent-based CO 2 capture processes

This technical final report submitted to DOE/NETL presents all the research activities performed during the entirety of DE-FE0031660 project-Emissions Mitigation Technology for Advanced Water-Lean Solvent-Based CO 2 Capture Processes which spans from October 2018 through March 2022. RTI International has been conducting studies from fundamental and operational aspects to reduce the overall amine emissions from the advanced Water-Lean Solvent (WLS) systems, specifically RTI’s Non-Aqueous Solvent (NAS). This technical final report will highlight the key findings from project which align closely to the project objectives which are: Identify the contribution of vapor loss, entrainment, and aerosols to the overall emissions of water-lean systems; Determine the significance of CO 2 capture system operating parameters to the amine emissions; Develop an emissions model based on critical operating parameters; Evaluate the effectiveness of emissions mitigation devices to reduce the amine emissions to <1 ppm under flue coal-fired flue gas; and, Determine the contribution of the ECTs to the overall CO 2 capture cost. The following are the key findings based on numerous tests using both lab-scale setups and parametric testing performed at RTI’s Bench-scale Gas Absorption System (BsGAS). During the BP1, the aerosol generation system and monitoring equipment were installed at BsGAS to produce and determine the aerosol characteristics during the NAS CO 2 capture process. The aerosol produced by this setup produced aerosols with the peak diameter and concentration of 50 micron and 1.2E10 7 cm -3 , respectively. These particle sizes and concentrations are matched to those observed in the actual coal-fired power plant flue gases and expected to be found at the absorber inlet of the CO 2 capture system. Over 1,300 hours of parametric testing have been conducted to evaluate the impact of the aerosols and operating conditions during the CO 2 capture with NAS on the overall amine emissions in the treated flue gas. At the worse condition tested, the presence of the aerosols in the flue gas could increase the overall emissions by 10X compared to the baseline emissions from NAS’s vapor pressure. CO 2 capture rate was found to be a main factor impacting the overall emissions as well as aerosol size and concentrations in the absorber off-gas. The higher CO 2 capture rate, the higher amine emissions in the treated gas. The temperature difference between the temperature bulge seen in the absorber and the water wash temperature also impacts the particle growth where the larger the temperature difference, the more amine emissions from aerosols in the treated gas. The majority of the aerosols did not grow substantially in the system, and the particle concentrations remained nearly constant between the absorber inlet and wash outlet. Only a small portion of the particles were found to grow significantly. The high efficiency demister with mesh size of 5-10 micron can be installed to remove a portion of the aerosols from the gas stream leaving the water wash. Overall, these results from parametric testing have established the emission baseline and validate our assumption on the need of emission control technologies (ECT) in order to minimize the emissions from the baseline NAS CO 2 capture process. Over 2,000 of BsGAS operating hours was used to investigate a handful of process improvements which led to a selection of the vital few changes that effectively control the amine emissions. These process improvements are lime-coated-filters for absorber gas inlet, advanced demister at the top of the absorber, a second water wash with amine recovery unit were designed, installed, and tested at BsGAS at the end of BP1. The result showed that the NAS CO 2 capture process with these additional emission control devices could lower the amine emission in the treated gas to about 1 ppm using a simulated coal-fire flue gas stream. The main contributor in lowering the amine emission came from the second water wash with amine recovery unit where the amine concentration in the scrubbing water was kept below 2 wt% through a continuous amine removal via an adsorbent bed, resulting in a low amine vapor pressure. The adsorbent bed was regenerated via a direct steam regeneration and the recover amine was returned to the absorber to minimize wastewater and makeup amine. A flue gas generation system was designed and installed during the first half of BP2 to support the emission testing using a real coal-derived flue gas. The system is capable of generating both coal- and natural gas- derived flue gases with the composition of the gaseous species highly resemble to that of the power plant flue gases. The particulates detected in the coal-derived flue gas showed the mean diameter of 1 micron. The CO 2 capture operating was then proceed using the real coal-derived flue gas where the amine emission was controlled to be about 0-3 ppm for the total run time of about 200 hours. Similar testing was conducted with natural gas-derived flue gas and the result showed a highly amine emission of 30 ppm under the total run time of 200 hours. The Principal Component Analysis (PCA) and the Partial Least Squares Projection to Latent Structures (PLS) techniques were applied to the parametric testing data to derive a multivariate statistical model. The model was validated and trained with half of the data collected, and the predictive ability of the model was evaluated using the remaining half of the data. The resulting empirical model was capable of predicting the overall emissions from the NAS process without the ECTs with ±15% accuracy (average absolute deviation, AAD) in BP1. As more emission data were obtained under the real coal-flue gas in the BP2, the model incorporated these new set of data to reflect the final process configuration, operating parameters, and amine emission. This results in the updated empirical model predicting the amine emission from the NAS CO 2 capture process with 84% goodness-of-fit (R 2 ), 85% predictability (Q 2 ), and 15% AAD. The study evaluates the use of RTI’s Non-Aqueous Solvent technology for 90% CO 2 capture from a net 650 MWe pulverized coal power plant, downstream of the flue-gas desulfurization unit. The captured CO 2 has a purity of > 95% CO 2 , and is dried, compressed to 15.3 MPa (2,215 psia), ready for sequestration. The analysis uses Case B12B from the DOE Baseline study on Bituminous Coal, Revision 4 where the Cansolv CO 2 capture plant is replaced by the RTI CO 2 Capture plant. The CO 2 capture plant has been sized to capture >90% CO 2 from flue gas derived from a net 650 MWe supercritical pulverized coal power plant. The CO 2 capture plant is equipped with emission control technologies that limits the amine emissions to < 1 ppm. Two different cases were evaluated for the technoeconomic study. The key difference between the two cases is the regenerator pressure. In Case 1, the regenerator operates at 0.195 MPa (28.3 psia), whereas in Case 2, the regenerator pressure is 0.44 MPa (64 psia) thus removing the need for the first stage of compression of the eight-stage compression train. Results from the TEA are compared against the DOE reference cases for SCPC plant with and without CO 2 Capture (Case B12A and Case B12B of the DOE Baseline study, respectively). Case 2 with CO 2 regeneration at higher pressure results in the lower cost of CO 2 capture. The total capital cost of the capture process has been estimated using 2018 dollars in Aspen Process Economic Analyzer and was estimated to be $579 MM. The capture plant operation leads to a total parasitic power loss rate of 96 MWe, resulting in a decrease in pulverized coal power plant efficiency of 7.8% points. The resulting cost of electric power increases from 64.4 mills/kWh, for no capture, to 97.5 mills/kWh, with 90% capture, an increase of 51% in the COE. The cost of capturing 90% CO 2 was estimated to be $38.2/tonne-CO 2 , and meets the DOE target of $40/t-CO 2 . Emission control technologies (ECT) investigated in this project includes a second water wash with use of activated carbon beds for removal of amine from the wash water prior to recirculation in the water wash. These ECT allow operation of the CO 2 capture plant with < 1 ppm amine emissions with the treated flue gas and contributes to $2.4/t-CO 2 captured. Amine emissions derived from thermal and oxidative degradations were investigated under this project along with the emissions derived from aerosols for the NAS system. The thermally degraded of the lean NAS showed less than 4% decreased of the original total amine content in the NAS at 150 °C while the result obtained at 120 °C showed no drop in total amine content, suggesting that thermal degradation of the NAS is minimal. These results also suggested that the thermally degraded species are not likely formed and contributed to the emissions due to the low regeneration temperature of the NAS at 90-105 °C. The oxidative degradation, on the other hand, could become problematic as some of these oxidative degraded species were observed during the NAS-5 testing at National Carbon Capture Center (NCCC) and SINTEF in our previous project. The rapid screening of selected inhibitors suggested that oxidative degradation of NAS can be suppressed using thiol containing compounds in amounts of at least 1 mol%. The detailed mechanistic degradation pathway was conceived for a specific amine used in NAS formulation during BP2. he reduction of the nitrosamines caused by the NO x present in the flue gas was also examined. The study suggested that the thermo-chemical treatment of the NAS solvent would be a more effective and economically viable compared to removing NO x at the DCC.

01 COAL, LIGNITE, AND PEAT↗

Grid Application and Controls Development for Medium-Voltage SiC-Based Grid Interconnects

This paper studies, the grid-interconnection requirements of directly connected medium-voltage (MV) Silicon Carbide-based (SiC-based) converters and details the necessary control implementations. These power electronic converters follow the interconnection standard IEEE 1547-2018, but can also have additional controls supported by the microgrid standards in IEEE 2030.7, which is demonstrated in this work. Additionally, this paper defines the grid applications realized by these directly connected medium-voltage power electronic converters at the distribution scale and demonstrates results. The controls for the studied grid applications are then developed and implemented on the controller. The paper also includes details of the control algorithm development and validations of the control algorithm through hardware-in-the-loop results.

28 EE - Advanced Manufacturing Office (EE-5A)↗

SR19007 - Future TCAP Implementation Issues

This project demonstrates the success of the PDRD program in bringing a concept from the R&D phase to direct plant funding. Although Mini-TCAP technology is overall at a TRL of ~6.5, the specific questions addressed in this project were brought from a low (2-3 TRL) to a TRL 5 over the course of the project. This project successfully completed all initial goals ahead of schedule (inventory control, guard bed, ammonia impact, and cycle time) and furthermore addressed additional scope (continued TCAP evaluation, ion chamber) in FY20. First, this project resolved minor inventory control issues by introducing a new parameter tracking and correcting for inventory changes over multiple cycles. This project also involved modification of the previously constructed plant-configured Mini-TCAP in order to allow ammonia impurity studies. TCAP was tested with ammonia in the feed stream both with and without a guard bed present to determine guard bed efficacy and the effect of ammonia if it enters TCAP. The TCAP columns were then replaced with brazed columns, where the LN2 cooling coil is brazed to the column and the column is self-brazed along the coils. This drastically improved heat transfer and consequently reduced cycle time compared to the previous columns, in which the coils were mechanically held in place. Finally, additional scopes were taken on in FY20, including evaluation of TCAP with faster cycle time and procurement of ion chambers for future TCAP integration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Column Experimental Test Bed for Xe/Kr Separation

Previous research studies have shown that INL-developed engineered form sorbents are capable of capturing both Kr and Xe from various composite gas streams. The previous experimental test bed provided single column testing for capacity evaluations over a broad temperature range. To advance research capabilities, the employment of an additional column to study selective capture of target species to provide a defined final gas composition for waste storage was warranted. The second column addition also allows for compositional analyses of the final gas product to provide for final storage determinations. The INL krypton capture system was modified by adding an additional adsorption column in order to create a multi-column test bed. The purpose of this modification was to investigate the separation of xenon from krypton supplied as a mixed gas feed. The extra column was placed in a Stirling Ultra-low Temperature Cooler, capable of controlling temperatures between 190 and 253K. Additional piping and valves were incorporated into the system to allow for a variety of flow path configurations. The new column was filled with the AgZ-PAN sorbent which was utilized as the capture medium for xenon while allowing the krypton to pass through. The xenon-free gas stream was then routed to the cryostat filled with the HZ-PAN sorbent to capture the krypton at 191K. Selectivities of xenon over krypton were determined using the new column to verify the system performance and to establish the operating conditions required for multi-column testing. Results of these evaluations verified that the system was operating as designed and also demonstrated that AgZ-PAN exhibits excellent selectivity for xenon over krypton in air at or near room temperature. Two separation tests were performed utilizing a feed gas consisting of 1000 ppmv xenon and 150 ppmv krypton with the balance being made up of air. The AgZ-PAN temperature was held at 295 or 253K while the HZ-PAN was held at 191K for both tests. The effluent from the AgZ-PAN column was monitored via GC-TCD during the tests with no xenon being observed exiting the column during either test. Samples from each column were taken via evacuated sample bombs and were analyzed by GC-MS analysis. The results demonstrated the ability to separate xenon from krypton from a mixed gas feed utilizing the new multi-column system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, Revision 0 with ROTC 1

Corrective Action Unit 560 comprises seven corrective action sites (CASs): •03-51-01, Leach Pit •06-04-02, Septic Tank •06-05-03, Leach Pit •06-05-04, Leach Bed •06-59-03, Building CP-400 Septic System •06-59-04, Office Trailer Complex Sewage Pond •06-59-05, Control Point Septic System The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 560 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from October 7, 2008, through February 24, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, and Record of Technical Change No. 1. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: •Determine whether contaminants of concern (COCs) are present. •If COCs are present, determine their nature and extent. •Provide sufficient information and data to complete appropriate corrective actions. The CAU 560 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: •No contamination exceeding the FALs was identified at CASs 03-51-01, 06-04-02, and 06-59-04. •The soil at the base of the leach pit chamber at CAS 06-05-03 contains arsenic above the FAL of 23 milligrams per kilogram (mg/kg) and polychlorinated biphenyl (PCBs) above the FAL of 0.74 mg/kg, confined vertically from a depth of approximately 5 to 20 feet (ft) below ground surface. The contamination is confined laterally to the walls of the leach pit chamber and leach rock. The contamination present at CAS 06-05-03 within the leach pit was not feasible to remove. •The surface and subsurface soils within and surrounding the septic system at CAS 06-05-04 contained PCB concentrations above the FAL of 0.74 mg/kg. The lateral and vertical extent of COCs was determined for this CAS. Contaminated soils were removed up to within 18 ft of the building. The remaining contamination is confined to subsurface soils adjacent to and beneath Building CP-162 and was not feasible to remove. •The solid materials within the septic tank and soils immediately surrounding the inlet end of the tank at CAS 06-59-03 contained benzo(a)pyrene above the FAL of 0.21 mg/kg. The soils, tank contents, and tank were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. •The solids contained within the septic tank and inlet pipe at CAS 06-59-05 contained the following contaminants above their respective FALs: PCBs, arsenic, lead, benzo(a)pyrene, and pesticides. The tank and inlet pipe contents were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following corrective action recommendations: •No further action for CASs 03-51-01, 06-04-02, and 06-59-04, as no contaminants of potential concern were present that exceed FALs. •Closure in place for CAS 06-05-03 under a corrective action with a use restriction (UR) for remaining PCB- and arsenic-impacted potential source material (PSM). The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and NNSA/NSO CAU/CAS files. •Closure in place for CAS 06-05-04 under a corrective action with a UR for remaining PCBs in soil adjacent to and beneath Building CP-162. The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and NNSA/NSO CAU/CAS files. •No further action for CAS 06-59-03, as the COC of benzo(a)pyrene in soil and PSM have been removed. •No further action for CAS 06-59-05, as the COCs in PSM within the septic tank and inlet piping have been removed and the tank was filled with concrete.

54 ENVIRONMENTAL SCIENCES↗

High performance anode for advanced Li batteries

The overall objective of this Phase I SBIR effort was to advance the manufacturing technology for ASI’s Si-CNF high-performance anode by creating a framework for large volume production and utilization of low-cost Si-coated carbon nanofibers (Si-CNF) for the battery industry. This project explores the use of nano-structured silicon which is deposited on a nano-scale carbon filament to achieve the benefits of high cycle life and high charge capacity without the consequent fading of, or failure in the capacity resulting from stress-induced fracturing of the Si particles and de-coupling from the electrode. ASI’s patented coating process distinguishes itself from others, in that it is highly reproducible, readily scalable and results in a Si-CNF composite structure containing 25-30% silicon, with a compositionally graded interface at the Si-CNF interface that significantly improve cycling stability and enhances adhesion of silicon to the carbon fiber support. In Phase I, the team demonstrated the production of the Si-CNF anode material can successfully be transitioned from a static bench-scale reactor into a fluidized bed reactor. In addition, ASI made significant progress in the development of low cost, quick testing methods which can be performed on silicon coated CNFs as a means of quality control. To date, weight change, density, and cycling performance were the key metrics used to validate the high performance anode material. Under this effort, ASI made strides to establish a quality control protocol for the large volume production of Si-CNFs and has identified several key technical thrusts for future work. Using the results of this Phase I effort as a foundation, ASI has defined a path forward to commercialize and deliver high volume and low-cost production of SI-CNF material for anodes in Li-ion batteries.

25 ENERGY STORAGE↗

Organic Iodine Capture from Vessel Off-gas

The Department of Energy (DOE) Nuclear Fuel Cycle and Supply Chain Program Material Recovery and Waste Form Development (MRWFD) Campaign Off-gas Sigma Team has performed research and development on iodine control and iodine waste forms for the past several years. This research and development has included iodine adsorption tests using a laboratory-scale test system containing multiple-segmented fixed beds of iodine adsorbents. Iodine capture performance has been tested using non-radioactive synthetic gas mixtures blended from air, nitrogen, NO, NO2, water, and the target iodine compounds diatomic iodine (I2), representing likely inorganic iodides, and methyl iodide (iodomethane, CH3I) and 1-iodobutane (butyl iodide) a surrogates for potential organic iodides, that could exist in dissolver off-gas (DOG) and vessel off-gas (VOG) streams from used nuclear fuel aqueous reprocessing.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

COR-0011 Rev 6 MARVEL Project Code of Record

This Code of Record identifies the codes, standards, and procedures necessary to design, develop, construct, and startup the Microreactor Applications Research Validation and Evaluation (MARVEL) Project at the Materials and Fuel Complex (MFC) Transient Reactor Test (TREAT) Facility and the Idaho National Laboratory (INL). The MARVEL Project is an INL test microreactor funded by the United States Department of Energy (DOE) via the Microreactor Program (MRP). The goal of the project is to establish an operational nuclear applications test bed that can generate combined heat and power to enable integration and R&D with end-user technologies, as well as allow microreactor technologists to test next-generation control systems. The microreactor is a thermal reactor utilizing Uranium Zirconium Hydride (UZrH) fuel with review and authorization by the Department of Energy Idaho Operations Office (DOE-ID) for National Environmental Policy Act (NEPA) compliance, safety review, and supplemental readiness assessments for startup and operation. To enable rapid deployment, the MARVEL reactor will reside in the Transient Reactor Test (TREAT) Facility and utilize the existing operating Category B reactor facility, approved facility safety basis, operating crews, and recent re-start experience.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

An investigation into the effects of cyclic strain rate on the high cycle and very high cycle fatigue behaviors of wrought and additively manufactured Inconel 718

Additive Manufacturing (AM) has increasingly been used to fabricate parts in aerospace applications, which may require service lives beyond ten-million cycles due to the imposed high loading frequencies. Understanding the very high cycle fatigue (VHCF) behavior of these additive manufactured (AM) parts is an important step towards their design and qualification processes. This study focuses on the high cycle fatigue (HCF) and VHCF behaviors of both wrought and laser beam-powder bed fusion (LB-PBF) fabricated Inconel 718 in machined/polished surface condition, emphasizing on the influence of test frequency (i.e., cyclic strain rate). Uniaxial, fully-reversed force- and stress-controlled fatigue tests were conducted utilizing a servo-hydraulic and an ultrasonic test system operating at 5 Hz and 20 kHz, respectively, on wrought as well as LB-PBF vertically and diagonally built specimens. Fatigue cracks in the majority of the specimens were found to initiate from intra-granular slip bands near or at the surface, which gives rise to strong anisotropy in fatigue resistance in LB-PBF specimens due to the presence of columnar grains along the build directions. Longer fatigue lives were obtained at 20 kHz, which was ascribed to possibly lower-than-intended stresses applied in the ultrasonic tests. The corrected stress-life fatigue data at 20 kHz were found to converge to the one obtained from conventional testing at 5 Hz, implying no effect of cyclic strain rate on the fatigue behavior of Inconel 718 regardless of the fabrication process. The findings of this work confirm the use of ultrasonic fatigue testing to expedite generation of AM materials data to keep up with the current demand; however, the applied stress may need to be corrected.

36 MATERIALS SCIENCE↗

Propagation of light in serially coupled plasmonic nanowire dimer: Geometry dependence and polarization control

We experimentally studied plasmon-polariton-assisted light propagation in serially coupled silver nanowire (Ag-NW) dimers and probed their dependence on bending-angle between the nanowires and polarization of incident light. From the angle-dependence study, we observed that obtuse angles between the nanowires resulted in better transmission than acute angles. From the polarization studies, we inferred that light emission from junction and distal ends of Ag-NW dimers can be systematically controlled. Further, we applied this property to show light routing and polarization beam splitting in obtuse-angled Ag-NW dimer. The studied geometry can be an excellent test-bed for plasmonic circuitry.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Subtask 5.3 - Water and Energy Sustainability and Technology

The overall goal of this Energy & Environmental Research Center project was to evaluate water capture technologies in a carbon capture and sequestration system and perform a complete systems analysis of the process to determine potential water minimization opportunities within the entire system. To achieve that goal, a pilot-scale liquid desiccant dehumidification system (LDDS) was fabricated and tested in conjunction with a coal-fired combustion test furnace outfitted with CO{sub 2} mitigation technologies, including the options of oxy-fired operation and postcombustion CO{sub 2} capture using an amine scrubber. The process gas stream for these tests was a coal-derived flue gas that had undergone conventional pollutant control (particulates, SO{sub 2}) and CO{sub 2} capture with an amine-based scrubber. The water balance data from the pilot-scale tests show that the packed-bed absorber design was very effective at capturing moisture down to levels that approach equilibrium conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources: Preprint

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS—based on real-time optimal power flow—controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

61 RADIATION PROTECTION AND DOSIMETRY↗

Verification of the Accountability Method as a Means to Classify Radioactive Wastes Processed Using THOR Fluidized Bed Steam Reforming at the Studsvik Processing Facility in Erwin, Tennessee, USA - 13087

Studsviks' Processing Facility Erwin (SPFE) has been treating Low-Level Radioactive Waste using its patented THOR process for over 13 years. Studsvik has been mixing and processing wastes of the same waste classification but different chemical and isotopic characteristics for the full extent of this period as a general matter of operations. Studsvik utilizes the accountability method to track the movement of radionuclides from acceptance of waste, through processing, and finally in the classification of waste for disposal. Recently the NRC has proposed to revise the 1995 Branch Technical Position on Concentration Averaging and Encapsulation (1995 BTP on CA) with additional clarification (draft BTP on CA). The draft BTP on CA has paved the way for large scale blending of higher activity and lower activity waste to produce a single waste for the purpose of classification. With the onset of blending in the waste treatment industry, there is concern from the public and state regulators as to the robustness of the accountability method and the ability of processors to prevent the inclusion of hot spots in waste. To address these concerns and verify the accountability method as applied by the SPFE, as well as the SPFE's ability to control waste package classification, testing of actual waste packages was performed. Testing consisted of a comprehensive dose rate survey of a container of processed waste. Separately, the waste package was modeled chemically and radiologically. Comparing the observed and theoretical data demonstrated that actual dose rates were lower than, but consistent with, modeled dose rates. Moreover, the distribution of radioactivity confirms that the SPFE can produce a radiologically homogeneous waste form. The results of the study demonstrate: 1) the accountability method as applied by the SPFE is valid and produces expected results; 2) the SPFE can produce a radiologically homogeneous waste; and 3) the SPFE can effectively control the waste package classification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular Energy Storage System for Alternative Energy Vehicles

An electrical vehicle environment was established to promote research and technology development in the area of high power energy management. The project incorporates a topology that permits parallel development of an alternative energy delivery system and an energy storage system. The objective of the project is to develop technologies, specifically power electronics, energy storage electronics and controls that provide efficient and effective energy management between electrically powered devices in alternative energy vehicles plugin electric vehicles, hybrid vehicles, range extended vehicles, and hydrogen-based fuel cell vehicles. In order to meet the project objectives, the Vehicle Energy Management System (VEMS) was defined and subsystem requirements were obtained. Afterwards, power electronics, energy storage electronics and controls were designed. Finally, these subsystems were built, tested individually, and integrated into an electric vehicle system to evaluate and optimize the subsystems performance. Phase 1 of the program established the fundamental test bed to support development of an electrical environment ideal for fuel cell application and the mitigation of many shortcomings of current fuel cell technology. Phase 2, continued development from Phase 1, focusing on implementing subsystem requirements, design and construction of the energy management subsystem, and the integration of this subsystem into the surrogate electric vehicle. Phase 2 also required the development of an Alternative Energy System (AES) capable of emulating electrical characteristics of fuel cells, battery, gen set, etc. Under the scope of the project, a boost converter that couples the alternate energy delivery system to the energy storage system was developed, constructed and tested. Modeling tools were utilized during the design process to optimize both component and system design. This model driven design process enabled an iterative process to track and evaluate the impact of design alternatives and the impact of changes. Refinement of models was accomplished through correlation studies to measured data obtained from functioning hardware. Specifically, correlation and characterization of the boost converter resulted in a model that was effectively used to determine overall VEMS performance. The successful development of the boost converter can be attributed to utilization of previously proven technologies and adapting to meet the VEMS requirements. This program provided significant improvement in development time of various generations of boost converters. The software strategies and testing results support the development of current energy management systems and directly contribute to the future of similar, commercial products at Magna E-Car Systems. Because of this development project, Magna E-Car Systems is able to offer automotive customers a boost converter system with reduced time to market and decreased product cost, thus transferring the cost and timing benefits to the end use consumer.

25 ENERGY STORAGE↗

Managing Risks via Small/Pilot Scale Testing for INL's Integrated Waste Treatment Unit (IWTU) - 19268

In 2005, the THOR steam reforming fluidized-bed reactor (FBR) technology was selected by the U.S. Department of Energy (DOE) as the technology of choice for treatment of sodium- bearing waste (SBW) at the INL. The basis of the process was to use fluidized bed technology to convert an acidic radioactive nitrate-rich liquid waste into a solid carbonate product suitable for long-term disposal and storage. During initial commissioning, as well as subsequent start-ups, the plant faced many operational challenges, such as stagnant/de-fluidized bed, and wall-scale formation. Such operational issues prompted the original contractor to seek expertise in pilot-scale testing, thereby reaching out to Hazen Research Inc. (HRI, Golden, Co). Several tests were conducted, but the results did not seem to address the underlying issues observed in the full-scale plant, as evidenced by continued operational issues. A systematic approach was then taken by the Fluor-Idaho team (new contractor as of June 2016) with respect to solving these technical issues. First, two different bench-scale, 2-inch fluidized bed reactors (stainless-steal and quartz), were utilized to test several theories to better understand the underlying chemical reactions that may be taking place under expected normal operating conditions. Then, the team designed and built an 18-inch FBR unit, mimicking the full-scale main vessel at IWTU - Denitration Mineralization Reformer (DMR). This was used to test various aspects of operational challenges observed at IWTU, namely particle size control, wall-scale growth-rate control, long-term operational stability, process optimization, and process off- gas filtration challenges. An example of information obtained from bench-scale testing, which was then tested during pilot-scale testing, was the phenomena that an addition of 5 vol % of CO{sub 2} gas into the fluidizing gas system nearly eliminated the formation of agglomerates that had typically led to bed de-fluidization. This change proved to be correct in both the pilot and full-scale testing and will be implemented as part of a long-term operational strategy of IWTU. Several other findings that have provided answers with respect to IWTU operational issues will be discussed in this report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗