A Data-Driven Approach to Improve Wind Dispatchability
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Energy storage will help enable CSP compete by adding flexibility value to a high-variable-generation (solar plus wind) power system (see Mehos et al. 2016). Compared with PV, CSP systems are more complex to develop, design, construct, and operate, and they require a much larger minimum effective scale—typically at least 50 MW, compared with PV systems that can be as small as a few kilowatts. In recent years, PV’s greater modularity and lower LCOE have made it more attractive to many solar project developers, and some large projects that were originally planned for CSP have switched to PV. However, the ability of CSP to use thermal energy storage—and thus provide continuous power for long periods when the sun is not shining—could give CSP a vital role in evolving electricity systems. Because CSP with storage can store energy when net demand is low and release that energy when demand is high, it increases the electricity system’s ability to balance supply and demand over multiple time scales. Such flexibility becomes increasingly important as more variable-generation renewable energy is added to the system. For example, one analysis suggests that, under a 40% renewable portfolio standard in California, CSP with storage could provide more than twice as much value to the electricity system as variable-generation PV. For this reason, enhanced thermal energy storage is a critical component of the SunShot Initiative’s 2020 CSP technology-improvement roadmap.
Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.
Falling costs of energy storage combined with an increasing need to mitigate variable generation integration issues is leading to more PV projects that include batteries. Large PV plants that include batteries face challenges optimizing the value of the power they produce, especially when the batteries are DC-coupled and otherwise clipped power (due to high DC/AC ratio) is available. Multiple charging times and sources must be considered, including: grid charging, charging from PV that would otherwise be exported to the grid, and charging from clipped PV power. Then discharge schedules must be optimized against time-of-day pricing. The National Renewable Energy Laboratory in partnership with Southern Company has developed a heuristic algorithm in the System Advisor Model (SAM) which strategically charges the battery from PV and discharges the battery depending on the time-of-day prices of the PPA, the forecast PV production, and the estimated wear cost of the battery. The algorithm and case study results from a generic plant will be presented with recommendations for future work.
This fact sheet describes a project by University of California, Irvine, in collaboration with Siemens Corporate Research, to develop and demonstrate novel algorithms and dynamic control technology for optimal economic use of CHP systems under 5 MW. The control systems and technologies are increasing market penetration of CHP systems in the light industrial, commercial, and institutional markets.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.
Abstract not provided
Not Available
End-use electrical loads in residential and commercial buildings are evolving into flexible and cost-effective resources to improve electric grid reliability, reduce costs, and support increased hosting of distributed renewable generation. This article reviews the simulation of utility services delivered by buildings for the purpose of electric grid operational modeling. We consider services delivered to (1) the high-voltage bulk power system through the coordinated action of many, distributed building loads working together, and (2) targeted support provided to the operation of low-voltage electric distribution grids. Although an exhaustive exploration is not possible, we emphasize the ancillary services and voltage management buildings can provide and summarize the gaps in our ability to simulate them with traditional building energy modeling (BEM) tools, suggesting pathways for future research and development.
Not Available
In this work, we present the design, construction, and experimental results of a prototype latent heat thermal energy storage system. The prototype consists of a thermal storage tank with 100 kg of the aluminum-silicon eutectic as a phase change material, a valved thermosyphon that controls heat flow from the thermal storage tank to the power block, and thermoelectric generators for conversion of heat to electricity. We tested the prototype over four simulated days, where each day consisted of four phases of operation: charging, discharging, simultaneous charging and discharging, and storage. Our results show three major conclusions. First, the thermal energy storage system was able to receive and distribute heat with small temperature gradients - less than 5 degrees C throughout the thermal storage tank. Second, the valved thermosyphon was able to effectively control heat transfer, demonstrating an on/off thermal conductance ratio of 430. Third, the interfaces between subsystems had small temperature drops: of the ~ 560 degrees C temperature drop from the thermal storage tank to the heat rejection system, ~ 525 degrees C occurred across the power block. This work overcomes the challenges of integrating previously-developed subsystems together, providing a proof-of-concept of this system.
Not Available
Not Available