Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost trade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Optimization of direct air capture processes using reactive transport models of adsorption-desorption cycles

In this study, we develop and implement a reactive transport model in COMSOL Multiphysics® to address the challenges of direct air carbon capture. The model is validated against experimental data and used to simulate the cyclic steady state of the adsorption-desorption process. The optimization of this model is achieved through advanced trust-region methods integrated with Gaussian Processes. Key decision variables, including adsorption and desorption times, desorption temperature and pressure, input velocity, bed porosity, column length, and radius were optimized to minimize the capture cost. After optimization, a sensitivity analysis revealed the complex interplay between the decision variables and their effect on the specific energy and cost of removing the CO 2 . We optimized the capture cost while taking into account the trade-off between energy consumption and productivity. The resulting minimum capture cost was determined to be 265.2 $/t-CO 2 , which aligns with expected values reported in the literature. Numerical results suggest the effectiveness of the optimization strategies applied, and underscore the importance of simultaneous decision variable selection in improving the performance in direct air capture processes. We also extend the modeling approach to a 2D axisymmetric model to better visualize CO₂ uptake and temperature profiles, revealing significant radial gradients during the regeneration step. As a main drawback, this enhanced model comes with a computational cost approximately 40 times higher than that of the 1D model.

Adsorption-desorption process↗

Results of NASA/NOAA HES Trade Studies

This slide presentation reviews the trade studies that were done for the Hyperspectral Environmental Suite (HES). The goal of the trade studies was to minimize instrument cost and risk while producing scientifically useful products. Three vendors were selected to perform the trade study, and were to conduct 11 studies, with the first study a complete wish list of things that scientists would like from GEO orbit to the 11th study which was for a Reduced Accommodation Sounder (RAS) which would still result in useful scientific products, within constrains compatible with flight on GEOS-R. The RAS's from each vendor and one other HES sounders designs are reviewed.

Susskind, Joel↗

Alternative Perspectives on Risk

The goal of the commercial air transport system is to provide air transportation to the flying public at an acceptable cost with minimal risk. in an ideal situation these three goals would support each other. In fact, it is sometimes the case that the goals conflict: getting passengers to their destinations on time may conflict with fixing a minor mechanical malfunction that may or may not impact safety; flying a route that will avoid turbulence, thereby providing passengers with a more comfortable ride, may consume more fuel; managing traffic density may mean aircraft are delayed or must use an approach that will result in a long taxi to their gates, costing time and fuel. Various players in the system--pilots, dispatchers, controllers, as well as managers in the airline carriers and traffic management system--make decisions every day that involve trade-offs of benefits and costs. The prospect of revisions in the air traffic management system, with shifts in responsibilities from controllers to users, including airline operations center personnel and pilots, means that individuals may be performing either new jobs or old jobs under new guidance. It will be essential to know how the various players (a) perceive the risks and benefits associated with the decisions they will make under the old and new control structures, and (b) how much risk they are willing to accept in making decisions. Risk is here defined as the probability and magnitude of negative events (after Slovic, 1987). Of primary interest are risks associated with traffic, weather, and operational factors such as schedule, fuel consumption, and passenger service. Previous research has documented differences between groups in perceptions of risks associated with both everyday and aviation related situations. Risk perception varies as a function of familiarity with the situation, degree to which one is potentially affected by the risk, the level of control one has over the situation, and one's level of experience and responsibility in the situation. In our presentation we will consider several factors that may influence differences in risk perception, risk tolerance and risk management among the three major categories of participants in the aviation system (pilots, dispatchers, and controllers). Primary factors that may affect risk attitudes (the collective term we will use for the three components of risk) include: expertise or job-specific knowledge or training, personal involvement or vulnerability to consequences, goals, time horizon (imminence of consequences), span of control and type of control, and information or technology support. These will be considered in the context of five different types of risk (physical threat, economic, social, legal, and ethical). A study designed to study differences between pilots and controllers in their perceptions and responses to traffic risks under the present and a user-preferred control situation will be described. Future studies involving dispatchers' risk perceptions regarding various types of risk will be discussed.

Davison, Jeannie↗

A study of system requirements for Phobos/Deimos missions. Volume 4: Phase 3 results, combined missions to Mars and its satellites

Combined missions to Mars and Phobos/Deimos were considered in relation to large scientific returns at a low total cost. A matrix of all feasible major combined mission concepts was compiled. The most promising approach was selected from which a nominal mission profile was developed. A systems analysis was performed to trade off performance, configuration, and cost characteristics of candidate mission concepts. Configuration and subsystem optimization analysis were then conducted from which a baseline and an alternate program were selected. Program schedules and cost estimates were prepared for the recommended and alternate program.

Source record↗

Simplifying silicon burning: Application of quasi-equilibrium to (alpha) network nucleosynthesis

While the need for accurate calculation of nucleosynthesis and the resulting rate of thermonuclear energy release within hydrodynamic models of stars and supernovae is clear, the computational expense of these nucleosynthesis calculations often force a compromise in accuracy to reduce the computational cost. To redress this trade-off of accuracy for speed, the authors present an improved nuclear network which takes advantage of quasi- equilibrium in order to reduce the number of independent nuclei, and hence the computational cost of nucleosynthesis, without significant reduction in accuracy. In this paper they will discuss the first application of this method, the further reduction in size of the minimal alpha network. The resultant QSE- reduced alpha network is twice as fast as the conventional alpha network it replaces and requires the tracking of half as many abundance variables, while accurately estimating the rate of energy generation. Such reduction in cost is particularly necessary for future generation of multi-dimensional models for supernovae.

Hix, W. R.↗

Space biology initiative program definition review. Trade study 5: Modification of existing hardware (COTS) versus new hardware build cost analysis

The JSC Life Sciences Project Division has been directly supporting NASA Headquarters, Life Sciences Division, in the preparation of data from JSC and ARC to assist in defining the Space Biology Initiative (SBI). GE Government Services and Horizon Aerospace have provided contract support for the development and integration of review data, reports, presentations, and detailed supporting data. An SBI Definition (Non-Advocate) Review at NASA Headquarters, Code B, has been scheduled for the June-July 1989 time period. In a previous NASA Headquarters review, NASA determined that additional supporting data would be beneficial to determine the potential advantages in modifying commercial off-the-shelf (COTS) hardware for some SBI hardware items. In order to meet the demands of program implementation planning with the definition review in late spring of 1989, the definition trade study analysis must be adjusted in scope and schedule to be complete for the SBI Definition (Non-Advocate) Review. The relative costs of modifying existing commercial off-the-shelf (COTS) hardware is compared to fabricating new hardware. An historical basis for new build versus modifying COTS to meet current NMI specifications for manned space flight hardware is surveyed and identified. Selected SBI hardware are identified as potential candidates for off-the-shelf modification and statistical estimates on the relative cost of modifying COTS versus new build are provided.

Jackson, L. Neal↗

Mission Overview and Status IGARSS Conference

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Scheduled for launch in January 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records [1]. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s, building on the exceptional heritages of the Sea-Viewing Wide Field-of-View Sensor (SeaWiFS), the Moderate Resolution Imaging Spectroradiometer (MODIS), the Multi-angle Imaging SpectroRadiometer (MISR), and the Visible Infrared Imaging Radiometer Suite (VIIRS). The PACE project office at NASA’s GSFC is responsible for the satellite development, launch and operations. The NASA Headquarters PACE Program Science office is responsible for supporting the science data processing system and assembling competed community science teams, which will include field-based vicarious calibration and data product validation efforts to support the PACE Project Science team. The mission is planned for launch into a Sun synchronous polar orbit at 676.5 km with an inclination of 98 degrees and a 1 pm local ascending node crossing time. The PACE observatory is comprised of three instruments, an Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone). The OCI is the primary instrument on the observatory and is being developed at Goddard Space Flight Center (GSFC). The OCI is a hyperspectral scanning radiometer designed to measure spectral radiances from the ultraviolet to shortwave infrared (SWIR) to enable advanced ocean color and heritage cloud and atmospheric aerosol science [2]. The HARP2 and SPEXone are complimentary instruments on the PACE observatory, acquired outside of GSFC. The HARP2 is multi-spectral, wide swath (supporting atmospheric correction of OCI), and hyper-angular, with capabilities for cloud science that exceed what is capable from OCI alone. The SPEXone is narrow swath, multi-angular, and hyperspectral, with capabilities for atmospheric aerosol science that exceed what can be accomplished with OCI. NASA Headquarters directed the mission development to be guided by a Design-to-Cost (DTC) process. All elements of the mission, other than the cost, are in the DTC trade space. At the heart of the DTC process are the mission studies, performed across all the mission elements. The mission studies were used to define appropriate approaches within and across elements while maximizing science capabilities at a high cost confidence. Mission baseline requirements development is also embedded within the DTC process, as these requirements were not established at the onset of the mission concept development. Baseline mission requirements are a product of the mission studies and are defined by the project office as part of the DTC process. At the time of this writing, OCI, HARP2 and SPEXone are integrated onto the PACE spacecraft, creating the PACE observatory. The instruments and spacecraft subsystems are undergoing combined functional performance testing in preparation for observatory-level environmental testing prior to shipment to the launch site. Here, we will provide an update on science capabilities and observatory readiness for its early 2024 launch.

remote sensing↗

Team X Report #1401: Exoplanet Coronagraph STDT Study 2013-06

This document is intended to stimulate discussion of the topic described. All technical and cost analyses are preliminary. This document is not a commitment to work, but is a precursor to a formal proposal if it generates sufficient mutual interest. The data contained in this document may not be modified in any way. Cost estimates described or summarized in this document were generated as part of a preliminary, first-order cost class identification as part of an early trade space study, are based on JPL-internal parametric cost modeling, assume a JPL in-house build, and do not constitute a commitment on the part of JPL or Caltech. JPL and Team X add cost reserves for development and operations. Unadjusted estimate totals and cost reserve allocations would be revised as needed in future more-detailed studies as appropriate for the specific cost-risks for a given mission concept.

cost estimating↗

Optimality study of a gust alleviation system for light wing-loading STOL aircraft

An analytical study was made of an optimal gust alleviation system that employs a vertical gust sensor mounted forward of an aircraft's center of gravity. Frequency domain optimization techniques were employed to synthesize the optimal filters that process the corrective signals to the flaps and elevator actuators. Special attention was given to evaluating the effectiveness of lead time, that is, the time by which relative wind sensor information should lead the actual encounter of the gust. The resulting filter is expressed as an implicit function of the prescribed control cost. A numerical example for a light wing loading STOL aircraft is included in which the optimal trade-off between performance and control cost is systematically studied.

Komoda, M.↗

The P-Mesh: A Commodity-based Scalable Network Architecture for Clusters

We designed a new network architecture, the P-Mesh which combines the scalability and fault resilience of a torus with the performance of a switch. We compare the scalability, performance, and cost of the hub, switch, torus, tree, and P-Mesh architectures. The latter three are capable of scaling to thousands of nodes, however, the torus has severe performance limitations with that many processors. The tree and P-Mesh have similar latency, bandwidth, and bisection bandwidth, but the P-Mesh outperforms the switch architecture (a lower bound for tree performance) on 16-node NAB Parallel Benchmark tests by up to 23%, and costs 40% less. Further, the P-Mesh has better fault resilience characteristics. The P-Mesh architecture trades increased management overhead for lower cost, and is a good bridging technology while the price of tree uplinks is expensive.

Nitzberg, Bill↗

Metrics for in-space telescope assembly techniques

Reliable metrics are not yet available for choosing among human and robotic assets for space-based construction and servicing of large space telescopes. Using FAIR-DART as a reference design, we generated example event sequences for telescope assembly scenarios in enough detail to identify infrastructure assumptions and technology requirements. A systems trade among human and robotic techniques (human EVA, on-site telerobotic, ground-in-the- loop robotic, commanded or sequenced robotic, and autonomous/decision-making robotic) helped us to define key metrics in the human-robotic trade space, including quality, time, cost, and risk. Our methodology included examining representative end-member scenarios. Case A treated each step in the assembly sequence as if all other steps have no on-site human involvement, and Case B treated each step as if human EVA is already involved in all other steps. With this trade, we identified key enabling technologies and infrastructure for space-based assembly and servicing of large space telescopes.

space telescopes human and robotic in-space assemb↗

Automation for Air Traffic Control: The Rise of a New Discipline

The current debate over the concept of Free Flight has renewed interest in automated conflict detection and resolution in the enroute airspace. An essential requirement for effective conflict detection is accurate prediction of trajectories. Trajectory prediction is, however, an inexact process which accumulates errors that grow in proportion to the length of the prediction time interval. Using a model of prediction errors for the trajectory predictor incorporated in the Center-TRACON Automation System (CTAS), a computationally fast algorithm for computing conflict probability has been derived. Furthermore, a method of conflict resolution has been formulated that minimizes the average cost of resolution, when cost is defined as the increment in airline operating costs incurred in flying the resolution maneuver. The method optimizes the trade off between early resolution at lower maneuver costs but higher prediction error on the one hand and late resolution with higher maneuver costs but lower prediction errors on the other. The method determines both the time to initiate the resolution maneuver as well as the characteristics of the resolution trajectory so as to minimize the cost of the resolution. Several computational examples relevant to the design of a conflict probe that can support user-preferred trajectories in the enroute airspace will be presented.

Erzberger, Heinz↗

Large-scale V/STOL testing

Several facets of large-scale testing of V/STOL aircraft configurations are discussed with particular emphasis on test experience in the Ames 40- by 80-foot wind tunnel. Examples of powered-lift test programs are presented in order to illustrate tradeoffs confronting the planner of V/STOL test programs. It is indicated that large-scale V/STOL wind-tunnel testing can sometimes compete with small-scale testing in the effort required (overall test time) and program costs because of the possibility of conducting a number of different tests with a single large-scale model where several small-scale models would be required. The benefits of both high- and full-scale Reynolds numbers, more detailed configuration simulation, and number and type of onboard measurements increase rapidly with scale. Planning must be more detailed at large scale in order to balance the trade-offs between the increased costs, as number of measurements and model configuration variables increase and the benefits of larger amounts of information coming out of one test.

Koenig, D. G.↗

How to design a zero-emissions vehicle mandate? Simulating impacts on sales, GHG emissions and cost-effectiveness using the AUtomaker-Consumer Model (AUM)

We report although numerous studies investigate the impacts of policy on zero-emissions vehicle (ZEV) sales, few address the impacts of a ZEV sales mandate and its particular design features. We use the AUtomaker-consumer Model (AUM) to simulate varying designs of a ZEV mandate in Canada's light-duty vehicle sector, requiring 30% ZEV sales by 2030. Design features include: different penalties for non-compliance, different allocations of credits per ZEV type, and the allowance of banking credits across years. For each policy design, we consider impacts on ZEV adoption, GHG emissions, consumer surplus, automaker profits, and overall policy cost-effectiveness. Results demonstrate trade-offs among the policy designs. Generally, ZEV mandate designs that are more effective at increasing ZEV adoption and decreasing GHG emissions also induce larger reductions in consumer surplus and automaker profits. To achieve the ZEV sales goal, simulations show that a higher non-compliance penalty (CDN$ 10k per credit) is needed. ZEV adoption and GHG reductions are also improved by a “One credit per ZEV” scheme, rather than a “California-style” scheme that gives multiple credits per battery-electric vehicle. Further, allowing automakers to bank credits softens the policy impact on profit and increases automaker compliance in initial years. Across these different design combinations, we find that the most cost-effective design ($CDN/tonne mitigated, including consumer surplus and automaker profits impacts) utilizes a $10k non-compliance penalty and “One credit per ZEV” system that allows banking. Our analysis demonstrates the importance of various ZEV mandate design features, and the complex trade-offs involved among various policy goals.

54 ENVIRONMENTAL SCIENCES↗

A comprehensive methodology for intelligent systems life-cycle cost modelling

As NASA moves into the last part on the twentieth century, the desire to do 'business as usual' has been replaced with the mantra 'faster, cheaper, better'. Recently, new work has been done to show how the implementation of advanced technologies, such as intelligent systems, will impact the cost of a system design or in the operational cost for a spacecraft mission. The impact of the degree of autonomous or intelligent systems and human participation on a given program is manifested most significantly during the program operational phases, while the decision of who performs what tasks, and how much automation is incorporated into the system are all made during the design and development phases. Employing intelligent systems and automation is not an either/or question, but one of degree. The question is what level of automation and autonomy will provide the optimal trade-off between performance and cost. Conventional costing methodologies, however, are unable to show the significance of technologies like these in terms of traceable cost benefits and reductions in the various phases of the spacecraft's lifecycle. The proposed comprehensive life-cycle methodology can address intelligent system technologies as well as others that impact human-machine operational modes.

Korsmeyer, David J.↗

Role of Cryogenic Aerodynamic Testing for Current and Future Technologies

The motivation for cryogenic wind tunnels originated during the 1960s from an internationally recognized need for a high Reynolds number test capability based on experiences with preflight predictions of aerodynamic characteristics and an anticipated need in support of research and development for future aerospace vehicle systems. More specifically, the motivation for a flight (or near flight) Reynolds number ground test facility was captured in the foreword to reference 1 which states:“...AGARD held a Specialists’ Meeting in Paris on ‘Transonic Aerodynamics’ in recognition of the fact that the absence of adequate theoretical methods and wind tunnels of high enough Reynolds number had already led to costly shortcomings in the transonic performance of certain combat and transport aircraft.” Preflight prediction of flight characteristics is a necessary process for the developer of any aerospace vehicle, and introduces significant risk to the success of the vehicle. Whether the vehicle customer is commercial or governmental, the final full-scale vehicle must meet certain requirements to be certified as safe, and certain performance requirements to be economically successful. Aircraft companies strive to know the flight characteristics and performance of their vehicle with high confidence prior to flight, thus enabling optimal design trades and elimination of any costly modifications to the aircraft during and after initial flight testing. The problems of predicting flight characteristics across the full flight envelope prior to flight have been and continue to be challenging. Much has changed since the US National Transonic Facility (NTF) became operational in the 1980s, followed by the European Transonic Windtunnel (ETW) in 1990s, not the least of which has been the advancement and positive impact of computational fluid dynamics (CFD) on aircraft design and development. Today, the need for integrated CFD and ground-based high Reynolds number test and evaluation capability remains as aerodynamics will always be central to defining an aircraft directly as well as providing critical input to other disciplines. Today the economic stakes of being surprised during flight tests are higher than ever. This oral-only presentation describes the past, current, and future role of high Reynolds number aerodynamic testing in aerospace vehicle design and development. Discussion of relevant flow physics, past experiences with preflight prediction, and future needs, challenges, and opportunities is included. 1.“Facilities and Techniques for Aerodynamic Testing at Transonic Speeds and High Reynolds Number,” AGARD CP-83-71, 1971.

Aerodynamics↗

Computer program to assess impact of fatigue and fracture criteria on weight and cost of transport aircraft

A preliminary design analysis tool for rapidly performing trade-off studies involving fatigue, fracture, static strength, weight, and cost is presented. Analysis subprograms were developed for fatigue life, crack growth life, and residual strength; and linked to a structural synthesis module which in turn was integrated into a computer program. The part definition module of a cost and weight analysis program was expanded to be compatible with the upgraded structural synthesis capability. The resultant vehicle design and evaluation program is named VDEP-2. It is an accurate and useful tool for estimating purposes at the preliminary design stage of airframe development. A sample case along with an explanation of program applications and input preparation is presented.

Tanner, C. J.↗

How good are learning-based control v.s. model-based control for load shifting? Investigations on a single zone building energy system

Both model predictive control (MPC) and deep reinforcement learning control (DRL) have been presented as a way to approximate the true optimality of a dynamic programming problem, and these two have shown significant operational cost saving potentials for building energy systems. Furthermore, there is still a lack of in-depth quantitative studies on their approximation levels to the true optimality, especially in the building energy domain. To fill in the gap, this paper provides a numerical framework that enables the evaluation of the optimality levels of different controllers for building energy systems. This framework is then used to comprehensively compare the optimal control performance of both MPC and DRL controllers with given computation budgets for a single zone fan coil unit system. Note the optimality is estimated based on a user-specific selection of trade-off weights among energy costs, thermal comfort and control slew rates. Compared with the best optimality we can find through expensive optimization simulations, the best DRL agent can maximally approximate the optimality by 96.54%, which outperforms the best MPC whose optimality level is 90.11%. However, due to the stochasticity, the DRL agent is only expected to approximate the optimality by 90.42%, which is almost equivalent to the best MPC. Except for Proximal Policy Optimization (PPO), all DRL agents can have a better approximation to the optimality than the best MPC, and are expected to have better approximation than the MPC with a prediction horizon of 32 steps (15 min per step). In terms of reducing energy cost and thermal discomfort, MPC can outperform the rule-based control (RBC) by 18.47%–25.44%. DRL can be expected to outperform RBC by 18.95%–25.65% ,and the best DRL control policy can outperform RBC by 20.29%–29.72%. Although the comparison of the optimality level is performed in a perfect setting, e.g., MPC assumes perfect models, and DRL assumes a perfect offline training process and online deployment process, this can shed insight on their capabilities of approximating to the original dynamic programming problem.

24 POWER TRANSMISSION AND DISTRIBUTION↗