Search NASA⌕ Search

SEARCH · Search NASA

Results for “cryomodule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Observations On Submicropulse Electron-beam Effects From Short-range Wakefields In Tesla-type Superconducting RF Cavities

aExperiments were performed at The Fermilab Accelerator Science and Technology (FAST) facility to elucidate the effects of short-range wakefields (SRWs) in TESLA-type rf cavities. FAST has a unique configuration of a photocathode rf gun beam injecting two TESLA-type single cavities (CC1 and CC2) in series prior to the cryomodule. To investigate short-range wakefield effects, we have steered the beam to minimize the signals in the higher-order mode (HOM) detectors of CC1 and CC2 for a baseline, and then selected a vertical corrector to steer the beam off axis at an angle into CC1 or CC2. A Hamamatsu synchro-scan streak camera viewing a downstream OTR screen provided an image of y-t effects within the micropulses with ~10-micron spatial resolution and 2-ps temporal resolution. At 500 pC/b, 50 b, and 2 mrad off-axis steering into CC2, we observed an ~ 100-micron head-tail centroid shift in the streak camera image y(t)-profiles. This centroid shift value is consistent wit h a calculated short-range wakefield effect using ASTRA simulations.

43 PARTICLE ACCELERATORS↗

Magnetic design of the commutational magnet and quadrupoles for PERLE accelerator

PERLE (Powerful Energy Recovery LINAC for Experiment) is a high-power Energy Recovery LINAC (ERL) facility with 20 mA beam current and beam energy from 250 MeV to 500 MeV featuring three passes through two cryomodules. It is a hub for validation of the ERL technology development towards future energy and intensity frontier machines. Design challenges of PERLE and its beam parameters make it a test-bed to validate multi-turn high current ERL operation for the LHeC. It will be the first ERL for some pioneering experiment of the eN interaction with radioactive nuclei. In this work, design and optimization of the commutational magnet (B-com) used to spread/combine the three beams and one series of the quadrupole magnet is discussed. It gives the design parameters including: yoke geometry, pole profile, and material, and calculation of the excitation current needed to drive the magnet, the coil parameters and the number of turns. The B-com magnet is optimized for a 30° bending angle with magnetic field of 0.88 T along the magnet length and a harmonic content of 0.036%. The quadrupole magnet is designed for a gradient field of 34.15 T/m and experiences saturation above this value. Further studies to avoid saturation and achieve the maximum gradient of 44.1 T/m required by the beam dynamics is undergoing.

Abukeshek, R.↗

Lattice design of 250 MeV version of PERLE

The PERLE (Powerful Energy Recovery LINAC for Experiment) collaboration is working on a high power energy recuperation linac facility with three acceleration (up to 500 MeV) and three deceleration passes through two cryomodules with an injection current of 20 mA. Here we present the lattice design of the first phase of this machine, which features a single cryo-module and demonstrates six-pass operation at a maximum energy of 250 MeV at a high current. This initial lattice design boasts a simpler structure with fewer elements, resulting in lower initial costs and faster construction and shorter commissioning time. Furthermore, all magnets and cryo-modules are designed to be compatible with both phases, keeping upgrade costs to a minimum.

Fomin, A.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

As a follow on to the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility, the front end of the DC photo-gun-based injector has gone through a phased upgrade. The first phase focused on the beamline between the gun and the RF chopper system, and the second phase addresses the beamline after the RF chopper system including replacing the capture section and quarter cryomodule with a new booster module containing a 2-cell and 7-cell cavity string. Throughout the design process, we maintained and developed three models, one for the existing injector and one for each of the upgrade phases. With these models, we evaluated proposed hardware upgrades, evaluated and determined optimized beamline element positions, developed buncher voltage requirements, and settings for optimal injector running. In this paper, we will describe the models and results from these various studies and provide a brief summary of Phase 1 commissioning.

Kazimi, R.↗

First conduction cooled photoinjector status

SRF photoguns become a promising candidate to produce highly stable electrons for UEM/UED applications because of the ultrahigh shot-to-shot stability compared to room temperature RF photoguns. SRF technology was prohibitively expensive for industrial use until two recent advancements: Nb3Sn and conduction cooling. SRF gun can provide a CW operation capability while consuming only 2W of RF power which eliminates the need of an expensive high power RF system and saves a facility footprint. Euclid is developing a continuous wave (CW), 1.5-cell, MeV-scale SRF conduction cooled photogun operating at 1.3 GHz. We aim for generation of the first beam in 2024. In this paper, we present the most up-to-date progress including results of the first cool down of the gun-cavity in the newly developed conduction cooled cryomodule and LLRF system development.

43 PARTICLE ACCELERATORS↗

Universal Injector at LERF – Baseline Design

A new electron injector complex has been proposed within the Low Energy Recirculating Facility (LERF) vault, which would serve both the 22 GeV CEBAF and the positron programs, while being compatible with the electron source required to produce positrons for Ce+BAF. The baseline design of a 3-pass recirculator features a main linac configured with three cryomodules, five isochronous arcs and three straight sections, allowing electron beam acceleration up to 650 MeV. The injector offers the flexibility to extract 1-pass and 2-pass energy electrons, as needed for positron production, with final reconfiguration to a 3-pass 650 MeV injector for 22 GeV CEBAF. This paper provides an overview of the baseline design of the Universal injector complex, including the 8 MeV injector and the recirculator. A comprehensive suite of beam dynamics studies to validate our design is being launched, starting with start-to-end tracking with Elegant followed by the orbit correction and error mitigation.

Bogacz, A. [Thomas Jefferson National Accelerator ↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Integration of computer vision system to track the alignment SRF cavities into the test cryostat for PIP-II at Fermilab

PIP-II cryomodules use a computer vision system (H-BCAMs system) to monitor the alignment of SRF cavities and focusing lenses during assembly, testing, and operation. This contribution details the integration of the H-BCAMs into the Spoke Test Cryostat (STC) at Fermilab, which is utilized for cold testing SRF cavities prior to their integration into the string assembly. Thermal and structural finite element analyses were employed to estimate the cavities’ deformations, to be validated during cold testing in the STC using H-BCAMs. Notably, this marks the first instance of H-BCAMs integration into a cryostat and operation within a cryogenic environment.

43 PARTICLE ACCELERATORS↗

LLRF commissioning of the CEBAF C75 upgrades SAM 2024/25

An often-overlooked aspect of Low Level Radio Frequency (LLRF) design is commissioning of a new system. During Jlab’s Scheduled Accelerator Maintenance (SAM) in 2024, two C75 Cryomodule were installed in CEBAF with Jlab’s LLRF 3.0 system. Jlab’s team has invested effort in automating and standardizing their commissioning process. Several key components are klystron characterization, cavity characterization, and interlock verification. This poster will present the summary of LLRF preparation and commissioning efforts at Jlab.

Accelerator Physics↗

Proton Improvement Plan – II: Overview of Progress in the Construction

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV linac, which comprises a room temperature front end followed by an SRF accelerator. The front end has been constructed and operated with (pulsed & CW) beam in the PIP-II Injector Test facility (PIP2IT). The SRF accelerator consists of five different types of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at state-of-the-art parameters. The first two PIP-II cryomodules, HWR and Single Spoke Resonator 1 (SSR1) are installed in PIP2IT and have accelerated beam to 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was recently baselined, and site construction is underway

43 PARTICLE ACCELERATORS↗

Extended Range SRF Cavity Tuner for LCLS II HE Project

The off-frequency detune method is being considered to be applied in the LCLS-II-HE superconducting linac to produce multi-energy electron beams for supporting multiple undulator lines simultaneously. To deliver off-frequency operation (OFO) requirements for SRF cavity tuner must be changed. Tuner design modifications and results of the testing eight cavity/tuner system, deployed in verification cryomodule (vCM), will be presented.

43 PARTICLE ACCELERATORS↗

First N-Doping and Mid-T Baking of Medium-ß 644 MHz 5-Cell Elliptical Superconducting RF Cavities for Michigan State University’s Facility for Rare Isotope Beams

Two hadron linacs currently under development in the US, the PIP-II linac at Fermi National Accelerator Laboratory (FNAL) and the upgrade for Michigan State University’s Facility For Rare Isotope Beams (FRIB), will employ 650 and 644 MHz ß-0.6 elliptical superconducting cavities respectively to meet their design energy requirements. The desired CW operation modes of these two linacs sets Q-factor requirements well above any previously achieved for cavities at this operating frequency and velocity, driving the need to explore new high-Q treatments. The N-doping technique developed at FNAL and employed at an industrial scale to the LCLS-II cryomodules is a strong candidate for high-Q treatments, but work is needed to refine the treatment to the lower operating frequency and velocity regime. We present the first results of the first N-doping tests and a "mid-T" bake test in the FRIB 644 MHz 5-cell elliptical cavities.

43 PARTICLE ACCELERATORS↗

PIP-II 650 MHz Power Coupler Thermal Studies

The Proton Improvement Plan - II (PIP-II) project is underway at Fermilab with an international collaboration involving CEA in the development and testing of 650 MHz cryomodules. One of the first main contributions of the CEA was the participation in the design efforts for the current 50 KW CW 650 MHz power couplers. This paper reports some of the results of thermal and paramet-ric studies carried out by the CEA on these power couplers

43 PARTICLE ACCELERATORS↗

Processing and Test Result of 650 MHz 50 kW CW Prototype Couplers for PIP-II Project

For PIP-II project Fermilab is developing 650 MHz couplers to deliver up to 50 kW CW RF power to the superconducting low-beta (LB650) and high-beta (HB650) cavities. To meet project requirements two different designs of the couplers were proposed, one is conventional design with copper plated stainless steel walls. In second design (EM-shielded) a copper screen is used to shield stainless steel wall from electromagnetic field. For prototyping we built two couplers of each type and tested them at 50kW with full reflection at different reflection phases. In each test the assembly of two couplers were processed with DC bias up to +5 kV, starting with short pulses and ramping power up to 100 kW. Final run for 2 hours in CW mode at 50 kW to reach equilibrium temperature regime and qualify couplers. One pair of couplers was also processed without DC bias. Finally, all four couplers demonstrated full requirements and were qualified. Based on test results the conventional coupler with some modification was chosen as a baseline design. Modified version of coupler is now ordered for prototype of HB650 cryomodule. In paper we will discuss details of coupler processing and results

43 PARTICLE ACCELERATORS↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

SIMS CHARACTERIZATION OF NITROGEN DOPING OF LCLS-II-HE PRODUCTION CAVITIES

The thermal diffusion of nitrogen into the surface of niobium has been shown to yield superior low-loss SRF performance. An effective solution was identified and promptly employed in the production of cryomodules for LCLS-II. With added experience and R&D, a modified process was chosen for use in the upgrade for LCLS-II-HE. Largely motivated by this circumstance, supporting research has significantly refined the technique for making calibrated secondary ion mass spectrometry (SIMS) measurements of the N concentration depth profiles produced by production processes. Standardized reference samples were included with four HE production cavities in their N-doping furnace runs. We report the calibrated dynamic SIMS depth profiles of N, C, and O for these samples, together with the cryogenic acceptance test performance of the associated cavities. Interpretation and comparison with similar samples acquired in other furnaces highlights the importance of intentional process quality control of furnace conditions.

Reece, Charles↗